WalkShop. Highland Creek Village

Similar documents
Highland Creek Village Transportation Master Plan: Stakeholder #3 Meeting Summary

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Tonight is for you. Learn everything you can. Share all your ideas.

NORTH TURNAROUND. Recommended Design: Expand the existing transit terminal

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

MASTER BICYCLE AND PEDESTRIAN PLAN

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Austin Avenue Bridges Project. Public Meeting Summary

Comments The Plan for Port Whitby

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event

Polk Streetscape Project

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST

Executive Summary Route 30 Corridor Master Plan

CONNECTING PEOPLE TO PLACES

Safe Streets. City of Lake Forest Park. March 21, 2017

NEWMARKET UPHAM S CORNER

Bicycle Facilities Planning

Hamilton Transportation Master Plan Public Consultation. Public Information Centre One Summary

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

STONY PLAIN ROAD STREETSCAPE

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

East Burke Transportation, Safety and Capacity Improvements

Public Information Centre

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Table #6 VISION CHARACTERISTICS

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Glebe Neighbourhood Cycling Plan

PRIORITIES RESULTS YOUR PRIORITIES FOR BRIDGEPORT 5% 4% 13% RESIDENTIAL CHOICES TRAILS & PARKS

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Hennepin County Bicycle and Pedestrian Planning

Chapter 5. Complete Streets and Walkable Communities.

Why invest in the 1 Street S.W. Corridor?

Plant City Walk-Bike Plan

SURVEY minutes to complete this questionnaire. Your feedback will help the City determine a future design for Ocean Avenue and Geneva Avenue. Thanks!

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

City of Wilsonville 5 th Street to Kinsman Road Extension Project

5 CIRCULATION AND STREET DESIGN

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Dowling/Beaty Cycling Route

Highland Creek Village Transportation Master Plan

EXECUTIVE SUMMARY. Vision

Transportation Planning Division

Recommendations. Central Salem Mobility Study

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

City of Davis East Covell Corridor Plan

Lincoln Highway Streetscape Plan Concept Plan

and older adults and people with disabilities still face barriers when using the pedestrian network and public transportation.

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Completing the Street: Denning Drive

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

1 ALEXANDER STREET BIKEWAY

Major Bike Routes 102 Avenue Workshop April 21, 2015

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Bicycle Master Plan Goals, Strategies, and Policies

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

NJDOT Complete Streets Checklist

Sustainable Transportation Initiatives and Plans in Caledon

Transportation Corridor Studies: Summary of Recommendations

Public Works and Infrastructure Committee. General Manager, Transportation Services. P:\2016\Cluster B\TRA\TIM\pw16009tim.docx

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Solana Beach Comprehensive Active Transportation Strategy (CATS)

CONTENTS EXECUTIVE SUMMARY 1

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Franklin Parking Analysis

COMPLETE STREETS PLANNER S PORTFOLIO

The Bike Buzz in Richland. November 2017 Carl Berkowitz

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

Prince George s County plans, policies, and projects

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

East 12 th Street Bikeway Feasibility Study

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

The Wiggle Route in Context

York Boulevard Streetscape Master Plan

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

CLOSED. Highlights of the Final Concept Design:

2.0 Existing Conditions

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

2018 Transportation Alternatives Program (TAP) Application Presentation to Palm Beach TPA BRANT BRIDGE CONNECTION LOOP EXTENSION ON CARL BOLTER DR

95 th Street Corridor Transportation Plan. Steering Committee Meeting

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

Transcription:

On June 5, 2014, 15 people participated in a for the Transportation Master Plan. The purpose of the was to receive feedback from a diverse range of local stakeholders and document existing transportation problems and future opportunities. City staff and consultants were also seeking input on potential improvements to the area s roadway network, pedestrian environment, streetscaping, cycling network connections, on-street parking and transit. Overall, the provided an important opportunity to inform the study prior to hosting the first public information centre on June 25, 2014. Local stakeholders represented a variety of interests including: businesses, residents, community groups, institutions, property owners, and faith groups. This report summarizes the feedback received from the stakeholders. Points have been amalgamated, summarized and organized by topic. Points have been numbered within topics for referencing convenience and do not represent the priority of importance.

Overall Feedback in One Sentence While there are differences of opinion regarding existing transportation problems and potential improvements, there is common ground on opportunities to support local businesses and revitalization through continuous sidewalks, enhanced streetscaping, and other modifications that focus on safely and efficiently accommodating all road users.

Key Points 1. A lot of discussion on the important role parking plays in the Village to support businesses, that it be convenient and safe, and the need to identify new spaces for additional spots. 2. Pedestrian environment needs continuous sidewalks throughout area. 3. Bike lanes identified on Military Trail, Lawson Overpass, and Old Kingston Road. 4. Some uncertainty with transit operations through and around the area. 5. Requests for a Streetscape Plan for the Village. 6. Questions about who is driving through the Village. 7. Reminder to consider the whole road pattern, not just parts for improvement. 8. Changes suggested for major Village intersections in terms of normalizing and increasing safety. Road Network Participants were given a key map with 5 roads to walk along and provide comments on both existing conditions and future opportunities: 1. What do you like or dislike about the current transportation system? 2. Where can improvements to the public realm be made? What existing features should be retained? 3. How can the Village better connect and serve all users? 4. Where is on-street parking needed the most? Where are the parking issues and at what times of the day do they occur? 5. Would you like to see a round-about in the Village (Kingston Road & Old Kingston Road)?

Choiceland Blvd 6 Watson St Key Map June 5, 2014 Deep Dene Dr Falcon Lane Graphic Crt Tanis Cres Kingston Rd Meadowvale Rd Thomas Ave Bush Gt 3 4 2a Lawson Rd Ramp Franklin Ave Highway 2a W Highway 2a E Highland Creek Overpass Scenic H ill Crt 1 2 Old Kingston Rd Military Trl Morrish Rd Kingston Rd Study Area Lawson Rd Meadowvale Rd 5 Highland Creek Kingston Rd Colonel Danforth Trl Highland Creek Dr N 0 25 50 100m

1 Military Trail Military Trail, looking south from Old Kingston Road Left turn onto Old Kingtson Road from Military Trail is dangerous in part due to grade change Normalize Old Kingston Road and Military Trail intersection (eg. get rid of channelized right turn) Provide sidewalks on both sides Bike lanes and streetscaping needed Request for bus stop westbound at Military Trail

2 Old Kingston Road Old Kingston Rd, Village heart Suggestions for pedestrian improvements: Continuous sidewalks Pedestrian only area and one suggestion to close street west of Kingston Road to auto traffic Consider closing street at certain times of year (ie. festivals) One person stated: People not on the streets because sidewalks are dysfunctional! Suggestions for parking improvements: Parking interest behind Ted s came up a lot Use potential round-about space for parking Some requested leaving angled parking (maintains village feel and number of parking spots) while others felt parallel parking is safer St. Joseph s Church is great for allowing public parking in their lot

2 Old Kingston Road (cont d) Comments about local businesses: Shops keep suffering and will continue to if angled parking removed Concern regarding automotive business s operations Develop comprehensive Streetscape Plan: More trees please Ensure maintenance and maybe local involvement So much could be added: benches, clock, signage, etc. Other comments: Bike lanes needed Removing overpass will change traffic through village and not sure if this will be a positive or negative result Don t change area north of Old Kingston Road Signals at Morrish Road were a bad idea

3 Morrish Road Morrish Road, looking north toward Old Kingston Road General comments: Requests for bike lanes and walk signal on traffic lights Park plan needed for programming with a name and events to host South end confusing and in terrible condition As local road, it moves well Watch impacts to businesses with new road to south and how to mitigate Sidewalks are needed at both ends of Morrish Road and can help facilitate café business Suggestions for parking improvements: Keep angled parking for character Keep parking on one side due to loss of lot Allow on-street parallel parking Explore access to back parking

4 Kingston Road Kingston Road, south side looking east towards Morrish Road General comments: Normalize intersection with Old Kingston Road and one person stated: Intersection with Old Kingston is bizarre and confusing Roundabout interesting idea but questions around land requirements/impacts and could cause more headaches Keep and or divert buses from Village onto Kingston Road Bike lanes or bike sharrows (shared lane pavement markings) Add parking New townhomes are positive and walkable to The Village Need more detailed Origin-Destination traffic survey info from the east to here to understand what types of people are driving through Questions as to if this road is needed and who access is for: Might be better to terminate Kingston at Highway 2A at a signalized intersection Should be used for through traffic instead of Old Kingston Road Do we want to provide access for more people and cars to shop (but restrict as through route)?

5 Highland Creek Overpass Highland Creek Overpass, west side looking south Lots of life left in structure, why remove it: Create southbound to westbound ramp off Lawson Overpass for more direct route Bridge isolates Village from Pickering traffic Needs to be a level intersection: Keep ramp to get onto Highway 2A Lots of land currently wasted on west side Other comments: Bike lane should be installed because provides link to zoo and other recreational destinations Observation to move/shift for future transit passage way to points east like Kennedy Station One comment that changing overpass at grade should be the first step to achieving workable road system

Potential Improvements Participants were asked to fill out the following questions either before or after the on the following questions. Public Realm Where can improvements be made (include greening, street furniture, sidewalks, etc) All in favour of sidewalks: Sidewalks should be installed now Need for strong landscaping and streetscaping (benches, lighting) component All properties in Village should have commercial on ground floor Parking Angle vs parallel parking? What kind of parking arrangement do you find safer? Where do you want to see more parking? Until alternative parking is available, leave as is! Keep angled parking and concern with dramatically reducing number of spots Parallel parking is safer Alternative parking arrangement available like behind buildings and/or current arrangement between developer and Church dramatically reducing number of spots Sidewalks Where would you like to improve existing sidewalks? Many areas identified including Old Kingston Road from the Valley to bridge over the creek westward to hill, to seniors apartments and Morrish Road south side of Old Kingston Road

Highway Access How do you currently access Highway 2A? Are there any issues with Highway 2A through traffic in the Village? Depending on the mood I m in or my destination, I will either use Kingston Road or Old Kingston Road through the Village and the valley to West Hill Generally no issues here with traffic in the Village Cycling What are the most important cycling issues? What do you want to see? The Village can be a prime or stop over destination for cyclists Very little need for bicycle at present time Design a bicycle friendly area and maybe a bicycle port in the village core Bike paths with bike racks similar to Woodbine Beach Area Dangerous areas, identified at: 1. Eastbound Kingston Road and turning left (north/west) on Military Trail 2. Kingston Road, Military Trail to Morningside 3. Old Kingston Road behind parked cars feels precarious Kingston Road @ Old Kingston Road Intersection Would you prefer a round about or signalized intersection? Why? Round-about could work provided space permits, adds character, traffic calming and safe pedestrian crossings Not feasible due to property restrictions and proximity to signalized intersection at Kingston Road and Lawson Road Other Transit Very strange bus routes through village that fly across Kingston Road and lack of stops in Village