New Smyrna Beach Multi-use Trail

Similar documents
C ITY OF NEW SMYRNA BEACH

City of New Smyrna Beach

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

BIKE PLAN CONTENTS GATEWAY

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

PEDESTRIAN ACTION PLAN

ST. JOHNS GOLF CLUB PHASE II FINDINGS, PHASE III RECOMMENDATION, AND POTENTIAL PARTNERSHIP OPPORTUNITY

Speed Limits Study and Proposal. Public Input Session: 8/14/13

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

4 Goals, Objectives & Actions

Mount Dora Community Redevelopment Agency Annual Report

Environment and Public Works Committee Presentation

DATE: June 22, General Release SUBMITTED BY: LAND DEVELOPMENT SERVICES. RE: City Centre Survey Results

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. Halifax Regional Council January 16, 2017

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

PLANNING & DEVELOPMENT Business Plan

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Perryville TOD and Greenway Plan

TRANSPORTATION & MOBILITY

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

Regional Transportation Needs Within Southeastern Wisconsin

City of New Smyrna Beach The Week Ahead January 27-February 2, 2019

Encouragement. Chapter 4. Education Encouragement Enforcement Engineering & Facilities Evaluation & Planning. Encouragement Chapter 4

Tonight is for you. Learn everything you can. Share all your ideas.

Mayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017

Engineering - Bicycle and Pedestrian

IMPLEMENTATION STRATEGIES

Westgate/Belvedere Homes Community Redevelopment Agency. Belvedere Heights. Streetlights & Sidewalks Improvements Project.

LOCAL REVENUE MEASURE ANNUAL COMMUNITY REPORT

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

County of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1.

Thank you for this opportunity to discuss with you how we can work together to make our streets more complete.

City of Novi Non-Motorized Master Plan 2011 Executive Summary

East Burke Transportation, Safety and Capacity Improvements

CITY MANUALS AND STANDARDS REVIEW

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

DRAFT. Lecompton. Table of Contents. Background

Blue Ribbon Commission Report Recommendations on Pedestrian and Bicycle Infrastructure Improvements

Bicycle and Pedestrian Plans and Improvements

City of New Smyrna Beach

integrated action plan

Business Plan Presentation

Project Update May 2018

CLEARWATER COMPREHENSIVE BOATING PLAN PUBLIC OUTREACH MEETING 2. December 16, 2015

2017 Annual Reports. Melbourne Community Redevelopment Agencies. Melbourne Downtown CRA Babcock Street CRA Olde Eau Gallie Riverfront CRA

Third Street Bridge & Corridor Project

October 30 th, 2012 Committee of the Whole Meeting Cycling Task Force Recommendations BIKE RACKS

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

2016 TELL THE TPO SURVEY

Living Streets Policy

Transportation Master Plan Advisory Task Force

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

DRAFT. Table of Contents. Background

2760 Cameron Road, West Kelowna, BC V1Z 2T6 Tel.: ; Fax:

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

North Shore Transportation Improvement Strategy

North Coast Corridor:

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CHAPTER 3: Vision Statement and Goals

CASE STUDY WALKABLE WASHINGTON WHO WE ARE & WHAT WE DO CITY OF BOTHELL DOWNTOWN REVITALIZATION PLAN BOTHELL, WA

Chapter 5. Complete Streets and Walkable Communities.

Pennsylvania Avenue (CR 484) Design Alternatives Study

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Executive Summary Route 30 Corridor Master Plan

Bicycle Master Plan Goals, Strategies, and Policies

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

Ann Arbor Downtown Street Plan

North Carolina Wildlife Resources Commission Agency Overview. Appropriations Subcommittee on Natural and Economic Resources February 22, 2011

Non-Motorized Transportation 7-1

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

MEMORANDUM. Existing Operations. City of Clearwater. Michael Herrman. Date: January 26, Seminole Boat Launch Overview. M&N Job No.

Comments The Plan for Port Whitby

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Complete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall

Draft Recommended List of Potential Projects

Frequently Asked Questions

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Draft. Lecompton. Table of Contents. Background

Public Facilities & Services

PEOPLE ARE PEDESTRIANS BY DESIGN JOIN THE MOVEMENT AT

2045 Long Range Transportation Plan. Summary of Draft

ECONOMIC DEVELOPMENT ELEMENT

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

FINAL PLAN APPENDIX D CITY OF BERKELEY BIKE PLAN D-1

POLICY ADVISORY COMMITTEE

Citizens Advisory Committee March 26, 2014

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY. REQUESTED BY: DEPARTMENT: PREPARED BY: Name: Parks and Recreation Kevin V.

CHAPTER 1 INTRODUCTION

JEFFERSON COUNTY BIKE PLAN 2010: EMPHASIS SUMMARY

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

110 Edgar Martinez Drive South P.O. Box Seattle, WA (206) August 15, 2018

Integrated Pest Management Program Final Report

Transcription:

City of New Smyrna Beach, FL ANNUAL REPORT 2014 New Smyrna Beach Multi-use Trail Photo courtesy of Don Bok. New Smyrnians are stepping out on a new, traffic-free path. In November, the City of New Smyrna Beach opened a multi-use trail that quickly became popular with bicyclers, walkers and runners. The trail spans 2.2 miles from West Pine Avenue just north of S.R. 44 off Mission Road to Sugar Mill Drive. The 12-foot-wide path has been constructed in an existing utility corridor. Along the way, users cross a 125-foot bridge over Turnbull Creek and pass (the future) Holland Park. The eastern trail head is on West Pine Avenue between Jungle Road and Pioneer Trail. The western end is next to Geiger-Glencoe Cemetery on Sugar Mill Drive. Parking is available at both ends. Motorized vehicles are not permitted on the paved trail. Long-range plans are to add segments to lengthen the trail from I-95 to the City s downtown and also connect with the Cross Volusia Trail. Construction on the $1.8-million project was funded jointly by the Volusia ECHO Program, the Florida Department of Transportation River to Sea Transportation Planning Organization, and the City of New Smyrna Beach.

Message from the Mayor: Positioning for the future City Commission members Mayor James Hathaway Zone 1 Judy Reiker Zone 2 Jake Sachs Zone 3 Jason McGuirk Vice-Mayor Zone 4 Kirk Jones City Manager Pam Brangaccio Assistant City Manager Khalid Resheidat City Attorney Frank B. Gummey, III City Clerk Johnny Bledsoe Provided as a public service by the City of New Smyrna Beach, FL. 210 Sams Avenue New Smyrna Beach, FL 32168 (386) 424-2100 We ve come a long way in a few short years, and the City of New Smyrna Beach continues to plan for the future. Our residents and business i owners established roots here because of our quality of life. While the beach draws thousands of visitors to town annually, we know New Smyrna has much more to offer. We value our Mayor James Hathaway hometown s character and sense of community. The City Commission is strategically looking at the next 25 years and the challenges and opportunities we may face. At the end of 2014, 32 projects either were planned or under construction to address infrastructure and public service needs. Outdoor enthusiasts are enjoying the new multi-use trail and Swoope Boat Ramp. The Alonzo Babe James Community Center is being expanded to accommodate larger groups and conferences. Drivers soon will benefit from the convenience of the Colony Park Road extension as a shorter route from Otter Boulevard and Pioneer Trail to businesses along S.R. 44. For a look at all future projects, citizens are encouraged to view the five-year capital improvement plan, which is posted on the City s website. Cutting the ceremonial ribbon on the new Fire Station 50 the final project funded by a 2004 voter-approved general obligation bond was a proud moment. Voters agreed to tax themselves to replace aging public safety facilities. This year, voters passed a tax incentive initiative to help New Smyrna Beach to stay competitive in today s business environment. The incentive encourages qualified businesses to expand and new businesses to open within our city limits. Also in 2014, our Volusia County partners approved a new 20-year community redevelopment area to address blighted conditions along the U.S. 1 corridor, the Historic Westside Community, and a few surrounding areas. Growth is inevitable for all cities. But in New Smyrna Beach, we are working to address future issues today to protect our character and quality of life. The City Commission is setting goals based on the community s input. In 2015, the focus will be on the Indian River Lagoon, parks and public property, job creation and retention, U.S. 1 redevelopment, S.R. 44 development and preservation of our historic and neighborhood character. We thank those who provided the City Commission input on issues of general concern. We also encourage all of our citizens to get involved. Attend a town hall meeting. Join a neighborhood advisory group. Attend a City Commission meeting. With your input, the city will be well-positioned for the next 25 years. NSB gets a new look More than 20,000 users visit the City s website each month. When they log on to, the City only gets one chance to make a first impression. To highlight the area s assets for current and potential residents and business owners, the website recently was redesigned to make a great first impression. Today website visitors are greeted with a fresh look. In a recent survey, respondents described New Smyrna Beach as a beachy, friendly and laid back hometown. Those adjectives were the basis for the updated color scheme and homepage layout. The clean design helps users to navigate the website more easily. To provide citizens an opportunity to engage with their local government, the homepage offers up-to-date information on news, events and public meetings. Citizens also may initiate online service requests. Information on neighborhood initiatives, capital projects and budgets also are available at the click of a mouse from a desktop computer or mobile device.

A busy year for building Anglers now may launch their boats closer to the inlet. The new Swoope boat ramps opened in March 2014. Drivers soon will be able to use Colony Park Road to connect with Pioneer Trail to gain direct access to S.R. 44. The extension project is expected to be completed in April 2015. City firefighters have moved into a more centrally located main station on S.R. 44. The new Fire Station 50 is the final public safety project to be built using an $18.3-million general obligation bond (GOB) approved by voters in 2004. Capital improvement projects On the horizon 2015-2018 Several large-scale projects are on the drawing board for New Smyrna Beach. Sports Complex home-side bleacher replacement Brannon Center City Hall expansion 5th Street Bridge repairs Holland Park S. Atlantic Beachfront Park

Where the City s money comes from REVENUE SUMMARY Tax Revenue Licenses & Permits Intergovernment Revenue Charges for Services Fines & Forfeitures Miscellaneous Revenue Transfers Debt Proceeds Total Revenue 2013-14 ESTIMATED $ 18,638,746 1,696,107 6,581,239 12,689,700 158,804 2,757,838 1,444,300 7,946,779 $ 51,913,511 nue $ 51,913,511 The City of New Smyrna Beach s revenues are derived from taxes, fees, charges for services, special assessments and grants. Where the City s money goes FUND SUMMARY General Fund Stormwater Fund Special Law Enforcement Trust Fund Airport Fund Impact Fee Funds Building & Inspection Fund Community Redevelopment Agency Fund Debt Service Fund Capital Project Fund Golf Course Fund Sanitation Fund Marina Fund Fleet Fund Total Estimated Actuals Revenues are designated for various funds for projects as seen below. The general fund is the City s general operating fund. 2013-14 ESTIMATED $ 22,271,419 1,998,384 11,732 4,604,449 365,151 1,654,996 1,731,852 3,674,802 7,878,863 1,215,231 5,128,651 276,307 1,101,674 $ 51,913,511 Each year the City publishes a Comprehensive Financial Report, which contains detailed information on the City s revenue and expenditures. Reports are available online at to /Finance

Charting the course to 2039 In early 2014, the City surveyed its citizens for input on a long-range vision NSB in 2039. A March public workshop also encouraged citizens to help the City to identify issues of broad concern. In December, the City Commission held a strategic planning session and reviewed the community s priorities when setting its goals. In 2015, the City Commission is focusing on: The Indian River Lagoon Parks and open spaces The Redevelopment of U.S. 1 A historical preservation vision The development character on S.R. 44 Economic development/job creation and retention These community-defined issues will serve as a guide for the next 25 years. Public Safety Day The New Smyrna Beach police and fire departments demonstrated their on-duty skills during a public safety open house September 6. The agencies conducted live demonstrations and explained exhibits at the Public Safety Complex on Industrial Park Avenue. The purpose of the event was to provide citizens a closer look at the tasks required by the City s emergency responders. Staff demonstrated crime scene processing, vehicles and equipment, training and technology. The public was encouraged to ask questions about operations and the proposed FY 15 budget. Police Department accreditation New Smyrna Beach citizens now may boast about its accredited police department. This fall, the Commission for Florida Law Enforcement Accreditation (CFA) spent three days vetting all aspects of the New Smyrna Beach Police Department. Attaining accredited status through CFA is a highly prized recognition that attests to an agency s professional excellence. Before an agency is considered for accreditation, it first must pass the rigorous on-site review process including compliance with 260 standards many of which are critical to the life, health and safety of the employees and the citizens they serve.

Community Redevelopment Agency (CRA) highlights 2014 Charting the course to 2039 In early 2014, the City surveyed its citizens for input on a long-range vision NSB in 2039. A March public workshop also encouraged citizens to help the City to identify issues of broad concern. In December, the City Commission held a strategic planning session and reviewed the community s priorities when setting its goals. In 2015, the City Commission is focusing on: City of New Smyrna Beach, FL ANNUAL REPORT 2014 Babe James Community Center expansion In July, officials broke ground on the long-anticipated expansion of the Babe James Community Center to add 1,646 square feet of space to create banquet seating for 250 people and a more secure entry. When complete, the center will support the growth of additional community service programs for young adults and seniors and assist in the economic development of the area by providing more space to cater to larger events.. The Indian River Lagoon Parks and open spaces The Redevelopment of U.S. 1 A historical preservation vision The development character on S.R. 44 Economic development/job creation and retention These community-defined issues will serve as a guide for the next 25 years. Public Safety Day The New Smyrna Beach police and fire departments demonstrated their on-duty skills during a public safety open house September 6. The agencies conducted live demonstrations and explained exhibits at the Public Safety Complex on Industrial Park Avenue. The purpose of the event was to provide citizens a closer look at the tasks required by the City s emergency responders. Staff demonstrated crime scene processing, vehicles and equipment, training and technology. The public was encouraged to ask questions about operations and the proposed FY 15 budget. Police Department accreditation Proposed landscaping. North Causeway useway improvements A gateway to the beach, the North Causeway soon will get a new, bold look. The improvement project is in the design phase and will include additional landscaping, new crosswalks, lighting and other features. A $500,000 Florida Department of Transportation grant and CRA funds will cover project costs. Volusia County approves new CRA New Smyrna Beach citizens now may boast about its accredited police department. This fall, the Commission for Florida Law Enforcement Accreditation (CFA) spent three days vetting all aspects of the New Smyrna Beach Police Department. Attaining accredited status through CFA is a highly prized recognition that attests to an agency s professional excellence. Before an agency is considered for accreditation, it first must pass the rigorous on-site review process including compliance with 260 standards many of which are critical to the life, health and safety of the employees and the citizens they serve. New Smyrna Beach Multi-use Trail In December 2014, the Volusia County Council approved a new community redevelopment area (CRA) for New Smyrna Beach. The CRA is expected to renovate blighted areas of the City's Historic Westside Community and U.S. 1 using an estimated $15 million generated over 20 years. The new CRA includes most of U.S. 1 in the City limits, the New Smyrna Beach Municipal Airport, the Historic Westside, West Canal Street, the former K-Mart Plaza, a portion of the North Causeway, and 180 acres of Florida East Coast Railway Company (FECR) property west of U.S. 1. Beachside properties and Canal Street properties from U.S. 1 to Riverside Drive, which are in the current CRA, are not included in the new CRA. For more information, please log on to /US1-CRA. Boosting business In 2014, the CRA Opportunity Site Grant Program won the Florida Planning and Zoning Association Surfcoast Chapter Award. Five grants were awarded for commercial building projects on Canal Street, Flagler Avenue and the North Causeway. The program s success is most evident on Canal Street where grant projects encouraged private investments of more than $750,000 in non-grant projects. Vacant commercial spaces went from 17 in 2011 to one by the end of 2014. Since 1985, the expiring CRA has worked to eliminate blight in the City s character districts and surrounding areas. The agency will sunset in 2015. Photo courtesy of Don Bok. New Smyrnians are stepping out on a new, traffic-free path. In November, the City of New Smyrna Beach opened a multi-use trail that quickly became popular with bicyclers, walkers and runners. The trail spans 2.2 miles from West Pine Avenue just north of S.R. 44 off Mission Road to Sugar Mill Drive. The 12-foot-wide path has been constructed in an existing utility corridor. Along the way, users cross a 125-foot bridge over Turnbull Creek and pass (the future) Holland Park. The eastern trail head is on West Pine Avenue between Jungle Road and Pioneer Trail. The western end is next to Geiger-Glencoe Cemetery on Sugar Mill Drive. Parking is available at both ends. Motorized vehicles are not permitted on the paved trail. Long-range plans are to add segments to lengthen the trail from I-95 to the City s downtown and also connect with the Cross Volusia Trail. Construction on the $1.8-million project was funded jointly by the Volusia ECHO Program, the Florida Department of Transportation River to Sea Transportation Planning Organization, and the City of New Smyrna Beach.