INSTRUCTIONS 60 Y-DROP HAGIE STS 05
INSTRUCTIONS 60 Y-DROP HAGIE STS 05 INTRODUCTION Before beginning, it s important to know where each mounting bracket fits relative to the row spacing involved. The 60 Y-DROP unit should be precisely centered on the machine, as this is critical to the assembly of the system to the sprayer and for mounting the system to your sprayer boom. There are, however, many boom variations among all sprayer models. Your sprayer may not be identical to the model in the following steps of the guide, and the pictures may not exactly reflect your model. While these steps will help you install most of your 60 Y-DROP system, you may need to custom-fit some components with your particular boom. QUESTIONS Call our Product Support team at 888-5-890
INSTRUCTIONS 60 Y-DROP HAGIE STS 05 I. ESTABLISH DROP LOCATIONS Figures and Step Locate the center of the machine and identify the location of all the drops. On the sprayer boom, mark where each riser mount will be located. This will ensure that the extension tubes will not interfere with the riser mounts. Figure Figure Step From the center, measure out 5" (±5") on either side, as shown in Figure. NOTE: The center mounting position will have to be offset in order to eliminate conflict with the center riser mount. For the primary boom; starting at the wing fold pivot pin, measure out and make marks at 50", 0", 68", " and 7" (all measurements are ±5"). Repeat for the other primary boom. Figure Figure
INSTRUCTIONS 60 Y-DROP HAGIE STS 05 II. INSTALL PRIMARY BOOM SPRAYER MOUNT PACKAGE Figure Step With the threads pointing down, install Step diamond U-bolt () on the top side of the OEM primary boom. Install diamond boom clamp () on the 5 bottom of the OEM primary boom. Install bracket assembly () and the Figure flange lock nut (). Hardware Kit D Step Install extension tube (5). Repeat Steps - for the the other OEM mount bracket. Figure 5 Step 5 Install boom bracket () onto extension tube (). Figure 5
INSTRUCTIONS 60 Y-DROP HAGIE STS 05 III. INSTALL CENTER SECTION EXTENSION TUBE Figures 6 and 7 Step With the threads pointing down, install " diamond U-bolt () over the OEM center section boom. Step Position diamond boom clamp (), " top plate (), bracket assembly () as shown in Figure 7, and install the /8" Figure 6 flange nuts (5). Install extension tube (6) onto bracket assembly (). Step Install boom bracket (7). Figure 8 Step 5 Step 6 Install a carriage bolt and nut () on the front and rear of the top plate. Install stainless steel set screw and jam nut assembly (). Figure 7 5 6 7 Figure 8 5
IINSTRUCTIONS 60 Y-DROP HAGIE STS 05 IV. INSTALL 60 Y-DROP BOOM Figure 9 Step Assemble 5' boom sections () utilizing 8" boom connectors () and the supplied hardware. Hardware Bag CC Step Repeat Step as needed in order to assemble the entire 60 Y-DROP boom. Set the Y-DROP boom assembly onto boom bracket (). Figure 9 Repeat Steps - for the remaining boom assemblies. CAUTION: The 60 Y-DROP boom assembly may weigh up to 50 lbs. (68 kg). Exercise caution and enlist help for this process. Figure 0 Step In order to span the full length of the center section 60 Y-DROP boom, you will need to cut and drill one of the 5' boom sections to '. Mount this ' section between two full 5' boom sections. Drill a 7/6" through hole centered " from the outside edge. Figures and Step 5 Install square U-bolt (), the 5/6" extra thick washers, and the 5/6" nuts over the 60 Y-DROP boom (). Hardware Kit A Figure 0 Figure Step 6 Step 7 Install stop bolt () at the both the front and the rear of the extension tube. Repeat for remaining stop bolts. Hardware Kit B Install stainless steel set screw and jam nut assembly (). See Figure for detail. Repeat for the remaining mount assemblies on the primary boom. Figure 6
INSTRUCTIONS 60 Y-DROP HAGIE STS 05 V. INSTALL RISER MOUNTS Figure Step Install riser mount () using the square U-bolts () and the extra thick washer and nylock nut. Repeat for the remaining riser mounts. Hardware Kit C Figure Figure may show more or fewer riser mounts than your installation. The alignment and quantity of the riser mounts will depend on your row spacing. Figure Figure 5 Step Install riser tube assembly () into the riser mount (). Install pin (). Repeat Steps and for the remaining riser tube assemblies. Figure Figure 5 7
INSTRUCTIONS 60 Y-DROP HAGIE STS 05 VI. INSTALL SHIELDS AND RISER HOSES Figure 6 Step Install shield () onto riser tube (). Figure 7 Step Install base unit () onto riser tube (). Figure 8 Figure 9 Step Assemble drag hoses () to Y-DROP base and secure with hose clamps (). Note the orientation of the drag hose clamps. The tails should point inward. Figure 6 Figure 7 Figure 8 Figure 9 8
INSTRUCTIONS 60 Y-DROP HAGIE STS 05 VI. INSTALL SHIELDS AND RISER HOSES (continued) Figure 0 CAUTION: Do NOT use a drill or impact driver for Steps 5 and 6. Step 5 Install two ½" screws (). Step 6 Install two ¾" screws (). Figure 0 Figure Step 7 Figure Step 8 Install rubber washer () into the Y. Install riser hose assembly () into the Y. Figure Step 9 Route riser hose assembly () as shown in Figure. Step 0 Install the riser hose assembly to the OEM nozzle body. Step Use equally spaced plastic ties to secure the riser hose assembly. Figure Repeat Steps - for the remaining shield assemblies. Figure INSTALLATION COMPLETE. Figure All other trademarks are the property of 60 Yield Center, its affiliates and/or its licensors. 06 60 Yield Center. All rights reserved. YCG600