Eastport Pitch and Putt

Similar documents
ATV/ARGO Trails for Red Indian Lake Outfitting

Understanding Today s Environmental Issues and the Oregon Stewardship Guidelines. David Phipps GCSAA NW Field Staff

Barnegat Bay-Friendly Golf Course Certification Program

Environmental Assessment Registration File Ref No NAME OF UNDERTAKING: Replacement of St. Vincent s Breakwater

GEO Certified Independent Verification Report

COURSE AND CGSA SUPERINTENDENT PROFILE

LANH29 SQA Unit Code H52B 04 Implement plans for the management of sports turf areas

GUIDE TO RESIDENTIAL SWIMMING POOL ENCLOSURE PERMITS

ADOPT-A-STREAM WATERSHED APPROACH COMMUNITY-BASED STEWARDSHIP. Nova Scotia Salmon Association March 2005

Chagrin River TMDL Appendices. Appendix F

Southampton. Our cottage/retirement home: The pre-build phase

1995 Metric CSJ SPECIAL PROVISION ITEM 7. Legal Relations And Responsibilities To The Public

SPILL CONTINGENCY AND EMERGENCY RESPONSE PLAN

Estimated on-the-ground start and end dates: 1 June October 2018

Creston Golf Club Development Plan

TOWNSHIP OF DOURO-DUMMER BY-LAW NO

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME

SITE INSPECTION PROCEDURE FORM

BASS LAKE PLANNING UNIT Willow Creek Watershed

ROCK CLIMBING STRATEGY

ST. JOHNS GOLF CLUB PHASE II FINDINGS, PHASE III RECOMMENDATION, AND POTENTIAL PARTNERSHIP OPPORTUNITY

Responsible Golf Course Management.

CORPORATION OF THE MUNICIPALITY OF STRATHROY-CARADOC BYLAW NO

Styal Golf Course Accommodation Works Environmental Statement Non-Technical Summary 1007/6.15.2/169

3225 MAIN STREET P.O. Box226 BARNSTABLE, MA FAX:

WORKING WITH THE MICHIGAN DEPARTMENT OF NATURAL RESOURCES. Jack D. Bails, Deputy Director Michigan Department of Natural Resources, Lansing

Bay of Fundy Estuary Profile

LANCS17 SQA Unit Code H Maintain and repair paths or surfaces

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT

Report Date: February 20, 2018 Contact: Nick Kassam Contact No.: RTS No.: VanRIMS No.: Meeting Date: March 14, 2018

MARLWOOD GOLF & COUNTRY CLUB WASAGA BEACH, ONTARIO

Visitor Guidelines for WPC-owned Properties. Last revised 5/20/2010

Rule 1-4: Points Not Covered by Rules. Rule 14-3: Artificial Devices, Unusual Equipment and Unusual Use of Equipment. Rule 18: Ball at Rest Moves

Rural Exceptions 1r 100r (Section 240)


The Malaspina Okeover

YELLOWSTONE RANCH PRESERVE HEBGEN LAKE, MONTANA

Bicycling Routes on Provincial Roads Policy

File Code: 2720/1950 Date: January 6, 2017

Project Specific Information Package Kakwa Expansion Pipeline Project

Aquatic Facilities Water Spray/Play Ground Application, Design & Operating Requirements Environmental Health Guide

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Wild Virginia and Heartwood first raised this issue at the May 19, 2014 public meeting.

Rural Exceptions 101r-200r (Section 240)

Welcome to. Golf Show Packages. Scroll For Next Page

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

Environmentally and Player Friendly, Deacon's Lodge Opens for Public Play in Brainerd Lakes Area

The Blue Heron Slough Conservation Bank

TRCP National Sportsmen s Survey Online/phone survey of 1,000 hunters and anglers throughout the United States

REPORT OF THE AD HOC COMMITTEE ON THE FEASIBILITY OF A COMMUNITY TRAIL USING THE RAIL CORRIDOR RIGHT-OF-WAY APRIL 28, 2016

SIDEWALK GUIDELINES April 14, 2008

ETIQUETTE is at the heart of the game of golf

PASSENGER RAIL STATION LOCATION AND DESIGN WORKING GROUP MEETING STOCKBRIDGE

TABLE OF CONTENTS LEGAL NOTICE

ONTARIO COURT OF JUSTICE PROVINCIAL OFFENCES ACT

M6 Junction 10 Public Consultation

ECONOMIC DEVELOPMENT ELEMENT

Role Description. 30,000 35,000 dependant on experience and qualifications (on a self-employed basis and reviewed after a trial period)

Broken Bar W Ranch TETON VALLEY, IDAHO. Hunting Ranching Fly Fishing Conservation

Seattle Department of Parks and Recreation Golf Records,

CCR Fugitive Dust Control Plan

Vancouver 2010 Olympic Winter Games Venue Locations

Location, Location, location! Serenity awaits at this. Inn on the Intervale 134 Stoney Brook Rd., Little Judique Road, Little Judique, NS

Project Specific Information Package Simonette Expansion Pipeline Project

DRAFT. Malibu Bluffs Park Skate Park Facility Site Assessment. Prepared For: The City of Malibu Parks and Recreation Department

Agenda Report PARK, RECREATION & OPEN SPACE COMMISSION ARTS, RECREATION & COMMUNITY SERVICES DEPARTMENT

RESPONSE TO COMMENT: 45

Wildlife Hazard Mitigation Policy, Plan and Procedure. May

Brenda Patterson, General Manager, Parks, Forestry and Recreation. P:\2011\Cluster A\PFR\PE AFS#13791

General Manager, Parks, Recreation and Culture. Request for Upgrades to Bridgeview Park Ball Diamonds

Shimmerhorn Ranch. Buford, Wyoming // Albany County

MUNICIPALITY OF HURON EAST ONTARIO, CANADA

La Crescent Township Zoning Ordinance

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Information for File # SEW

THE CORPORATION OF THE MUNICIPALITY OF STRATHROY-CARADOC BY-LAW NUMBER 24-09

Faler Creek Ranch DANIEL, WYOMING. Fly Fishing Hunting Ranching Conservation

Amendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December Grand Valley Ranger District

Audubon Cooperative Sanctuary Program for Golf Courses. Place Alternating Slideshow Photo Here

Appendix H RESPONSES TO PUBLIC COMMENTS

Job Description HEAD GROUNDSMAN Bready Cricket Club, North West Cricket Union

Contents. Preface Contents Legal Declaration Document Sources Definitions and Interpretations Overview...

PROCEDURES AND CRITERIA FOR DETERMINING AND ADDRESSING EMERGENCY SITUATIONS AS REFERRED TO IN ARTICLES 8 AND OF THE 1996 LONDON PROTOCOL

Comments The Plan for Port Whitby

NARRATIVE FOR SERENITY HILL OF HALSTED BAY SERENITY HILL OF LAKE MINNETONKA, LLC

Special Event Management Plan

HEAD GROUNDSMAN Bready Cricket Club

Mount Snow Disc Golf Course and Mountain Bike Race Course Project

Policy Statement. Page 2 of 5

Our foundation introduce Nature and conservation in Lake Izunuma Uchinuma.

Chapter 138 Attachment 2 - Table of Uses by Zoning Districts; Any Uses Not Listed Are Prohibited. Ballston Lake Waterfront. Ballston Lake Residential

Iron Ore Company of Canada Health, Safety & Environment

Conservation Planning in Vermont

Subject to sale, withdrawal, or error.

TRAINING & EDUCATION RULES OF GOLF 2019 MAIN HEAD FOR DOCUMENT

VAIL HOMEOWNERS ASSOCIATION, INC. VHA Action Notice: Update on Golden Peak Proposal April 10, 2017

Golf Course Metrics WHEREAS:

City of Burnaby Environmental Review Committee (ERC) Guide for Applicants

GOLF COURSE & BUSINESS

Transcription:

1.0 NAME OF UNDERTAKING: Eastport Pitch and Putt 1.1 Proponent: Graham C. Feltham, Proprietor 22 Grieve Cres. Gander, NL A1V 1P3 Telephone: 709-651-2842 (home) e-mail: innbythesea@nf.sympatico.ca 709-677-3002 (business) 1.2 Chief Executive Officer: As above 1.2 Principal Contact Person for Environmental Assessment: As Above

2.0 THE UNDERTAKING 2.1 Nature of the Undertaking The proposed project involves development of a nine-hole golf course known as a Pitch and Putt adjacent to an existing business consisting of a five-bedroom Bed and Breakfast operating as Inn By The Sea. 2.2 Rationale for the Undertaking The Eastport Peninsula is a very popular vacation destination for tourists from all over the world. There are three beaches in the area Eastport Beach, Eastport North Beach and Sandy Cove Beach. All are popular with tourists in addition to Family Funland Resort, three fine restaurants, the Shriners RV Park, several craft shops and a growing arts community. During peak periods, all accommodations in the area are booked to capacity including cabins, motels, bed and breakfasts, inns, and campgrounds. We believe that a nine-hole pitch and putt golf course will further enhance tourism on the Eastport Peninsula. It will be situated so as to provide a breathtaking view of Eastport Beach and Salvage Bay, and will be designed to be challenging for young and old alike.

3.0 DESCRIPTION OF THE UNDERTAKING 3.1 Geographic Location The Pitch and Putt will be located on Route 310, on the road to Salvage. It will be accessed by an existing gravel road leading to a five-bedroom tourist business operating as Inn By The Sea. The area to be developed consists of approximately fifteen (15) acres in its natural state, heavily treed with approximately 15% bog. It lends itself well to the proposed project since very little fill is required. 3.2 Physical Features Parking for 15 cars Registration Office / Pro Shop 24 x 32 story and a half Equipment and storage shed 24 x 32 single story Nine (9) holes with tee-offs, fairways, bunkers and greens Irrigation supplied by the existing Eastport water supply system Pathways between greens and tee-offs will be crushed stone Surfaces of greens and tee-offs will be artificial turf The Registration Office will be connected to the same water/sewage system as the bed and breakfast, on the Town of Eastport system. The electrical system for the registration and storage buildings will also be from the same system as the bed and breakfast. 3.3 Areas to be Affected by the Undertaking Construction of the Pitch and Putt will require very little backfill. The land lends itself well to cultivation as is common to the Eastport area. The Pitch and Putt will be designed to conserve the maximum number of trees and foliage in order to enhance the natural beauty of the area. Land clearing will occur only in areas where tee-offs, walkways, fairways, greens and bunkers are to be located. The parking lot will be adjacent to the bed and breakfast and will be located in an area that has already been backfilled. Drainage from wetlands is provided by a

small brook which drains into a larger brook and subsequently empties into Salvage Bay. 3.4 Potential Impact on Physical and Biological Environment The project is designed to maximize existing wetlands, forestation and foliage in their natural state to minimize environmental impact as well as for esthetic enhancement; therefore, biological and physical concerns are minimal. There are no domestic wells in the area since the community is serviced by the town water supply. The area is well drained. Environmentally friendly products will be utilized as much as possible and the use of petroleum products and other potential pollutants will be kept to a minimum. Storage areas and operational controls will be inspected on a regular basis to ensure that the integrity of the environment is not compromised. 3.5 Construction 3.5.1 Construction Period Construction will be completed by the autumn of 2006 Chainsaws and brush cutters will be used to clear land Trucks, tractors and backhoes will be used during the construction phase. 3.5.2 Construction Impact on Natural Environment Potential Exposures Petroleum, oil and lubricant spills from equipment. Disposal of debris and solid waste. Increased noise levels from construction activities. Airborne emissions from construction equipment. Increased run-off during fertilization. Mitigation Measures

Construction equipment will not be refueled within 100 metres of the project. Regular inspections will be conducted to ensure that equipment is properly maintained to prevent oil spills and minimize exhaust emissions. No storage of fuel or petroleum products will be permitted onsite during construction. Appropriate permits will be obtained for burning brush on site. Rocks exposed during clearing will be utilized for backfill in parking area. Environmentally friendly fertilizers will be used. Soil will be tested to determine application rates for lime and fertilizer. Only those pesticides approved by the Pesticide Control Division of the Dept. of Environment will be used. 3.5.3 Resource Conflicts Wildlife Habitat There is no concern with effect on fisheries due to the location of the project. Wildlife in the area consists of moose, bear, fox, coyote, rabbit, grouse and many species of birds. There is no reason to believe that the natural habitat of these species will be adversely affected due to the minimal disturbance to forestation and wetlands. The natural habitat of the area will be preserved to the maximum level possible. Existing Recreation Area Eastport Beach has a swimming / recreation area located approximately 250 metres away, on the opposite side of Route 310. It is our intention to protect this area from any runoff or pollutants. Existing Residential Area There are no neighbours close enough to be affected by stray balls; see attached site map.

4.0 OPERATION The Pitch and Putt will operate from the Victoria Day weekend through to Thanksgiving weekend, opening from sun up to sun down each day. 4.1 Sources of Operational Pollutants Potential Exposures Fertilization and application of pesticides. Possible spills from maintenance equipment. Exhaust emissions from maintenance equipment. Noise from maintenance equipment. Mitigation Measures The Pitch and Putt will operate with the least possible effect on the environment Lime and fertilizer will be applied at rates suggested by provincial and federal agriculture departments. Use of soil conditioners will be kept to a minimum and will be applied in accordance with appropriate guidelines. Organic fertilizers and other environmentally friendly products will be utilized as much as possible. Natural, non-chemical methods of pest control will be utilized as much as possible. When required for insect infestation, pesticide use will be in accordance with the Pesticide Control Division of the Department of Environment. Pesticide applicators will require licensure in accordance with the appropriate regulating agency. Storage of lime, fertilizers and pesticides will be in accordance with appropriate regulations and standards. Golf equipment will not be refueled within 100 metres of a natural drain. All equipment will be put on a preventive maintenance schedule to ensure that it is in good working order to minimize emissions and prevent fluid leakage. Temporary storage of solid waste will be provided onsite in a manner which ensures compliance with municipal regulations.

4.2 Resource Conflicts 4.2.1 Land Use The Town of Eastport has given full support for this project. See enclosed letter. 4.2.2 Fisheries We are committed to protecting the natural environment from any kind of runoff from fertilizers and pesticides. 4.2.3 Wildlife The site is surrounded by an area inhabited by moose, bear, fox, coyote, and many bird species. Our intention is to preserve the beauty of the area by retaining forestation and foliage in its natural state to the fullest extent possible, thereby minimizing the effects on wildlife habitat.

5.0 OCCUPATIONS 5.1 Construction Occupations It is anticipated that the construction phase of the project will require persons working in the following capacities: Legal surveyor Backhoe operator Labourer Truck driver Construction Manager (The applicant/proponent will personally manage and oversee all aspects of the construction phase as well as participate in a significant portion of the labour work. 5.2 Operational Staff The operation of the Pitch and Putt will required the following staff: Manager (1) Customer Service Personnel (2) Maintenance Worker (1)

6.0 APPROVAL OF UNDERTAKING The following permits and authorizations are required for this project: Release of undertaking from the provincial Dept. of Environment. Municipal approval from the Town of Eastport. Deed for Crown Land from the Crowns Registry, Government of Newfoundland and Labrador. Cutting and burning permits from Forest Resources. 7.0 SCHEDULE The construction phase of the project is scheduled to commence during the spring of 2004 with completion expected approximately two years later in the spring of 2006. These dates were selected in order to coincide with the retirement of the proponent / applicant to allow for full time commitment to the project.

8.0 FUNDING The project will be funded primarily from private sources; however the project may seek financing from the following agencies: Atlantic Canada Opportunities Agency (ACOA) Cabot Place, 11 th Floor P. O. Box 1060, Station c St. John s, NL A1C 5M5 Dept. of Tourism, Government of Newfoundland and Labrador Gander and Area Development Corp. (GADCO) 175 Airport Blvd. Gander, NL Bank of Nova Scotia Elizabeth Drive Gander, NL TD / Canada Trust Elizabeth Drive Gander, NL 8.1 Cost of Project The overall cost of the project is expected to be in the area of $100,000 Date Chief Executive Officer