Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Similar documents
Forest Hills Improvement Initiative

COMMUNITY MEETING AGENDA

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN


2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

122 Avenue: 107 Street to Fort Road

City of Davis East Covell Corridor Plan

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Roosevelt Estates Neighborhood Improvements

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Welcome to the Quebec Alternatives Analysis Public Meeting

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Austin Avenue Bridges Project. Public Meeting Summary

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Tonight is for you. Learn everything you can. Share all your ideas.

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

Complete Streets. Designing Streets for Everyone. Sarnia

Transportation Planning Division

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Building Great Neighbourhoods BONNIE DOON

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

Clay Street Bridge Replacement Project

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

SAFE ROUTES TO SCHOOL (SR2S)

Executive Summary Route 30 Corridor Master Plan

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

WELCOME Public Information Centre

9/21/2016 VIA . RE: The Knot (DR16-270)

Clarkson Walkability Audit: Results and Recommendations Summary

Prince George s County plans, policies, and projects

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

North Shore Transportation Improvement Strategy

Welcome to the Sellwood Bridge Project Open House!

David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

HUDSON, MA PUBLIC FEEDBACK SUMMARY Second Public Meeting October 26, :30pm Welcome and Rotary Trivia - 7:00-8:30pm Event

6.4 RECOMMENDED IMPROVEMENTS

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Plant City Walk-Bike Plan

North Avenue Corridor Study

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

San Jose Transportation Policy

Terwillegar Drive Expressway Draft Concept Plan

Major Bike Routes 102 Avenue Workshop April 21, 2015

Pre-Construction Meeting

5 CIRCULATION AND STREET DESIGN

4/14/2017 VIA . Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Traffic Management and Mitigation Study in the Leslieville Community Transportation Services Division & IBI Group IBI GROUP

BAC-PAC-LHA Joint Meeting July 11, PM

Water Street Promenade Engineering and Design Services

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

Orange Center Elementary School

MAKE YOUR PLACE IN CHANNELSIDE

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Sebastopol Charter School Traffic Management Plan

Transportation Corridor Studies: Summary of Recommendations

Kathy Dahl (Great Works Consulting), Mitch Riabko (Great Works Consulting) City of Saskatoon Representatives:

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting

TRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

Chapter 5. Complete Streets and Walkable Communities.

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

MARTIN LUTHER KING JR. WAY

Columbia Pike Implementation Team (CPIT) Meeting

Ocean Park Boulevard Green Street Project Community Workshop

NEWMARKET UPHAM S CORNER

CONNECTING PEOPLE TO PLACES

Lawrence Avenue Streetscape Concepts August 30, 2011

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Public Information Centre

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

Bicycle + Pedestrian Connectivity Gap Analysis

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

5. RUNNINGWAY GUIDELINES

8/1/2018 VIA . Darcy Goulart City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

11/3/2014 VIA . WALKSacramento has reviewed the Stockton and T Mixed-Use project at 3675 T Street in the

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Improving intersections for people that walk in Minneapolis

Transcription:

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Study Area

April 9 Public Meeting Comments Summary Pedestrian Safety - A Walking Neighborhood Pedestrian traffic is very difficult A need for better sidewalks on Union Street New sidewalks and street trees on Memorial Avenue from Baldwin Street easterly (pedestrian fatalities mentioned) Some people walk in the road instead of on the sidewalk especially on Main Street A very difficult area to ride a bicycle Pedestrians use a short-cut down the Route 5 southbound exit ramp at the Memorial Bridge rotary and climb a fence to access Bridge Street Many pedestrians walk long distances to access the Eastern States A need for better access to the Memorial School Traffic The Main/Memorial intersection is very bad and promotes high travel speeds Speeding River/Baldwin Street intersection is too congested, confusing and has poor turning radii Truck traffic in areas where it shouldn t be Vehicles do not comply with the Memorial School pick up/drop off plan Poor access management People exiting the Doctor s offices at 373 Park Street cause chaos at the intersection of South Boulevard with Park Street and River Street

April 9 Public Meeting Comments Summary (cont.) Parking Need on-street parking on Union and Main Streets Lack of parking in Globe/Railroad/Bridge Street area Management and enforcement of existing regulations needed Existing parking regulations are not business friendly The parking lot across from 380 Union Street is used by local residents during snow clean-up Aesthetic improvements desired Unattractive gateways into the city rotaries, Agawam Bridge A need for more parks and playgrounds Public infrastructure investments (sidewalks, trees, lighting, benches, parks) Town Common was mentioned Need street tree replacement (from Church Street south) Many tornado damaged building are still vacant and have not been repaired Regulatory/enforcement measures imposed on businesses and residences Elimination of illicit and inappropriate activity at existing parks and playgrounds Redevelopment No current development plans for the Eastern States as the existing parking area is critical to the site.

Summary of Recommendations

Recommendations Recommendations handout summarizing a number of potential improvements to be considered for the study area Recommendations have been summarized by location when practical. A corresponding Summary Map was developed to assist in identifying the location of proposed recommendations. Responsible Party - the lead party for implementing the recommendation. Priority Immediate Priority 6 months to 1 year implementation Short Term 1 to 3 year implementation Long Term - >3 year implementation Cost Low Cost = < $500,000 Medium Cost = $500,000 - $2,000,000 High Cost = > $2,000,000 Annual Maintenance This column identifies if the recommendation requires a dedicated annual maintenance program

Complete Streets Complete Streets enhance opportunities for all transportation modes and users Treatments Consist of Pavement markings Plantings Improved Pedestrian Crossings Enhanced Bus Stops Narrow lanes encourage lower travel speeds Complete Streets are unique

Merrick/Memorial TCSP Opportunity Focus Areas 380 Union Street Baldwin St/ River St Main St/ Mem Ave Agawam Bridge/ Big E Gateway Big E

Gateway Recommendations: Main at Memorial Parking Realign Intersection Protect Homes Sidewalks 2-way Traffic Parking Redevelop Century Shopping Center

Main at Memorial: Gateway Area Concept 1 Park

Main at Memorial: Gateway Area Concept 2 New mixed-use buildings Give or sell excess right of way to abutting properties ( ) Narrow Main St. & realign with Mulberry St. Add sidewalk & bike lane Define parking Reconfigure Bresnahan St. Make two-way Add sidewalks Add bump-outs at crosswalks Add bike line Define parking v New mixed-use building Add gateway landscaping

Gateway Recommendations: River at Memorial Ped./bike Connection Redevelop River Walk Gate 1 Add Right Turn Lane Agawam

River at Memorial: Gateway Area Concept 73 spaces (per zoning) New mixed-use building Add gateway landscaping Close curb cuts. Add sidewalk.

Intersection Improvements Gateway Recommendations: Baldwin St at River St 333 River St 26 Sears Way Add Parking Memorial El. School Parking Lot Bike Lanes

Baldwin at River: Gateway Area Concept

Baldwin at River: Gateway Area Concept

North End Bridge and Memorial Bridge Rotaries

Union Street at Day Street

Memorial Avenue Boulevard Concepts

Area Recommended for Rezoning to Residential

Please Send Your Comments Handouts and Presentation available Thursday May 15, 2014 at www.pvpc.org Draft Report available beginning Monday May 19, 2014 Available online and at the library 30 day public participation period through June 19, 2014 Submit written comments to: Pioneer Valley Planning Commission 60 Congress Street Floor 1 Springfield, MA 01104-3419 Attention: Gary Roux gmroux@pvpc.org

END