Montclair s Complete Streets Experience

Similar documents
Improvements Infrastructure Gap Assessment and Improvements Street Striping

NJDOT Complete Streets Checklist

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES

CURBSIDE ACTIVITY DESIGN

Active Transportation Facility Glossary

TRAFFIC CALMING POLICY & PROCEDURES

Copenhagen Cycling Map. Red Lines Cycling facilities

5. RUNNINGWAY GUIDELINES

Long Island Rail Road Expansion Project Floral Park to Hicksville

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Non-Motorized Transportation 7-1

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Homework Module 7.01 Drivers Manual Study Questions

Citywide Sidewalk and Crosswalk Programs

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

ACTIVE TRANSPORTATION

COMPLETE STREETS PLANNER S PORTFOLIO

MASTER BICYCLE AND PEDESTRIAN PLAN

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

MONTCLAIR SAFE COMPLETE STREETS IMPLEMENTATION PLAN. Monday November 13, 2017 Michael Dannemiller, Principal Engineer NV5, Inc.

Public Information Centre

Completing the Street: Denning Drive

New Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

Appendix 3 Roadway and Bike/Ped Design Standards

BICYCLE FACILITIES INVENTORY: SUMMARY REPORT

George Washington Bridge Restoring the George Construction Program Supplemental Information on Bicycle and Pedestrian Access

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

What Is a Complete Street?

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Welcome and Introductions Overview of the Study to Date Community Involvement Intersection Improvement Concepts Bike-Ped Recommendations ITS

WELCOME Public Information Centre

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Walkable Community Workshop Report

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Complete Streets: Planning, Policy & Performance

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Community Bicycle Planning

Complete Streets Funding Program Project Prioritization Plan

Chapter 5: Crossing the Street

10.0 CURB EXTENSIONS GUIDELINE

CONTEXT SENSITIVE STREETS STANDARDS COMMITTEE

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Vision. Goals and Objectives. Walking

Hennepin County Transportation Department

Arlington s Master Transportation Plan

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

Item No. 14 Town of Atherton

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

complete streets design and construction standards public primer City of Edmonton

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Complete Streets. Designing Streets for Everyone. Sarnia

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

City of Vestavia Hills Traffic Calming Policy for Residential Streets

Best Southwest Transportation Committee. North Central Texas Council of Governments Transportation Department

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

About the Studio. Edward J. Bloustein School of Planning and Public Policy - Rutgers University

MONTCLAIR TOWNSHIP PEDESTRIAN SAFETY COMMITTEE

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

City of Seattle Edward B. Murray, Mayor

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

Ottawa Beach Road Study

Morristown, NJ Complete Streets Policy

and older adults and people with disabilities still face barriers when using the pedestrian network and public transportation.

APPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET. B. Subdivision/Site Development Plan/Grading Permit Name and Number:

Road Diets FDOT Process

Omaha s Complete Streets Policy

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

County of Spartanburg South Carolina

Readington Road (C.R. 637) Construction

2.0 LANE WIDTHS GUIDELINE

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

City of Margate, Florida. Neighborhood Traffic Management Manual

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Bicycle Facilities Planning

5 CIRCULATION AND STREET DESIGN

DOT Policy and Procedure Integrity Excellence Respect

TRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia

BIKE ON ROAD NETWORKS: URBAN & RURAL. Non-motorized Transportation Networks. Madison County Council of Governments

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

INDOT Complete Streets Guideline & Policy

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Duwamish Way-finding and CTR Report

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

II. EXISTING NEIGHBORHOODS

Transcription:

Presented by: Hon. Jerry Fried, Mayor Montclair Township

About Montclair Six square miles Six commuter rail stations Four local bus routes (NJ Transit) Two private commuter bus routes Five business districts 97.7 miles of road (14.4 County)

Safe Routes to Schools - Demonstration Project Seminars Educating parents, teachers and students about the benefits of walking and bicycling to school Events Walking school bus Walk or bike to school days

Advocacy groups played a role Montclair Health & Wellness Partnership Mission: to promote the physical, emotional, and social well-being of students, staff and families of the Montclair Public Schools through increased access to quality services, education and information. Bike/Walk Montclair Mission: To create a bicycle-friendly & walk-able Montclair through advocacy, education, and encouragement. Through these means, our aim is to improve our health, clean our air, make our streets safer and improve our overall quality of life.

Complete Streets make sense, but It s going to cost too much There s too much emphasis on cyclists and not enough on pedestrian safety

Proposed bicycle lanes raised additional concerns: Liability Cost

What the final policy says All Township streets shall be designed and constructed to include accommodations for pedestrians, bicyclists, public transit, and other motorized vehicles and their passengers. A bicycle plan shall be developed within 90 days Limited exceptions allowed as follows: Facilities are not required where they are prohibited by law. Public transit facilities are not required on streets not serving as transit routes. Cost of ped/bike facilities exceeds 20% of overall project cost

What the final policy says All Township streets shall be designed and constructed to include accommodations for pedestrians, bicyclists, public transit, and other motorized vehicles and their passengers. Limited exceptions allowed as follows: Facilities are not required where they are prohibited by law. Public transit facilities are not required on streets not serving as transit routes. Cost of ped/bike facilities exceeds 5% of overall project cost

Effects on the Design Process: 1. Conduct Inventory Functional Classification Vehicular traffic volume and speeds Number of pedestrians & cyclists Area character (residential, commercial, mixed, etc.) Existing ROW width Existing pavement width Existing number of lanes Turn lanes and/or medians? Curbing (one or both sides)? Are there shoulders (one or both sides)? Parking (one or both sides)? Sidewalk (one or both sides)? Existing speed limit Rail grade crossings Crash history Emergency call boxes Street furniture/lighting Transit routes and stops Safe Route to School Bike route (signage, marked or unmarked)

Effects on the Design Process: 2. Design Review Assess and note deficiencies a. Horizontal Alignment b. Vertical Alignment c. Pedestrian Crossings (presence/absence of crosswalks and ADA compliant ramps) d. Cyclist patterns/usage (proposed bike lane or shared roadway issues; impacts on parking, etc.) e. Transit stops, waiting areas, shelters

Effects on the Design Process: 3. Design (Plan Development) a. General Safety/Security b. Pedestrian Amenities c. Bicycle Amenities d. Transit Amenities

Effects on the Design Process: 4. Design Reviews Open House with residents at 90% complete NJDOT, CDBG funded projects must be submitted for review/approval before bidding Council must approve Municipally-funded projects when new bicycle or pedestrian facilities exceed 5% of the total cost

Lessons learned Make sure the agenda is focused and prioritized to tackle the most important things first Develop allies within the staff and community who are in a position to move the agenda forward Reach out to the governing body early in the process to flesh out any potential issues (no surprises!)

Challenges ahead Assessing and making determinations regarding location and class of bicycle facilities to be provided Interlocal coordination of planning for pedestrian and bicycle route continuity between jurisdictions Changing land use and zoning laws that discourage provision of sidewalks

Challenges ahead Paying for new sidewalks or acquiring additional land for bicycling facilities Re-allocating existing roadway space from motorists to pedestrians and/or bicyclists Addressing liability concerns so cyclists and motorists are fairly accommodated

Jerry Fried, Mayor Montclair Township 205 Claremont Avenue Montclair, NJ 07042 ph: 973-509-49?? fax: email: jfried@montclairnjusa.org Kimberli Craft, P.E. Montclair Township Engineer 219 N. Fullerton Avenue Montclair, New Jersey ph: 973-509-5707 fax: 973-783-7703 email: kcraft@montclairnjusa.org