Instruction Manual D&RGW K-36 LIVE STEAM

Similar documents
Instruction Manual D&RGW K-37 LIVE STEAM

D&RGW K #463

Instruction Manual. WSL #3 Heisler Live Steam

Instruction Manual. Chesapeake & Ohio / Virginian Railway Allegheny Live Steam

Instruction Manual. B&O WITH SLOPE BACK TENDER Live Steam

ACCUCRAFT UK LTD Unit 4, Long Meadow Industrial Estate, Pontrilas, Herefordshire. HR2 0UA Tel:

Instruction Manual - War Department Baldwin Live Steam Instruction Manual

ACCUCRAFT UK LTD Unit 8, Mynd Industrial Estate Church Stretton, Shropshire. SY6 6EA Tel:

Steam Locomotive Operating Procedures SVLS Locomotive 1973 Steam Up

ACCUCRAFT UK LTD Unit 8, Mynd Industrial Estate Church Stretton, Shropshire. SY6 6EA Tel:

NEVADA STATE RAILROAD MUSEUM

FOWLER Owners Handbook

NEVADA STATE RAILROAD MUSEUM

CALIFORNIA STATE RAILROAD MUSEUM

Conversion instructions from natural gas to propane

Vale of Rheidol 2-6-2

INSTRUCTION MANUAL SAXONIAN IK 0-6-0T

INSTRUCTIONS FOR THE KOBUKI TORCH

NOT A TOY. ADULT SUPERVISION REQUIRED. MISUSE OR CARELESS USE MAY CAUSE SERIOUS INJURY OR DEATH.DANGEROUS UP TO 350 YARDS (320 METER).

Build Your Own Flamethrower Step-by-step Manual

SPECIFICATIONS Type: Twin stack, single phase Tank: 4 gallon Air Output: PSI; PSI Max PSI: 125 PSI HP: 1.

Installation, Operation, and Maintenance Manual

Freedom8 ShoeBox Compressor Manual

OWNER S MANUAL READ THIS MANUAL BEFORE USING YOUR NEW AIRGUN

Propane Conversion Kit Instructions

4 Machine maintenance and repair

COMPRESSOR REPLACEMENT PROCEDURE (R-134A)

RARS5000 AIR BODY SAW OWNER S OPERATING MANUAL

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

Owner s Manual for Assembly, Operating & Maintenance of

Instruction manual for FX Gladiator. Instruction manual for FX Gladiator

D05 Pressure Regulating Valves

Manual Actuated Boiler Blowdown Valves

Hot Compressed Air Lance Operation Manual. LAB Manufacturing 9483 Reading Road Cincinnati, OH (800)

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

Instructions for High Altitude Conversion

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Solid Indicator (Non-mixer) Model CP-30SI

MANUAL BE SERIES Test Benches

Welker Constant Pressure Cylinders With Welker Solid Indicator, Syringe T-Handle, or Vortex Mixer

SUBMITTAL NOTES PROJECT: Ross Model 50RWR-A Pilot Operated Surge Relief Valve with Hydraulic Anticipation. Size: inch / mm

Windy City II. User instruction manual WARNING: Fill pressure: 200 bar (approximately 2,900 psi)

STREAMLINE SHOP SERIES MODEL 30040V OPERATION & PARTS MANUAL

OXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS

DS05C,D,G Dial Set Pressure Regulating Valves

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

INSTRUCTIONS FOR SCORPION TORCHES

General Information. NTA607HD Lift Assist Adjustments. Tools Required. Work Location. Notations and Conventions U B F D R B F L

TSS21 Sealed Thermostatic Steam Tracer Trap

INSTRUCTOR GUIDE REFERENCES: PUMPING APPARATUS DRIVER/OPERATOR HANDBOOK, FIRST EDITION, IFSTA

BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications

Table of Contents. Rules of Safe Shooting 3. Getting Started 4. Charging the Rifle 5. Loading 6. Safety 7. Looking After Your FX 8.

8-GALLON AIR-OPERATED OIL CHANGER

Propane Conversion Kit Instruction

2 GALLON TWIN STACK AIR COMPRESSOR W/ HOSE REEL

29 SERIES - SAFETY VALVE

MANUAL. Sesame. Thermoplastic Tank Technologies

Spring Loaded Regulators Constant Loaded Regulators Twin Parallel Flow Regulators Field Service Regulators

STREAMLINE SHOP SERIES MODEL OPERATION & PARTS MANUAL

Bobtail DOT 407 / 412 Vacuum

HPIC D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS

5 Gallon Pressure Pot with HVLP Spray Gun and Hose

TABLE OF CONTENTS SAFETY FIRST!...3 BASIC OPERATION...4 ADJUSTMENTS...5. Cocking Pressure...5. Three-Way Valve Adjustment...6

PARTS LIST FOR CM MMB

Hercules Space Saver Sole Press series

CNG/LPG Vehicles Emergency First Response Guide

User Instruction Manual

1805 Series Relief Valves

Right-Angle Tube Roller Model

Related Products: Auto Drain Valve. Model/Specifications. Model

PETERSEN 161-SERIES HIGH PRESSURE LIFTING AIR BAGS OPERATING INSTRUCTIONS WARNING!

Tactical Sniper air rifle & carbine

50L ENGINE DRIVEN AIR COMPRESSOR MODEL NO: XPPV11 & XPP15 RANGE

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

FV Flash Vessel Installation and Maintenance Instructions

Nitrogen Tyre Inflator Owner s Manual

256 Pneumatic Pressure Indicator

Propane Conversion Kit Instruction

Exercise 2-3. Flow Rate and Velocity EXERCISE OBJECTIVE C C C

FX IMPACT OWNER S MANUAL

APT14, APT14HC and APT14SHC Spares 2

Pressure Dump Valve Service Kit for Series 2300 Units

INSTRUCTION MANUAL. January 23, 2003, Revision 0

product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

USER S INFORMATION MANUAL

AIR/OVER HYDRAULIC JACK 20 TON

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

MUELLER GAS. No-Blo Operations Using D-5. Drilling Machine. Reliable Connections. General Information 2

Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848

INSTALLATION & MAINTENANCE INSTRUCTION

Installation, Operation, and Maintenance Manual

COMPATTO & BANTAM

4 ANGLE GRINDER MODEL NO: CAT 52 PART

Installation of Your SprayMaster System

LCR-6-WT-EPP CYLINDER ROLLER EXPLOSION PROOF SERIES INSTRUCTION MANUAL MANUAL NUMBER Rev A Issued November 2011

Irrigation System Winterization and Pressurization Procedures

U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL

Welcome to your new Firepod It will only work properly on Propane Gas (Also known as LPG and Patio Gas) with the special regulator supplied

Transcription:

Instruction Manual D&RGW K-36 LIVE STEAM ACCUCRAFT COMPANY 33268 Central Avenue Union City, CA 94587 Tel: 510-324-3399 Fax: 510-324-3366 Email: info@accucraft.com Copyright 2009

NOTES: Prototype Information In 1925 the D&RGW railroad received from Baldwin Locomotive Works ten 2-8-2 locomotives numbered from #480 to #489. Their Classification would be K-36 for they had a tractive effort of approximately 36,000 pounds. These were significantly larger than the locomotives of the recently acquired K-28 class had super heaters, and were equipped with the most up to date features for steam locomotives of the year. They were put to work in places that demanded their superior power; were well received by their crews and through the years have come to symbolize perhaps the high water mark of American narrow gauge motive power. In fact, many narrow gauge fans are quick to nominate the K-36 as their favorite locomotive. Happily, except for one locomotive which was dismantled (#485), one was put on display and the rest eventually found their way to either the Durango and Silverton Narrow Gauge, or the Cumbres and Toltec Scenic Railway. 1

Please read following directions before unpacking your locomotive. 1. Remove foam around the locomotive. Slide the inner box cover to the side, and open the inside cardboard box with a cutting knife. 2. Place taped locomotive on a fl at surface. Carefully cut the tape along the wood board side surface. Be sure to cut both sides of the wood board. Slowly lift the tape from the locomotive. Be very careful with small parts. Tape cannot be re-used to re-pack the model. Use new packing tape if necessary. 9 General information: Operating a model live-steam locomotive is much different from running an electrically powered engine. It is a more hands-on and interactive experience. The locomotive must be periodically fueled, oiled and watered. As supplied the K-36 is manually controlled, which means that you must actually drive the locomotive using the controls in the cab, just as you would a full-size engine. The performance of the engine is also unlike electric locomotives. The K-36 should pull a dozen or more standardsize freight cars on a good level track. Grades and sharp curves will diminish its capability. A good engineer will learn the engine s characteristics and idiosyncrasies over time to get the best performance and longest duration from it. Safety: For your safety, there are certain rules that should be observed, as follows: 1. The safety valve is under the steam dome. It has been set at the factory to release at around 60 pounds per square inch of pressure. Never tamper with the safety valve. 2. The fi ring system has been designed to use butane gas only. Do not use any other gas (including propane or butane/propane mix), as the storage pressures can reach unsafe levels. 3. Always refuel the engine well away from other working live steam locomotives. The fuel fi lling system allows a small amount of the gas to bleed off as the fuel tank is being fi lled. A passing engine can ignite this bleed-off gas, causing a potentially hazardous situation. 4. When lighting up light your match fi rst and then turn on the gas. 5. A steam engine gets very hot. Be very careful. Carrying the engine: The locomotive and tender should always be carried separately because of their weight. We suggest carrying the locomotive to the track by supporting it underneath the wheels with both hands, as opposed to lifting it by the pilot (which may not stand the stress) and rear beam. For general carrying, the engine can be carried on a carrying tray with handles. A steam-locomotive engineer goes through a lighting-up ritual every time the engine is to be run. It is good to follow the same routine each time so that nothing is overlooked. 2

1. Oil all external moving parts of the engine and tender with a high grade, light weight machine oil like 3-in-1. Don t forget the wheel bearings in the pilot and trailing trucks, as well as those in the tender. 2. Place the engine and tender on the track and couple them together. There is a drawbar between the units that has two holes. For tighter curves use the outer hole. For wide-radius curves, the engine and tender can be coupled together using the inner hole. Insert the twin gas jets (at the end of the hose coming from the tender) into the backs of the burners, making sure they seat snuggly. Adjustable Hydrostatic Lubricator Pressure Gauge 3. The adjustable lubricator located in the cab ensures the cylinders and valves are properly lubricated inside. As the steam passes through it, a small amount will condense into water. This water will sink to the bottom of the lubricator, forcing a similar quantity of oil into the steam line and thus to the cylinders. Remove the lubricator cap and draw out any water from previous run with a syringe. Use only proper steam cylinder oil. Fill the lubricator, but leave a small air space between the oil and the cap. Water Filler Reverse Lever Water Glass Level Technical Specifications: Scale: 1:20.3 (15mm = 1 0 ) Gauge: Wheel arrangement: 2-8-2 Boiler: Boiler fi ttings: Fuel: Cylinder lubrication: Cylinders: Valve gear: Caution! N 1 (45mm) Double fl ue, gas fi red, silver-soldered copper, blow off pressure, 60 psi Safety valve, throttle, blow down valve, water glass, pressure gauge Butane gas Displacement lubricator in the left side of cab Fixed cylinders, D-valves, exhaust through the stack Modifi ed Walschaerts, controlled from the cab This model is an accurate replica of the original locomotive. It has sharp and moving parts. The locomotive drive rods are stainless steel with sharp edges. OPERATORS MUST NOT COME IN CONTACT WITH A MODEL THAT IS BEING POWERED AT ANY TIME. UNDER NO CIRCUMSTANCES SHALL ACCUCRAFT TRAINS BE RESPONSIBLE FOR ANY INCIDENTAL OR CON- SEQUENTIAL DAMAGES ARISING IN REGARD TO ANY ACCUCRAFT PRODUCT. Gas Tank Heater Throttle 3 8

Notes on radio control Although the K-36 was designed as a manually controlled locomotive, there is no reason why radio control (R/C) cannot be fi tted with some ingenuity. A two channel radio is all that s necessary, one for the throttle and one for the reversing lever. The gas valve should always be controlled manually. The reversing lever will have to be modifi ed so that it does not lock in position, but must still have stops at either end of its throw for proper positioning of the reversing valve. 7 4. Unscrew the fi ller plug; which is at the top of the steam turret inside the cab and fi ll the boiler with water. The water level will show in the sight glass on the boiler s back head. Fill the boiler until the water reaches the top of the glass. (Arrow indicating area in picture below) This is a BIG locomotive and it will take a lot of water. Do not overfi ll the boilerthere needs to be room above the water for steam to be formed. Use only distilled water in your engine s boiler. Tap water contains minerals that will leach out and ultimately affect the performance of the engine. 5. Finally add the fuel. Your K-36 burns butane gas. The gas tank is located in the tender beneath the dummy coal load. Remove the coal load with the ring provided. Butane gas can be purchased at the grocery store or at a tobacconist s as cigarette-lighter refi lls. These will come with a nipple suitable for the fi ller valve on the K-36 s gas tank. (Butane can also be purchased more economically in larger containers at camping-supply stores, but these cans will require a special adapter for fi lling the engine s tank.) Simply press the nozzle of the butane canister hard onto the fi ller valve atop the tank, making sure that the control valve is closed. You will hear the gas transferring and will see a little gas bleeding out of the valve. The gas may tend to sputter a little from time to time while fi lling. When the tank is full the gas will begin to sputter a lot and much more gas will escape the valve. When the gas tank is full you are then ready to fi re up the engine. NOTE: Because of the size of this locomotive and the fact that it has two burners, a very large gas tank has been provided, which takes a while to fi ll completely. If you fi nd that you are getting relatively short runs and there is still a lot of water left in the boiler, chances are that you did not fi ll the gas tank all the way. Firing up The engine s burners reside at the back of the fl ues inside the boiler. Open the hinged smokebox door at the front of the engine. To light up, strike a match and hold it at the opened smokebox door while simultaneously opening the gas valve in the tender very slowly until the gas ignites. You should hear the gas coming into the burner. Opening the valve too wide or too fast may blow out the fl ame or cause the fi re to burn in the smokebox. 4

The fi re should fl ash back into the back of the fl ues with a quiet pop. If it wants to burn in the smokebox or in the forward part of the fl ues, slowly close the gas valve until it fl ashes back to the burner. Do not let the fi re burn in the smokebox your engine will not run as it should and may be damaged. The object is to run the burner at the lowest setting possible to operate the engine, thereby increasing the effi ciency of the engine and the duration of the run. You will get the hang of this with practice. If a burner goes out while the engine is in operation (you should be able to tell by the sound of the fi re or by sluggish performance) it must be manually relit. One burner will not automatically ignite the other. After another ten or twelve minutes, pressure on the pressure gauge should read about 20 psi (pounds per square inch) or so. The safety valve is set at 60 psi. The engine can be run when the pressure on the gauge reaches 40 psi. Drain cocks Unlike most small-scale live steam locomotives, your K-36 is fi tted with working drain cocks on the cylinders. When fi rst starting out, the cocks should be open (levers moved to outside positions). This will allow water in the cylinders to drain while the cylinders heat up to working temperature. As steam enters cold cylinders, it condenses, so expect a fair amount of water to come out at the beginning of each run. Once the cylinders have warmed up, you can close the drain cocks. To close them, move the levers to the up position. Drain Cock Running Move the reversing lever at the right side of the cab to the forward position. With the engine on the track and without a train, open the throttle. The engine may need to be pushed a little to overcome the steam condensing into water in the cold cylinders, however the opened drain cocks will minimize this. After a few moments the engine should take off on its own; moving away slowly. Once the engine is running smoothly, a train can be coupled on and the run can proceed. Since all of the locomotive s functions are controlled from the cab, it can be driven like a full-size engine. If you have suitable track, the engine can be left to run on its own at a steady speed. Keep your eye on the water glass. When the water level reaches the bottom of the glass, shut the engine down and repeat the fi ring up process. With practice and good weather, steady runs of an hour or more are not uncommon for this engine. Shutting down To shut the engine down, simply close the gas valve and allow the engine to run off any residual steam. At the end of the run, open the blow down valve and leave it open. This will relieve the boiler of what little pressure remains and prevent a vacuum from forming inside the boiler that could draw lubricating oil into the boiler if the throttle valve is not fully closed. Because of the size of the engine blowing down could take several minutes. After a day s operation in the garden, you ll probably fi nd that your engine has a coating of oil all over it. This is steam-cylinder oil that has been exhausted from the stack. A simple wipe down with a dry cloth is all that s necessary to restore the engine to pristine condition. This is best done while the engine is hot. Wipe any grit and excess oil from the wheels and running gear. The boiler can be drained of water, or not, as you will. Leaving water in the boiler will not harm it. The lubricator can also be drained and refi lled with steam oil in preparation for the next run. Cold-weather running The weather can dramatically affect the performance of your locomotive. Cold and wind can decrease effi ciency to a disappointing level. Butane gas becomes liquid at 32 F and will not work. As it approaches 32 F, its pressure (and effectiveness) diminishes. The coal compartment in the tender in which the gas tank resides can be fi lled with warm water in cooler weather. This will warm the gas in the tank and keep its pressure up; which will cause the engine to operate in a much livelier manner, much as it does in warm weather. If the water in the tank cools, just replace it with warmer water. Empty the tender at the end of the day s run. Never put hot boiling water in the compartment. A tank heater is provided to warm water around the gas tank! See photo on page 3. NOTE: the temperature of the fuel supply must always be higher than that of the engine s gas tank. If you have warmed the engine s tank and the supply tank is cooler; gas will not transfer. 5 6