CHART IN262 EAST OF 79 E: POSITIONS To agree with the adjoining chart IN262 which is referred to WGS84 Datum, in the area east

Similar documents
UNITED NEW YORK SANDY HOOK PILOTS BENEVOLENT ASSOCIATION AND UNITED NEW JERSEY SANDY HOOK PILOTS BENEVOLENT ASSOCIATION

SECTION II CORRECTIONS TO C. G. LIGHT LIST, VOLUME I ATLANTIC COAST, (5) Height. (4) Characteristic LIDO BEACH LIGHT Remove from list.

NEW JERSEY WATER SUPPLY PLAN

SECTION II NM 11/13 NAVIGATION PUBLICATIONS COAST PILOT CORRECTIONS. Chapter 4 Paragraphs 85 to 86; read: (85)

Nome Harbor Page 2 of 12

Grays Harbor O&M and Deepening Dredging

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

Table 1-1 USEPA QA/R-5 Elements and Newark Bay Study Area RIWP Cross-Reference Table

Grays Harbor Federal Project

MAC Transit Advisories as of April 30, 2018

VESSEL TRAFFIC SERVICE NEW YORK USER'S MANUAL

SECTION XI - COAST PILOT UPDATING. 1. To acquire a general knowledge of the responsibilities of the Auxiliary in COAST PILOT UPDATING activities.

State of Texas Operations and Maintenance

BAYKEEPER. Utilizing Volunteers in Baykeeper s Oyster Restoration Program

COAST GUARD ADVISORY NOTICE (CGAN ) To: Distribution Date: September 1, 2017

SECTION II NM 26/10 NAVIGATION PUBLICATIONS ALMANACS CORRECTIONS

TOWN OF DENNIS 10 YR COMPREHENSIVE DREDGE PERMIT SEPTEMBER 10, 2013

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

L Jll111I.6 3 = MICROCOPy RESOLUTION TEST CHART L40. NATIONAt TIRFAII nlf qtanpar[os IQ64 A

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)

SECTION II CORRECTIONS TO C. G. LIGHT LIST, VOLUME I ATLANTIC COAST, (4) Characteristic. (5) Height. Fl G 4s 4 Green. Fl G 4s 4 Green.

Compiled by Uwe Dornbusch. Edited by Cherith Moses

Ketchikan Harbors Thomas Basin and Bar Point Harbor

15A NCAC 03J.0103 is amended with changes as published in 30:03 NCR as follows:

VESSEL TRAFFIC SERVICE NEW YORK USER'S MANUAL Revised September 2018

FY-16 Ongoing Contracts FY-16 Scheduled Contracts

CARTA East Cooper Transit Service Transportation Committee Town of Mount Pleasant. February 5, 2013

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

ROUTEING MEASURES OTHER THAN TRAFFIC SEPARATION SCHEMES

Proceedings, 2001National Conference on Beach Preservation Technology, pp COASTAL INLET BANK EROSION. William C.

PROGRESS AS OF JUNE 25, 2010 ON COMPLETING A DISSOLVED OXYGEN MANAGEMENT PLAN/TMDL FOR THE NY/NJ HARBOR

SECTION II CORRECTIONS TO C. G. LIGHT LIST, VOLUME I ATLANTIC COAST, (4) Characteristic. (5) Height

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

Dredged Material Management Plan Atlantic Intracoastal Waterway Port Royal Sound, South Carolina to Cumberland Sound, Georgia November 2015

Aransas Pass: Channel

The 2017 Panama City Beaches Beach Interim Renourishment Project. Answers to Common Questions

Notice to Competitors #1 March 21, Effective April 11, 2012 Class Splits and Starts

1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007

BookletChart. Chesapeake Bay Severn and Magothy Rivers NOAA Chart A reduced-scale NOAA nautical chart for small boaters

Beach Renourishment in Jacksonville

Forth Ports Limited. Ruling Depths & Under Keel Clearances

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Condition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No , )

Wexford Harbour. Yachting Guide. Navigation

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

1,385,500 $13,803,290 $15,008,620

Bicycle Crashes. Number of Bike Crashes. Total Bike Crashes. are down 21% and severe bike crashes down 8% since 2013 (5 years).

Code of Federal Regulations

PEASE DEVELOPMENT AUTHORITY DIVISION OF PORTS & HARBORS ANNUAL DREDGE REPORT

Delaware River Vessel Reporting System Mariners Advisory Committee For

INTER CLUB SERIES SAILING INSTRUCTIONS

USCG NAVIGATION RULES CORRECTIONS, COMDTINST M166722D Ed 1999

GULF OF MEXICO. 268 U.S. Coast Pilot 5, Chapter 6 04 AUG (see catalog for complete coverage) General Index of Chart Coverage in Chapter 6

APRIL 2017 COMMERCIAL SHRIMPING REGULATIONS

APPENDIX F. Biological Assessment of Threatened and Endangered Species CHARLESTON HARBOR POST 45 CHARLESTON, SOUTH CAROLINA

Current Survey. Not maintained. iso 10.4m. iso 10.4m 2018_H025. iso 10.3m 2018_H025. iso 11.6m 2018_H _H025. iso 11.6m. iso 11.

SECTION II NM 24/13 NAVIGATION PUBLICATIONS COAST PILOT CORRECTIONS

Pier 1 In-fill Development, Port of Durban: Modelling of potential environmental changes in the port marine environment

Port of Charleston, South Carolina, After Action Report

Active Development Applications Deemed Complete After December 12, 2017 (Effective August 16, 2018)

SECTION II CORRECTIONS TO C. G. LIGHT LIST, VOLUME I ATLANTIC COAST,

National Maritime Center

Admiralty Leisure Folio SC5601 East Devon and Dorset Coast, Exmouth to Christchurch

Coast Pilot Manual (8th) Edition. U.S. Department of Commerce Gary F. Locke, Secretary

Current observations at the Jan Mayen Ridge

Preston s Edmond Market Report

Ninilchik Harbor Page 2 of 11

BookletChart. Intracoastal Waterway Matecumbe to Grassy Key NOAA Chart A reduced-scale NOAA nautical chart for small boaters

CORPS ON THE COAST. North Carolina Coastal Conference Coastal Infrastructure Raleigh, NC April 14, Jim Medlock Chief, Programs Management Branch

Juneau Douglas Harbor

Channel Turns. Cape Fear River

JUNE 2018 RECREATIONAL SHRIMPING REGULATIONS

The Storm Surge Hazard 2018 TS-8 Tropical Meteorology 2

Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update

United States - Canada Hydrographic Commission Halifax, Canada May 16, NOAA Nautical Chart Manual Updated for Satellite Derived Bathymetry

2 NOTICES TO COMPETITORS Notices to competitors will be posted on the official notice board of the host club and/or their websites.

1-44. SITKA HARBOR, ALASKA (Western Channel, Crescent Bay Basin, Channel Rock Breakwaters) (CWIS NOS , 16840, 10322, 55030, 13787)

V. HARBOR DEPTHS, CHANNEL DESIGN AND PROPOSED CONSTRUCTION AND DREDGING

Anchoring Is Important

ADANI PORTS & SEZ LTD. ++ MUNDRA PORT ++ GENERAL INFORMATION

Inner-Bank Erosion Processes and Solutions at Coastal Inlets

Cat Island Chain Restoration

Dodger Channel. Chart 3671 Map 92C/ N W The southern section is the favoured anchoring area. Good holding. Settled weather only.

JUNE 2018 RECREATIONAL SHRIMPING REGULATIONS

***This summary does not include shad and herring net requirements.***

Cordova Harbor Page 2 of 9

2018 HR & PAYROLL Deadlines

Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report

Oyster Spatfall in Virginia Rivers: 1981 Annual Summary

3. EXCEL FORMULAS & TABLES

Navigation Sub-Committee Report

Hunting and Fishing Bag Limits and Seasons

OCTOBER 2018 COMMERCIAL SHRIMPING REGULATIONS

SECTION II CORRECTIONS TO C. G. LIGHT LIST, VOLUME I ATLANTIC COAST, (4) Characteristic. (5) Height

BALD HEAD ISLAND, NC SAND SHARING SYSTEM OVERVIEW AND ASSESSMENT. Erik J. Olsen, P.E. olsen associates, inc.

BENEFIT-COST ANALYSIS OF HARBOR DREDGING ON THE GREAT LAKES

NEWFOUNDLAND AND LABRADOR COAST List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Nominal. Range TRINITY BAY

Ship Navigation Simulation Study, Port Jersey Channel, Bayonne, New Jersey

DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1229 GALVESTON, TEXAS CESWG-CDR (1145)

Transcription:

On Chart 69 CHARTS IN262 AND 1584: POSITIONS To agree with the smaller scale charts IN262 and 1584 which are referred to WGS84 Datum, positions read from chart 69 must be adjusted by 0 09 minutes NORTHWARD and 0 08 minutes WESTWARD. On Chart 1566 CHART IN262: POSITIONS To agree with the adjoining chart IN262 which is referred to WGS84 Datum, positions read from chart 1566 must be adjusted by 0 09 minutes NORTHWARD and 0 06 minutes WESTWARD. On Chart 1587 CHART IN262 WEST OF 79 E: POSITIONS To agree with the adjoining chart IN262 which is referred to WGS84 Datum, in the area west of 79 E, positions read from chart 1587 must be adjusted by 0 09 minutes NORTHWARD and 0 07 minutes WESTWARD. On Chart 1587 CHART IN262 EAST OF 79 E: POSITIONS To agree with the adjoining chart IN262 which is referred to WGS84 Datum, in the area east of 79 E, positions read from chart 1587 must be adjusted by 0 02 minutes NORTHWARD and 0 13 minutes EASTWARD.

To accompany Notice to Mariners 4664/18 On Chart 590 SUISUN BAY TABULATED FROM S BY THE CORPS OF ENGINEERS - S TO JUN 2018 MIDDLE HALF OF CHANNEL 1. SUISUN PT. REACH 45.9 49.6.6 6-18 300 0.8 35 2. BULLS HEAD CHANNEL.9 35.9 6-18 300-3 1.2 35 3. EAST BULLS HEAD CHANNEL 34.2 33.8 33.4 6-18 3 1.1 35 4. PT. EDITH CROSSING RANGE.1 31.5 6-18 3 1.1 35 5. PRESTON PT. REACH 34.7 35.0 29.8 6-18 3 0.9 35 6. ROE ISLAND CHANNEL 34.0 34.9 34.1 6-18 3 1.1 35 7. PORT CHICAGO REACH 38.5 37.8.9 6-18 3 0.52 35 MIDDLE GROUND CHANNEL 8. WEST REACH.3 37.5.1 6-18 3 1.29 35 9. EAST REACH.6.9 34.8 6-18 3 1.09 35 On Chart 3204 NEW YORK HARBOR - LOWER BAY TABULATED FROM S BY THE CORPS OF ENGINEERS - REPORT OF MAR 2018 AND S TO FEB 2018 AMBROSE CHANNEL REACH A REACH B REACH C REACH D 52.6.3 51.8.4 54.8.0 52.9 54.0 54.9 52.3 52.4 54.8 51.0.9 47.6.4 5.1 4.2 2.6 2.9 SANDY HOOK CHANNEL (EAST) 33.5 37.0 38.4 32.8 6,7-15 800-2160 4.5 35 SANDY HOOK CHANNEL (BAYSIDE) 29.5 38.2.9 31.1 6,7-15 800 2.4 35 CHAPEL HILL: SOUTH CHANNEL (B) 30.1 30.2 31.0 21.4 10, 11-14 1000 2.6 30 NORTH CHANNEL (B) 21.0 28.5 26.4 27.0 10, 11-14 1000 2.2 30 TERMINAL CHANNEL (NAVY) 45.0 45.0 45.0 45.0 9-09 0-10 0.8 A45 RARITAN BAY EAST REACH 31.5 37.4 38.5 33.1 7-17 600-800 4.0 35 RARITAN BAY WEST REACH 31.0 39.8 30.7 7-17 600 2.4 35 A. THE PROJECT IN THE TERMINAL CHANNEL AND TURNING BASIN IS 45 FEET, EXCEPT AROUND PIERS 2 AND 3 WHERE THE PROJECT IS 35 FEET. S SHOALER THAN PROJECT ARE CHARTED IN CHANNELS. B. SPORADIC SHOAL OBSTRUCTIONS EXIST WITHIN THE CHANNEL BUT ARE NOT CHARTED. CONSULT THE CORPS OF ENGINEERS FOR LOCATION OF OBSTRUCTIONS..

On Chart 3457 ARTHUR KILL, KILL VAN KULL AND NEWARK BAY TABULATED FROM S BY THE CORPS OF ENGINEERS - REPORT OF APR 2018 AND S TO FEB 2018 ARTHUR KILL (A) FRESH KILLS REACH 33.7 35.5.6 33.9 2-17 0 1.65 35 TREMLEY POINT REACH 31.1 38.0 37.3 33.3 2-17 0 0.85 35 PRALLS ISLAND REACH 31.8 35.1.8 30.7 2-17 0 1.13 35 GULFPORT REACH 42.9 43.1 42.1 35.1 2-17 0-600 1.03 35 ARTHUR KILL (B) ELIZABETHPORT REACH 51.5.7 49.7 49.5 2-17 705-0 0.92 NORTH OF SHOOTERS ISLAND REACH.8 51.5.2 47.9 2-17 1105-515 1.07 SOUTH OF SHOOTERS ISLAND REACH C9.1 C11.8 C16.4 C5.3 11-15 0 0.94 30 KILL VAN KULL (A): BERGEN PT. WEST REACH 51.8 52.0 51.9 51.8 3-15 800-1710 1.09 BERGEN PT. EAST REACH.9 51.8.9.3 3-15 800-895 0.96 CONSTABLE HOOK REACH 51.6 52.1 52.2 51.9 3-15 -800 2.52 NEWARK BAY: SOUTH REACH MIDDLE REACH (SOUTH) MIDDLE REACH (NORTH) NORTH REACH PORT ELIZABETH: SOUTH REACH EAST SOUTH REACH WEST BRANCH REACH PORT NEWARK: BRANCH REACH INSHORE REACH PIERHEAD REACH 48.8 43.2 37.5 16.5.0 44.2 47.9 35.8 32.4.8 49.6 44.2 38.2 21.6 49.7 44.5 48.8 37.3 30.4 38.0.8 44.2 37.4 17.9 49.5 44.5 48.3 37.6 29.9 38.0 47.3.9 25.4 6.7 49.4 44.6 47.0 21.7 29.4.1 8-17 8-17 8-17 2-18 2-18 2-18 1000-20 1655-810 800-565 0-1030 515-0 0-100 7-0 1785-0 0 300-7 PASSAIC RIVER: KEARNY PT REACH 15.1 14.2 14.2 9.4 12-16 300 1.00 30 HACKENSACK RIVER: DROYERS REACH 19.9 23.6 23.6 17.6 10-17 300-0 1.55 B32 A. CONTROLLING S ARE REFERENCED FROM SEAWARD WHEN ENTERING FROM LOWER BAY. B. CONTROLLING S ARE REFERENCED FROM SEAWARD WHEN ENTERING FROM UPPER BAY. C. NUMEROUS WRECKS AND OBSTRUCTIONS WITH MINIMUM TO 4 FEET WITHIN CHANNEL LIMITS. D. REACHES WERE NEVER COMPLETED TO A 32 FOOT. PREVIOUS DREDGING WAS TO 30 FEET ONLY. 1.28 0.87 0.54 1.37 0.26 0.17 1.27 0.38 1.06 0.65 35 45

On Chart 3458 RARITAN BAY, ARTHUR KILL AND RARITAN RIVER TABULATED FROM S BY THE CORPS OF ENGINEERS - REPORT OF MAR 2018 AND S TO APR 2018 RARITAN BAY EAST REACH 31.5 37.4 38.5 33.1 7-17 600-800 4.0 35 RARITAN BAY WEST REACH 31.0 39.8 30.7 7-17 600 2.4 35 SEGUINE POINT BEND 32.9 35.9 35.9 21.9 5-17 600-1000 1.2 35 RED BANK REACH 33.5 41.4 41.1 34.4 5-17 600 1.2 35 WARD POINT BEND (EAST) 28.3 39.4 27.9 5-17,2-18 600-800 1.1 35 WARD POINT BEND (WEST) 33.3 34.0 32.1 31.7 5-17,2-18 600-800 1.3 35 OUTERBRIDGE REACH 11.9 35.5.5 32.5 5-17 600-8 1.6 35 PORT SOCONY REACH 33.2 35.9 35.5 32.9 2-17 600-800 0.87 35 PORT READING REACH 32.0 35.2 35.5 31.5 2-17 0-8 1.8 35 FRESH KILLS REACH 33.7 35.5.6 33.9 2-17 0 1.65 35 RARITAN RIVER CUTOFF (A) 19.2 19.5 18.7 18.2 3-17 600-17 1.0 20 WARD POINT SECONDARY CHANNEL 18.3 18.2 18.2 18.1 5-17 0 0.8 30 GREAT BEDS REACH (B) 22.8 24.1 24.1 23.6 12-16 300 0.76 25 SOUTH AMBOY REACH (B) 23.1 22.8 22.8 22.6 12-16 300 1.2 25 A. CONTROLLING S ARE REFERENCED FROM SEAWARD WHEN ENTERING FROM RARITAN RIVER B. THE CORPS. OF ENGINEERS REPORTS MIDDLE HALF OF CHANNEL. On Chart 3459 NEW YORK HARBOR - LOWER BAY TABULATED FROM S BY THE CORPS OF ENGINEERS - REPORT OF MAR 2018 AND S TO FEB 2018 AMBROSE CHANNEL REACH B REACH C REACH D.3 51.8.4.0 52.9 54.0 52.3 52.4 54.8.9 47.6.4 4.2 2.6 2.9 SANDY HOOK CHANNEL (EAST) 33.5 37.0 38.4 32.8 6,7-15 800-2160 4.5 35 SANDY HOOK CHANNEL (BAYSIDE) 29.5 38.2.9 31.1 6,7-15 800 2.4 35 CHAPEL HILL: SOUTH CHANNEL (B) 30.1 30.2 31.0 21.4 10, 11-14 1000 2.6 30 NORTH CHANNEL (B) 21.0 28.5 26.4 27.0 10, 11-14 1000 2.2 30 TERMINAL CHANNEL (NAVY) 45.0 45.0 45.0 45.0 9-09 0-10 0.8 A45 TURNING BASIN (NAVY) 45.0 45.0 45.0 45.0 9-09 0-2300 0.6 A45 RARITAN BAY EAST REACH 31.5 37.4 38.5 33.1 7-17 600-800 4.0 35 A. THE PROJECT IN THE TERMINAL CHANNEL AND TURNING BASIN IS 45 FEET, EXCEPT AROUND PIERS 2 AND 3 WHERE THE PROJECT IS 35 FEET. S SHOALER THAN PROJECT ARE CHARTED IN CHANNELS. B. SPORADIC SHOAL OBSTRUCTIONS EXIST WITHIN THE CHANNEL BUT ARE NOT CHARTED. CONSULT THE CORPS OF ENGINEERS FOR LOCATION OF OBSTRUCTIONS.

To accompany Notice to Mariners 4676/18 On Chart 2809 CHARLESTON HARBOR, COOPER RIVER AND SHIPYARD RIVER TABULATED FROM S BY THE CORPS OF ENGINEERS - S TO FEB 2018 ( FORT SUMTER RANGE 41.9 48.5 48.1 34.1 12-17 A,B 1000 17.0 47 MOUNT PLEASANT RANGE 48.6 49.0.6.4 11-17 1000-600 1.8 45 REBELLION REACH 45.0 47.4 49.9 46.4 11-17 600-999 1.6 45 ANCHORAGE BASIN A 25.7 31.8 32.7 37.0 11-17 999 1.4 45 BENNIS REACH 45.6 47.8 47.1 47.3 11-17 600 1.5 45 HORSE REACH 49.2.4.1 48.5 11-17 C 600 0.4 45 CUSTOMHOUSE REACH.8.6 37.6 11-17 999 0.7 45 SOUTH CHANNEL 17.0 17.0 18.0 27.0 6-15 600-1000 2.9 30 HOG ISLAND REACH 46.7 47.1 45.8.2 11-17 D 800-600 1.8 45 DRUM ISLAND REACH 42.5 47.7 48.0 46.5 1-18 880 0.8 45 TIDEWATER REACH 29.4 26.5 25.1 24.7 11-17 6 0.7 TOWN CREEK LOWER REACH 35.8 38.4 41.4.9 11-17 4-0 1.3 45 TOWN CREEK LOWER REACH TB 38.4 37.3.9 11-17 300 0.3 35 TOWN CREEK UPPER REACH.7.2.0 42.1 11-17 999 1.1 16 MYERS BEND 45.0 47.6 47.1 45.9 11-17,1-18 999 0.5 45 DANIEL ISLAND REACH 47.1 47.8 47.3 46.6 1-18 880 1.3 45 DANIEL ISLAND BEND 39.7.0 51.6 49.1 1-18 800-700 0.5 45 CLOUTER CREEK REACH 45.6 48.4 48.3 45.2 1-18 600 1.3 45 NAVY YARD REACH 46.2 47.7 46.3 45.6 1-18 600-700 1.1 45 NORTH CHARLESTON REACH 48.2 49.3 48.8 47.0 1-18 0-600 0.9 45 FILBIN CREEK REACH 44.3 49.0.1 47.5 1-18 0 0.9 45 PORT TERMINAL REACH 44.8 48.6 48.4 47.7 1-18 600 0.7 45 ORDNANCE REACH.2.4 38.8 42.6 1-18 600 0.4 45 ORDNANCE REACH TURNING 43.0 42.2 30.4 1-18 800 0.4 45 WANDO RIVER: LOWER REACH 44.1 47.2 48.0 44.9 2-18 10-0 1.4 45 UPPER REACH 38.4.3 39.135.9 2-18 8-600 0.9 45 TURNING BASIN 42.2 47.3 47.5 49.3 2-18 5 0.7 45 SHIPYARD CREEK: LOWER CHANNEL 34.5 35.8 32.7 1-18 1300-300 0.7 45 TURNING BASIN 38.0 38.3 38.4.4 8-17;1-18 999 0.2 45 UPPER CHANNEL 8.5 16.7 18.0 16.2 10-17;1-18 200 0.6 30 COOPER RIVER: RANGE A 39.0 39.0 39.0 E37.0 6-11; 9-11 0-6 1.2 35 RANGE B 32.6 35.1 35.1 35.0 3-10; 6-11 0-700 0.9 35 A. MAINTAINED 800 FEET WIDE AT PROJECT OF 47 FEET. B. FINAL 100 FEET AND PROJECT 42 FEET. C. ONLY REPORTING 600 FEET WIDE FROM TOE OF CHANNEL. D. ONLY REPORTING 300 FEET AND OF CENTERLINE. E. 31.0 FT ALONG CHANNEL EDGE..

To accompany Notice to Mariners 4677/18 On Chart 3149 PENSACOLA HARBOR AND BAYOU CHICO CHANNELS TABULATED FROM S BY THE CORPS OF ENGINEERS - REPORT OF FEB 2018 AND OF FEB 2018 MIDDLE HALF OF CHANNEL ( PENSACOLA HARBOR BAY CHANNEL 33.0 33.0 32.7 5-17 300 2.7 33 WEST CHANNEL 26.0 26.3 26.7 5-17 300 0.8 33 EAST CHANNEL 29.4 32.2 29.5 5-17 300 1.3 33 HARBOR CHANNEL 26.9 26.9 26.5 5-17 0 0.8 33 BAYOU CHICO CHANNELS ENTRANCE CHANNEL 15.0 15.0 11.1 2-18 100 0.8 15 INNER CHANNEL 14.0 14.0 14.0 2-18 75 1.0 14 TURNING BASIN 4.9 10.3 9.0 2-18 0 0.1 14 To accompany Notice to Mariners 4680/18 On Chart 2810 BRUNSWICK HARBOR TABULATED FROM S BY THE CORPS OF ENGINEERS - REPORT OF MAY 2018 CONTROLLING S FROM SEAWARD IN FEET AT MEAN LOWER LOW WATER () DATE OF ( ST SIMONS RANGE 27.5 B34.4 35.9 24.2 0 9.7 38 PLANTATION CREEK RANGE 32.9 37.2.4.0 0 1.8-38 JEKYLL ISLAND RANGE 35.8 38.1 37.5 37.2 0 1.9 CEDAR HAMMOCK RANGE.1.7.9 34.0 0 1.4 BRUNSWICK POINT CUT RANGE 35.0 37.0.3 32.2 0 2.4 TURTLE RIVER LOWER RANGE 37.5.7 37.3 34.8 0 1.8 BLYTHE ISLAND RANGE 29.3 27.7 25.5 24.9 300 1.5 30 TURTLE RIVER UPPER RANGE 26.0 28.8 28.4 25.2 300 2.7 30 UPPER EAST RIVER ENTRANCE TO SECOND AVE 37.2 37.9 38.6 35.1 0 1.2 37 SECOND AVE TO MAYOR S POINT C34.3 35.8.6 34.0 0 1.0 EAST RIVER TURNING BASIN SOUTH BRUNSWICK RIVER (A & B) WIDENER WIDENER 11 (W11) WIDENER 12 (W12) WIDENER 13 (W13) BASIN BASIN 14 (B14) BASIN 15 (B15) BASIN 16 (B16) 28.0 24.5 A. THE SOUTH BRUNSWICK RIVER WIDENER LEAST WAS 20.7 FEET. B. EXCEPT FOR A 35 FEET OBSTRUCTION LOCATED BY A NOS OF JUL 2006 AT 31 04 15.5 N; 81 16 57.4 W. C. EXCEPT FOR A DANGEROUS WRECK LOCATED IN APPROXIMATE POSITION 31 08 49.8 N; 81 29 59.3 W. 27.1 17.4 1100 0 0.9 1.3 37