Miles PROJECT LOCATION EOP, MP STATION BOP, MP 379 STATION

Similar documents
PROJECT LOCATION & VICINITY MAP PROJECT LOCATION RAINBOW INDIAN BOP: MP LAT LONG

Baldwin Peninsula. Windmill Road. Cape Blossom EOP N W. ![ Project Location Kotzebue Cape Blossom Road DOT & PF Road

Beacon Lakes NW 122nd Ave

Information for File #MVP MVM

CITY OF WARRENVILLE MEMO

The Impacts of Changing Climate on the Local Seafood Industry

Streetscape Report Streetscape Report FALL 2017

Alaska s Economy: Then and Now

NWP Page 1 of 9 Enclosure

Minam Curve. Project Location OR82: Minam Curve Project Wallowa Lake Hwy No. 010 (OR 82) Umatilla. Wallowa

GLYNN COUNTY PUBLIC WORKS DEPARTMENT

Pacific Ocean Division. Navigation Program Overview. Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii.

Proposed Road Program. Executive Summary

Walkabout Summary Report

The Coast Guard has 145 Years of Arctic Service UNCLASSIFIED

Union Pacific Railroad

Kasaan to Goose Creek Road Project Project Description U.S. Army Corps of Engineers Permit The following table presents the mile point of the culverte

1 HAT and MLLW are referenced to the station datum for each NOAA tide station.

SNOW SURVEY SCHEDULE Speel River X X X X. *No site visit scheduled for Long Lake in winter unless repairs needed.

Limerick Metropolitan Cycle Network Study

Freshwater Fish Assessment

August 2009 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY. 6 No GSC. 13 No GSC. 20 GSC Preseason 4:30 5:30 (AG and PS only)

SNOW SURVEY SCHEDULE Speel River X X X X. *No site visit scheduled for Long Lake in winter unless repairs needed.

SNOW SURVEY SCHEDULE Speel River X X X X. *No site visit scheduled for Long Lake in winter unless repairs needed.

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

Simulating Streams Through Culverts in Mat-Su, Alaska

Attachment 6 Sensitive Areas and Habitats

Analyzing indicators for small northern places

Information for File # MVP LSP

STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER LAND USE PERMIT APPLICATION AS

APPENDIX F. Stream Crossings

Demand for Harbors, Dockage, and Other Navigational Needs for Small Boats and Commercial Fishing Vessels in Alaska

Sonic Detection and Ranging (SODAR) Data Collection and Evaluation Report

Assessment of Pre-restoration Habitat Conditions and Fish Populations in Branch Brook

City of Palmer Action Memorandum No

RE: Supplemental Information for the Donlin Gold Natural Gas Pipeline State Pipeline Right-of-Way Lease Application (ADL )

COPYRIGHTED MATERIAL. The Best of Alaska. As a child, when my family traveled outside Alaska for vacations, I often met other.

B-36

ROCKLIN COMMUNITY TRANSIT STUDY

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS

Chapter 3 Bicycle Element

U.S. Fish & Wildlife Service West Virginia Field Office 694 Beverly Pike Elkins, WV. ATTN: Project Review Request

Legend. Lower Swatara Township DAUPHIN COUNTY. 1 inch = 100 feet 02/2017. Fairview Township YORK COUNTY

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan

SOUTH MAIN STREET ROUTE 28

CONGESTION MANAGEMENT PROCESS PLAN. Bay County TPO

1.Mill Creek Watershed Summary Description and Land Use

The Emerging Arctic. A New Maritime Frontier

Aransas Pass: Channel

Estuary Park/Jack London Aquatic Center

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

NAME ALTERNATE MINIMUMS NAME ALTERNATE MINIMUMS INSTRUMENT APPROACH PROCEDURE CHARTS IFR ALTERNATE AIRPORT MINIMUMS

REVISION RECORD. Revision Number. Date Sections Affected/Reason 0 04/17/2017 Creation of Initial EAP

FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

Technical Report Culvert A Hydraulic Analysis

Thought the number of households in their community that met their harvest needs were: Between 26-50% Survey Results 2017

Inspection Modifications Recommend increasing the culvert size to a 48" squashed pipe. Discussion Board Decision

REVISION RECORD. Revision Number. Date Sections Affected/Reason 0 04/17/2017 Creation of Initial EAP

Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3

1-44. SITKA HARBOR, ALASKA (Western Channel, Crescent Bay Basin, Channel Rock Breakwaters) (CWIS NOS , 16840, 10322, 55030, 13787)

ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR )

APPENDIX L DETAILED ANALYSIS OF EAST AND LATERAL RUNWAY SAFETY AREA ALTERNATIVES ON TIDAL CHANNEL GEOMORPHOLOGY

NAVIGABLE WATERS OF THE UNITED STATES WITHIN THE SEVENTEENTH COAST GUARD DISTRICT

INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

How did you hear about this meeting?

HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10

Interim Guidance Fish Presence Absence

WATER OBSTRUCTION AND ENCROACHMENT PERMIT

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

Big Spring Creek Habitat Enhancement and Fishery Management Plans

3.7 River Navigation Affected Environment

APPENDIX A PHOTOGRAPHIC SUMMARY. RAINY RIVER PROJECT Final Environmental Assessment Report

APPENDIX B: CATALOG OF SISKIYOU COUNTY CULVERTS LOCATED ON FISH-BEARING STREAM REACHES. Prepared for the Siskiyou County Public Works Department

Post Office Box , Anchorage, AK

Legend. Figure 1 Location Map McKelvey Woods Trail Project City of Maryland Heights St. Louis County, Missouri. Proposed Trail NORTH.

Stephens Creek Culvert Replacement. CAC April 28, 2010

Detailed Model Simulation Results for Proposed Situation

Honorable City Council i. A / Richard A. Leahy, City Manager \~v Thomas E. Hansen, P.E., Public Works Director/ ;?:?-

E-3: Jurisdictional Determination Supplement Report

JUNEAU SECOND CHANNEL CROSSING WATERWAY USER SURVEY RESULTS

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

Juneau Douglas Harbor

Stream Assessment Cut-block: For: Island Timberlands Limited Partnership, Cameron Operation

CONSERVATION COMMISSION Meeting Minutes THURSDAY May 10, :00 p.m. Stoughton Police Department 26 Rose Street, Stoughton, MA 02072

62. Gulkana River, Main Fork, Middle Fork, and West Fork

Importance of un-named tributary streams to Brook Trout populations. Dr. Jonathan M. Niles Dr. Dan Ressler

TOWN OF DENNIS 10 YR COMPREHENSIVE DREDGE PERMIT SEPTEMBER 10, 2013

Seafood Industry. The 2012 Juneau and Southeast Alaska Economic Indicators 11/1/12 Page 60

Fish Passage Assessment Report Mare Brook Culverts

Initial Project Assessment DRAFT Technical Memorandum

FINAL REPORT ON THE FISHERY SURVEYS ALONG NORTHWEST ALASKAN PIPELINE COMPANY'S PROPOSED GAS PIPELINE ROUTE - DELTA JUNCTION TO THE CANADA BORDER

NWS 44: Mining Activities Location #1, Stanislaus River

MEETING CALLED TO ORDER: THOSE PRESENT: EXCUSED: GUESTS: 310 INSPECTION REPORTS ~ READY FOR DECISION:

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)

Environmental Review and Permitting for Wild Trout

Transcription:

K avik River Barrow Prudhoe Bay Kotzebue Nome Fairbanks Eagle Tok McGrath Glennallen Bethel Valdez Kenai Dillingham Homer Seward Kodiak Cold Bay Unalaska PROJECT LOCATION Haines Juneau Sitka Ketchikan Ugnuravik River Anaktuvuk River M iluveach River Sakonowyak River, MP 401.1 STATION 66+93 River Putuligayuk River (Main Channel) Kuparuk Canning River Itkillik River, MP 379 STATION 914+00 DALTON HIGHWAY Kadleroshilik River Juniper Creek Anaktuvuk River Nanushu k River LOCATION: COPPER RIVER MERIDIAN T5N R14E SECTIONS 6,7,,18,,29,32 T5N RE SECTION 1 T6N RE SECTIONS 1,2,,,24,25,36 T7N R14E SECTIONS 5,7,8,18,19,30 T8N R14E SECTIONS,28,32,33 Toolik River Lupine River G Echooka River ilead Cree k Ivishak R iver Kavik River Miles 0 25 50 0 Pogopuk Creek Sources: Esri, DeLorme, NAVTEQ, TomTom, Intermap, ipc, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster LOCATION NL, Ordnance & Survey, VICINITY Esri Japan, METI, Esri China (Hong DATE: Kong), APRIL and the GIS 15 User Community POA-15-350,

SUMMARY OF PROPOSED IMPACTS TO WETLANDS AND WATERS OF THE U.S. SUMMARY OF PROJECT IMPACTS Wetlands Below OHW Area (Acres) Fill (CY) Area (Acres) Fill (CY) Roadway Embankment MP 379-401.1 88 752,000 0 0 Culverts 0 0 0.18 572 Temporary Impacts (Work Zone + Veg Buffer) 0 0 0 0 TOTAL 248 752,000 0.18 572 *SUMMARY OF PROPOSED MATERIAL SITE IMPACTS Material Site # Wetlands Area (Acres) Volume (CY) Material Site 65-9-040-2 1.6 2,000,000 Excavation / 36,500 Fill Material Site 65-9-024-2 47.5 2,000,000 Excavation / 23,000 Fill Material Site 65-9-099-2 1.1 3,000,000 Excavation / 34,000 Fill TOTAL 265.2 SHEET SUMMARY Sheet # Name 1 LOCATION & VICINITY 2 SUMMARY OF PROJECT IMPACTS 3 TYPICAL SECTION A 4 TYPICAL SECTION B 5 TYPICAL SECTION C 6 PLAN VIEW SUMMARY 7-39 40 MS 65-9-024-2 DETAIL 41 MS 65-9-024-2 SECTION X-X' 42 MS 65-9-024-2 SECTION Y-Y' 43 MS 65-9-040-2 DETAIL 44 MS 65-9-040-2 SECTION X-X' 45 MS 65-9-040-2 SECTION Y-Y' 46 MS 65-9-099-2 DETAIL 47 MS 65-9-099-2 SECTION X-X' 48 MS 65-9-099-2 SECTION Y-Y' 49 MATERIAL SITE ACCESS ROAD TYPICAL SECTION 50 CULVERT SUMMARY 51 NON-FISH PASSAGE CULVERT DETAIL 52 FISH PASSAGE CULVERT DETAIL SUMMARY OF PROJECT IMPACTS DATE: APRIL 15 2 POA-15-350,

POA-15-350,

POA-15-350,

POA-15-350,

Detail Plan Sheets, sheets 7-39 25 24 23 26 Putuligayuk River 29 28 27 30 31 32, MP 401.1 STATION 66+93 33 34 35 36 37 38 39 (Main Channel) * MS 65-9-099-2 15 19 18 Sagavanirk tok River 14, MP 379 STATION 914+00 DALTON HIGHWAY NOTES: 7 8 9 * MS 65-9-040-2 *See Material Site 65-9-040-2, Material Site 65-9-024-2, & Material Site 65-9-099-2 Plan View Detail Sheets * MS 65-9-024-2 ** Legend Applies to Sheets 6-40, 43, & 46 Legend DALTON HIGHWAY Permanent Impact Area New Culvert MATERIAL SITE Material Site Impact Area Material Site Boundary WETLAND DELINEATION Wetlands Ponds River Barrens/Unvegetated Gravel Bar Upper Perennial Stream Uplands/Disturbed Sources: Esri, DeLorme, NAVTEQ, TomTom, Intermap, ipc, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster Lakes NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), and the GIS User Community Miles 0 5 **Legend, see Notes DATE: APRIL 15 6 POA-15-350,

950+00 940+00 Trans-Alaska Pipeline SECTION 32 930+00 9+00 36"x74' Culvert STA 914+00, MP 379 BEGIN Typical Section A 9+00 MP 379 (Main Channel, MP 379 STATION 914+00 DATE: APRIL 15 POA-15-350, 7

980+00 SECTION 29 970+00 MP 380 36"x90' Culvert 960+00 SECTION 32 950+00 (Main Channel DATE: APRIL 15 POA-15-350, 8

SECTION 30 MP 381 SECTION 19 +00 SECTION SEE MS 65-9-024-2 SHEET +00 00+00 SECTION 29 990+00 980+00 (Main Channel DATE: APRIL 15 POA-15-350, 9

36"x82' Culvert 36"x84' Culvert 50+00 40+00 SECTION 19 SECTION 30+00 MP 381 +00 (Main Channel 0 250 500 SEE MS 65-9-024-2 1,000 SHEET DATE: APRIL 15 POA-15-350,

90+00 SECTION 18 80+00 MP 382 SECTION 36"x82' Culvert 36"x0' Culvert 70+00 36"x80' Culvert 36"x9' Culvert SECTION 19 60+00 SECTION 36"x82' Culvert 36"x84' Culvert (Main Channel DATE: APRIL 15 POA-15-350,

MP 383 Trans-Alaska Pipeline SECTION 7 +00 SECTION 8 Two 48"x75' Culverts +00 36"x85' Culvert +00 SECTION 18 SECTION 10+00 90+00 (Main Channel DATE: APRIL 15 POA-15-350,

+00 +00 Four 48"x78' Culverts SECTION 7 50+00 Three 48"x83' Culverts 40+00 MP 383 +00 Trans-Alaska Pipeline Two 48"x75' Culverts SECTION 18 (Main Channel +00 DATE: APRIL 15 POA-15-350,

+00 U005N0E SECTION 1 SECTION 6 90+00 48"x80' Culvert 48"x76' Culvert MP 384 80+00 U005N0E SECTION SECTION 7 +00 +00 (Main Channel Four 48"x78' 0Culverts 250 500 1,000 DATE: APRIL 15 14 POA-15-350,

MP 385 30+00 +00 U005N0E SECTION 1 SECTION 6 +00 +00 (Main Channel DATE: APRIL 15 15 POA-15-350,

70+00 60+00 U006N0E SECTION 36 U006N014E SECTION 31 50+00 40+00 MP 385 U005N0E SECTION 1 SECTION 6 30+00 (Main Channel DATE: APRIL 15 POA-15-350,

U006N0E SECTION 25 00+00 U006N014E SECTION 30 72"x4' Culvert 90+00 MP 386 U006N0E SECTION 36 80+00 U006N014E SECTION 31 70+00 (Main Channel DATE: APRIL 15 POA-15-350,

MP 387 40+00 30+00 U006N0E SECTION 25 +00 U006N014E SECTION 30 Trans-Alaska Pipeline Two 48"x81' Culverts +00 00+00 (Main Channel DATE: APRIL 15 18 POA-15-350,

80+00 70+00 U006N0E SECTION 24 U006N014E SECTION 19 60+00 50+00 MP 387 U006N0E SECTION 25 40+00 (Main Channel U006N014E SECTION 30 DATE: APRIL 15 19 POA-15-350,

14+00 U006N0E SECTION 1400+00 MP 388 90+00 U006N0E SECTION 24 80+00 (Main Channel DATE: APRIL 15 POA-15-350,

SHEET 1450+00 MP 389 1440+00 U006N0E SECTION 1430+00 14+00 14+00 (Main Channel DATE: APRIL 15 POA-15-350,

1480+00 U006N0E SECTION U006N0E SECTION 1470+00 1460+00 SEE MS 65-9-099-2 SHEET U006N0E SECTION 14 U006N0E SECTION 1450+00 MP 389 (Main Channel DATE: APRIL 15 POA-15-350,

15+00 U006N0E SECTION 2 U006N0E SECTION 1 15+00 MS 65-9-099-2 BOUNDARY 1500+00 MP 390 U006N0E SECTION U006N0E SECTION 1490+00 1480+00 (Main Channel DATE: APRIL 15 23 POA-15-350,

1550+00 MP 391 1540+00 U006N0E SECTION 2 U006N0E SECTION 1 1530+00 15+00 (Main Channel DATE: APRIL 15 24 POA-15-350,

U006N0E SECTION 2 U007N0E SECTION 35 tion 1590+00 1580+00 U007N0E SECTION 36 1570+00 1560+00 U006N0E SECTION 1 1550+00 MP 391 (Main Channel DATE: APRIL 15 25 POA-15-350,

U007N0E SECTION 25 +00 +00 U007N0E SECTION 36 00+00 MP 392 STA 00+00, MP 392 END Typical Section A BEGIN Typical Section B 1590+00 (Main Channel DATE: APRIL 15 26 POA-15-350,

60+00 50+00 MP 393 U007N0E SECTION 25 40+00 U007N014E SECTION 30 30+00 +00 U007N0E SECTION 36 (Main Channel U007N014E SECTION 31 DATE: APRIL 15 27 POA-15-350,

00+00 MP 394 U007N0E SECTION 24 U007N014E SECTION 19 90+00 80+00 70+00 U007N0E SECTION 25 U007N014E SECTION 30 60+00 (Main Channel DATE: APRIL 15 28 POA-15-350,

Three 48"x91' Culverts 30+00 +00 U007N014E SECTION 19 +00 Trans-Alaska Pipeline 00+00 MP 394 U007N0E SECTION 24 90+00 (Main Channel DATE: APRIL 15 29 POA-15-350,

U007N014E SECTION U007N014E SECTION 60+00 U007N014E SECTION 18 50+00 MP 395 40+00 Three 48"x91' Culverts U007N014E SECTION 19 30+00 (Main Channel DATE: APRIL 15 30 POA-15-350,

1800+00 U007N014E SECTION 7 MP 396 U007N014E SECTION 8 90+00 80+00 U007N014E SECTION 18 U007N014E SECTION 70+00 60+00 (Main Channel DATE: APRIL 15 31 POA-15-350,

1840+00 1830+00 18+00 18+00 1800+00 U007N014E SECTION 7 U007N014E SECTION 8 MP 396 (Main Channel DATE: APRIL 15 32 POA-15-350,

1850+00 1860+00 1870+00 U007N014E SECTION 5 MP 397 U007N014E SECTION 8 1840+00 1830+00 (Main Channel DATE: APRIL 15 33 POA-15-350,

19+00 Tran U008N014E SECTION 32 1900+00 MP 398 1890+00 U007N014E SECTION 5 U007N014E SECTION 4 1880+00 1870+00 (Main Channel DATE: APRIL 15 34 POA-15-350,

1950+00 MP 399 1940+00 1930+00 U008N014E SECTION 32 U008N014E SECTION 33 19+00 19+00 Trans-Alaska Pipeline 1900+00 U007N014E SECTION 5 (Main Channel U007N014E SECTION 4 DATE: APRIL 15 35 POA-15-350,

1980+00 U008N014E SECTION 29 U008N014E SECTION 28 1970+00 STA 1970+00, MP 399.4 END Typical Section B BEGIN Typical Section C 1960+00 U008N014E SECTION 33 U008N014E SECTION 32 1950+00 MP 399 1940+00 (Main Channel DATE: APRIL 15 36 POA-15-350,

+00 MP 400 U008N014E SECTION 28 00+00 Two 48"x0' Culverts One 84"x5' Culvert 1990+00 1980+00 (Main Channel DATE: APRIL 15 37 POA-15-350,

U008N014E SECTION 50+00 U008N014E SECTION 40+00 30+00 +00 U008N014E SECTION 27 U008N014E SECTION 28 +00 (Main Channel DATE: APRIL 15 38 POA-15-350,

U008N014E SECTION U008N014E SECTION 15 U008N014E SECTION 66+93 U008N014E SECTION, MP 401.1 STATION 66+93 STA 66+93, MP 401.1 END Typical Section C 60+00 MP 401 50+00 (Main Channel DATE: APRIL 15 39 POA-15-350,

SECTION 28 40+00 MS 65-9-024-2 BOUNDARY TRANS-ALASKA PIPELINE *Y BUFFER MINING *Y' SECTION 19 SECTION 30+00 DALTON HIGHWAY STAGING & STOCKPILING SECTION ACCESS ROAD MP 381 +00 BUFFER MINING +00 SECTION 30 *X *X' 00+00 NOTES: *See MS 65-9-024-2 Section X-X' and Y'Y' Details Sheets SECTION 29 990+00 MS 65-9-024-2 IMPACTS *Area (Acres) Volume (CY) Total In Wetlands In wetlands Mining 66 41 2,000,000 Excavation Staging and Stockpile 6 5.7 18,000 Fill Access Road 2 0.8 5,000 Fill TOTAL 74 47.5 MP 385 MP 390 DALTON HIGHWAY MP 395 980+00 MP 400 MS 65-9-024-2 BOUNDARY 0 500 1,000 2,000 MP 380 DATE: APRIL 15 MS 65-9-024-2 DETAIL POA-15-350,

POA-15-350,

POA-15-350,

MS 65-9-040-2 BOUNDARY *Y U004N014E SECTION U004N014E SECTION BUFFER TRANS-ALASKA PIPELINE BUFFER MINING DALTON HIGHWAY STAGING & STOCKPILING *X *X' ACCESS ROAD U004N014E SECTION 28 U004N014E SECTION 27 MS 65-9-040-2 BOUNDARY *Y' MP 374 NOTES: *See MS 65-9-040-2 Section X-X' and Y'Y' Detail Sheets MS 65-9-040-2 IMPACTS *Area (Acres) Volume (CY) Total In Wetlands In wetlands Mining 5 82 2,000,000 Excavation Staging and Stockpile 18 18 30,000 Fill Access Road 4 1.6 6,500 Fill TOTAL 147 1.6 DALTON HIGHWAY MP 385 MP 390 MP 395 MP 400 0 500 1,000 2,000 MP 375 MP 380 DATE: APRIL 15 MS 65-9-040-2 DETAIL POA-15-350,

POA-15-350,

POA-15-350,

U006N0E SECTION 2 15+00 DALTON HIGHWAY *Y MS 65-9-099-2 BOUNDARY U006N0E SECTION 1 1500+00 MP 390 BUFFER 1490+00 U006N0E SECTION ACCESS ROAD 1480+00 STAGING & STOCKPILE U006N0E SECTION BUFFER *X' BUFFER MINING *X 1470+00 NOTES: See MS 65-9-099-2 Section X-X' and Y-Y' Detail Sheets 1460+00 MS 65-9-099-2 IMPACTS *Area (Acres) Volume (CY) Total In Wetlands In wetlands U006N0E Mining 0 98 U006N0E 3,000,000 Excavation Staging SECTION and Stockpile 14 18 SECTION 33,000 Fill Access Road 0.2 0.1 1,000 Fill TOTAL 1.2 1.1 MP 380 MP 385 MP 390 DALTON HIGHWAY MP 395 1450+00 MP 400 MP 389 MS 65-9-099-2 BOUNDARY *Y' 0 500 1,000 2,000 DATE: APRIL 15 MS 65-9-099-2 DETAIL TRANS-ALASKA PIPELINE POA-15-350,

POA-15-350,

POA-15-350,

POA-15-350,

CULVERT SUMMARY LOCATION CULVERT DIAMETER CULVERT LENGTH IMPACTS TO WATERS OF THE U.S. (Below OHW) COMMENTS MILEPOST STATION (IN) (FT) **AREA (SQ FT) FILL (CY) 379 915+66 36 74 153 See Non-Fish Passage Culvert Detail 379.8 960+05 36 90 153 See Non-Fish Passage Culvert Detail 381.6 381.9 382 51+95 65+42 77+66 36 36 36 84 9 0 153 153 153 See Non-Fish Passage Culvert Detail See Non-Fish Passage Culvert Detail See Non-Fish Passage Culvert Detail 52+42 66+.7 78+36 36 36 36 82 80 82 153 153 153 See Non-Fish Passage Culvert Detail See Non-Fish Passage Culvert Detail See Non-Fish Passage Culvert Detail 382.6 19+18.8 36 85 153 See Non-Fish Passage Culvert Detail 382.9 25+29.5 48 75 272 See Fish Passage Culvert Detail 25+35.5 48 75 272 See Fish Passage Culvert Detail 45+79 48 83 272 See Fish Passage Culvert Detail 383.3 45+89 48 83 272 See Fish Passage Culvert Detail 45+95 48 83 272 See Fish Passage Culvert Detail 55+69 48 78 272 See Fish Passage Culvert Detail 383.4 55+75 48 78 272 See Fish Passage Culvert Detail 55+87.5 48 78 272 See Fish Passage Culvert Detail 55+93.5 48 78 272 See Fish Passage Culvert Detail 384.1 88+18 48 76 272 See Non-Fish Passage Culvert Detail 88+36 48 80 272 See Non-Fish Passage Culvert Detail 386.1 95+44 72 4 6 45 See Fish Passage Culvert Detail 386.5 14+79.7 48 81 272 See Non-Fish Passage Culvert Detail 14+86 48 81 272 See Non-Fish Passage Culvert Detail 35+99 48 91 272 See Fish Passage Culvert Detail 394.9 36+06 48 91 272 See Fish Passage Culvert Detail 36+14 48 91 272 See Fish Passage Culvert Detail 1997+80.8 48 0 272 See Fish Passage Culvert Detail 399.9 1997+88.5 84 5 833 62 See Fish Passage Culvert Detail 1997+96.3 48 0 272 See Fish Passage Culvert Detail TOTAL: 7718 572 1. Culvert Impact Areas are included in the 'Permanent Impact Area' boundary shown on sheets 6-38. 2. Culvert locations and dimensions are approximate and may be adjusted to fit existing drainage features. CULVERT SUMMARY DATE: APRIL 15 POA-15-350,

POA-15-350,

POA-15-350,