May 4, Dear Mr. Thomas and Mr. Snyder,

Similar documents
Modest Improvements for More Bicycle-Friendly Road Projects

Bicycle Facilities Planning

DUPAGE COUNTY ON-ROAD BICYCLE CONNECTION GUIDELINES

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Duwamish Way-finding and CTR Report

Cycle Track Design Best Practices Cycle Track Sections

Draft North Industrial Area-Wide Traffic Plan

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area

PEDESTRIAN SAFETY ASSESSMENT SR 934/NORMANDY DRIVE AND 71 Street

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

Improvements Infrastructure Gap Assessment and Improvements Street Striping

NJDOT Complete Streets Checklist

Active Transportation Facility Glossary

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

City of Scotts Valley CITY COUNCIL STAFF REPORT

TO: VDoT, FDoT. CC: Cathy Hudgins, Paul Davis FROM: RA. RE: Critical intersections surrounding the Wiehle-Reston East Metro station

Transportation Planning Division

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Public Meeting #1 Comment Summary

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Ottawa Beach Road Study

City of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program

Bicycle Boulevards and Neighborhood Greenways

Why plan for bicycles?

Off-road Trails. Guidance

Appendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

Broad Street Bicycle Boulevard Design Guidelines

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

Hidden Oaks Elementary School

General Design Factors

SAFE ROUTES TO SCHOOL

Forest Hills Improvement Initiative

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Citywide Sidewalk and Crosswalk Programs

TRAFFIC IMPACT ANALYSIS

Appendix 3 Roadway and Bike/Ped Design Standards

Memorandum. Sunday, July 13, Saturday, July 19, 2014

West Circle Drive (CSAH 22) Traffic Operations Study

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

What Is a Complete Street?

Multi-Modal Traffic Analysis. Parisi and Associates

Foothill Expressway Improvements Between El Monte and San Antonio

Sharrows and Elephants and Bike Boxes!, s, Oh My!

Miller Creek Rd./Las Gallinas Ave Bicycle & Pedestrian Study Public Meeting #1. Summary of Breakout Group Comments

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Comments EXECUTIVE SUMMARY

St. Francis Drive through the City of Santa Fe Corridor Study

Small Town & Rural Multimodal Networks

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

LINCOLNWOOD POLICE DEPARTMENT

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

Table 3. Summary of Proposed Roadway and Intersection Improvements. Suggested Sponsoring Agency Township Deficiency Noted

Meadow Woods Elementary School

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

ACTION TRANSMITTAL No

Corydon-Osborne Neighbourhood Plan Recommendations

Bowman-Melton Associates, Inc. june 2011

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

On-Street Bicycle Facilities

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

Carbondale to Murphysboro Bike Route JACKSON COUNTY

Central Avenue Bikeway Traffic and Safety Impact Assessment

Introduction Additional Safe Routes to School Resources Main Street Elementary School Survey Results Field Audit...

Appendix C. Bicycle Route Signage

DRAFT Santa Fe MPO Bicycle Master Plan, March 2012, Appendix 11, p Appendix 11: Best Practices and Emerging Practices

Emergency Response Support Signage on Multi-Use Trails Plan

SCHOOL ROUTE PLAN. For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY. Prepared for:

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Rank #1 Highest Priority Intersection

Safe Routes to School Action Plan Aberdeen, Idaho

WEDNESDAY, SEPTEMBER 6, :00 PM City Council Chambers, 1 Civic Center Drive, San Marcos, CA 92069

This page intentionally left blank.

CITY OF SARATOGA SPRINGS PEDESTRIAN CROSSING TOOLBOX

C C C

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

2012 Capital Budget Capital Improvement Program

5. RUNNINGWAY GUIDELINES

TABLE OF CONTENTS. Executive Summary

Transportation Corridor Studies: Summary of Recommendations

Traffic Signs and Signals

MEMORANDUM. Discussion of the planned crosswalk improvement on Mount Vernon Road near Stratham Drive

Tuesday, September 25 th Mount Holly Municipal Complex 400 East Central Avenue 5:30pm to 7:30pm. Activity Stations o Where do you Live?

DRAFT Sellwood Bridge Existing Roadway Deficiencies

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

G AT E WAY PLAN. Community BRIEFING KIT GATEWAY BIKE

TOWN OF IRONDEQUOIT ACTIVE TRANSPORTATION PLAN

Blair/Williamson Intersection Expressed Needs

Route 28 Critical Locations Bicycling Network Connectivity November 2017

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Transcription:

Daniel Thomas, Principal Planner Christopher Snyder, County Engineer DuPage County Division of Transportation 421 N County Farm Road Wheaton, IL 60187 May 4, 2016 Dear Mr. Thomas and Mr. Snyder, On behalf of our members and other bicyclists we represent, thank you for the opportunity to review upcoming DuPage County DOT road projects for impacts on bicyclists and pedestrians. First, we want to express our appreciation for several trail projects on your list, including the extension of the Great Western Trail west to Sassafras Drive in West Chicago, construction of segments 13 and 14A of the East Branch DuPage River Trail, realignment of the Illinois Prairie Path from Eola Road to the Batavia Spur to avoid the EJ&E/CN railroad crossing, and addition of a sidewalk on 63 rd Street from Woodridge Drive to Janes Avenue. The county s fine work on trails and Healthy Roads Initiative projects continues to add to the quality of life of its residents. On the next pages are detailed suggestions for several road projects. Please consider these as the designs move forward. We would be glad to discuss further. Sincerely, Ed Barsotti Chief Programs Officer ed@rideillinois.org 630-978-0583

31st Street at IL 83 (part of IL 83 Jorie project) Recommended: Bring the sidepath trail s crossing closer to 31st for better visibility as part of the intersection but maintain the perpendicular crossings. Move the right turn lane out further to allow for a larger corner island, and use this island in the sidepath crossing. Doing so also isolates turning motion conflicts and allows sidepath users to cross to the island during westbound 31st turns onto southbound IL83 thus avoiding conflicts with eastbound 31st right-turners when the signal turns to green. Provide good visual delineation for the crossing, perhaps using continental crosswalks. Recommended: Bring the sidepath trail s crossing closer to 31st. Try to cross the right-turn lane more perpendicularly. Continue to use a corner island in the sidepath crossing. Refresh the zebra/diagonal crosswalk or go to continental style.

31st Street at Jorie (part of IL 83 Jorie project) Recommended: Maintain this crossing as shown, perhaps extending the center median closer to 31st to include the sidepath trail crossing. Recommended: Nicely-designed crossing in terms of crosswalk style, use of a right-corner island where a right -turn lane is present, and nearly-perpendicular crossing of the right-turn lane. Maintain these characteristics, but smooth out the crossing through the center median s ramp nose.

Warrenville Road over East Branch DuPage River Recommended: This bridge replacement is an opportunity to advance both: 1) the East Branch DuPage River Greenway Trail, a high priority in the 2008 DuPage County Regional Bikeway plan; and 2) a trail connection between Lisle and the Arboretum. Please investigate a potential trail underpass of Warrenville Road on the west bank of the river, along with a connection to Arboretum Woods Park and a loop up to the road for a 2-way trail crossing using the new bridge (ala Ferry Road over the West Branch). Such an underpass would remove the greatest barrier on a proposed trail north from Lisle, and be a much better and safer option than a trail along IL53 and its complicated intersections at Warrenville Rd and I-88. If going under Warrenville Road on a west bank trail is not possible, a considerably lesser option but still a plus would be an at-grade crossing immediately west of the river, requiring a wider bridge with a median refuge island and (preferably) demand-actuated Rapid Rectangular Flashing Beacons for the crossing. Such an island now exists right by Warrenville Road s I-88 underpass, but sightlines are too poor. Warrenville Road itself is a very popular bike route, especially with regular commuters and club-level cyclists. Most of this audience is better served with (consistent) bike lanes or 4+ paved shoulders on both sides of the street. Others, and pedestrians, may be served with a sidepath trail or merely a sidewalk on one or both sides. Over its length, Warrenville Road has many variations in its bike/ped accommodations. The removal of some shoulders in the past two decades (by Mill/Ferry, also near Freedom Dr and Naperville Rd) has been a point of frustration for many cyclists. For this bridge project and any further work on Warrenville Road, we ask that paved shoulders or bike lanes be maintained and/or added, along with an off-road accommodation on at least one side.

87th Street at Woodward Recommended: Add right-turn corner islands. Priorities are the northeast and southeast corners, due to the sidepath trail crossing. Adding these will isolate turning motions faced by bike/ped sidepath users, and reduces natural conflicts such as one between northbound motorists turning right and northbound bike/ped sidepath users crossing 87th. Corner islands bring the crossing closer to Woodward, improving visibility. Traffic operations can be helped with shorter crossing distances.

County Farm Rd S-Curve Project Recommended: As part of this IDOT Highway Safety Improvement Program project, please also improve the safety of pedestrians and off-road cyclists by closing the important sidewalk gaps there. A short sidewalk link connecting a west sidewalk (or sidepath trail) to Church Road would be helpful, too as evidenced by the desire line worn there already.

75th Street at Fairview Ave (part of Lyman-Adams project) Recommended: Top priority Bring sidepath trail and sidewalk crossings of Fairview closer to 75th Street. These are now too far back, at unrealistic locations to expect motorists to stop. Also, right-corner islands would improve any of the corners, although the northeast and southeast corner are higher priority due to the sidepath trail crossing. 75th Street at Fairmount Recommended: At many intersections and other entrances, the sidewalk is brought close to the parallel road. This improves visibility and prevents bicyclists and pedestrians from being blocked or having to pass through a queue of cars dangerous from a visibility standpoint. Other crossings, however, are too far back and placed behind the stopline. If there is an opportunity to correct this, it would help.

Naperville Rd at Diehl (part of Diehl- Ogden project) Recommended: Add a crosswalk across the north face of the intersection. It is unrealistic to expect that a sidewalk user will spend several minutes to cross the other three faces of the intersection. Recommended: Add on-road bicycle detection if westbound Diehl at Naperville is a demand-actuated stoplight. Various methods are available. Depending on how this is done, MUTCD-approved pavement markings and accompanying, explanatory signage may be needed to supplement a detector.