DECISION MEMO. Pursuant to 36 C.F.R (e), the following persons are exempted from this order:

Similar documents
Korell Outfitter and Guide Special-Use Permit Amendment

Mount Snow Disc Golf Course and Mountain Bike Race Course Project

Chagrin River TMDL Appendices. Appendix F

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Black Sturgeon Regional Plan

ENFIELD BOARD OF EDUCATION ENFIELD, CONNECTICUT

Administrative Action. Programmatic Categorical Exclusion (Pursuant to the National Environmental Policy Act (42 USC 4332(2)(c)))

Wild Virginia and Heartwood first raised this issue at the May 19, 2014 public meeting.

Maryland Chapter Trout Unlimited Brook Trout Conservation Effort

Amendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December Grand Valley Ranger District

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

Example Applications

FISHERIES BLUE MOUNTAINS ADAPTATION PARTNERSHIP

What is a River Basin Restoration Priority? 1. Criteria for Selecting a Targeted Local Watershed (TLW) 2. Hiwassee River Basin Overview 3

Road Design Guidelines for Low Impact to Hydrology *

FOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

Description of Road Management Objectives, Existing Use, and Proposed Use:

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page

Special education/504 students shall be adjudged on an individual basis, in accordance with their Individual Education Plans (IEPs)/504 Plans.

Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019

107 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Trout Buffer Variance

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME

La Crescent Township Zoning Ordinance

Current Wild Trout Classification Overview and Listing Process

Executive Summary. Map 1. The Santa Clara River watershed with topography.

Klamath Lake Bull Trout

Catlow Valley Redband Trout

Watershed Restoration Plan for the Hiwassee River Basin

Levels, and Road Uses

WFC 10 Wildlife Ecology & Conservation Nov. 29, Restoration Ecology: Rivers & Streams. Lisa Thompson. UC Cooperative Extension

IMPLEMENTING REGULATIONS OF THE WILDLIFE CONSERVATION LAW. Authorized by the Republic of China Wildlife Conservation Law, amended October 29, 1994.

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

Implementing the New Fisheries Protection Provisions under the Fisheries Act

Western Pocono Chapter. Trout Unlimited. 67 West Butler Drive fc ^

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

Western native Trout Status report

Sixty-Day Notice Of Intent To Sue For Clean Water Act Violations By Suction Dredge Mining On Salmon River Without A Permit

Aquatic Biological Assessment. Lassen 15 Restoration Project. Modoc National Forest Warner Mountain Ranger District

National Oceanic and Atmospheric Administration. Notice of Intent to Prepare an Environmental Impact

APPLICANT: Pacific Northwest National Laboratory Attention: Mr. Charles Brandt 1529 West Sequim Bay Road Sequim, Washington 98382

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

Endangered Species Act and FERC Hydroelectric Projects. Jeff Murphy & Julie Crocker NHA New England Meeting November 16, 2010

FOREST SERVICE MANUAL

'30"W '25"W 82 43'20"W 94B 94C 94C1 56 NOLICHUCKY

145 FERC 62,070 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Upper Iroquois River atershed Management Plan

Trail Proposal #1; May 14, 2005

Brook Trout in Massachusetts: A Troubled History, A Hopeful Future

What was the historic coaster fishery like?

Environmental Review and Permitting for Wild Trout

Fisheries Management Zone 10:

Interim Guidance Fish Presence Absence

Case 1:15-cv EGS Document 52-7 Filed 04/14/17 Page 1 of 7. Exhibit 7

REPORT TO THE MINISTER OF NATURAL RESOURCES. Pursuant to an appointment made by the Honourable Frank S. Miller, Minister of Natural

Assessing Ecosystem Impacts from Road Stream Crossings through Community Involvement

Mining & Petroleum Focus Group Southern Rocky Mountain Management Plan. Synopsis of Focus Group Key Issues

Unassessed Waters Initiative ( )

Description of Road Management Objectives, Existing Use, and Proposed Use:

Wildlife Introduction

CERTIFIED MAIL RETURN P.O. Box 710. RECEIPT REQUESTED Tucson, AZ NUMBER:

Definitions as used in this Subchapter:

SUBJECT: Provision of Fish or Gametes from the Provincial Fish Culture Program

MINISTRY OF ENVIRONMENT ENVIRONMENTAL STEWARDSHIP DIVISION FISH AND WILDLIFE BRANCH. Horsefly River Angling Management Plan

Know Your River Conwy Salmon & Sea Trout Catchment Summary

San Lorenzo Valley Water District, Watershed Management Plan, Final Version Part I: Existing Conditions Report

Nebraska National Forests and Grasslands Bessey Ranger District Motorized Trail Width Project

Forest Service Travel Management Rule Status and Directives NOHVCC/NAOPM Conference Houston, TX March 26, 2009

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

California Steelhead: Management, Monitoring and Recovery Efforts

Endangered Species on Ranches. Nebraska Grazing Conference August 14 15, 2012

Regional School District #19 Transportation Policy

Proposed Shuswap River Boating Regulations Open House

Access Fund Comments to Zion National Park Backcountry Management Plan/Environmental Assessment

states and is considered an important asset to conservation and management actions.

Eastern Brook Trout. Roadmap to

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca

Spring-run Chinook Salmon Reintroduction Experimental Population Designation Elif Fehm-Sullivan National Marine Fisheries Service

FOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

Warner Lakes Redband Trout

Outline. 1. Overview 2. Population 3. Flooding 4. Land Use 5. References. Overview

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

Resources and Guidance for writing a River Herring Management Plan

Lake Tahoe Shoreline Plan. 05 Policy Topic: Piers- Fish Habitat, Design, and Scenic Issues

CT EXPANSION PROJECT SILT FENCE DESIGN CRITERIA AND METHODOLOGY CONNECTICUT LOOP. Submitted by:..

IC Chapter 34. Nongame and Endangered Species Conservation

CHAPTER 6 10/29/2018 Clean Version REGULATING PIERS, WHARVES, MOORING BUOYS, SWIMMING RAFTS AND INFLATABLES ON ROCK LAKE

U.S. Fish and Wildlife Service Native American Crosscut Funding

Estimated on-the-ground start and end dates: 1 June October 2018

ADDENDUM I TO AMENDMENT 3 OF THE INTERSTATE FISHERY MANAGEMENT PLAN FOR WEAKFISH

Chemical and Biological Recovery from Acidic Deposition in the Honnedaga Lake Watershed

3.9 Recreational Trails and Natural Areas

Massachusetts Stream Crossing Case Studies

Accommodating Pedestrians in the Work Zone

Engineering Report: Apache-Sitgreaves National Forests. Black Mesa Ranger District. Analysis of. National Forest System Roads (NFSRs) #s 504 & 169

TABLE OF CONTENTS LEGAL NOTICE

Chapter 1: Introduction

Searsville Dam Removal

Elko County Wildlife Advisory Board 571 Idaho Street, Room 105, Elko, Nevada Phone Fax

Transcription:

DECISION MEMO Forest Supervisor s Orders for the Upper Tellico Off-Highway Vehicle System USDA Forest Service Southern Region Nantahala National Forest Tusquitee Ranger District Cherokee County, North Carolina DECISION I have decided to put into force a Forest Supervisor s Order for the Upper Tellico Off-Highway Vehicle (OHV) System on the Tusquitee Ranger District of the Nantahala National Forest. This decision is based on information gathered during site-specific condition surveys and comprehensive environmental analysis conducted from October 2007 through January 2009, and on public comments received during scoping of a proposed action for the long term management of the System. The Order implements the following management measures: Pursuant to 36 C.F.R. 261.50 (a) and (b) and in accordance with 36 C.F.R. 212.52, the following acts are prohibited on the entire length of all National Forest System Trails and Roads located within the Upper Tellico OHV Trail and Road System, with exception of Trail TRUT- 1/NFSR 420-1, NFSR 402 and that portion of Trail TRUT 2/NFSR 420-2 traversing from NFSR 402 to Jenks Gap, which will all remain open for use by registered, street legal motor vehicles only as further described on the Upper Tellico OHV Trail System Map. This closure is effective from April 1, 2009 until March 31, 2011, or earlier if the order is officially terminated by the Forest Supervisor. Possession or use of a motorized vehicle on a road or trail within the Upper Tellico OHV Trail and Road system, which is closed by sign, gate or barricade. 36 C.F.R. 261.54 (a) and (e) and 36 C.F.R. 261.55 (a) and (b). Pursuant to 36 C.F.R. 261.50 (e), the following persons are exempted from this order: 1. Persons with a permit from the authorized Forest Service Officer specifically authorizing an otherwise prohibited act or omission. 2. Owners or lessees of land accessed by the specified trails are exempt from the prohibitions listed above to the extent necessary to gain access to their land. 3. Any Federal, State or local officer or member of an organized rescue or firefighting force working in the performance of an official duty. 1

PURPOSE AND NEED FOR THE ACTION The purpose of this temporary, emergency closure is to provide short-term resource protection for the Upper Tellico watershed, while allowing time to complete environmental analysis, public review and comment prior to implementation of a forthcoming long term management decision. Direction in the Land and Resource Management Plan for the Nantahala National Forest (Amendment 5, 1994) identifies the lands within the Upper Tellico OHV Area as existing in Management Areas 1B and 2C and 4D. The description for these management areas state These lands are managed to provide opportunities for public enjoyment of the Forest through motorized recreation driving for pleasure in conventional and four-wheel-drive vehicles as well as machines commonly classified as ORV s. While these uses will be encouraged on appropriate roads and trails, use will not be allowed to damage the Forests environment. (MA 1B, p. III-57). Also, Provide opportunities for vehicles commonly classified as ORV s on designated routes primarily within designated ORV areas... if such use does not adversely affect other resources. (MA 2C, p. III-67). Also, Maintain roads to accommodate the intended use and to protect resources. Identify where existing designated four-wheel drive ways do not meet water quality standards and develop strategies to bring them into compliance. (MA 4D p III-88 ) These actions are needed to correct ongoing impacts to area waters and aquatic resources caused by sediment from the Upper Tellico road and trail system. In October and November of 2007 and March of 2008, the Forest Service conducted comprehensive condition surveys of the entire Upper Tellico OHV System. Additional survey and analysis conducted during the remainder of 2008 found numerous problems with the trail system in its current configuration. These are discussed in detail in the Upper Tellico OHV System Environmental Analysis. Some of the key findings include: Forest Plan standards for soil and water are being violated. The Nantahala and Pisgah Land and Resource Management Plan (the Forest Plan or LRMP) standard for soil and water management states: Prevent visible sediment from reaching perennial and intermittent stream channels Comprehensive field surveys conducted in 2007 and 2008 revealed 2000 sources of visible sediment along the 39-mile trail. This represents over 50 points of visible sediment for each mile of trail. One third of the 2000 sources of visible sediment are reaching the Upper Tellico River and its tributaries. Six miles of the trail are within 100 feet of streams and 1.7 miles are within 25 feet of streams. 2

Best management practices are currently failing. Best management practices (BMPs) include 2000 trail drainage features- waterbars, broad-based dips, grade sags, ditches, cross drain culverts, outsloping, and sediment traps. Less than half of the trail drainage features are functioning properly. Poorly designed, located, and maintained drainage features coupled with excessive use has resulted in significantly deteriorated travel-ways to the point that regular road or trail BMPs are no longer adequate to protect trails from erosion and stream channels from sedimentation. BMPs are not sustainable due to severely erosive soils and heavy rainfall. The area receives greater than 80 inches of rainfall per year with the wettest period occurring during the winter months. All trails on the system are classified as severe hazard by the Natural Resources Conservation Service (NRCS). A rating of severe indicates that erosion of the trail is expected, the trail requires frequent maintenance, and costly erosion control measures are needed. About 75,000 tons of soil has eroded from the existing trail system since the old logging transportation system was put in place. The effectiveness of the BMPs is continuously compromised due to the sheer number (2000) that must receive very frequent maintenance due to the severe soils and heavy rainfall. It is virtually impossible to remove the water from deeply entrenched trail sections using standard road and trail engineering or drainage structures. If the trail becomes worn down to bedrock it may also expose springs that add to water flow and thus potential sedimentation. Several trail sections on the OHV system exhibit this deeply entrenched condition, making it difficult to manage the runoff without closure and rehabilitation. The trails are highly susceptible to damage from traffic during the winter months when the soils are moist and experience frequent freezing and thawing. North Carolina standards for turbidity are being exceeded. In 1991, the North Carolina Wildlife Resources Commission classified the Tellico River as Wild Trout Waters. The state of North Carolina s standard for turbidity states, the turbidity in the receiving water shall not exceed 10 NTU in streams, lakes, or reservoirs designated as trout waters Compliance with this turbidity standard can be met when land management activities employ BMPs BMPs must be in full compliance with all specifications governing the proper design, installation, operation and maintenance of such BMPs. Turbidity measurements from the Tellico River have been recorded up to 370 NTU at the state line during storm events. During a run-off event occurring on March 4, 2008, the 10 NTU state standard was exceeded in virtually all surveyed streams. 3

Brook trout habitat is being negatively affected. Improving brook trout habitat is a Forest Plan standard. All streams within the Upper Tellico River watershed are suitable for brook trout. There are elevated fine sediment deposits in the Tellico River and its tributaries compared to nearby reference streams that are not impacted by the trail system. Brook trout spawning is reduced by increases in fine sediment deposits. Toxicity tests near three high challenge areas show elevated levels of petroleum products. Research has shown that these toxic substances can inhibit reproduction and recruitment of fish populations. The Forest Service has no control over the effects of droughts, floods, geology, or acid deposition within the Upper Tellico River watershed that may affect brook trout. As land managers however, we can reduce the human induced sedimentation from the trail system and thus eliminate an environmental stressor and provide the greatest opportunity for long-term persistence of brook trout within the watershed. Forest Plan direction regarding level of challenge is being exceeded. The Forest Plan direction for all OHV trails on the National Forests in North Carolina calls for providing easy to moderate levels of challenge. Several trails on the Upper Tellico system provide a high degree of challenge and do not meet the Forest Plan direction. Forest Plan direction regarding trail density is being exceeded. The Forest Plan direction calls for providing approximately two miles per square mile of OHV trails. The current system is currently over four miles per square mile. The Forest Plan would need to be amended to allow a higher density for the Tellico OHV area. The Proposed Action is needed to implement immediate resource protection measures. These trails have been identified as contributing sediment to the Tellico River system. The closure will protect the Upper Tellico watershed from further resource degradation while allowing time to complete environmental analysis, public review and comment prior to implementation of a long term management decision. The actions will be implemented pursuant to 36 C.F.R. 261.50 (b) which states, The Chief, each Regional Forester, each Experiment Station Director, the Administrator of the Lake Tahoe Basin Management Unit and each Forest Supervisor may issue orders which close or restrict the use of any National Forest System road or trail within the area over which he has jurisdiction. In addition, these actions are being executed in accordance with 36 C.F.R. 212.52. 4

REASONS FOR CATEGORICALLY EXCLUDING THE DECISION These actions do not individually or cumulatively have a significant effect on the quality of the human environment, and therefore, are categorically excluded from documentation in an environmental impact statement (EIS) or an environmental assessment (EA). The specific category, identified in Forest Service Handbook 1909.15 Environmental Policy and Procedures is Section 31.12 Category 1: Orders pursuant to 36 CFR Part 261 Prohibitions to provide shortterm resource protection or to protect public health and safety. FINDING OF NO EXTRAORDINARY CIRCUMSTANCES No extraordinary circumstances exist that warrant further analysis and documentation in an EA or EIS. The District interdisciplinary team screened these actions for the presence of any one of the extraordinary circumstances identified in Amendment No. 1909.15-2008-1 to Forest Service Handbook 1909.15. Section 30.4 lists the following resource conditions that were considered: Federally listed threatened or endangered species or designated critical habitat, species proposed for Federal listing or proposed critical habitat, or Forest Service sensitive species; Flood plains, wetlands, or municipal watersheds; Congressionally designated areas, such as wilderness, wilderness study areas, or national recreation areas; Inventoried roadless areas; Research natural areas; American Indians and Alaska Native religious or cultural sites; Archaeological sites, or historic properties or areas. SCOPING AND PUBLIC INVOLVEMENT The purpose of scoping is to determine the issues and concerns related to the proposal. Public involvement on the proposed action for long term management of the Upper Tellico OHV System began on June 9, 2008 when a letter was mailed and emailed to groups and individuals known to be interested in management of the Upper Tellico OHV Area. On June 28, 2008, during the scoping period, a public open house was held in Murphy, NC, with approximately 87 participants. Approximately 1500 responses from individuals, groups, organizations and other government agencies were received by mail, emailed, phoned in or by personal visit to the District office. These responses conveyed numerous issues, and are summarized in the Response to Public Comments, in the Upper Tellico OHV Project file. In the 30 day scoping period, newspaper articles were published in the Asheville Citizen-Times, The Cherokee Scout, and the Clay County Progress. A draft of this Closure Order was released to the public on February 27, 2009, concurrent with the Notice and Comment Period for the Environmental Assessment for the Upper Tellico OHV Project. The public was invited to submit comments concerning the Closure Order. Numerous comments specifically addressing the proposed closure order were received. Most were 5

submitted with comments related to the preferred alternative for long term management. Those supporting the Forest Supervisor s preferred alternative for long term management tended to be supportive of the temporary closure as a necessary step toward restoration of the area. Those opposing the preferred alternative tended to be critical of the temporary closure. Primary concerns included the impact on the local economy, the potential need for individuals to cancel planned trips to the area, and cancellation of scheduled events in the Upper Tellico OHV System (for which the agency had not issued event permits). Few (less than ten) comments were received from local area businesses. Some comments expressed a concern that the emergency temporary closure indicated a predecisional selection of alternative for the long term management of the OHV System. This decision is independent of any future decisions related to long term management of the OHV System. This decision may impact specific individuals who plan to visit the Upper Tellico OHV System vicinity; however, I have determined that the findings in the Purpose and Need section of this document compel implementation of this order. FINDINGS REQUIRED BY OTHER LAWS Forest Plan Consistency The actions in this decision are consistent with the Land and Resource Management Plan for the Nantahala and Pisgah National Forests (Forest Plan) and all Amendments to the Forest Plan. Endangered Species Implementing the actions in this decision will not adversely affect threatened or endangered species, or result in loss of any other species viability, or create significant trends towards Federal listing of the species under the Endangered Species Act. Cultural Resources The actions in this decision will not adversely affect any sites listed, or eligible for listing, in the National Register of Historic Places, nor will they cause the loss or destruction of significant scientific, cultural or historic resources. NOTICE, COMMENT AND APPEAL OPPORTUNITIES These actions are not subject to legal notice and opportunity to comment (36 CFR 215.4(a)). This decision is not appealable (36 CFR 215.12(f)). /s/ Marisue Hilliard MARISUE HILLIARD Forest Supervisor National Forests in North Carolina 3/31/09 DATE 6