Manual Series I UT3030, UT5036, UT5042 & UT5052 (S/N KA1096A-) Rolling Spike Update Ultra-Till (Disc & Coulter) Manufacturing, Inc.! Read the operator s manual entirely. When you see this symbol, the subsequent instructions and warnings are serious - follow without exception. Your life and the lives of others depend on it Cover illustration may show optional equipment not supplied with standard unit. Copyright 2007 Printed 03/14/2007 578-040M
Great Plains Manufacturing, Inc. Corporate Office: PO. Box 5060 Salina, Kansas 67402-5060 USA
Instructions for the Rolling Spike Update Start out by raising machine all the way up and install cylinder transport lock on transport cylinders. Identify the appropriate gangs to be reworked by comparing the updated machine layout drawing with your existing gang arrangement. Determine which gangs need feathering wheels and which gangs need blank spools. Arrange the new parts around the machine gangs as shown in the update layout drawing. Use a ratchet strap (15) or chain to hold one end of rolling spike gang up to rolling spike tube (1). Do one end at a time so you do not have to drop whole gang assembly from machine. Drive the spirol roll pin out of 1 1/2 slotted hex nut (2) on end of rolling spike gang bolt (3). Remove slotted hex nut (2) and machine washers (4) from rolling spike gang bolt (3), then remove 5/8 hex nut (5) and 5/8 lock washer (6) from 5/8 u- bolt (7). Slide bearing hanger and bearing flange (8) off end of rolling spike gang bolt (3). Remove spider wheel spacer (9) and spider wheel and replace spider wheel with feathering wheel (10) or blank spool (11). Refer to placement drawings for correct placement of updated parts. Re-assemble all the rest of the parts in the order they were taken off. Tighten 1 1/2 slotted hex nut (2) to 800-900 foot pounds. Replace spirol roll pin with 1/4 x 2 3/4 Gr. 8 hex bolt (12), 1/4 flat washers (13) and nylon lock nut (14). When you have all the updated parts installed you will need to check the placement of the assembled gangs with the placement drawings. The X dimension shows the distance from end of rolling spike tube to the leading edge of the ball joint bracket. To slide the gang assembly, loosen the appropriate u-bolts (7) or hex bolts and slide gang assembly to their proper location. Be sure and tighten all bolts when finished 03/14/2007 Ultra Till Rolling Spike Update 578-040M 1
UT3030 Machine Layout Ultra Till Rolling Spike Update 578-040M 03/14/2007 2
UT3030 Machine Layout 03/14/2007 Ultra Till Rolling Spike Update 578-040M 3
UT5036 Machine Layout Ultra Till Rolling Spike Update 578-040M 03/14/2007 4
UT5036 Machine Layout 03/14/2007 Ultra Till Rolling Spike Update 578-040M 5
UT5042 Machine Layout Ultra Till Rolling Spike Update 578-040M 03/14/2007 6
UT5042 Machine Layout 03/14/2007 Ultra Till Rolling Spike Update 578-040M 7
UT5042 Machine Layout Ultra Till Rolling Spike Update 578-040M 03/14/2007 8
UT5052 Machine Layout 03/14/2007 Ultra Till Rolling Spike Update 578-040M 9
UT5052 Machine Layout Ultra Till Rolling Spike Update 578-040M 03/14/2007 10
UT5052 Machine Layout 03/14/2007 Ultra Till Rolling Spike Update 578-040M 11
Great Plains Manufacturing, Inc. Corporate Office: PO. Box 5060 Salina, Kansas 67402-5060 USA