Module # 8 DISTILLATION AND ABSORPTION COLUMN

Similar documents
Liquid -Vapor. Contacting columns

Use equation for the cylindrical section and equation or for the ends.

2.1 Introduction to pressure vessels

ERTC PETROCHEMICAL Conference 20 st -22 nd February 2002, Amsterdam, The Netherlands

PHYS 101 Previous Exam Problems

OPENINGS AND REINFORCEMENTS 26

Homework of chapter (3)

Lecture 10 : Sewer Appurtenances

Irrigation &Hydraulics Department lb / ft to kg/lit.

MS.RAJA ELGADY/PRESSURE PAPER 3

Rolled Rotary Ball Screw

SRI Jigger Tubes System

2 Available: 1390/08/02 Date of returning: 1390/08/17 1. A suction cup is used to support a plate of weight as shown in below Figure. For the conditio

Crosby style JCE Safety Valve Installation, Maintenance and Adjustment Instructions CROSBY

CERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION

and its weight (in newtons) when located on a planet with an acceleration of gravity equal to 4.0 ft/s 2.

THIN CYLINDERS AND SHELLS

Tutorial 5 Relative equilibrium

Precision Rotary Ball Screw

. In an elevator accelerating upward (A) both the elevator accelerating upward (B) the first is equations are valid

SV5 Safety Valve Installation and Maintenance Instructions

A soft sealed atmospheric safety valve with large flow capacity and soft seat tightness for steam condenser and turbine applications

Old-Exam.Questions-Ch-14 T072 T071

3. A fluid is forced through a pipe of changing cross section as shown. In which section would the pressure of the fluid be a minimum?

1. Air is blown through a pipe AB at a rate of 15 litre per minute. The cross-sectional area of broad

Pressure Vessel-Tank Sizing

Ball Float Steam Trap UNA 43 PN 16/CL 125/JIS 10K UNA 46 PN 40/CL 150/CL 300/JIS 10K/JIS 20K DN 80, 100, 150, 3", 4", 6"

Consult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc.

Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives)

Baffles and Traps Cryotrap

SHOP WELDED TANKS STANDARD CONNECTIONS

Float valves Types SV 4, SV 5 and SV 6

Operating instructions Pitot Static Tube

Equilibrium. Observations

Integral type Differential pressure flowmeter VNT Series

PRESSURE REDUCING VALVE RP45 (EN)

CONTENTS Article NC-1000 Introduction Figures Article NC-2000 Material

Design. Pompetravaini-NSB API SB Liquid Ring Compressor for Gas Processing. Working Principle

Level 3 Cambridge Technical in Engineering 05822/05823/05824/05825/05873 Unit 3: Principles of mechanical engineering

SIMPLAIR PIPING TOOL. JXT Company

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

Dean Pump Self-Priming Chemical Process Pumps

DISTILLATION POINTS TO REMEMBER

CEE 452/652. Week 9, Lecture 2 Absorption. Dr. Dave DuBois Division of Atmospheric Sciences, Desert Research Institute

Vertical and Horizontal Bladder Tanks

Efficiency Benefits of High Performance Structured Packings

Horizontal Bladder Tanks

Restriction Orifice. Single or Multi Stage Orifice to. Reduce Pressure or. Limit the Flow Rate

PhysicsAndMathsTutor.com

Mini Channel & Fittings

MSA Confined Space Entry Equipment

for Building facilities Industrial facilities etc.,multipurpose Pilot operated type(high capacity)

Design and Analysis of Pressure Safety Release Valve by using Finite Element Analysis

Pressure reducing valves Index

The water supply for a hydroelectric plant is a reservoir with a large surface area. An outlet pipe takes the water to a turbine.

TECHNICAL CIRCULAR. Circular No: S-P 32/13 Revision: 1 Page: 1 of 7 Date:

Water Weir Flow Controller. Introduction. Safety Precautions. Mounting the Hardware

Liquefied gas cargo tanks and process pressure vessels

Serving. Petrochemicals Power Semiconductor Waste Treatment Oil & Gas Transmission Lines Bulk Gas Plants

Pump Selection and Sizing (ENGINEERING DESIGN GUIDELINE)

Serving. Petrochemicals Power Semiconductor Waste Treatment Oil & Gas Transmission Lines Bulk Gas Plants

Exam Question 9: Hydrostatics. March 6, Applied Mathematics: Lecture 8. Brendan Williamson. Introduction. Density, Weight and Volume

2. Determine how the mass transfer rate is affected by gas flow rate and liquid flow rate.

Vessel Weighing. Load Cells and Weigh Modules VPG TRANSDUCERS. Technical Note VPGT-06. Scope. Accuracy. Mode of Operation. Mechanical Considerations

Osborne Engineering Limited. OEJ Equalised thrust bearing internals

INSTRUCTION FOR THE INSTALLATION AND INSPECTION OF BELLOWS EXPANSION JOINTS JOINTS INSTRUCTIONS FOR THE INSTALLATION

Model MTB-ASME Vertical Bladder Tanks

FLUID DYNAMICS Ch.E-204 Umair Aslam Lecturer Department of Chemical Engineering

Hatch cover securing and tightness

Vertical Bladder Tanks

Model MTB-ASME Vertical Bladder Tanks

Name: SOLUTIONS MIDTERM 2, Spring 2019

Model MTB-ASME Horizontal Bladder Tanks

Serie 06-M6. Swing wafer check valve. made in. Application fields. Check valves E U R O P E WATER CONDITIONING INDUSTRY

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

CHAPTER 2 EXPERIMENTAL SETUP AND PROCEDURE

Vessel Weighing. Load Cells VPG TRANSDUCERS. Application Note VPG-06 TECH NOTE. Scope. Accuracy. Mode of Operation. Mechanical Considerations

Slide and Turn System SF35

VERTICAL BLADDER TANK

solids Rotary Valves Type ZRS

HORIZONTAL BLADDER TANK

Bioreactor System ERT 314. Sidang /2011

Position locking powerful chuck. CKL2-*-HC Series CKL2-40CS-HC CKL2-50CS-HC CKL2-63CS-HC CKL2-80CS-HC Compressed air to

CKL2 Series. Powerful chuck. Operational stroke length: 5, 6, 8, 10, 12, 16, 20, 23mm. Specifications. Switch specifications

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

CHE 306 Stagewise Operations

Design, Static Structural & Model Analysis of Water Ring Vacuum Pump Impeller

MSC Guidelines for Independent Fuel Tanks

PC3_ and PC4_ Pipeline Connectors

Rail Track. Deck. Figure 3.9 Standard Fitting and Accessories for Single Deck Roof

Structure of Mechanically Agitated Gas-Liquid Contactors

ASSIGNMENT 2 CHE 3473

Development of High-speed Gas Dissolution Device

TECHNICAL BULLETIN CRYOGENIC APPLICATION SERVICES. website:

FLUID MECHANICS Time: 1 hour (ECE-301) Max. Marks :30

ASSIGNMENT 2 CHE 3473

PTF4 Pivotrol Pump (patented) version Dual Mechanism - Pressure Powered Pump

1800C and 1800C-HC Service Regulators

POP Safety Valve. POP Safety Valve INTRODUCTION DEFINITIONS

Anderson Greenwood Series 93 Positive Pressure POSRV Installation and Maintenance Instructions

Transcription:

Module # 8 MECHANICAL DESIGN OF MASS TRANSFER COLUMN: DESIGN OF DISTILLATION AND ABSORPTION COLUMN 1. Design and construction features of column internals 1.1. Plate construction 1.2. Downcomer details 1.3. Feed inlets and side stream draws 1.4 Tray drainage 1.5 Tray manways 2. Column design specifications 3. Stresses developed in column 3.1 Axial and circumferential stresses 3.2. Compressive stresses caused by dead loads 3.3. Axial stresses due to wind loads 3.4. Analysis of stresses Joint initiative of IITs and IISc Funded by MHRD Page 1 of 14

Lecture 1: Column Construction and Internals 1. Design and construction features of column internals 1.1. Plate construction Two types of plate constructions are practiced depending on the diameter of the column: Sectional construction: The trays, downcomer segments and other tray components are usually constructed in sections for column diameter of 1 m and above. The plate sections are designed in such that it can be removed through the column manholes, preferably detachable from both above tray and tray below. The plate sections are installedusually starting from one side on a peripheral supported ring welded to inside shell wall. The support ring is not normally extended into the downcomer area and tray perforations needs to be avoided over the support ring area. Support ring width is usually between 40 to 90 mm. Trays are either clamped or bolted to the support ring. The support beamsprevent tray deflection under load for larger diameter column. One or more major beams are required for large diameter column (usually >3 m). Trays can be supported by support rings and minor beams for small diametercolumn (usually <3 m) i.e. omitting the major beams. The beams are commonly placed at about 0.6 m apart and should able to hold on the necessary weight during column operation as well as installation.the maximum plate deflection under the operating conditions should be less than 3 mm for tower diameter more than 2.5 m ([1] page 564). The number of plate sections installed under an apron and across accumulator trays is kept as minimum as possible. Clearance should be provided between the bottom of the beams and the tray below for the perpendicular installation of the beams to the liquid flow direction on the tray below (Figure 8.1) i.e. in case of cross flow. Joint initiative of IITs and IISc Funded by MHRD Page 2 of 14

Figure 8.1. Common sectional construction of plate ([1] page 561). Cartridge construction: The cartridge or stacked type plate construction is used for column diameter smaller than 1 mas in such small diameter columns man entry to the column for the installation and necessary maintenance work is difficult. Cartridge constructions are employed for sieve, valve and bubble cap trays. The cartridge assemblies of 10 plates or so, are formed with the help of screwed rods and plate spacer bars. The tall column is divided into numbers of flanged sections and the prefabricated cartridge tray assemblies are installed in each flanged sections with suitable downcomer clearance. The plates are not fixed to the shell wall and leakage may occur.avertical metal seal is frequently used around each tray to decrease leakagearound the tray edge (Figure 8.2). Joint initiative of IITs and IISc Funded by MHRD Page 3 of 14

Figure 8.2.Common plate cartridge construction ([1] page 562). Joint initiative of IITs and IISc Funded by MHRD Page 4 of 14

1.2. Downcomer details The liquid from the top tray is directed to the tray below through a downcomer or downspout. The downcomer liquid flow passage is normally formed by a vertical plate starting from the weir outlet, called an apron. The adequate residence time needs to be ensured in the downcomers for the disengagement of vapor/gas from liquid. The downcomer residence time of more than 3 s is desirable to get only clear liquid on the tray. The different types of segmental downcomers constructions are shown in Figure 8.3. The bottom downcomer area is normally more than 50% of the top downcomer area for sloped downcomers. Figure 8.3. Design of segmental downcomers: (a) vertical apron, (b) inclined apron, (c) inlet weir and, (d) recessed well ([1] page 563). Joint initiative of IITs and IISc Funded by MHRD Page 5 of 14

1.3. Feed inlets and side stream draws The feed liquid iscommonly introduced vertically downward into the downcomer of the tray above the feed point through an open pipe. A slotted branch distributor is used for of flashing feed (liquid)to avoid early flooding (Figure 8.4).The vapor is generally entered the column tangentially through anopen inlet nozzle placed almost at right angles to the liquid flow on the above tray.the clearance between the feed pipe end and feed plate below is normallykept morethan 0.4 m when the feed liquid is flashed in active tray area. Wider tray spacing is needed where the feed pipe and the side stream takeoff pipe to provide a liquid seal are installed. 1.4 Tray drainage Figure 8.4. (a) Takeoff nozzles (draw off) and, (b) Feed ([1] page 564). Some amount of liquid is usually remains trapped on a bubble cap (positive seal tray) and on certain valve trays when the column is shut down. This liquid is normally drains through weep holes located near the outlet weirs. Weep hole diameter usually ranges from 3 to 15 mm. The recommended weep hole area is 4 inch 2 per 100ft 2 of tray area with 50 bubble caps and 4 inch weir to drain in about 8 h[3]. Joint initiative of IITs and IISc Funded by MHRD Page 6 of 14

1.5 Tray manways The maintenance workers travel from one tray to another through tray manways (Figure 8.1). The size of the manways should be such that a person can safely travel through a tray manway segment and also it is removable through the column manholes. Manways are usually rectangular and the recommended size is 40 cm 50 cm. Tray manways should be removable from top and as well as from the tray below. 2. Column design specifications The column specifications and operating conditions appended below are continued from the process design calculations of sieve plate tower given in module #7. Shell ID(D i ):2403mm (D i is denoted as D T in module #7) Number of trays: 14 Tray spacing (T t ): 600 mm Hole diameter (d ):12 mm Plate thickness (t t ): 12 mm Weir height ( W ): 40 mm Material for trays, down comers and weirs: Stainless steel SS304L Shell material: Stainless steel (SS304L), double welded bolt joints Allowable stress for shell material: 108 10 6 Pa (108 MPa) Density of shell material (ρ s ) =7800 kg/m 3 Skirt height:2 m Operating pressure = 118825 Pa (bottom tray pressure) Design pressure (p) = 1.1 operating pressure = 130708 Pa Operating temperature =56.3 to 105 C Design temperature= 1.1 maximum operating temperature = 116 C Top disengaging space: 600 mm (same as the tray spacing taken) Bottom separator space:1000mm Insulation material taken: Asbestos Insulation thickness considered: 50 mm Density of insulation (ρ ins ): 270 kg/m 3 (asbestos) Joint initiative of IITs and IISc Funded by MHRD Page 7 of 14

Minimum shell thickness (t s ): t s = pd i = 130708 2.403 ; J = 0.8 2fJ p 2 (108 10 6 ) 0.8 130708 (8.1) =1.81 2 mm Use t s =8 mm thickness including corrosion allowance of 6 mm. This value is in accordance to IS 2844-1964. major axis Standard ellipsoidal head with = 2: minor axis The minimum thickness required, t = (8.1) =1.81 mm 2 mm pd i = 130708 2.403 2fj 0.2p 2 108 10 6 0.8 0.2 130708 The head thickness of 8 mm is selected with corrosion allowance of 6 mm for uniformity. Column height (H) T t + T t 13 + t t 14 + 1000 600 + 600 13 + 12 14 + 1000 9.6 m [Head height from the cylindrical portion of the column is neglected) Joint initiative of IITs and IISc Funded by MHRD Page 8 of 14

Lecture 2: Stresses Developed in Column 3. Stresses developed in column 3.1 Axial and circumferential stresses The axial stress (f as ) resulting from the internal pressure in a closed cylindrical shell is given by ([2] page 155): f as = pd o 4j t s (8.2) [Pa] p =Internal column pressure (usually the design pressure is 5-10% higher than the operating pressure), Pa D o =Column outside diameter (=D i + 2 8 =2419 mm=2.419 m), m t s = Thickness of the column shell, m c =Corossion allowance, m j=joint efficiency f as = 130708 2.419 4 0.8 (8 10 3 ) = 12.4 106 (8.2) Pa Circumferential stress (f cs )=2 f as (8.3) = 24. 8 10 6 Pa 3.2. Compressive stressescaused by dead loads Stress induced by shell (f dead wt. shell ) and insulation (f dead wt. insulation ) at any distance, X, from the top of a vessel having a constant shell thickness ([2] page 156): W sell = m shell g = [ π 4 D o 2 D i 2 ρ s x]g (8.4) Where, W = Weight of shell above point x from column top, kg.m/s 2 D o and D i = Outside and inside diameter of shell, m x = Distance measured from the top of the vessel, m s = Density of shell material, kg/m 3 g =Gravity of the earth, m/s 2 Joint initiative of IITs and IISc Funded by MHRD Page 9 of 14

m shell =Shell mass, kg m shell = π 4 D o 2 D 2 i ρ s H 1.2 (8.5) = π 4 2.4192 2.403 2 7800 9.6 1.2 5446 kg including 20% extra weight for head covers, flanges, bolting etc. Shell weight stress ignoring corrosion allowance: f dead wt. shell = (8.6) m shellg π 4 D o 2 2 D i = 5446 9.81 π 4 2.4192 2.403 2 1 106 Pa Weight of insulation, W ins = m ins g = πd ins ρ ins xt ins g [kg.m/s 2 ] (8.7) Where, D ins = mean insulation diameter, m t ins = thickness of insulation, m ρ ins = density of insulation, kg/m 3 Mass of column insulation: m ins = πd ins ρ ins Ht ins = π 2.419 270 9.6 0.05 = 985 [kg] Insulation weight stress: f dead wt. insulation = = (8.8) W ins πd m (t s c) 985 9.81 π 2.419+2 0.05 [(8 6) 10 3 ] 0. 6 106 Pa D m =mean shell diameter ( D ins = D o + 2 insulation thickness), m Total liquid contents in the column depend on total number of trays, tray liquid holdup, liquid in down comer etc. Stress resulted from liquid retained tower in vessel is given by following equation ([2] page 157): f dead wt. liquid = W liquid πd m (t s c) (8.9) [Pa] Joint initiative of IITs and IISc Funded by MHRD Page 10 of 14

Mass of liquid in the column: Liquid depth on trays 40+27.2 68 mm [maximum of ( w + wc ) in both sections] Active area per tray (A A )=3.616 m 2 (please refer to module #7) Liquid density= 955 kg/m 3 module #7] Mass of liquid=(3.616 14 0.068 955) 1.3 4274 kg [maximum liquid density one could get in both sections: (This includes 30% additional liquid held in downcomers) f dead wt. liquid = (8.9) 4274 9.81 π 2.419+2 0.05 [(8 6) 10 3 ] 2.6 106 Pa Stress induced by column attachments like trays, overhead condenser, instruments, platform, ladders etc ([2] page 157): f dead wt. attachments = W attachments πd m (t s c) (8.10) Mass of column attachments=5446 kg (Considering 100% of shell mass for column [Pa] attachments like trays, tray supports, overhead condenser etc.). f dead wt. attachments = (8.10) 5446 π 2.419+2 0.05 [(8 6) 10 3 ] 3. 4 106 Pa The total dead load stresses, f total acting along the longitudinal axis of the shell: f dead,total = f dead wt. shell + f dead wt. insulation + f dead wt. liquid + f dead wt. attachments (8.11) = 7. 6 10 6 Pa<<allowable stress for the shell materials Joint initiative of IITs and IISc Funded by MHRD Page 11 of 14

3.3. Axial stresses due to wind loads The wind loading depends on wind velocity, air density and shape of the column ([2] page 157). The maximum anticipated wind pressure of 2500 Pais used in this design. It is considered that fours cables are equally placed for guyed column subtending an angle of 45 with vertical wall. The wind loading acting on a vertical vessel is given by: P w = 1 C 2 Dρ air V 2 w A (8.12) Where,C D = drag coefficient ρ air = density of air, kg/m 3 V w = wind velocity, m/s A = projected area of the column normal to the direction of wind, m 2 Above the guy ring: The column is designed like an unguyed vessel and the bending moment is given byfollowing equation ([2] page 159), where H = x. M w,h = 1 P 2 wx 2 D eff (8.13) = 1 2500 2 9.62 2.419 + 2 0.05 =290kN D eff =Effective column diameter considering the insulation thickness, m The bending stress due to wind load: f wind,h,above guy = = 4M w,h πd m 2 t s c 4 290 10 3 π 2.419 2 [(8 6) 10 3 ] = 31. 6 106 Pa (8.14) Below the guy ring:the maximum bending moment caused by wind load from guyed wire to column located at H above the base (X = 3 H) is given by ([2] page 162): 4 4 M w,h,guy (max ) = P w H 2 D eff 32 (8.15) Corresponding bending stress: = M w,h 16 =18.12kN f wind,h,below guy = 4M w,h,g max = f wind,h,above guy 2 πd m t s c 16 (8.16) Joint initiative of IITs and IISc Funded by MHRD Page 12 of 14

2 10 6 Pa The compressive stress in column induced by guy wire tension, where angle θ(45 ) is making by the guy wires with the vertical wall ([2] page 162): f com,guy = 0.04P w HD eff tan θ t s c D o = (8.17) 0.04 2500 9.6 2.419+2 0.05 1 [ 8 6 10 3 ] 2.419 3.4. Analysis of stresses For upwind side =0.5 10 6 Pa Total stress = Bending stress f wind,h,above guy + Circumfarential f as Radial stress f dead,total (8.18) = 31.6 + 12.4 7.6 37 MPa For downwind side Total stress = Bending stress f wind,h,above guy + Axial stress f cs +Compressive stress due to guy wires reaction(f com,guy ) Radial stress f dead,total (8.19) = 31.6 + 24.8 + 0.25 7.6 49 MPa The maximum stress of 49 MPa is much below the allowable design of stress of 108 MPa and the design is acceptable. Note: Influence of seismic load is not considered in this lesson. The detailed stress calculations and the underlying theories are discussed in module #6. Joint initiative of IITs and IISc Funded by MHRD Page 13 of 14

Practice problem: Perform the mechanical design of a bubble cap absorption column for the removal of NH 3 from a cracking operation using water as the scrubbing liquid. Refer to module #7 (practice problem) for the details. References [1]. R. K. Sinnott, Coulson & Richardson s Chemical Engineering: Chemical Engineering Design (vol. 6), Butterworth-Heinemann, 3 rd ed. 1999. [2]. Brownell L.E. and E.H. Young, Process Equipment Design, John Wiley and Sons, Inc. 1959. New York. [3]. KisterH.Z. Distillation design, McGraw-Hill Inc., 1992, New York. Joint initiative of IITs and IISc Funded by MHRD Page 14 of 14