This machine is setup to seam 1.5 panel - 180⁰ seam

Similar documents
CONTRACTOR SERIES ROOF SEAMER 4 STATION MACHINE PLEASE DISTRIBUTE TO THE ERECTION CREW

READ ME FIRST! FLIP-FLOP ROOF SEAMER FIELD MANUAL

FOR FIELD USE PLEASE DISTRIBUTE TO THE ERECTION CREW

VS-216 Roof System Seaming Guide

FOR FIELD USE PLEASE DISTRIBUTE TO THE ERECTION CREW

BERRIDGE ZEE-LOCK DOUBLE-LOCK SEAMER

BIGBEE STEEL BUILDINGS, INC Avalon Avenue Muscle Shoals, AL BigbeeVR Standing Seam Roof System SEAMING GUIDE

BigbeeLok-324 Standing Seam Roof System SEAMING GUIDE

USER MANUAL

Fiber Cable Puller with Tuf-Lugger lite

A U T O O P E N S E R I E S C A P P R E S S O P E R A T O R S M A N U A L

The MAXX Press DIGITAL CAP OPERATOR S MANUAL

D I G I T A L C L A M

Booster Pump PB4-60 Replacement Kits

I.H.S INSTALLATION INSTRUCTIONS

Parts and Service Memo

TSX1600L Rite-Lock Power Arm Kit, left Stowing W/One Top Mount Pivot W/20" Base & 27" Upper

CP10K. 10,000 lb. Cable Puller Instruction Sheet. SAFETY ISSUES

Installation Instructions - Electric Aluminum Drive Systems for Arm Sets to 22 Electric Arm Systems , ,

Read Before Operating!

EZ-Mount 4 Spring Enclosed System to 22 (Low & High Mount Applications) Installation Instructions

OPERATOR'S MANUAL DIRECT DRIVE DIXIE DOUBLE SEAMER Model 10D

Note: You will need a full tank of CO2 for connection and leak testing! Kit Number

MUELLER. A Wall Type. Indicator Post. Reliable Connections. General Information 2. Technical Data/ Dimensions 3. Installation 4-5.

44in Side Discharge Mower for Wheel Horse XL 440H Lawn Tractors Model No Serial No and Up

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

BATA-1 Twin Pitch. Pitching Machine

OPERATOR'S MANUAL Model 23 or 24 Belt Drive Electric Seamer

Installation Instructions - Electric Steel Drive Systems for Arm Sets to ,

INSTRUCTION MANUAL MST AFTERCOOLER SYSTEM MODEL

Model PSI Compressor with 3-Gallon Air Tank 12VDC

Read Before Operating!

Specifications Testing & Adjusting Disassembly & Assembly

CO2 Tank Conversion Kit P.N , P.N , and P.N

E-118 Assembly Guide

A A A

MASTER TRUING STAND TS-3. Optional Dial indicator set with brackets Dial indicator bracket set only

STYLE 3414/3416 & 3421/3423 Apollo Monitor with Foldaway Legs OPERATING & MAINTENANCE INSTRUCTIONS

B1-Curveball. Pitching Machine Owner s Operating Manual TABLE OF CONTENTS PARTS OF THE MACHINE. 2 REMOVING CONTENTS FROM PACKAGE.

INSTALLATION INSTRUCTIONS

Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii

A A A

OPERATORS MANUAL MODEL 365 BACK LAPPING MACHINE WARNING

ROLL FORMER CORP. ROLL FORMER CORP. Manufacturers of quality roll forming equipment leading

Final Assembly Instructions Bikes with 16 Wheel Size

Fluid Dispensing Systems H O S E R E E L S H O S E S HOSE REELS

SUMMITTM 400 & 600. Natural Gas Barbecues. Step-By-Step Guide

SPECIFICATIONS Type: Twin stack, single phase Tank: 4 gallon Air Output: PSI; PSI Max PSI: 125 PSI HP: 1.

INSTALLATION INSTRUCTIONS

BP48-1 AND SSP48-1 IN-GROUND POST INSTALLATION INSTRUCTIONS

Product Name: 2-Way Standing Seam Roof Clamp

AC1810 / AC1810-A TECHNICAL SPECIFICATIONS. Operating Pressure psi ( kgs/cm²) [AC1810] Displacement. Net Weight

SCOUT DECK ANCHOR 3 1/4" BONDING SCREW

B2 Series-C. Pitching Machine Owner s Operating Manual TABLE OF CONTENTS PARTS OF THE MACHINE... 2 REMOVING CONTENTS FROM PACKAGE..

-- SGP (NOVA TEAM SQUARE)

OPERATING and MAINTENANCE INSTRUCTIONS MAXIS 3K Puller (M3K-M)

Standard Specifications

1800C and 1800C-HC Series Service Regulators

ACCESSORY KIT INSTALLATION MANUAL

MUELLER A A Non-Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

Instruction Manual. PE-25/32/37 Tapping Machines. POLYTAPP Valves

OPERATING and MAINTENANCE INSTRUCTIONS MAXIS 6K Puller (M6K-M)

310 SERIES TILT-TO-LOAD ROTATOR. The Specialist In Drum Handling Equipment

Product Name: 2-Way Standing Seam Roof Clamp. Instruction Manual. Part #: 10600

Installation Instructions - Super Six Electric Arm Kits with Underbody Pivots , , ,

O P E R A T O R S M A N U A O P E R A T O R S M A N U A L L

Retractable Security Cover for a Swim Spa

Import Bike Rack OEM INSTALLATION MANUAL

THOR 10 HAMMER CAGE INSTRUCTIONS

! WARNING. Model PFC-1-G (direct acting) PFC-1-GR (reverse acting) Modulating Pneumatic Liquid Level Controls INSTRUCTION MANUAL MM-110B

ALTERNATOR RACKS 135, 170 & 190 INSTRUCTIONS

TECHNICAL DATA. Page 1 of 12

Binks SG-2 Plus TM Rotary 2 QT. PRESSURE CUP

Ecomow Electric Mower

DK ton, Double-acting, Die-type Crimping Tool

ELECTRON PRO 245A: ASSEMBLY GUIDE. Revision Valid for MY2017 Electron Pro

Repair instructions. Pivot bushing replacement. XL-AS10001RM-en-DE Rev B

MODEL NUMBER: M20005 AIR SOURCE KIT. 30% Duty Compressor on. 2.0 Gallon Air Tank SAVE THIS MANUAL FOR FUTURE REFERENCE

CODA EXPERT CRANK INSTRUCTION MANUAL

ACCESSORY KIT INSTALLATION INSTRUCTIONS

2 GALLON TWIN STACK AIR COMPRESSOR W/ HOSE REEL

INSTRUCTION GUIDE S-WORKS ROAD CARBON CRANKSET (Carbon and Alloy OSBB cups)

Retractable Hose Reel with 3/8" x 50' PVC Hose

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

DIRECT DRIVE DIXIE DOUBLE SEAMER Model 25D

BRILLIANT WONDERS LED BUBBLERS INSTALLATION INSTRUCTIONS & PRODUCT MANUAL CMP SERIES

TECHNICAL INFORMATION

ELECTRON PRO: ASSEMBLY GUIDE. Revision Valid for MY2017 Electron Pro

Tripod Setup Guide (M-TPx)

MODEL 300 BACKLAPPER OWNERS MANUAL

NOTE: Parts are no longer available for this tool. The manual will continue on the next page.

Installation Instructions - Steel 4 Spring Arm Kits , , , ,

LRS(H)4 Pressure-Reducing Regulator User Manual

FIRST TEAM SPORTS, INC Storm Portable Series Assembly Instructions

Constant Pressure Crude Oil Container Model CPCCP

VISIT THE LIFETIME WEB SITE: **For U.S. and Canada Customers ONLY:** IF ASSISTANCE IS NEEDED,

Wickets Installation Laundry Equipment Specific Installation Instructions 5/22/2009

1200B2 Series Service Regulators. Instruction Manual

2,500/4,000 LB Easy Riser Vertical Cable Feighner Lift

Parts: Included in the parts box: Inner Rear Tire Tray. Inner Front Tire Tray. Trail Doc Clamp. Pivot Assembly. Trail Doc Post.

Transcription:

This machine is setup to seam 1.5 panel - 180⁰ seam Instructions to change this setup are included in this Guide. (You may discard this page.)

CONTRACTOR SERIES ROOF SEAMER UNIVERSAL CONVERSION KIT PLEASE DISTRIBUTE TO THE ERECTION CREW UNITED STATES HOME OFFICE 915 HIGHWAY 45 CORINTH, MS 38834 CANADA DISTRIBUTION CENTRE 5676 PROGESS STREET NIAGARA FALLS, ONTARIO L2G 0C3 Contact us at 1-888-343-0456 or online at www.diroofseamers.com DUE TO THE PROCESS OF CONTINUOUS IMPROVEMENT, THE PRODUCTS AND PROCEDURES IN THIS GUIDE ARE SUBJECT TO CHANGE WITHOUT NOTICE GUIDE REVISION INFORMATION ACTIVITY ADDENDUM RELEASE # PAGES REVISED RELEASE DATE AUTHOR MOST RECENT #2 Format Change 4/7/2014 JLR PREVIOUS REVISIONS #1 Original Release 2/17/2014 JLR Page 1 of 8

PURCHASER INFORMATION If any inconsistencies appear in the seam or if you have any questions, problems, etc. STOP SEAMING and contact Technical Support at 1-888-343-0456 immediately. Follow all safety suggestions, warnings, etc. in this guide and posted on the machine itself. This tool has a six (6) month limited warranty. Please contact us for detailed information at 1-888-343-0456 or visit us at www.diroofseamers.com. Your Contractor Series Roof Seamer motor requires a 20 amp, 100-125 volt AC power supply. Poor performance and motor damage can result from use of an improper power supply. Recommended extension cord size: Distance (FT) 0-50 50-100 100-200 200+ Wire Gauge (AWG) 12 10 8 6 MAINTENANCE RECOMMENDATIONS Clean tooling DAILY with Mineral Spirits, or as needed, due to contaminants. If you must remove or replace tooling, place ONE DROP of Loctite 222 (purple) on the threads of the bolt before putting it back into the machine to prevent the bolts from backing out. When not in use, always store your Roof Seamer in a dry place to prevent damage to the machine. NEVER operate it in inclimate weather such as rain or snow. READ THIS FIELD GUIDE COMPLETELY BEFORE ATTEMPTING ANY CRIMPING OPERATIONS! SERIOUS INJURY OR DEATH MAY OCCUR! Page 2 of 8

OPERATING YOUR ROOF SEAMER Before beginning, ensure that the panels are installed correctly and are free of all debris and contaminants such as sand, snow, excessive fluids, sealant/mastic, tools, extensions cords, etc. Also, always attach a safety hook to a tether during any time the seamer is on the roof to prevent it from falling off. It is recommended to seam as you go. In other words, seam the roof panels as they are being installed. This ensures that each panel is kept within module and installed correctly. STEP 1 To begin, hand crimp 8-10 of each panel at the beginning of the seam with the 90 (Single Lock) Hand Crimpers. If you are seaming a 90⁰ profile, skip to STEP 3. STEP 2 Next, hand crimp 5 at the beginning of the seam with the 180 (Double Lock) Hand Crimpers. Page 3 of 8

STEP 3 If the roof has already been installed, each clip must be hand crimped with a 90 (Single Lock) Hand Crimper to keep each panel safely in place. Follow this diagram as a suggestion to crimping locations. Always follow your roof panel manufacturer's suggestions and warnings for the installation of your particular roof system. STEP 4 Next, place the machine on the hand crimped portion and engage the locking handle by pulling it out until it locks into place. Note: Ensure that the last set of tooling on the seamer is aligned over the Double Locked portion that was hand crimped. Connect the power supply into the quick-release plug near the handle of the machine and turn the machine on. Run the seamer for approximately 12 to ensure that you are receiving the desired seaming operation. If so, continue in this manner for the completion of the run. Page 4 of 8

It is important to remember to use extreme caution when reaching the edge of the roof. Stop and disengage the locking handle of the seamer while the wheels remain on the roof panel. Do not run the seamer within 6 of the end of a panel, beyond the end of a panel or over a previously seamed area. Use your hand crimpers to finish any area that the seamer may not be able to complete, such as against a ridge cap, end cap or at a pitch change in the roof. Note: The Roof Seamer may leave dark forming marks on light colored panels. This is acceptable as long as the paint finish is not damaged. Marks can easily be rubbed off by hand DO NOT use solvents that will soften or remove paint. CHANGING THE SEAMER SETUP The Universal Series Conversion Kit for the Contractor Series Roof Seamer can produce 6 different finished seam profiles. With the use of this kit you can complete a 90 or a 180 seam on 1, 1.5 and 2" roof panels. It is important to note that this seamer is for use on panels without a male down leg and a material composition of 24 gauge steel or lighter. This machine can be used on various metals such as steel, copper, zinc and aluminum. This kit includes all of the tools needed to convert your seamer to achieve the finished seam of your choice. You may access instructions to change the setups by visiting http://www.diroofseamers.com/seamers_csuniversal.html or clicking on the setup number in the following chart. Reference these setup instructions to set your machine to produce the finished seam of your choice. It is essential that your seamer is set correctly to achieve the proper finished seam. Each setup indicates the proper tooling, shims, guide wheels and gap settings needed to properly set your seamer to produce the desired finished seam profile. Page 5 of 8

SETUP INFORMATION Setup # Finished Profile 1 (29001) Base Setup 1.5 180 2 (29002) 1 180 3 (29003) 1.5 90 4 (29004) 1 90 5 (29005) 2 90 6 (29006) 2 180 TOOLING Included in your kit is the proper forming rollers and drive rollers needed to set up your machine to produce the desired finished seam profile. All steel forming rollers are identified by part # on the roller itself and the setup. There are also two different diameters of fiber drive rollers. The 40004 drive roller has a diameter of 2 and the 40009 has a diameter of 2.5. All rollers must be installed according the setup sheet of the intended finished seam profile. Tooling can be removed by using the 1/2 open end wrench and removing the hex bolt from the axle of the tooling you wish to remove. It is important to remember that the axle is keyed and the key should not be lost when changing tooling. There is also a washer (30134) that holds the tooling on. It is important to note that some locations require shims between the washer and the bottom of the tooling to keep the tooling in proper position. Proper shim placement is called out on each setup. GAP SETTINGS Gap settings are located at the bottom of each setup page. These gaps are set by using the appropriate gauge block (Go/No-Go Gauge) and measuring between the eyebolt and the seamer chassis as indicated on the setup sheets. Failure to set these gaps correctly will result in a poor finished seam quality. A 5/32" Allen wrench and a 7/16" open end wrench are included in the kit to help make these adjustments. These tools are used to remove the shoulder bolt from the eyebolt so that it can be adjusted as needed. The appropriate gauge block for each setup is listed in the chart below. Page 6 of 8

Setup # Gap Setting Gauge Block 1.300 +/- 30705 2.300 +/- 30705 3.355 +/- 30706 4.355 +/- 30706 5.385 +/- 30707 6.385 +/- 30707 GUIDE WHEELS There are three different size guide wheels included with your Universal Kit. These can be changed with the 3/16 Allen wrench. They are as follows: 30595-1 diameter for your 1 standing seam profile. 30050-2 diameter for your 1.5 standing seam profile. 30052 2.6 (< 2 5/8 ) diameter for your 2 standing seam profile. SHIMS Correct placement of shims is imperative when setting up your seamer. Please refer to the appropriate setup for details. Shims are as follows: Part # Color Thickness 50047 Silver.015 (1/64 ) 30310 Red.0625 (1/16 ) 30147 Blue.125 (1/8 ) 90⁰ SETUPS All 90 setups are bi-directional. This means that you can run up one seam and down the next. In order to use the seamer in this manner, the locking key (50272) must be removed so that the electrical switch can be moved to both the forward and reverse positions. Only a 90 hand crimper is needed to start the seamer when using one of the 90 set ups. All clip locations should be hand crimped to 90. 180 SETUPS All 180 setups must be run with the locking key (50272) installed in the electrical switch as indicated in the setup. Failure to install this key can result in damage to your seamer and/or your roof panels. 180 setups will run right to left and will complete the 180⁰ finished seam in one pass. Page 7 of 8

The 180 setups will require the use of both the 90⁰ and 180⁰ crimpers to properly start the seamer. Please refer to the hand crimping portion of this guide for proper crimping instructions. Never do a 180 crimp ahead of the seamer. All clip locations should be crimped to 90. Page 8 of 8