Meeting agenda at www2.oaklandnet.com/oak Meeting called to order at 6:06pm by BPAC Chair Ryan Chan.

Similar documents
AGENDA. 6:00 1 Roll Call/Determination of Quorum/Introductions (5 minutes)

City of Oakland, Bicyclist & Pedestrian Advisory Commission Minutes from the July 21, 2016 meeting City Hall, Hearing Room 3

Oakland Bicycle and Pedestrian Advisory Committee, September 19, 2013 Meeting

Minutes: A motion was made to approve minutes from both the July and August BPAC meetings. That motion was approved.

At roll call, quorum was established with seven commissioners present (X). Two arrived shortly after roll call (x). Present

Notes from BPAC Meeting January 20, 2011

City of Oakland, Bicyclist & Pedestrian Advisory Commission Minutes from the May 19, 2016 meeting City Hall, Hearing Room 3

Oakland BPAC 7/17/14 5:30 7:30 pm Hearing Room 4

6:00 1 Roll Call/Determination of Quorum/Introductions (5 minutes) Admin

Approval of Meeting Minutes: The September minutes were approved.

City Hall, 2 nd Floor, Sgt Daniel Sakai Hearing Room (aka Hearing Room 4) Meeting agenda at www2.oaklandnet.com/

5:30 1 Introductions, appointment of note taker (5 minutes) Ad

TABLE OF CONTENTS. Executive Summary

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

City of Oakland Mayor's Commission on Persons with Disabilities (MCPD) Monday, April 16, Minutes

MEETING OF THE CITY OF CONCORD BICYCLE, PEDESTRIAN AND SAFE ROUTES TO TRANSIT PLAN ADVISORY COMMITTEE AGENDA

City Hall, 2 nd Floor, Sgt Daniel Sakai Hearing Room (aka Hearing Room 4) Meeting agenda at www2.oaklandnet.com/w/oak

MUTCD Part 6: Temporary Traffic Control

Castro Valley Municipal Advisory Council March 19, 2018

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

5:30 1 Introductions, appointment of note taker (5 minutes) Ad

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

REGULAR MEETING of the San Mateo County Bicycle and Pedestrian Advisory Committee (SMCBPAC) Thursday, October 20, 2016

MEETING OF THE CITY OF CONCORD BICYCLE, PEDESTRIAN AND SAFE ROUTES TO TRANSIT PLAN ADVISORY COMMITTEE AGENDA

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

City staff: George Durney, Christina Ferracane, Laura Kaminski, Jamie Parks, Jason Patton, Jennifer Stanley, Iris Starr

Broad Street Bicycle Boulevard City Council Study Session Summary

PEDESTRIAN ACTION PLAN

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

City of Oakland, Bicycle and Pedestrian Advisory Committee, Monthly Meeting

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Orinda Bicycle, Trails and Walkways Master Plan

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Welcome! San Jose Avenue Open House August 25, 2015

MASTER BICYCLE AND PEDESTRIAN PLAN

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Proposed Language as approved by the NCUTCD on June 23, 2011, for new section on Pedestrian Channelizing Devices

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

City Hall, 2 nd Floor, Sgt Daniel Sakai Hearing Room (aka Hearing Room 4) Meeting agenda at www2.oaklandnet.com/oak

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Item No. 14 Town of Atherton

C C C

TRANSPORTATION COMMISSION Agenda Staff Report

5:30 1 Introductions, appointment of note taker (5 minutes) Ad

ACTION TRANSMITTAL No

COMPLETE STREETS DURING CONSTRUCTION

Rochester Downtown Bicycle Study 2009

Minutes of the regular meeting of the City of Birmingham Multi-Modal Transportation Board held June 19, 2014.

Duwamish Way-finding and CTR Report

Who is Toole Design Group?

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Pedestrian Project List and Prioritization

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

San Jose Transportation Policy

GIS Based Non-Motorized Transportation Planning APA Ohio Statewide Planning Conference. GIS Assisted Non-Motorized Transportation Planning

6:05 2 Approval of meeting minutes Attachment (5 minutes) Seek motion to adopt the January 2017 BPAC minutes.

Bicycle Master Plan Goals, Strategies, and Policies

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

ACTIVE TRANSPORTATION

Bike San Mateo County San Mateo County Bicycle Plan Recommendations August 30, 2010

AGENDA ITEM G-2 Public Works

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

11/28/2016 VIA

City of Oakland Mayor's Commission on Persons with Disabilities (MCPD) Monday, February 26, Minutes

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Zlatko Krstulich, P.Eng. City of O9awa

Urbana Pedestrian Master Plan

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

City of Oakland - Department of Transportation

Accommodating Pedestrians in the Work Zone

A Sample Report of TRAFFIC CONTROL DEVICES REVIEW

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Community Transportation Plan

COMMUNITY MEETING AGENDA

Environment and Public Works Committee Presentation

Bellevue Downtown Association Downtown Bike Series

Omaha s Complete Streets Policy

BIKE PLAN CONTENTS GATEWAY

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

ADA on Construction. Guidance for Section C Plan Preparers

Living Streets Policy

This page intentionally left blank.

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Foothill Expressway Improvements Between El Monte and San Antonio

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

Transcription:

City of Oakland, Bicyclist & Pedestrian Advisory Commission Minutes from the January 19, 2017 meeting City Hall, 2nd Floor, Sgt Daniel Sakai Hearing Room (aka Hearing Room 4) Meeting agenda at www2.oaklandnet.com/oak0623454 Meeting called to order at 6:06pm by BPAC Chair Ryan Chan. Item 1. Roll Call/Determination of Quorum/Introductions At roll call, quorum was established: Commissioners Reginald K Burnette Jr Ryan Chan (Chair) Chris Hwang Christopher Kidd Fred McWilliams Robert Prinz Midori Tabata Rosa Villalobos (Vice Chair) Kenya Wheeler Present Introductions were made. Other attendees (who signed in or spoke): Eric Fischer, Admas Zewdie, Scott Amundson, Chris Kintner, Tiff Mueller, Chris Hinkle, Dianne Yee, Carol Levine, Brian Toy Staff: Jason Patton, Jennifer Stanley, Menaka Mohan, Sarah Fine, Kerby Olsen Item 2. Nominations/elections for BPAC Chair and Vice Chair There was one nomination for Chair (Ryan Chan) and two nominations for Vice Chair (Robert Prinz and Kenya Wheeler). Chan accepted the nomination and was appointed Chair. A ballot was circulated to select Vice Chair with Prinz getting five votes and Wheeler getting three votes. Prinz accepted the position of Vice Chair. Item 3. Approval of meeting minutes A motion to adopt the Bicyclist & Pedestrian Advisory Commission meeting minutes from December 15, 2016 was made (Chan), seconded (Tabata), and approved by consent. Adopted minutes online at www.oaklandbikes.info/bpac. Item 4. Open Forum / Public Comment Eric Fischer reported that the configuration/design of signals and curb ramps at the Safeway on Pleasant Valley Ave was unfriendly to pedestrians. He reported the issue to the Call Center on October 20 but has not yet received a response. Commissioner Prinz reported that Bike East Bay approached the developer regarding other issues that are not consistent with previous BPAC

input or with the Conditions of Approval (COA) for the project. He will let Eric know if he hears back. The primary contact in Building Dept for COA compliance is Bill Quesada. Chris Kintner reported that the signal timing at MacArthur BART is bad for pedestrians. He has not reported it to the Call Center, but others have. Commissioner Prinz recommended that he contact the City Council person, and noted that there are other issues that haven't been consistent with COA. Dianne Yee asked whether developers are fined for non compliance with the COA. This depends on whether changes were approved by City. As a result of these comments, Commissioner Prinz suggested that a presentation to BPAC be made regarding legal requirements and oversight pertinent to bike/ped improvements included in COAs. Item 5. BPAC staffing changes Jason Patton, Bicyclist & Pedestrian Program Manager, explained that he is now the primary contact for BPAC, a responsibility previously held by Iris Starr. This change is due to the DOT reorganization. Questions were raised about the reorganization more generally. Jason proposed that the BPAC receive a high level report on the proposed DOT budget. Item 6. Temporary Traffic Control Guidance Update Senior Transportation Planner Sarah Fine introduced DOT Intern Kerby Olsen to present a report on recently issued City guidance to improve the quality of traffic control detours and diversions. See guidance in agenda packet and attached presentation. Kerby outlined the limitations of the guidance in the Manual on Uniform Traffic Control Devices (MUTCD), and described resulting problems that can decrease road user safety. He described the update process and rationale. Summary of comments: include schools, senior centers, and parks in the Tier 1 designation; ensure that the requirements can be enforced and that there is sufficient staffing; fix the map to ensure that the Safeway development, for example, falls within Tier 2 at least; consider changes to the Master Fee Schedule to incentivize compliance; share the guidance with the ADA Commission; continue to complain about inadequate TTC currently in place; when bike lanes are diverted to parking stalls, require posts to prevent people from continuing to park curbside. The public can review permits at https://aca.accela.com/oakland. Fines for non compliance are levied on a daily basis. TTC can be very expensive to developers, so the guidance is meant to be commensurate with impacts. For example, closures that close a (metered) parking space cost $1,000/space per month. (Fees help fund inspections.) An unrelated discussion regarding the plan for improvements to the Telegraph Ave bike lanes ensued, with an attendee asking a question about the status of bike lanes all the way to the Berkeley border. Sarah Fine responded that the current plans include new bike lanes north of 29th St to 41 st St, and physical separation in the beige areas between 20 th and 29 th Sts. These improvements are expected to be completed within two years. In the interim, the City plans to add flex posts to beige areas. Next month, Sarah is planning to present a before/after progress report on Telegraph Ave that will include safety data (collisions, speeds), user experience, retail results, and parking occupancy. City of Oakland, Bicyclist & Pedestrian Advisory Commission Minutes from January 19, 2017 meeting pg 2 of 4

Item 7. East Bay Greenway Menaka Mohan, Great Streets Delivery Division, gave an overview of the East Bay Greenway project (study) status. See attached presentation. The Alameda County Transportation Commission (ACTC) is the lead agency for the project. The entire bikeway cannot be a separated path some sections will be on street. There are four design options under study. The final environmental documents should be published in 2018 at a total cost of $2.6m. Construction cost estimates range from $130m to over $400m; cost will depend on the design option selected. Summary of discussion: acquiring right of way is expensive; it is not clear whether Union Pacific would want to sell ROW; current train frequency is not published, but known to be low the ROW is parallel to the track that is in use (and is different than the tracks used by the Capitol Corridor); the demand for the facility is documented by desire lines threading through the alignment; the project will invest in East Oakland; the existing segment between 75 th and 85 th Aves is a good alternative to riding on San Leandro St, and the automated counter showed 75,000 bike/ped trips in first 6 months after installation; and early implementation of high priority on street segments may be possible. BART Director Robert Raburn (who serves on the Capitol Corridor governing board) reported that the East Bay Greenway is a very important project for BART. Sarah Fine stated that the project could result in more freight on trains rather than trucks, reducing impacts to West Oakland (notably air quality). Speakers other than commissioners: Dianne Yee, Eric Fischer, Robert Raburn Item 8. 2017 bikeway/paving projects: Clay St & Fruitvale Ave Jason Patton gave an overview of the single citywide paving contract expected to be completed in 2017. The value of the contract is $4m, and will use bonded wearing course, new material for Oakland, more substantial than the recent micro surfacing on San Pablo Ave, but less than an overlay. Curb ramps will be included (not typical for preventative maintenance). Project design is led by the Safe Streets Division, with Jason designing the streets with bikeways; contracting will be handled by the Great Streets Delivery Division. Overview of the streets to be paved/striped: Joaquin Miller Rd (Mountain Blvd to Skyline Dr): a safety improvement to help drivers merge from side streets. With a 12 14% grade, prevailing traffic speeds may approach 50 mph. The design is in flux; the proposal was for bike lanes, but downhill, bike lanes would be too narrow for the high speeds. Paving is only in the downhill direction. 98 th Ave (San Leandro St to Bancroft Ave): long stretch with proposed road diet between Bancroft and E St (narrow segment) w/ peak hour parking restrictions, low parking volumes. Market St (7 th 18 th Sts): existing bike lane design will be upgraded to include buffers. Adeline St (10 th 19 th Sts): 4 to 2 lane road diet with bike lanes approved as part of West Oakland Specific Plan; final design under evaluation for which turn pockets to maintain. Martin Luther King Jr Wy: paving only, with bike lane striping via a separate, streetscape project. Clay St (7 th 17 th Sts): the current configuration is variable with 2 4 lanes. Proposed configuration is one lane in each direction w/ buffered bike lanes, except at one intersection where a turn pocket is required. Result of project outreach mailer sent in April 2016: 83% of respondents in support. City Council approved road diet along with the paving contract. Fruitvale Ave (Foothill Blvd Harold St): the current configuration is one lane in each direction with sharrows. The proposed configuration will add an uphill bike lane and narrow the downhill lane by moving the centerline by 2 feet. Approaching Harold St, northbound, parking is being removed to maintain two travel lanes; there is not enough width to maintain the bike lane. City of Oakland, Bicyclist & Pedestrian Advisory Commission Minutes from January 19, 2017 meeting pg 3 of 4

Comments (Clay St): add a bike box southbound approaching 9 th St; consider a separated bikeway; how will the project deal with double parking problems? Comments (Fruitvale Ave): support the uphill bike lane idea; make sure to stripe crosswalks wherever possible evaluate bus stop locations in particular; closely examine the turning movements at Harold St consider narrowing the median to make room for the bike lane; the turn pocket at E 27 th St creates a bad pinch point make sure the project doesn t worsen the situation. Speakers other than commissioners: Scott Amundson, Dianne Yee, Carol Levine, Chris Kintner, Robert Raburn. A motion to extend the meeting to 8:15 pm was made (Chan), seconded (Prinz) and passed on voice vote. Item 9. Three month agenda look ahead, suggestions for meeting topics, announcements Three month look ahead The items listed in the agenda packet have changed as follows: there will be a short item on the Pedestrian Master Plan in February and a longer one in March. The Bike to Work Day item will be in March and also include bike month. A progress report on Telegraph Ave will be scheduled for February. Suggestions for meeting topics Measure KK and BPAC s role (Kidd; also suggested in December 2016) Bike plan update status (Kidd) CIP for upcoming budget process and also DOT and paving funds (Kidd) HSIP grants projects update (Kidd, also suggested in December 2016) DOT/Transportation Commission and how BPAC would be involved (Kidd) Measure KK Budget Advisory Commission presentation (Wheeler) Announcements Commissioner Prinz: The time for Bike East Bay bike valet service at the Women s March printed in the agenda has been changed to 9am 4pm. Commissioner Burnette Jr: There will be a bike fix it clinic at The Shed, 81 st Ave Library, on First Friday (February 3). At the February 7 meeting, the Mayor s Office will ask City Council to reappoint Commissioners McWilliams, Tabata, and Wheeler. Commissioners extend thanks to Commissioner Villalobos Rosa for her service as Vice Chair. Meeting adjourned at 8:12p. Attachments (to be appended to adopted minutes) Temporary Traffic Control presentation East Bay Greenway Presentation Minutes recorded by Jennifer Stanley, City of Oakland Bicycle & Pedestrian Facilities Coordinator, emailed to meeting attendees for review on January 23, 2017, with comments requested by noon, Monday, January 30, to jstanley@oaklandnet.com. Revised minutes were attached to the February 2017 meeting agenda and adopted at that meeting. City of Oakland, Bicyclist & Pedestrian Advisory Commission Minutes from January 19, 2017 meeting pg 4 of 4

OakDOT Temporary Traffic Control Update Contents 1. TTC Permitting process 2. Why we updated the previous TTC guidance 3. Overview of new TTC guidance Temporary Traffic Control For the applicant An area of a highway where road user conditions are changed because of a work zone or incident by the use of temporary traffic control devices, flaggers, uniformed law enforcement officers, or other authorized personnel - (MUTCD). For the pedestrian: When construction blocks your path. Oakland s process If you want to do this: You need this: Obstruct any portion of a street or sidewalk Obstruction Permit Oakland s process If you want to do this: You need this: Traffic Control Plan Oakland s process Obstruction Permit Application Obstruction Permit* Traffic Control Application Traffic Control Plan (TCP)* *Must comply with chapter 5 of MUTCD

Does not specify when or where to allow detours vs. diversions MUTCD 6B, 2.E: Bicyclists and pedestrians, including those with disabilities, should be provided with access and reasonably safe passage through the TTC zone. CA MUTCD Problem: Construction blocking sidewalk Must meet design requirements Does not require traffic control plan if 5-6 left clear Pedestrian walkway canopy Problem: Inadequate barriers Problem: Construction blocking sidewalk

Problems with previous guidance Placed the most vulnerable road users at most risk Obstructed essential pedestrian routes in downtown, near BART Blocked access to retail Sidewalk and bike lane obstruction was allowed even when unnecessary for construction Barriers may not be adequate Bicycle and pedestrian accommodation was unclear Incompatible with the vision and goals of the OakDOT Strategic Plan Crafting new TTC guidance Inputs: Director s concerns Survey of best practices from other cities Internal feedback and comments Research on best practices Draft guidance memo New guidance memo For Pedestrians Tier 1 Downtown or within ¼ mile walk of a BART station Tier 2 Commercially zoned streets and major transit corridors Tier 3 All remaining sidewalks not included in Tier 1 or 2 Diversion Detour Tier 1 Flaggers required OK 4 hours MA Diversion Detour Flaggers required Tier 2 OK 24 hours MA Diversion Detour Tier 3 OK OK

Other additions: Permits must be posted, showing duration and contact info A qualified person must prepare the TCP Temporary bus stops must be provided Barricades must be detectable, cannot use water walls All facilities must be kept wheelchair accessible and free of debris Update For Bike Accommodation In order of preference: 1. Provide temporary bike lane in parking lane 2. Provide temporary bike lane in street by narrowing traffic lanes 3. Provide temporary bike lane in street by closing traffic lanes 4. Taper bike lane into shared traffic lane For Bikes 1 lane roadway Taper bike lane into shared traffic lane For Bikes Multi lane roadway Per direction

Thank you! Kerby Olsen kolsen@oaklandnet.com

Introducing East Bay Greenway Menaka Mohan Great Streets Division What is the East Bay Greenway? Lead Agency ACTC Proposed regional trail facility following BART alignment, Lake Merritt to South Hayward BART 16 miles Links seven BART stations Connects four jurisdictions 2 East Bay Greenway: Lake Merritt BART Station to South Hayward BART Station Project Corridor Oakland San Leandro County Hayward 16 miles 12.6 miles UPRR Oakland Subdivision BART East Bay Greenway Coliseum to 85 th Ave 3 4 Availability of options Design Options Under Evaluation On-street bikeways Multi-use pathway outside of UP right-of-way Multi-use pathway using partial UP ROW Multi-use pathway using full UP ROW 5 6 1

Multi-use pathway using full UP R/W Iron Horse Trail, Pleasanton Ohlone Greenway Manhan Rail Trail,Northhampton, MA Atlanta Beltline Multi-use pathway using partial UP R/W Elliott Bay Trail, Seattle Santa Fe Rail Trail Schuylkill River Trail, Philadelphia Springwater Corridor, Portland 8 Multi-use pathway outside UP R/W Segment 7A at 75 th Avenue BART R/W between 37 th Ave and 47 th Ave San Leandro Street at 98 th Avenue Whitman St at Harder Road On-Street Bikeways Brooklyn Waterfront Greenway Indianapolis Cultural Trail Seattle Neighborhood Greenway Austin Neighborhood Greenway 9 10 Project work flow Alignment Feasibility Assessment 1) On-street bikeways 2) Multi-use pathway outside UP R/W 3) Multi-use pathway using partial UP R/W 4) Multi-use pathway using full UP R/W Concept Plans 1) Rail-to-trail 2) Rail-with-trail Project Challenges UPRR right-of-way availability Rail-with-trail design constraints Contaminated soil/materials Operations and maintenance consensus Looking south from 138 th Avenue in San Leandro Cost/funding Looking north at San Leandro Creek 11 12 7

Project Schedule Cost and Funding Environmental phase fully funded by $2.6 million state Active Transportation Program grant supplemented by local Measure B and BB funds Costs consist of two main categories Construction cost: $30 million to $110 million? Right-of-way cost: $100 million to $300 million? 13 14 For additional information, go to: www.alamedactc.org/eastbaygreenway Equitable Jobs and Housing Holistic Community Safety 1 2 Vibrant Sustainable Infrastructure 3 Responsible Trustworthy 4 Government Read the Plan online: http://bit.ly/oakdotplan16 15 OakDOT Core Values East Bay Greenway Equitable Jobs and Housing Significant investment in East Oakland Potential to develop housing/jobs opportunities Holistic Community Safety Prioritize safe destinations Ensure safe access within 2 miles from BART Vibrant Sustainable Infrastructure Supports new trail network Creates new green space Responsible Trustworthy Government Inclusive community process Thank you! Menaka Mohan Great Streets Delivery mmohan@oaklandnet.com