VIE: GMS Corridor Towns Development Project - Quang Tri Subproject

Similar documents
RESETTLEMENT ACTION PLAN (RAP)

VIE: Northern Mountain Provinces Transport Connectivity Project

List of delegates to Italy From June 2018

DECREE THE GOVERNMENT. Pursuant to the Convention on International Trade in Endangered Species of Wild Fauna and Flora; DECREES: Chapter I

SCIENTIFIC COMMITTEE NINTH REGULAR SESSION August 2013 Pohnpei, Federated States of Micronesia

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

ISSN: [Dung * et al., 6(8): August, 2017] Impact Factor: 4.116

EXPLORING MOTIVATION AND TOURIST TYPOLOGY: THE CASE OF KOREAN GOLF TOURISTS TRAVELLING IN THE ASIA PACIFIC. Jae Hak Kim

VILLAGE OF STIRLING IN THE PROVINCE OF ALBERTA Bylaw No Animal Control Bylaw

Traffic Calming Policy

COUNCIL DIRECTIVE 79/409/EC. of 2 April on the conservation of the wild birds

List of Participants

IMPLEMENTING REGULATIONS OF THE WILDLIFE CONSERVATION LAW. Authorized by the Republic of China Wildlife Conservation Law, amended October 29, 1994.

U.S. 1, , 2000 JANUARY

Case study: Establishing pioneer Fisheries Associations in Vietnamese fishing communities. Overview. Key lessons learned

REGULATION 22. STANDARD RELATING TO THE USE OF ARTIFICIAL RUGBY TURF

BASELINE SURVEY VOLUME 3: BASELINE SURVEY RESULTS FOR THUA THIEN HUE PROVINCE

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

MDB Road Safety Initiative: A Development Priority

Office of Inspector General The School District of Palm Beach County

A Study on Weekend Travel Patterns by Individual Characteristics in the Seoul Metropolitan Area

Amendment 80 Non-AFA Trawl Gear Catcher/Processor

Country report. Croatian bathing water quality in Croatia. May Photo: Peter Kristensen

Section 2 Strategic Alignment. Contents

Adrian J Tidbury - Estates and Valuation Surveyor Portfolio Development

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

RFU REGULATION 5 FINANCIAL. 5.1 Finance

Country report. Bulgarian bathing water quality in Bulgaria. May Photo: Peter Kristensen

WORLD RUGBY MEMBERSHIP PATHWAY

REPORT. Pangasius Sustainability Roundtable Discussion

CONFLICT OF INTEREST POLICY

Northern Ireland Football League. Player Registration Regulations

Central Hills Prairie Deer Goal Setting Block G9 Landowner and Hunter Survey Results

Audit Report. Department of the Interior Office of Inspector General

AFC Futsal Club Licensing Regulations. The AFC Futsal Club Licensing Regulations

Country report. Austrian bathing water quality in Austria. May Photo: Peter Kristensen

RESOLUTIONS TO AMEND THE CONSTITUTION, BYLAWS AND REGULATIONS Annual General Meeting

BICYCLE PARKING IN RESIDENTIAL AREAS

ADA TRANSITION PLAN. TOWN OF DeMOTTE

Northwest Parkland-Prairie Deer Goal Setting Block G7 Landowner and Hunter Survey Results

Drought Situations and Management Policy in Vietnam

Laws of the People's Republic of China Governing Foreign-Related Matters Volume II

Report to COUNCIL for decision

Marin County, CA. Key Findings The NCS is presented by NRC in collaboration with ICMA

A rapid assessment of rural transport services in Iringa Region, Tanzania

OVA Privacy Policy. a) Arranges and encourages volleyball matches and competitions within Ontario;

1999 On-Board Sacramento Regional Transit District Survey

CORPORATE GOVERNANCE REPORT (Year 2014)

Fishing Activities of Trawlers and Gillnets in Kien Giang Province, Vietnam

SCIENTIFIC COMMITTEE ELEVENTH REGULAR SESSION. Pohnpei, Federated States of Micronesia 5-13 August 2015

IMPLEMENTATION STRATEGIES

UNIVERSITY OF TENNESSEE HEALTH SCIENCE CENTER INSTITUTIONAL REVIEW BOARD CONTINUING REVIEW OF RESEARCH

Report to the Benjamin Hair-Just Swim For Life Foundation on JACS4 The Jefferson Area Community Survey

Baseline Survey of New Zealanders' Attitudes and Behaviours towards Cycling in Urban Settings

Southington Lightning Girls Softball Program. Guidelines

CHAPTER 7.0 IMPLEMENTATION

Review of the Bulgarian legislation in the field of energy efficiency of buildings

The 2001 Economic Benefits of Hunting, Fishing and Wildlife Watching in MISSOURI. Prepared by:

ICC REGULATIONS ON SANCTIONING OF EVENTS

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

all Participants are entitled to the baseline limit of 2,500 tonnes;

6. Transport GAUTENG CITY-REGION OBSERVATORY QUALITY OF LIFE SURVEY 2015 LANDSCAPES IN TRANSITION

SUMMARY OF DISCUSSION OF THE 7TH STRATEGIC PLAN COMMITTEE ON DEVELOPING ASEANSAI STRATEGIC PLAN

Highway Safety Workforce Development Committee

HEALTH AND FAMILY WELFARE (S) DEPARTMENT. G.O (MS)No.37/2012/H&FWD Dated, Thiruvananthapuram,

UEFA Coaching Convention Contract and Directive

CMM Conservation and Management Measure for the Management of New and Exploratory Fisheries in the SPRFMO Convention Area.

INTERNATIONAL DECADE OF OCEAN SCIENCE FOR SUSTAINABLE DEVELOPMENT ( ) OUTLINE

Initial Environmental and Social Examination Report Annex D

REPUBLIC OF LITHUANIA LAW ON WILDLIFE. November 6, 1997 No. VIII-498. Vilnius CHAPTER I GENERAL PROVISIONS

CODE OF CONDUCT. (Version: 1 January 2018)

TOURO LAW CENTER S 1 st ANNUAL NATIONAL MOOT COURT COMPETITION: LAW AND RELIGION. April 10-11, COMPETITION RULES

Farm Animals Breeding Act 1

Indian River County Impact Fee Update Study. FINAL REPORT Executive Summary

VOLLEYBALL ALBERTA - WEB PRIVACY POLICY

Living Streets Policy

GOLF OPERATIONS MANAGER NF

TRAFFIC STUDY GUIDELINES Clarksville Street Department

PROFESSIONAL PROGRAMME UPDATES FOR CAPITAL COMMODITY AND MONEY MARKET MODULE 3- ELECTIVE PAPER 9.2

AED Program 2017 January 2017

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT

GOLF QUEENSLAND - Selection Policy

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Sony Centre for Performing Arts

Regulations of the International Young Naturalists Tournament

NORTH ADELAIDE LOCAL AREA TRAFFIC AND PARKING MANAGEMENT ENGAGEMENT OUTCOMES EXECUTIVE SUMMARY PREPARED FOR THE CITY OF ADELAIDE

The Dispute Resolution System within the framework of FIFA

Neighborhood Traffic Calming Policy & Guidelines

Rights of Way Enforcement Procedure for Land Managers

82 ND MEETING PROPOSAL IATTC-82-A-1 PRESENTED BY JAPAN DRAFT RESOLUTION ON IATTC CATCH DOCUMENTATION SCHEME

VDOT BICYCLE & PEDESTRIAN IMPLEMENTATION GUIDE FOR LOCALITY INVOLVEMENT April 2017

The European Athletic Association (hereinafter European Athletics) shall promote a European Cross Country Championships every year.

TRAFF IC CALMING POLICY

IPC Athlete Classification Code. Rules, Policies and Procedures for Athlete Classification. July 2015

TRANSPORT PUBLIC SAFETY SERVICES THAT SUPPORT COMMUNITIES. Provide access to, from and for emergency services

EUROPEAN COMBINED EVENTS TEAM CHAMPIONSHIPS 701. PROMOTION AND RIGHTS

Bowling Green, KY Technical Appendices

CMM on Management of New and Exploratory Fisheries in the SPRFMO Convention Area

III. Player Eligibility Code

Transcription:

Social Monitoring Report 1st Semi-Annual Report October 2017 VIE: GMS Corridor Towns Development Project - Quang Tri Subproject Prepared by Consulting and Human Resource Development Company for the Quang Tri Provincial People s Committee and the Asian Development Bank.

This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

QUANG TRI PROVINCIAL PEOPLE'S COMMITTEE GREATER MEKONG SUBREGION CORRIDOR TOWN DEVELOPMENT PROJECT MANAGEMENT UNIT INDEPENDENT MONITORING REPORT ON RESETTLEMENT PLAN IMPLEMENTATION GREATER MEKONG SUBREGION CORRIDOR TOWN DEVELOPMENT PROJECT QUANG TRI SUBPROJECT Prepared by: Consulting and Human Resource Development Company Quang Tri, 2017 2

LIST OF ABBREVIATIONS PMU DMS EM LURC IMO IRP IOL PAH RF urp PPC LFDC PC SES Project Management Unit - Detailed Measurement Survey - Ethnic minorities - Land-use Right Certificate - Independent Monitoring Organization - Income Rehabilitation Program - Inventory of loss - Project affected household - Policy framework - Updated Resettlement Plan - Provincial People's Committee - Landfund Development Center - People's Committee - Socio-Economic Survey 3

TABLE OF CONTENT LIST OF ABBREVIATIONS... 3 I. Background... 6 II. Objectives, tasks and methods of monitoring... 6 2.1. Objectives and tasks... 7 2.2. Methods... 7 III. Monitoring results... 8 3.1. Desk study... 10 3.2. Information dissemination and community consultation... 10 3.3. Detailed measurement survey, preparing and approving compensation and support plan... 11 3.3.1. Detailed measurement survey... 11 3.3.2. Approval of compensation plan and payment... 13 3.3.3. The households that have not received money and reasons... 15 3.4. Resettlement... 16 3.5. Livelihood, Gender and Ethnic Minorities Program... 18 3.6. The general assessment of the implementation of compensation... 20 3.7. Complaints and settlement... 22 4.1. Conclusions... 23 4.2. Recommendations... 24 V. Appendix... 25 5.1. List of consultations... 25 5.2. Legal documents on compensation policy and compensation unit prices... 44 5.3. List of households that have not received compensation... 44 5.4. Some photos of field monitoring... 46 4

LIST OF TABLES Table 1: Survey results on project desemination of information... 11 Table 2: Number of households affected by works... 11 Table 3: Evaluation of the DMS process... 12 Table 4: Evaluation results of compensation and support unit prices... 13 Table 5: The compensation plan approval and compensation payment progress... 13 Table 6: Status of resettlement implementation... 16 Table 7: The participants in the Income Rehabilitation Program by components... 19 Table 8: Summary of livelihood activities of the Subproject... 19 Table 9: The initial evaluation of the effectiveness of the Income Rehabilitation Program... 20 Table 10: General assessment of the compensation implementation of the Subproject... 21 5

I. Background 1. The (Loan 2969-VIE) was implemented in the provinces of Quang Tri and Tay Ninh. The objective of the project is to promote the transformation of the transportation corridors in the Greater Mekong Subregion into a comprehensive economic corridor by improving urban infrastructure and institutional capacity building within the selected corridors. The project is implemented in three urban corridors: Dong Ha city, Lao Bao town, Khe Sanh town (in Huong Hoa district) Quang Tri province and Moc Bai city in Tay Ninh province. 2. In Quang Tri province, the project is implemented in Dong Ha city and Huong Hoa district (Lao Bao and Khe Sanh towns), which are on East-West Economic Corridor (EWEC). The project componentsby Quang Tri Subproject are as follows: No. Components No. Components I Dong Ha city II Huong Hoa district 1 Thanh Nien 1 Sepon River 2 2 to Dong Luong - Dong Le 3 Ba Trieu 3 To Huu 2 Cluster-4 (Doan Khue and Truong Cong Kinh) 4 Hoang Dieu 4 Hung Vuong 5 Truong Chinh 5 Flooding s 6 Le Thanh Tong 6 7 Hieu River Embankment 8 Recycling facility Solid waste collection and treatment system in Huong Hoa district 3. Currently, there are 07 updated Resettlement Plans/Resettlement Ethnic Minorities Development Plans(uRPs/uREMDPs), including: (i) urp for Thanh Nien and 2 to Dong Luong, Dong Le; (ii) urp for Ba Trieu and Hoang Dieu s; (iii) urp for Truong Chinh ; (iv) uremdpforthe along Se Pon River, Duy Tan-Cao Viet-Tan Kim (To Huu), Cluster-4 (Doan Khue and Truong Cong Kinh); (v) uremdpfor Hung Vuong and flooded s; (vi) uremdp for the solid waste collection and treatment in Huong Hoa district (Lao Bao dumping site) and (vii) urp for Dong Ha river embankment. 05 urps/uremdpsreceived non-objection letters from the ADB, and the urpsfor Dong Ha river embankment and Huong Hoa district solid waste collection and treatment are in the approving process. In addition, the urp for Le Thanh Tong is in the establishing process. There is land fund for the construction of the recycling facilities in Dong Ha city, therefore it is not necessary to set up a Resettlement Plan for this component. 4. The compensation, support and site clearanceis being implemented in all construction components of Quang Tri subproject. Dong Ha river embankment and the solid waste collection and treatment in Huong Hoa district have completed the DMS and are waiting for the urp approvalto carry out the next steps of compensation. Le Thanh Tong is the latest component but is implementing the DMS. II. Objectives, tasks and methods of monitoring 5. The independent monitoring for this report was conducted in September and ended on 28/9/2017. 6

6. The composition of the independent monitoring team consists of 4 people, including 01 resettlement specialist and 03 support staff. 2.1. Objectives and tasks 7. All independent monitoring activities for site clearance aim at achieving the objectives set out in the updated Resettlement Plan of the Project, where the most importance is to ensure the entitlements and benefits of the project affected households and theirlivelihood rehabilitation. 8. Specific objectives and tasks include: Monitor the implementation, management and keeping of records and documents at the offices; Monitor the compliance of the implementation of compensation, support and resettlement for the affected households/organizations with the Project s updated Policy Framework and urps; and Review and propose measures to resolve issues that arise during the site clearance of the affected organizations/households. Update the resettlement progress of the Project, including the dissemination of information and community consultation, DMS, resettlement planning, payment of compensation, support, provision of resettlement land and the implementation status for displaced households as well as the income rehabilitation programs etc.; Review of the compliance of the compensation and support with the approved Project s urp and the Project s Policy Framework; Assessment of the affected people s participation in the resettlement as well as their satisfaction on the resettlement, in particular, and the project, in general; Comparison of differences in number of affected households, compensation values between the urp and actual implementation; Identification of shortcomings in the implementation of resettlement, causes and recommendations for resolution; Suggestion of solutions in need to improve the efficiency. 9. In this independent monitoring stage, of the implementation of the Resettlement Plan focuses on the following: Update the urp implementation progress in all components of GMS Quang Tri subproject; Monitor the components that have paid compensation, including: Dong Ha city: (i) Thanh Nien ; (ii) 2 to Dong Le, Dong Luong; (iii) Ba Trieu ; (iv) Hoang Dieu ; (v) Truong Chinh ; Huong Hoa district: (i) the along Se Pon River; (ii) Block 4 (Doan Khue and Truong Cong Dinh); (iii) To Huu ; and (iv) Flooded s. 2.2. Methods 10. The qualitative, quantitative and field observation methods were selected for monitoring and evaluation. Specifically, the monitoring team carried out the following tasks: Working at the PMU and the LFDC offices: 7

Review documents at the offices such as the DMS records by the LFDC of Dong Ha city and the LFDC of Quang Tri province and the LFDC of Huong Hoa district; Compare benefits of APs with the benefits proposed in the approved urps; Review the pricing and the calculation ofcompensation and support values of each type of affected asset which form the total values of compensation and support for the affected people to determine the accuracy of the compensation plans. Review if the compensation and support pricingwas based on the replacement costs of the sub-project; Interview and discuss with key staff of the PPMU and the LFDCs, including: Leaders and specialists of GMS Quang Tri PPMU s site clearance team; Site clearance officers of Quang Tri LFDC and Dong Ha LFDC. In these discussions, the Consultant monitored the following issues: (i) the general progress of the project, including the compensation implementation; (ii) advantages and disadvantages in the implementation process; (ii) shortcomings in the urp implementation; (iv) Complaints, inquiries and settlement status etc. Field monitoring: Interview and discuss with local authorities, communal cadastral officials and village/hamlet/village officials to discuss (i) the project implementation process (information disclosure, DMS results, compensation payment, site clearance status); (ii) community s consensus with the project; (iii) shortcomings; Questionnaire survey was conducted with 100% of severely affected households and 20% of the total affected households. Accordingly, the survey was conducted with 436 affected households, of which 233 are severely affected (affected houses and lost from 10% of productive land) and 203 are lightly affected. Of the surveyed households, 18 are poor (4.12%), 12 are ethnic minority (2.75%) and 26 are vulnerable (5.96%). The monitoring was carried out at all compensation and supportpayment by the PPMU and the LFDCs. 2.3. The progress 11. The progress of compensation, support, site clearance and land allocation is described in the following table: No. Components Progress Note 8

I Dong Ha city 1 Thanh Nien 2 2 to Dong Luong - Dong Le 3 Ba Trieu 4 Hoang Dieu 5 Truong Chinh The compensation and site clearance has been completed for the construction units at the sections where the site clearance is complete. The compensation and site clearance has been completed for the construction units at the sections where the site clearance is complete. The compensation and site clearance has been completed for the construction units at the sections where the site clearance is complete. The compensation and site clearance has been completed for the construction units at the sections where the site clearance is complete. The compensation and site clearance has been completed for the construction units at the sections where the site clearance is complete. 6 Le Thanh Tong DMS is implementing The compensation plans for 14 households have not been approved. The compensation plans for 20 households have not been approved. The compensation plans for 132 households have not been approved. The compensation plans for 61 households have not been approved. The compensation plans for 38 households have not been approved. 7 Hieu river embankment urp is being submitted DMS is complete II Huong Hoa district 1 Road along Sepon River 2 Block 4 (Doan Khue - Truong Cong Dinh) Complete the implementation of uremdp The compensation and site clearance has been completed for the construction units at the sections where the site clearance is complete. 13 households have not received compensation 9

3 To Huu 4 Hung Vuong 5 Flooded s 6 The solid waste collection and treatment system in Huong Hoa district The compensation and site clearance has been completed for the construction units at the sections where the site clearance is complete. The compensation and site clearance has been completed for the construction units at the sections where the site clearance is complete. The compensation and site clearance has been completed for the construction units at the sections where the site clearance is complete. urp is being submitted 01 households have not received compensation 12 households have not received compensation 10 households have not received compensation DMS is complete III. Monitoring results 3.1. Desk study 12. The monitoring team worked with theppmu and the LFDCs of Quang Tri and Dong Ha and the LFDC of Huong Hoa district.there, the team accessed to compensation documents and legal documents related to compensation and site clearancefor Quang Tri subproject. The monitoring results show that the offices have kept full project documents likedecisions on promulgation of compensation unit prices and approval of compensation plans, minutes of DMS, resettlement, compensation and support plans, minutes of compensation payment signed by the affected individuals/organizations. 13. The minutes of DMS were prepared according to the project form, clearly showing the quantity of affected asset. The compensation planswere clear and transparent, whichclearly show the quantity, unit prices and value of assets. The monitoringteam randomly checked 20% of the compensation plans and found that all were checked withouterrors. 14. The compensation dossiers are archived scientifically and convenient for reference. 3.2. Information dissemination and community consultation 15. The dissemination of information and community consultation are carried out by GMS Quang Tri PPMU in collaboration with the officers of the communes/wards and maintained throughout the project implementation. 16. During the RP update period, along with the implementation of the DMS, a socioeconomic survey was conducted by the Independent Monitoring Consultant for all Quang Tri subproject components. This survey was conducted with 100% of severely affected households and vulnerable households according to the definition by the Donor. The dissemination of information and public consultation in the implementation phase was paid with special attention, especially the consultations before the DMS and the public listing of DMS results as well as compensation plans. During this phase, at least 2 consultations were conducted for each subproject component. In addition, after the publicly listing of DMS results and compensation plans, the PPMU and the LFDCs regularly hold meetings, dissemination and explanation of the DMS results or resettlement, compensation and support plans. 17. The contents of information to be transmitted include: General information about the project such as Project Owner, Donor, total investment, project components, compensation 10

prices, data on damages of affected households, benefits of compensation and support, implementation plan likedms time, compensation payment time, construction time. The differences between the ADB Policy and the Vietnamese Law as well as the policies applied to Quang Tri subproject were mentioned in the consultations. 18. The forms of information include: information through the media, information through loudspeaker systems, community consultationsby the PPMU and the consultancy units, participating in the IOL and SES surveys and public listing etc. 19. The survey results on the project dissemination show that basically AHs received theproject information and know well about the damage data, the unit prices applied by the subproject and the benefits and entittlements of compensation, support they are entitled to. The following survey table will reflect this. Table 1: Survey results on project desemination of information Very pleased Pleased Unpleased Do not know, do not participate Total Number of households Percentage (%) 178 219 22 17 436 40.83 50.23 5.05 3.90 100.00 20. Of the 436 surveyed households, 40.8% of the households arevery pleased, 50.2% arepleased with the information provided for them, only 5.0% are unpleased. In addition, 17 households (3.9%) replied that they neither know about project information nor attend information meetings. 3.3. Detailed measurement survey, preparing and approving compensation and support plan 3.3.1. Detailed measurement survey 21. The detailed measurement survey (DMS) and the compensation planningfor GMS Project of Quang Tri province were conducted by Quang Tri LFDC, Dong Ha LFDC and Huong Hoa LFDC. 22. In order to carry out the DMS, DMS team of the LFDCs was established, including: PPMU representatives, LFDC members, representatives of affected villages/hamlets and representatives of the People's Inspectors. The DMS wasimplemented publicly and transparently. Before carrying out the DMS, through the local authorities, the PPMU and the LFDCs informed the DMS plan to the affected households in orderthat they could take time to join the DMS team, thus limiting confusion, errors or questions about DMS results. 23. As mentioned above, the DMSfor all works has been basically completed, except Le Thanh Tong, which is in the process of implementation. Accordingly, there are 2,061 households/organizations (hereinafter referred to as households) affected by the subproject, in which the construction works in Dong Ha city affect 1,086 households and the construction works in Huong Hoa district affect 975 households. The details of affected households are presented in Table 2 below. Table 2: Number of householdsaffected by works No. Components urp Actually Notes I Dong Ha city 1,086 1,086 1 Thanh Nien 190 190 11

2 2 to Dong Luong - Dong Le 180 180 3 Ba Trieu 241 241 4 Hoang Dieu 226 226 5 Truong Chinh 84 84 6 Le Thanh Tong Implementing DMS 7 Hieu River Embankment 165 165 II Huong Hoa district 1,003 975 1 Sepon River 216 216 2 Cluster-4 (Doan Khue and Truong Cong Kinh) 119 122 3 To Huu 120 120 4 Hung Vuong 97 97 5 Flooding s 407 376 6 Solid waste collection and treatment system in Huong Hoa district 44 44 Total 2,089 2,061 Reduce of affected household number because of not investing in Cao Thang. Compensation plan is not approved. 24. The number of households in reality compared to the RP differs by 28 households. The cause of the difference is mainly due to the fact that the subproject does not invest in Cao Thang (in the coponent of flooded s). Other routes do not substantially differ. 25. In terms of the DMS implementation, among 436 interviewed households (98.85%) 431had household heads or household members directly involved in the DMS process. In terms of the DMS results, 429 households (98.39%) said that the DMS was sufficient compared to the actual assets, only 7 households (1.61%) said that the DMS was incorrect or missing withwrong type, size etc. 26. In terms of publicity, 433 households (99.31%) said that the DMS was open and transparent with the participation of many stakeholders, including representatives from residential areas and affected households. They also said that the DMS plan was announced in advance therefore they could take time to join, only 0.69% (03 households) said thatthey did not known before the DMS plan, therefore they could not participate. After the DMS finished, the DMS minutes were approved and signedby the stakeholders, including the household represetatives. The details are in Table 3. Table 3: Evaluation of the DMS process Participating in DMS Participating Not participating Participating in Correct, enough Missing Disclosure information of DMS Publicity, transparency Not public Number of households 431 5 429 7 433 3 % 98.85 1.15 98.39 1.61 99.31 0.69 12

3.3.2. Approval of compensation plan and payment 3.3.2.1. Approval of compensation plan 27. Among 14 construction components in Quang Tri province,apart from the construction of the recycling facilitywhich is not engaged in land acquisition, 13 componentsmust carry out resettlement. At present, the subproject has approved the compensation, support and resettlement plans for10 works: (i) Thanh Nien ; (ii) 2 to Dong Luong - Dong Le; (iii) Truong Chinh ; (iv) Ba Trieu ; (v) Hoang Dieu ; (vi) Hung Vuong ; (vii) Flooding s; (viii) Cluster-4 (Doan Khue and Truong Cong Kinh, (ix) the along Sepon River, and (x) Duy Tan-Cao Viet-Tan Kim (To Huu ). Other works: (i) the solid waste collection and treatment system in Huong Hoa district, (ii) Le Thanh Tong, and (iii) Song Hieu river embankment has not been approved due to waiting for the RP approval or under the DMS implementation process. 28. However, for the subproject components that completedthe DMS, due to the progress requirement, the PPMU and the LFDCs did not develop and approve the compensation plansfor the whole routesbut section by section. Accordingly, out of the 2,061 affected households joined in the DMS (excluding Le Thanh Tong which has not implemented the DMS), now 1,587 compensation plans were approved (77%), of which Huong Hoa district approved for 931/975 affected households (95.48%) and Dong Ha city approved 656/1086 affected households (60.4%). 29. At present, in Huong Hoa district, only the compensation plan for thesolid waste collection and treatment system has not been approved, other works have been approved. However, in Dong Ha city, apart from the compensation plans ofhieu River Embankment and Le Thanh Tong have not been approved, other works have been approved. The details of the implementation of the compensation plans are presented in Table 5. 30. The compensation and support plans are developed pursuant to the policies specified in the urps and in line with the project policy framework. The unit pricesapplicable to calculate the compensation and support are based on the replacement costs established by the Consultancy Unit and approved by Quang Tri Provincial People's Committee. 31. The consultations with the communal leaders as well as the AHs on the compensation,support unit prices of residential land, agricultural land, buildings and crops show that most of them have the same opinion that the unit prices of the subproject is reasonable and acceptable. For this assessment, from 86% to 94% of the households whose residential land, agricultural land and crops are affected accept the compensation prices, onlythe rating for the prices of houses and buildings is lower ( 70.4%). The number of households evaluating the prices as equal to market ratesis low at 1% to 4%; for all types of assets, below 10% of the households said that they are slightly lower than market prices;from 2.16% to 17.6% said that the compensation prices are too low and unacceptable, of which the highest is relating to the unit prices of works and structures (17.6%), while other assets isbelow 10%. Type of property Table 4: Evaluation results of compensation and support unit prices Appropriate to market prices Acceptable Slightly lower than market prices Too low, inappropriate Total Nb % Nb % Nb % Nb % Nb % Residential land 4 1.34 258 86.29 12 4.01 25 8.36 299 100.0 Agricultural land 1 0.72 131 94.24 4 2.88 3 2.16 139 100.0 13

Houses, buildings 5 4.00 88 70.4 10 8.00 22 17.60 125 100.0 Plants and crops 5 1.19 390 92.86 8 1.90 17 4.05 420 100.0 14

N o. Components HHs I Dong Ha city 1,08 6 Table 5: The compensation plan approval and compensation payment progress urp Amount 227,461,573, 000 1 Thanh Nien 190 20,819,180,0 00 2 to 2 Dong Luong - 180 51,088,488,0 Dong Le 00 3 Ba Trieu 241 28,558,698,0 00 4 Hoang Dieu 226 89,275,040,0 00 5 6 7 II Truong Chinh Le Thanh Tong Hieu River Embankment Huong district Hoa 84 23,531,816,0 00 HH s 656 176 160 109 165 46 Practical implementation Approved Paid Unpaid Amount HH HH Amount s s 155,582,53 5,000 16,773,973, 000 49,706,613, 000 9,483,329,0 00 65,649,775, 000 13,968,845, 000 638 174 159 108 158 39 144,024,336, 000 16,347,497,0 00 48,555,720,0 00 9,248,411,00 0 60,490,442,0 00 9,382,266,00 0 18 2 1 1 7 7 Amount 11,558,199,000 426,476,00 0 1,150,893, 000 234,918,00 0 5,159,333, 000 4,586,579, 000 Notes Unit: VND The compensation plans for 14 households have not been approved The compensation plans for 20 households have not been approved The compensation plans for 132 households have not been approved The compensation plans for 61 households have not been approved The compensation plans for 38 households have not been approved 0 0 0 0 0 0 0 0 The DMS is in progress. 165 14,188,351,0 00 1,00 3 67,647,328,8 21 1 Sepon River 216 16,449,252,0 00 0 0 0 0 0 0 931 68,394,387, 000 216 19,278,859, 000 895 59,976,208,0 00 216 19,278,859,0 00 36 8,418,179, 000 0 0 The compensation plans have not been approved.

2 Cluster-4 (Doan Khue and Truong Cong Kinh) 119 11,079,688,0 00 122 12,568,448, 000 109 9,413,162,00 0 13 3,155,286, 000 Number of AHs and compensation value is reduced due to design adjustment 3 To Huu 120 4,822,304,00 0 120 5,553,296,0 00 119 5,526,604,00 0 1 26,692,000 The compensation value is reduced due to design adjustment 4 Hung Vuong 97 21,241,226,8 57 97 21,540,891, 000 85 17,161,962,0 00 12 4,378,929, 000 5 Flooding s 407 9,344,557,07 6 376 9,452,893,0 00 366 8,595,621,00 0 10 857,272,00 0 Number of AHs and compensation value is reduced because Cao Thang is not invested. 6 Solid waste collection and treatment system in Huong Hoa district Total 44 4,710,300,88 8 2,08 9 295,108,901, 821 1,5 87 0 0 0 0 0 0 The compensation plans have not been approved. 223,976,92 2,000 1,5 33 204,000,544, 000 54 19,976,378,000 14

32. At present it is too early to compare the number of households and the compensation value between the approved urps with the actual implementation of the whole Project. The comment above is because there are only 5/13 components which basically completed the resettlement plan (in Huong Hoa district), 08 components are still in the implementation stage, in which some components are preparing compensation plans and even some components are implementing the DMS (Le Thanh Tong ). 33. However, it is preliminary comparison that the components was basically completed in Huong Hoa district without major change. Accordingly, the number of affected households was only changed in 2 components: Cluster-4 (reduces 3 households) due to the adjustment of the design to reduce damage to people and the flooded s reduce 28 HHs because the Project does not invest in Cao Thang (Lao Bao town). In terms of value, for all 4 components in Huong Hoa district, the compensation reduced. The main reason is narrowing the scope of land acquisition. However, the exact comparison was made only for 2 works, Cluster-4 and To Huu, which completed the compensation, support and site clearance and rewarded for timely site clearance. In addition, for Hung Vuong and flooded s, although the compensation plans for the whole routes completed, the reward for timely site clearance have not been approved, therefore the compensation data for these routes is not final. 34. For Dong Ha city, among 07 components of works, no-one completes the compensation and site clearance on the whole. According to the preliminary statistics of these routes, the compensation plans for 430 households have not approved, not including Le Thanh Tong route which has no data on the number of affected households as the DMS is not completed. The comparison in Dong Ha city will be resumed in the next monitoring report. The details of households, compensation value between urp and actual implementation is shown in Table 5. 3.3.2.2. The payment of compensation, support 35. The total approved amount of compensation, support and resettlement of 10 routes is VND 223,976, 922,000 (This amount does not include 2% of operation cost for LFDCs). The compensation and support funding for the routes in Huong Hoa district is VND68,394,387,000 and Dong Ha city is VND155,582,535. 36. Up to now, the compensation has been paid to 1,533 households (96.59%) with the amount of VND 204,000,544,000 (91.08%), of which for the s of Huong Hoa district the compensation includes 895 households (96.13%) with the amount of VND 59,976,208,000,for Dong Ha city the compensation includes 638 households (97.26%) with the amount of VND 144,024,336,000 (92.57%). 3.3.3. The households that have not received money and reasons 37. Up to now, out of the total number of households whose compensation plans were approved, there are 54 households (3.40%) with the amount of VND 19,976,378,000 (8.91%) have not been paid, in which Huong Hoa has 36 households (3.87%) with the compensation amount of 8,418,179,000 (12.30%) and Dong Ha has 18 households (2.74%) with the amount of VND 11,558,199,000 (7.43%). 38. There are groups of causes leading to households not receiving compensation: (i) Low compensation prices (29 households); (ii) Waiting for resettlement land plots/disagreement with resettlement plots (2 households); (iii) Proposing for allocation of resettlement land (5 households); (iv) Proposing for rechecking affected asset (4 households); (v) Disagreement with the land classification in compensation plans/proposing 15

for land compensation (4 households); and (vi) 10 households were absent at the compensation payment, therefore they have not received their compensation money. 39. The details of the number of households, compensation and support amounts that were approved and paid andthe number affected people who have not received compensation money are shown in Table 5. The list of households who have not received compensation is presented in Appendix 5.3. 3.4. Resettlement 40. Up to now, the Subproject identified150 affected households, in which 37 fully affected households have no land for rebuilding housesand have tomove to Resettlement Site, 113 other households have sufficient remaining land, therefore they resettle on site and built and repaired houses on their remaining land. The above figures are calculated for the cases whose compensation planswere approved. 41. For the households whose houses are affected, in addition to compensation, support pursuant to thesubproject s unit prices and policy, if they do not have sufficient land to rebuild houses, they will be relocated to Resettlement Sites. The allowances or supports are provided to the resettled households in addition to compensation money such as stable-life support, relocation support, temporary residence support etc. Table 6: Status of resettlement implementation No. Components Number of resettlement households I Dong Ha city 25 1 2 to Dong Luong-Dong Le 2 Hoang Dieu 6 3 Ba Trieu 3 4 Truong Chinh 12 II Huong Hoa district 12 1 The along Sepon River 4 5 Name of resettlement site 3 households move to the resettlement site of Living Quarter 5 - Dong Le ward and 01 household move to Southern Dong Ha resettlement site. Northern Hieu river resettlement site. Khoa Bao and Thanh Co (ancient town) resettlement sites. 09 households move to Truong Chinh - Le Thanh Tong resettlement site. 03 households move to small land managed by ward 5. Khom resettlement site. Cao Status of implementation The procedure for land allocation is in progress. The households still live on the acquired land. The procedure for land allocation is in progress. The households still live on the acquired land. The procedure for land allocation is in progress. The households still live on the acquired land. The procedure for land allocation is in progress. The households still live on the acquired land. The land is allocated. The households built houses and stabilized 16

2 Cluster 4 4 3 Hung Vuong 3 Hung Vuong resettlement site. Hung Vuong resettlement site. their lives. The procedure for land allocation is in progress. The households still live on the acquired land. The procedure for land allocation is in progress. The households still live on the acquired land. 42. As Quang Tri GMS sub-project has a small number of relocated households and people are dispersing, Quang Tri province has been planning and constructing Resettlement Sites for relocation and resettlement of affected households when implementing projects in the province,therefore, Quang Tri GMS sub-project does not design new Resettlement Sites but uses existing Resettlement Sites in Quang Tri province, Dong Ha city and Huong Hoa district. 43. The displaced households selected Resettlement Sites according to their aspirations and the list prepared by Quang Tri GMS PPMU and Huong Hoa District for the subproject. Accordingly, 06 resettled households affected by Hoang Dieu will enter the Northern Resettlement Site of Hieu River. At present, they have selected resettlement plots and the City LFDC is finalizing the dossiersfor submission to the People's Committee of Dong Ha city for approving the resettlement plan. 44. For Ba Trieu, 03 affected householdswill move into the Resettlement Site of Block 2 of Khoa Bao and Thanh Co s. At present, Quang Tri GMS PPMU and the Provincial People's Committees are compiling dossiers and procedures for the households that select resettlement plots. 45. The relocated households (4 households) affected by Thanh Nien and 2 to Dong Le - Dong Luong will be allocated in Resettlement Sites: 3 households in Block 5 of Dong Le ward (the households affected by 2 to Dong Le - Dong Luong) and 01 household (affected by Thanh Nien ) to the SouthernResettlement Site of Dong Ha city. The process of division of resettlement plots is still ongoing.the households have not moved to the Resettlement Site. 46. In Huong Hoa district, the concentrated resettlement households affected by the construction in Lao Bao town include:the along Sepon River, the flooded s,are arranged intheresettlement Site of Cao VietCluster. At present, the subproject has completed resettlement land for them. They received and moved to resettlement land and handed over their acquired land to the Project for construction. 47. The concentrated resettlement households affected by construction in Khe Sanh town include Cluster-4 (Doan Khue and Truong Cong Kinh), Hung Vuong are relocated at Hung Vuong Resettlement Site. At present, the subproject is carrying out necessary procedures to prepare resettlement land for the households. 48. It can be said that the pace of allocation of resettlement land for the affected households is slow, which isone of the causes to the subproject delay.however, the Project does not have to provide additional rental assistance to households who have not been allocated resettlement land because they have neither received resettlement land nor handed over site for the Project. 17

49. Currently, most households that resettle on their remaining land cleared the site, built/repaired houses and stabilized their lives. For these households, their lives are not affected much because they do not have to move. The monitoring team went to the site and took pictures of the new houses or built-up works of these households (Appendix 5.5).All 113 households that have to build and repair houses do not have to rent houses during construction because they can take advantage of the rest of their houses which are not demolished or live with relatives. 3.5. Livelihood, Gender and Ethnic Minorities Program 50. The Income Rehabilitation Program of the subproject has been integrated through the compensation, support and resettlement of the subproject such as support for living stabilization of the severely affected households (lost from 10% of productive land or income), support for job change and looking for new jobs for households whose agricultural land is acquired, support for business affected households, special support for vulnerable groups (7,000,000 VND/household). The support for the households whose business is affected has been paid, too. Accordingly, the affected households would be provided with one time allowance in cash as follows: (i) For affected households that have business registration, the support is 70% of excise tax; (ii) For households that don t have business registration, the support is 70% of the minimum excise tax (693,000 VND/household). 51. A separate Income Rehabilitation Programhas been developed for Quang Tri GMS Subproject. Accordingly, the support activities have been implemented: - Training on improving knowledge and skills related to the following contents: Business planning and small business start-up; Use of compensation money to make profits; - Support to practice breeding models: goats, chickens, pigs: Training on transfer of goat, chicken and pig breeding techniques; Allocation of goats, chickens and pigs to affected households; - For the s of Sepon River, To Huu, Cluster-4, 54 households received breeding chickens. Each household received 23 chickens of 21-days-old which were vaccinated and quarantined according to the regulations, 01 feeding trough and 01 water trough. 22 households received piglets. The level of support for the breeding model is 1,500,000 VND/household; - For 43 households living in Ka Tup hamlet, each household received 2 breeding goats, with an average weight of 8-12kg/head, the average support level is 4,000,000 VND/household. 52. Participants in the Income Rehabilitation Program are severely affected households (affected houses or houses lossing from 10% of productive land), vulnerable households and affected business households. 53. According to the DMS as well as the survey results for the development of the income rehabilitation program for the whole project (excluding Le Thanh Tong which is being in DMS implementation, therefore the data is not updated), there are 712 households participating in the income rehabilitation program, in which Dong Ha has 489 households and Huong Hoa has 223 households. Classified by subjects, there are 183 households whose houses are affected, 210 households which lossing from 10% production land or income source, 223 vulnerable households, and 96 households whose business is affected. 54. Currently, the income rehabilitation program has been implemented for 9 components: (i) Thanh Nien ; (ii) 2 to Dong Le, Dong Luong; (i) Ba Trieu 18

No. ; (iv) Hoang Dieu ; (v) the along Sepon River; (vi) To Huu ; (vii) Block 4 ; (viii) Hung Vuong ; and (ix) flooded s. The number of households participating in the IRP of these 9 components includes 551 households. However, in practice, there are only 484 households because some households may belong to different groups of participants in the IRP. For example, a household may suffer from both lossing houses and lossing from 10% productive land and/or subject to vulnerable groups and/or subject to affected business. 55. According to the present data update, 133 households have affected houses, 96 households loss from 10% of their land, 181 households are vulnerable households and 74 affected business households, which have participated in the Income Rehabilitation Program of the Project. The detailed data are presented in Table 7. Component Table 7: The participants in the Income Rehabilitation Program by components House AHs AHs losing from 10% of land Total Poor Female heads of households Vulnerable AHs Disabled people Helpless old people Policy households Ethnic minorities Business AHs I Dong Ha city 83 69 60 19 11 10 5 14 1 71 283 1 Thanh Nien 3 0 18 3 1 5 0 9 0 6 27 2 2 to Dong Luong-Dong Le 28 26 22 9 6 2 3 1 1 0 76 3 Hoang Dieu 35 1 18 7 3 2 2 4 0 60 114 4 Ba Trieu 17 42 2 0 1 1 0 0 0 5 66 II Huong Hoa district 50 27 121 11 39 7 6 14 44 3 201 1 Cluster 4 15 0 5 1 0 0 4 0 0 1 21 2 Hung 28 16 4 2 2 0 0 0 0 2 Vuong 50 3 To Huu, Se 6 11 81 3 19 6 2 8 43 0 Pon s 98 4 Flooded 1 0 31 5 18 1 0 6 1 0 s 32 Total 133 96 181 30 50 17 11 28 45 74 484 56. Up to the present, the Income Rehabilitation Program implemented the training activities throughout the subproject. The seed distribution has been completed in Huong Hoa district (except the solid waste collection and treatment component). For Dong Ha city the seed distribution have been completed for four s of Thanh Nien, 2 to Dong Le - Dong Luong, Hoang Dieu and Ba Trieu. Other works includinghieu River Embankment, Truong Chinh, Le Thanh Tong have not yet implemented. 57. The number of households involved in the Income Rehabilitation Programincludes 484, of which Huong Hoa district has 201 households and Dong Ha city has 283 households. The number of breeding animals which have been allocated is 12,300, of which the number of chickens is 121,922 (419 households); the number of pigs is 22 (22 households) and the number of goats is 86 (43 households). Please refer to Table 8 for details. Table 8: Summary of livelihood activities of the Subproject Total 19

No. Activities Number of households Number of seed Other support Total I Huong Hoa district 201 3,810 1 Chicken breeding 54 23 01 feeding trough, 01 water trough, 25 kg animal food 1,242 2 Chicken breeding 82 30 No 2,460 3 Pig breeding 22 1 No 22 4 Goat breeding 43 2 No 86 II Dong Ha city 283 30 8,490 1 Chicken breeding 283 30 No 8,490 Total 484 12,300 58. The seed distribution to the households participating in the Income Rehabilitation Programhas been implemented in July and August 2017. The livelihood activities were developed methodologically from the assessment of demand to the implementation of activities,which were consulted with theaffected people. 59. Monitoring the compensation plan, we can affirm that the income restoration program as well as the community consultation and the policies set out in the urp/uremdp for vulnerable groups were fully implemented by GMS Quang Tri PMU. 60. At present, it is too early to evaluate the effectiveness of the Income Rehabilitation Program because the livestock provisionhave been implemented for about one month. However, during the monitoring, we preliminarily assessed the program through questionnaires to the households. The results are as follows: Table 9: The initial evaluation of the effectiveness of the Income Rehabilitation Program Nb % Very effective 3 1.48 Being effective 57 28.08 Not assessed (just feeding) 106 52.22 Ineffective 37 18.23 Total 203 100.00 61. Among 203 households participating in the Income Support Program, when being interviewed, about 50% said that it is not able to be evaluated now because they has just started the breeding, 57 households (28.08%) said that it is being effective, only 3 households (1.48) said that it is very effective, and 37 households (18.23%) said that it is not effective. Learning whyit is ineffective, we know that among 37 households, 21 households (56.8%) whose animals were dead from disease, 12 households (32.4%) said due to poor quality of seeds and 4 households (10.8%) said that the animals are not good at climate. 3.6. The general assessment of the implementation of compensation 62. It can be said that up to now the implementation of the Resettlement Plan of the, Quang Tri subproject has achieved above 2/3 of the workload. However, the activities related to this work are still 20

No. 1 2 3 4 ongoing, therefore the understanding of AHs' assessment on compensation, support and resettlement plays a very important role. The results of this assessment will help the project implementers to have a holistic view and draw experiences in the implementation process. 63. During the September 2017 monitoring period, the Independent Monitoring Consultant sought to the assessment of people's perceptions of all aspects of the project from disclosure of information, DMS, income rehabilitation, compensation, to the issues related to the implementation process, complaints and grievance redress as well as the satisfaction of the AHs. The details are intable 8 below. 64. The overall satisfaction of compensation is rated good, when 83.72 respondents said that they are pleased, 12.16% said that they accepted, and only 3.9% said that they are unpleased. 65. Assessing according to the criteria, we learn that the information dissemination and community consultation of the subproject was highly appreciated, when 51.15% are totally pleased, 7.8% are pleased, 41.06% are acceptable, no one are unpleased or very unpleased about this. Next to the DMS, 39.45% of the households are very pleased, 14.45% are pleased, 44.72% are acceptable, and only 1.38% is unpleased. 66. The affected people s assessment is not high in relation to complaints and grievance redress, compensation costs (in particular compensation for buildings and residential land) and support for income rehabilitation. Accordingly,regarding complaints and grievance redress, among 17 households that complained, 11 households (64.71%) are unpleased, 03 households (17.65%) are very unpleased, and 03 are acceptable. At a lower level, 16.54% of the households are unpleased about the unit prices of structural compensation, while the very unpleased figure is 3.94% and the acceptable figure is 40.16%. Similarly, for the supports and Income Rehabilitation Program, 13.29% of the households are unpleased, 38.73% are acceptable, however, the satisfaction of the people remains high (47.98%). The households that are unpleased due to deadanimals or because their animals do not grow. The details are referred to Table 10. Table 10: General assessment of the compensation implementation of the Subproject Activities Information dissemination and consultation with affected people Inventory of affected assets Land compensation prices Agricultural land compensation prices Very pleased Pleased Acceptable Unpleased Very unpleased Total Nb % Nb % Nb % Nb % Nb % Nb % 223 51.15 34 7.80 179 41.06 0-0 - 436 100.00 172 39.45 63 14.45 195 44.72 6 1.38 0-436 100.00 0-100 34.72 161 55.90 21 7.29 6 2.08 288 100.00 1 0.68 105 71.92 40 27.40 0-0 - 146 100.00 5 House/building 0-50 39.37 51 40.16 21 16.54 5 3.94 127 100.00 21

6 7 8 9 10 11 12 compensation prices Payment of compensation Resettlement places Complaints and settlement of complaints Support and livelihood restoration Coordination between agencies in the implementation of compensation Monitoring the implementation of compensation, support and resettlement Overall assessment of their satisfaction with the compensation of the Subproject. 1 0.25 225 55.15 178 43.63 4 0.98 0-408 100.00 3 2.86 74 70.48 22 20.95 4 3.81 2 1.90 105 100.00 0-0 - 3 17.65 11 64.71 3 17.65 17 100.00 0-166 47.98 134 38.73 46 13.29 0-346 100.00 0-366 84.14 55 12.41 15 3.45 0-436 100.00 2 0.46 367 84.17 52 11.93 15 3.44 0-436 100.00 1 0.23 365 83.72 53 12.16 17 3.90 0-436 100.00 3.7. Complaints and settlement 67. Quang Tri PMU, Dong Ha DRC, Huong Hoa DRC, and CPCs where the subproject runs through were very concerned with the expectation and questions of people related to the subproject implementation. So any complaint or question of AHs could be conveyed to authorized agencies in the following procedures: 68. AP might address a complaint/grievance related to the compensation, land acquisition to the CPC in writing or verbally; and within 15 days upon the receipt of such the complaint/ grievance, CPC would hold a informal meeting between the AP and the chairman of the CPC to hear to problem; 69. If the CPC could not address the AP s concerns to his/her satisfaction, such the complaint/grievance could be raised to the DPC. Within 30 working days from the receipt of the complaint/grievance, the DPC would give the decision; 70. If the DPC could not address the AP s concerns to his/her satisfaction, such the complaint/grievance could be raised to the PPC. Within 30 working days from the receipt of the complaint/grievance, the PPC, together with PRC and PIU would give the decision. 71. If AP still did not satisfy with the PPC s decision, they could submit the case to the Provincial People s Court. This is the final source to deal with the compliant/grievance. 22

72. In fact, during the land acquisition and compensation process, most of complaints of AHs were solved up by DRC and CPCs at the commune level, so none of them had to log to higher level. 73. There are 31 complaints from AHs to the Compensation and Site Clerance Committee. At present, 30 cases have been resolved and all agreed with the Project s solutions except one case that has just sued the complaint and is in the settlement process. IV. Conclusions and Recommendations 4.1. Conclusions 74. The implementation of compensation, support and site clearance of Quang Tri GMS subproject is being implemented simultaneously in all construction components. Due to the demand for progress to avoid the rainy season, the PPMU and the LFDCs participated in the compensation, which have been divided into phases in each components of works. At present, the compensation workloadhas been completed about 80%.The Income Rehabilitation Program has been implemented.the construction of some components have been allowed. 75. The DMShas beencompleted for 12 construction components throughout Quang Tri sub-project, except Le Thanh Tong, which is implementing the DMS. Accordingly, the total of 2,061 affected households wereparticipated in the DMS, of which thecompensation plans of 1,587 households were approved. At present, the compensation has been paid to 1,533 out of 1,587 affected households whosecompensation plans were approved, while the rest of 54 affected households have not received compensation. 76. The activities of the Income Rehabilitation Program have been implemented. Accordingly, 484 households have joined in the Project sincome Rehabilitation Program. Apart from the training and capacity building, the households participating in the program wereprovided with breeding livestock, including: Chickens, Pigs and Goats. However, the preliminary assessment of the Income Rehabilitation Program shows that the program has not been as effective as expected as breeding animals died many and in some households their breeding animals died all, especially chicken. 77. The compensation, support and resettlement complies with the urps/uremdpswhich were approved by the ADB and Quang Tri PPC. 78. The compensation and support unit prices were made on the basis of replacement costs. Please see Appendix 5.2 for more details. 79. The implementation of the subproject receives the high consensus of the majority of people as well as the affected people. Through the monitoring, we found that over 80% of the affected households are pleased with the project implementation. 80. However, the implementation of the subproject remainscertain shortcomings, leading to complaints or dissatisfaction of affected people, for example, the compensation prices of land (especially at the cross-sections), the compensation prices for structures and buildings, the settlement of complaints by the APs, especially the time to respond to complaints, and the effectiveness of the Income Rehabilitation Program. 81. The progress of approving the compensation plans for the rest of sections remains slow, leading to pressing concerns among the people. 23

82. The delay in the land allocation documentation makes some households can not hand over land to the subproject. 4.2. Recommendations 83. Quang Tri GMS-PMU should coordinate with the LFDCs and the People's Committee of Dong Ha city to accelerate the preparation and approval of compensation plans for remaining routes to pay compensation to AHs. 84. Quang Tri GMS-PMU should cooperate with Dong Ha People's Committee, Huong Hoa People's Committee and the People's Committees of the communes/wards/towns to resolve 54 cases of households that have not received compensation money. 85. The LFDCs need to quickly process the land allocation dossiers and submit them to Dong Ha CPC to decide allocation of resettlement land to the households that have to move to the resettlement sites to stabilize their lives and livelihoods. 86. The LFDC of Huong Hoa district needs to quickly synthesize and approve the reward site clearance policy for the households that received compensation in the areas of Cluster-4 and flooded s as the routes basically completed the implementation of the urp (except some households that have not received compensation money as mentioned above). 87. To improve the efficiency of the Income Rehabilitation Program, we believe that apart from improving the quality of breeding stock, the most importance is improving the technical breeding level of the households like the periodic vaccination and standard breeding facilities. 24

V. Appendix 5.1. List of consultations Address Type of affection Objects No Components Village/te am/cluste r Commune/war d/town Distric Full name of HH heads Affected house Affected from 10% producti ve land Slightly affecte d Poor hous ehold s EM Vulner able house holds Join in the Livelihoods program 1 Truong Chinh 10 5 Dong Ha city Trần văn Hóa 1 2 Truong Chinh 10 5 Dong Ha city Trương Đức Tĩnh 1 3 Truong Chinh 10 5 Dong Ha city Nguyễn Tiến Dũng 1 4 Truong Chinh 10 5 Dong Ha city Nguyễn Trung 1 5 Truong Chinh 10 5 Dong Ha city Nguyễn Hữu Xanh 1 6 Truong Chinh 10 5 Dong Ha city Nguyễn LY 1 7 Truong Chinh 10 5 Dong Ha city Nguyễn Thị Ngân 1 8 Truong Chinh 10 5 Dong Ha city Trần Văn Bích 1 9 Truong Chinh 9 5 Dong Ha city Nguyễn Văn Phương 1 1 10 Truong Chinh 9 5 Dong Ha city Lê ĐÌnh Phú 1 1 11 Truong Chinh 9 5 Dong Ha city Hồ Duy Tuấn 1 12 Truong Chinh 9 5 Dong Ha city Mai Thị Phương 1 13 Truong Chinh 9 5 Dong Ha city Mai Thị Thu Hằng 1 14 Truong Chinh 9 5 Dong Ha city Đào Văn Hải 1 15 Truong Chinh 9 5 Dong Ha city Đào Văn Hiên 1 16 Truong Chinh 9 5 Dong Ha city Đào Văn Quế 1 17 Truong Chinh 9 5 Dong Ha city Phan Thị thu Vân 1 18 Truong Chinh 9 5 Dong Ha city Đào Thị hồng 1 19 Truong Chinh 7 5 Dong Ha city Lương Văn Phú 1 20 Truong Chinh 7 5 Dong Ha city Nguyễn Hùng 1 25

21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 Đai Áng Đai Áng Đai Áng Đai Áng Đai Áng Đai Áng Đai Áng Trung Chi Trung Chi Trung Chi Trung Chi Trung Chi Trung Chi Trung Chi Trung Chi Trung Chi Trung Chi Đông Lương Đông Lương Đông Lương Đông Lương Đông Lương Đông Lương Đông Lương Đông Lương Đông Lương Đông Lương Đông Lương Đông Lương Đông Lương Đông Lương Đông Lương Đông Lương Đông Lương Dong Ha city Lê Xuân Thông 1 Dong Ha city Nguyễn Văn Bích 1 Dong Ha city Nguyễn Văn Thủy 1 Dong Ha city Lê Thị Quy 1 1 Dong Ha city Nguyễn Thị Huyền 1 Dong Ha city Nguyễn Quế 1 1 Dong Ha city Nguyễn Thị Bốn 1 1 Dong Ha city Trần Văn Hai 1 1 Dong Ha city Trần Lục 1 1 Dong Ha city Lê Văn Cao 1 1 Dong Ha city Trần Đức Tính 1 1 Dong Ha city Lê văn Ký 1 1 Dong Ha city Trần Sản 1 1 Dong Ha city Trần Văn Lô 1 1 Dong Ha city Lê Thị Trà 1 1 Dong Ha city Lê Thị Thể 1 1 Dong Ha city Hoàng Hiền 1 1 1 2 Dong Ha city Trần Văn Dũng 1 1 2 Dong Ha city Phạm Thị Hồng 1 1 2 2 Dong Ha city Hoàng Thị Sen 1 2 2 Dong Ha city Nguyễn Đức Chiến 1 1 26

42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 2 2 Dong Ha city Hoàng Thị Sáu 1 1 1 2 2 Dong Ha city Phan văn Thương 1 2 2 Dong Ha city Hoàng Văn Trữ 1 5 2 Dong Ha city Nguyễn Thị Ly 1 1 4 2 Dong Ha city Hoàng Tùy 1 1 1 2 Dong Ha city Nguyễn Công Thức 1 1 1 2 Dong Ha city Nguyễn Công Tuấn 1 1 5 2 Dong Ha city Nguyễn Văn Liên 1 1 1 2 2 Dong Ha city Hoàng Khuyến 1 1 3 2 Dong Ha city Hoàng Thị Huệ 1 1 3 2 Dong Ha city Hoàng Sá 1 1 3 2 Dong Ha city Hoàng văn Trâu 1 1 4 2 Dong Ha city Hoàng Đảo 1 1 6 2 Dong Ha city Trần Vinh 1 1 6 2 Dong Ha city Hoàng hữu Chiểu 1 1 8 2 Dong Ha city Trần Bỉnh 1 1 8 Đông Lễ Dong Ha city Nguyễn Ngọc Thanh 1 1 8 Đông Lễ Dong Ha city Nguyễn Hữu My 1 1 8 Đông Lễ Dong Ha city Nguyễn Hữu Vấn 1 1 8 Đông Lễ Dong Ha city Nguyễn Con 1 1 8 Đông Lễ Dong Ha city Nguyễn Hữu Kiến 1 1 27

63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 8 Đông Lễ Dong Ha city Đinh Thị Hoa 1 1 8 Đông Lễ Dong Ha city Nguyễn Hữu Thơ 1 1 8 Đông Lễ Dong Ha city Nguyễn Hữu Hoan 1 1 8 Đông Lễ Dong Ha city Nguyễn văn Mùi 1 1 8 Đông Lễ Dong Ha city Nguyễn văn Điển 1 1 8 Đông Lễ Dong Ha city Nguyễn Vinh 1 1 8 Đông Lễ Dong Ha city Nguyễn văn Quý 1 1 8 Đông Lễ Dong Ha city Nguyễn Thanh Việt 1 1 8 Đông Lễ Dong Ha city Nguyễn Viết Lịch 1 1 8 Đông Lễ Dong Ha city Lê Thị Ánh 1 1 8 Đông Lễ Dong Ha city Trần Thị Lợi 1 1 1 2 Dong Ha city Hoàng Xuân Tin 1 1 2 Dong Ha city Phan Trung 1 2 2 Dong Ha city Nguyễn Đức Chiến 1 2 2 Dong Ha city Phan Công Dưỡng 1 4 2 Dong Ha city Hoàng Đảo 1 4 2 Dong Ha city Nguyễn Thị Sáu 1 6 2 Dong Ha city Nguyễn Công Tính 1 6 2 Dong Ha city Trần Vinh 1 6 2 Dong Ha city Nguyễn Hữu Chiểu 1 8 Đông lễ Dong Ha city Nguyễn Hữu Châu 1 28

84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 8 Đông lễ Dong Ha city Nguyễn Thị túy 1 8 Đông lễ Dong Ha city Lê Thị Tình 1 8 Đông lễ Dong Ha city Lê Thị Lê 1 8 Đông lễ Dong Ha city Nguyễn Huyền 1 8 Đông lễ Dong Ha city Nguyễn Thanh Thế 1 8 Đông lễ Dong Ha city Nguyễn Ngọc Thanh 1 8 Đông lễ Dong Ha city Nguyễn văn Điểm 1 8 Đông lễ Dong Ha city Nguyễn Văn Thức 1 8 Đông lễ Dong Ha city Nguyễn Thị Phúc 1 8 Đông lễ Dong Ha city Nguyễn Viết Tuấn 1 8 Đông lễ Dong Ha city Bùi Hữu Thụy 1 8 Đông lễ Dong Ha city Nguyễn Hữu Tân 1 5 Đông lễ Dong Ha city Phạm Thị Thơi 1 5 Đông lễ Dong Ha city Lê Thị Minh 1 5 Đông lễ Dong Ha city Nguyễn Thị Diệp 1 5 Đông lễ Dong Ha city Lê Thị Tào 1 5 Đông lễ Dong Ha city Nguyễn Thị Oản 1 5 Đông lễ Dong Ha city Phạm Thị Ái 1 5 Đông lễ Dong Ha city Nguyễn Thị Mượn 1 5 Đông lễ Dong Ha city Phạm Thị Hoa 1 5 Đông lễ Dong Ha city Trương Văn Phong 1 29

105 Hoang Dieu 8 106 Hoang Dieu 8 107 Hoang Dieu 7 108 Hoang Dieu 7 Dong Ha city Hoàng Thị Thảnh 1 1 1 1 Dong Ha city Hồ Thị Mến 1 1 Dong Ha city Lê Xuân Kính 1 1 Dong Ha city Lê Thị Ngọc Tiên 1 1 109 Hoang Dieu 4 4 Dong Ha city Nguyễn Nhân 1 110 Hoang Dieu 5 4 Dong Ha city Nguyễn Văn Nghĩa 1 111 Hoang Dieu 5 4 Dong Ha city Trần Văn Đản 1 1 112 Hoang Dieu 5 4 Dong Ha city Trần Văn Thi 1 113 Hoang Dieu 5 4 Dong Ha city Trần Văn Đường 1 114 Hoang Dieu 5 4 Dong Ha city Trần Vân Anh 1 115 Hoang Dieu 7 Dong Ha city Nguyễn Ngọc Quang 1 1 116 Hoang Dieu 7 Dong Ha city Lê Xuân lục 1 1 117 Hoang Dieu 7 Dong Ha city Thái Thị Lương 1 1 118 Hoang Dieu 8 Dong Ha city Hồ Hải Thanh 1 1 119 Hoang Dieu 8 Dong Ha city Hồ Tất Hoàng 1 1 120 Hoang Dieu 8 Dong Ha city Hồ Thị Lưu 1 1 121 Hoang Dieu 8 Dong Ha city Hồ Tất Thanh 1 1 122 Hoang Dieu 8 Dong Ha city Hồ Hữu Nhạn 1 1 123 Hoang Dieu 8 Dong Ha city Hồ Thị Bôn 1 1 124 Hoang Dieu 9 Dong Ha city Phạm Thị Thố 1 1 125 Hoang Dieu 9 Dong Ha city Phạm văn Ga 1 1 126 Hoang Dieu 9 Dong Ha city Hồ tất Dừng 1 1 127 Hoang Dieu 9 Dong Ha city Hồ Sỹ Niên 1 1 30

128 Hoang Dieu 9 129 Hoang Dieu 9 130 Hoang Dieu 9 131 Hoang Dieu 9 132 Hoang Dieu 9 133 Hoang Dieu 7 134 Hoang Dieu 7 135 Hoang Dieu 7 136 Hoang Dieu 7 137 Hoang Dieu 7 138 Hoang Dieu 7 139 Hoang Dieu 7 140 Hoang Dieu 7 141 Hoang Dieu 7 142 Hoang Dieu 7 143 Hoang Dieu 7 144 Hoang Dieu 7 145 Hoang Dieu 7 146 Hoang Dieu 7 147 Hoang Dieu 7 Dong Ha city Hồ Tất Thảo 1 1 Dong Ha city Hồ tất Dũng 1 1 Dong Ha city Nguyễn văn Hưng 1 1 Dong Ha city Phạm Văn Toán 1 1 Dong Ha city Nguyễn Thị hải 1 1 Dong Ha city Nguyễn Ngọc Oanh 1 Dong Ha city Lê Thị Mai 1 Dong Ha city Lê văn mạnh 1 Dong Ha city Nguyễn Thị Cháu 1 Dong Ha city Lê Văn Tính 1 Dong Ha city Nguyễn Ngọc Hiển 1 Dong Ha city Lê Văn Diễn 1 Dong Ha city Lê Thị Thi 1 Dong Ha city Lê Thị Tựu 1 Dong Ha city Nguyễn Ngọc Hậu 1 Dong Ha city Hoàng Công Xá 1 Dong Ha city Hoàng Thị Kim Thủy 1 Dong Ha city Trương Thị An 1 Dong Ha city Lê Xuân Ánh 1 Dong Ha city Lê Thị Thông 1 31

148 Hoang Dieu 8 149 Hoang Dieu 8 150 Hoang Dieu 8 151 Hoang Dieu 8 152 Hoang Dieu 8 153 Hoang Dieu 8 Dong Ha city Phạm thị Lẽn 1 Dong Ha city Hồ Thị Quy 1 Dong Ha city Phạm văn Công 1 Dong Ha city Hồ Tất Quốc 1 Dong Ha city Phạm Văn Vinh 1 Dong Ha city Phạm văn An 1 154 Ba Trieu 1 3 Dong Ha city Nguyễn Thị Dành 1 1 155 Ba Trieu 1 3 Dong Ha city Nguyễn Quang Huy 1 1 156 Ba Trieu 1 3 Dong Ha city Nguyễn Thị Mua 1 1 157 Ba Trieu 1 3 Dong Ha city Nguyễn Đăng Minh 1 1 158 Ba Trieu 1 3 Dong Ha city Nguyễn văn Thanh 1 1 159 Ba Trieu 1 3 Dong Ha city Nguyễn Văn Pho 1 1 160 Ba Trieu 1 3 Dong Ha city Nguyễn Văn Thận 1 1 161 Ba Trieu 3 3 Dong Ha city Nguyễn Văn Hiền 1 1 162 Ba Trieu 3 3 Dong Ha city Nguyễn Thị Quy 1 1 163 Ba Trieu 3 3 Dong Ha city Nguyễn Đức Tỵ 1 1 164 Ba Trieu 3 3 Dong Ha city Nguyễn Thị Thắng 1 1 165 Ba Trieu 3 3 Dong Ha city Nguyễn thị thiệp 1 1 166 Ba Trieu 3 3 Dong Ha city Nguyễn Mây 1 1 167 Ba Trieu 3 3 Dong Ha city Nguyễn Thị Kỳ 1 1 168 Ba Trieu 3 3 Dong Ha city Nguyễn thị Lầm 1 1 169 Ba Trieu 3 3 Dong Ha city Nguyễn Văn Sơn 1 1 170 Ba Trieu 3 3 Dong Ha city Nguyễn Thị Thửa 1 1 171 Ba Trieu 3 3 Dong Ha city Nguyễn Thị Nga 1 1 172 Ba Trieu 3 3 Dong Ha city Nguyễn văn Chương 1 1 173 Ba Trieu 3 3 Dong Ha city Nguyễn Đăng Kỳ 1 1 32

174 Ba Trieu 3 3 Dong Ha city Nguyễn Văn Mót 1 1 175 Ba Trieu 3 3 Dong Ha city Nguyễn Văn Thaắng 1 1 176 Ba Trieu 4 3 Dong Ha city Nguyễn Thị Nữ 1 1 177 Ba Trieu 4 3 Dong Ha city Nguyễn Thị Thương 1 1 178 Ba Trieu 4 3 Dong Ha city Nguyễn Đăng Thân 1 1 179 Ba Trieu 4 3 Dong Ha city Nguyễn Văn Quang 1 1 180 Ba Trieu 4 3 Dong Ha city Nguyễn Thị Ngân 1 1 181 Ba Trieu 4 3 Dong Ha city Nguyễn Đăng Tình 1 1 182 Ba Trieu 4 3 Dong Ha city Nguyễn Thị Gái 1 1 183 Ba Trieu 4 3 Dong Ha city Nguyễn Văn Phức 1 1 184 Ba Trieu 4 3 Dong Ha city Nguyễn Thị Thu(Thi) 1 1 185 Ba Trieu 4 3 Dong Ha city Nguyễn Văn Bình 1 1 186 Ba Trieu 4 3 Dong Ha city Nguyễn Thị Tưởng 1 1 187 Ba Trieu 4 4 Dong Ha city Lê văn Chút 1 1 188 Ba Trieu 4 4 Dong Ha city Trần Thị Đào 1 1 189 Ba Trieu 4 4 Dong Ha city Nguyễn Thị Tùng 1 1 190 Ba Trieu 4 4 Dong Ha city Võ Sỹ Quyền 1 1 191 Ba Trieu 4 4 Dong Ha city Võ Thị Chiu 1 1 192 Ba Trieu 4 4 Dong Ha city Trần Văn Biển 1 1 193 Ba Trieu 4 4 Dong Ha city Lê Ngọc Giáo 1 1 194 Ba Trieu 4 4 Dong Ha city Lê Châu Thạnh 1 1 195 Ba Trieu 4 4 Dong Ha city Lê Đức Khánh 1 1 196 Ba Trieu 4 4 Dong Ha city Lê Thị Thảnh 1 1 197 Thanh Niên 2 198 Thanh Nien 2 199 Thanh Nien 2 200 Thanh Nien 2 Dong Ha city Hoàng Đức Đấu 1 1 Dong Ha city Hoàng văn Tảng 1 1 Dong Ha city Mai Thị Đíu 1 1 Dong Ha city Hoàng Ngọc Chương 1 1 33

201 Thanh Nien 2 202 Thanh Nien 4 203 Thanh Nien 4 204 Thanh Nien 1 205 Thanh Nien 1 206 Thanh Nien 2 207 Thanh Nien 4 208 Thanh Nien 4 209 Thanh Nien 4 210 Thanh Nien 4 211 Thanh Nien 4 212 Thanh Nien 4 213 Thanh Nien 4 214 Thanh Nien 4 215 Thanh Nien 4 216 Thanh Nien 2 217 Thanh Nien 2 218 Thanh Nien 2 219 Thanh Nien 2 220 Thanh Nien 2 221 Thanh Nien 2 Dong Ha city Nguyễn Hiệp 1 1 Dong Ha city Hoàng ngọc Truyền 1 1 Dong Ha city Nguyễn Thị Thâm 1 1 Dong Ha city Hoàng Ngọc Dung 1 1 Dong Ha city Hoàng Kim THành 1 1 Dong Ha city Cao Thị Nghành 1 1 Dong Ha city Nguyễn Thị Phướn 1 Dong Ha city Hoàng văn Nuôi 1 Dong Ha city Hoàng Thị Xiêm 1 Dong Ha city Nguyễn Đình Ân 1 Dong Ha city Mai Thị Con 1 Dong Ha city Hoàng Ngọc Khâm 1 Dong Ha city Hoàng Đức Thất 1 Dong Ha city Nguyễn Đình Thắng 1 Dong Ha city Hoàng thị Xiêm 1 Dong Ha city Nguyễn Hoàng Phượng Dong Ha city Hoàng Đức tú 1 Dong Ha city Hoàng Ngọc Kế 1 Dong Ha city Hoàng kim Điện 1 Dong Ha city Ngô Xuân Hiền 1 Dong Ha city Hoàng Ngọc Đinh 1 1 34

222 Thanh Nien 2 223 Thanh Nien 2 224 Thanh Nien 2 225 Thanh Nien 2 226 Thanh Nien 2 227 Thanh Nien 2 Dong Ha city Hoàng Đức Hòa 1 Dong Ha city Hoàng Ngọc Trí 1 Dong Ha city Hoàng Ngọc Thế 1 Dong Ha city Hoàng thị Hạnh 1 Dong Ha city Hoàng thị Nghĩa 1 Dong Ha city Hoàng Kim Đồng 1 228 Hùng Vương 2 Khe Sanh town Huong Hoa Trương Thị Thu Bình 1 1 229 Hung Vuong 2 Khe Sanh town Hướng Hóa Nguyễn Văn Ngọc 1 1 230 Hung Vuong 2 Khe Sanh town Huong Hoa Trần Tính 1 1 231 Hung Vuong 2 Khe Sanh town Huong Hoa Lê Tân 1 1 232 Hung Vuong 2 Khe Sanh town Huong Hoa Lê Quang Thao 1 1 233 Hung Vuong 2 Khe Sanh town Huong Hoa Lê Thao 1 1 234 Hung Vuong 2 Khe Sanh town Huong Hoa Đinh Văn Tính 1 1 235 Hung Vuong 2 Khe Sanh town Huong Hoa Đinh Mười 1 1 236 Hung Vuong 2 Khe Sanh town Huong Hoa Trần Thị Phương Chi 1 1 237 Hung Vuong 2 Khe Sanh town Huong Hoa Lê Thị Thảo 1 1 238 Hung Vuong 2 Khe Sanh town Huong Hoa Đào Văn Diện 1 1 239 Hung Vuong 2 Khe Sanh town Huong Hoa Nguyễn Duy Mạnh 1 1 240 Hung Vuong 2 Khe Sanh town Huong Hoa Hà Thị Lệ Hằng 1 1 241 Hung Vuong 2 Khe Sanh town Huong Hoa Trương Thị Mừng 1 1 1 242 Hung Vuong 2 Khe Sanh town Huong Hoa Lê Quang 1 1 243 Hung Vuong 2 Khe Sanh town Huong Hoa Lê Đức Hanh 1 1 244 Hung Vuong 2 Khe Sanh town Huong Hoa Đinh Thế Thao 1 1 245 Hung Vuong 2 Khe Sanh town Huong Hoa Lê Hóa 1 1 246 Hung Vuong 2 Khe Sanh town Huong Hoa Hà Ngọc Giao 1 1 247 Hung Vuong 2 Khe Sanh town Huong Hoa Nguyễn Ngọc Quang 1 1 35

248 Hung Vuong 2 Khe Sanh town Huong Hoa Lê Đức Hanh 1 1 249 Hung Vuong 2 Khe Sanh town Huong Hoa Lê văn Ngọc 1 1 250 Hung Vuong 2 Khe Sanh town Huong Hoa Nguyễn Thế Hùng 1 1 251 Hung Vuong 2 Khe Sanh town Huong Hoa Hoàng Thị Nhung 1 1 252 Hung Vuong 2 Khe Sanh town Huong Hoa Trần Gíao 1 1 253 Hung Vuong 2 Khe Sanh town Huong Hoa Trần Minh Phước 1 1 254 Hung Vuong 2 Khe Sanh town Huong Hoa Trần Văn Bá 1 1 255 Hung Vuong 2 Khe Sanh town Huong Hoa Lê Thị Mót 1 1 256 Hung Vuong 2 Khe Sanh town Huong Hoa Đinh Duy Khánh 1 1 257 Hung Vuong 2 Khe Sanh town Huong Hoa Hồ Dừn 1 1 258 Đoan Khue 4 Khe Sanh town Huong Hoa Nguyễn Thanh Hóa 1 259 Đoan Khue Khóm 4 Khe Sanh town Huong Hoa Nguyễn Hữu Thành 1 1 260 Đoan Khue 4 Khe Sanh town Huong Hoa Dư Văn Thái 1 1 261 Đoan Khue 4 Khe Sanh town Huong Hoa Nguyễn Ngọc Minh 1 1 262 Đoan Khue 4 Khe Sanh town Huong Hoa Lê Thị Cúc 1 1 263 Đoan Khue 4 Khe Sanh town Huong Hoa Lê Thị Mùi 1 1 1 264 Đoan Khue 4 Khe Sanh town Huong Hoa Hoồ Tạo-Lê Thị lan 1 1 265 Đoan Khue 4 Khe Sanh town Huong Hoa Lê Văn kỳ 1 1 266 Đoan Khue Katúp Lao Bao town Huong Hoa Hồ Văn Lương 1 1 1 1 267 Đoan Khue Katúp Lao Bao town Huong Hoa Hồ văn Tuấn 1 1 1 1 268 Đoan Khue Katúp Lao Bao town Huong Hoa Hồ Văn Diện 1 1 1 1 1 269 Đoan Khue Katúp Lao Bao town Huong Hoa Hồ Văn Một 1 1 1 1 270 Đoan Khue Katúp Lao Bao town Huong Hoa Hồ Thị ly 1 1 1 1 1 271 Đoan Khue Katúp Lao Bao town Huong Hoa Hồ văn Lăng 1 1 1 272 Đoan Khue Katúp Lao Bao town Huong Hoa Hồ văn Khai 1 1 1 1 273 Đoan Khue Katúp Lao Bao town Huong Hoa Hồ Văn Hùng 1 1 1 274 Đoan Khue Katúp Lao Bao town Huong Hoa Hồ Thị Bộ 1 1 1 275 Đoan Khue Katúp Lao Bao town Huong Hoa Hồ Văn hân 1 1 1 1 276 Đoan Khue Katúp Lao Bao town Huong Hoa hồ Thị Thơn 1 1 1 1 36

277 Đoan Khue Katúp Lao Bao town Huong Hoa Hồ Văn Nhân 1 1 1 1 278 Đoan Khue Katúp Lao Bao town Huong Hoa Hồ Văn Me 1 1 279 Hung Vuong 1 Khe Sanh town Huong Hoa Nguyễn Văn Quang 1 1 280 Hung Vuong 1 Khe Sanh town Huong Hoa Dđinh Mười 1 1 281 Hung Vuong 1 Khe Sanh town Huong Hoa Trương Ba 1 1 282 Hung Vuong 1 Khe Sanh town Huong Hoa Lê Thị Kiểu 1 1 283 Hung Vuong 1 Khe Sanh town Huong Hoa Nguyễn Hữu Thụy 1 1 284 Hung Vuong 1 Khe Sanh town Huong Hoa Nguyễn Hữu Tiềm 1 1 285 Hung Vuong 1 Khe Sanh town Huong Hoa Nguyễn Thị Chỉ 1 1 286 Hung Vuong 1 Khe Sanh town Huong Hoa Lê Tứ Dư 1 1 287 Hung Vuong 1 Khe Sanh town Huong Hoa Lê Ngô 1 1 288 Hung Vuong 1 Khe Sanh town Huong Hoa Trần văn Biên 1 1 289 Hung Vuong 1 Khe Sanh town Huong Hoa Nguyễn Văn Hoan 1 1 290 Hung Vuong 1 Khe Sanh town Huong Hoa Lê Gia Bảo 1 1 291 Hung Vuong 1 Khe Sanh town Huong Hoa Trần Trọng Minh 1 1 292 Hung Vuong 1 Khe Sanh town Huong Hoa Hoàng Minh Đức 1 293 Hung Vuong 1 Khe Sanh town Huong Hoa Nguyễn thị Hòa 1 294 Đoàn Khuê 4 Khe Sanh town Huong Hoa Lê Thành Chung 1 1 1 295 Đoàn Khuê 4 Khe Sanh town Huong Hoa Trần huyền Trung 1 1 296 Trương Công Kỉnh 4 Khe Sanh town Huong Hoa Lê văn Quýnh 1 1 297 Trương Công Kỉnh 4 Khe Sanh town Huong Hoa Lê văn Thanh 1 1 298 Trương Công Kỉnh 4 Khe Sanh town Huong Hoa Nguyễn Thành Trung 1 299 Trương Công Kỉnh 4 Khe Sanh town Huong Hoa Lê Thị Thanh Tâm 1 1 300 Đoan Khue 4 Khe Sanh town Huong Hoa Nguyễn Thuận 1 301 Đoan Khue 4 Khe Sanh town Huong Hoa Phạm Xuân tú 1 302 SêPôn Tan Kim Lao Bao town Huong Hoa Lê Văn Hòa 1 1 303 SêPôn Tan Kim Lao Bao town Huong Hoa Nguyễn thống 1 1 304 To Huu Tan Kim Lao Bao town Huong Hoa Nguyễn Thị Tâm 1 305 SêPôn Tan Kim Lao Bao town Huong Hoa Nguyễn Thị Hoa 1 1 37

306 SêPôn Tan Kim Lao Bao town Huong Hoa Nguyễn Quang Lâm 1 1 307 SêPôn Tan Kim Lao Bao town Huong Hoa Nguyễn Thị Sáu 1 1 308 SêPôn Tan Kim Lao Bao town Huong Hoa Lê văn Chung 1 1 309 SêPôn Tan Kim Lao Bao town Huong Hoa Nguyễn Đình Giàu 1 310 SêPôn Cao Viet Lao Bao town Huong Hoa Nguyễn Công Bốn 1 311 SêPôn Cao Viet Lao Bao town Huong Hoa Trần Thị Huế 1 312 SêPôn Duy Tan Lao Bao town Huong Hoa Trương Văn Tiên 1 1 1 313 SêPôn Duy Tan Lao Bao town Huong Hoa Trương Văn Cẩn 1 1 1 314 SêPôn Duy Tan Lao Bao town Huong Hoa Trần Đại Luận 1 1 1 315 SêPôn Duy Tan Lao Bao town Huong Hoa Trần Bình 1 1 1 316 SêPôn Duy Tan Lao Bao town Huong Hoa Trương Văn Chiêm 1 1 317 SêPôn Duy Tan Lao Bao town Huong Hoa Trần Nam Trung 1 1 1 318 SêPôn Duy Tan Lao Bao town Huong Hoa Võ Quốc Chiến 1 1 1 319 SêPôn Duy Tan Lao Bao town Huong Hoa Lê Thị Liên 1 1 1 320 SêPôn Duy Tan Lao Bao town Huong Hoa Trần Thị Mai 1 1 321 SêPôn Duy Tan Lao Bao town Huong Hoa Trương Văn Cử 1 1 322 SêPôn Duy Tan Lao Bao town Huong Hoa võ Văn Lơ 1 1 323 SêPôn Duy Tan Lao Bao town Huong Hoa Nguyễn DĐÌnh Hòa 1 1 324 Truong Cong Kinh 4 Khe Sanh town Huong Hoa Lê Thị Ly Na 1 325 Truong Cong Kinh 4 Khe Sanh town Huong Hoa Nguyễn Thị Châu 1 326 Truong Cong Kinh 4 Khe Sanh town Huong Hoa Nguyễn Phận 1 327 Truong Cong Kinh 4 Khe Sanh town Huong Hoa Nguyễn Tương 1 1 328 Truong Cong Kinh 4 Khe Sanh town Huong Hoa Phan Thị Thuận 1 329 Truong Cong Kinh 4 Khe Sanh town Huong Hoa Thái Văn Khôi 1 330 Doan Khue 4 Khe Sanh town Huong Hoa Phan Thị Hà 1 331 Doan Khue 4 Khe Sanh town Huong Hoa Huỳnh Anh Nam 1 38

332 Doan Khue 4 Khe Sanh town Huong Hoa Nguyễn Hồng Tuyến 1 333 Doan Khue 4 Khe Sanh town Huong Hoa Ngô Đình Phước 1 334 Doan Khue 4 Khe Sanh town Huong Hoa Trần Đình Thi 1 335 Doan Khue 4 Khe Sanh town Huong Hoa Trương Công Hoàng 1 336 Doan Khue 4 Khe Sanh town Huong Hoa Lê Văn Toản 1 337 Doan Khue 4 Khe Sanh town Huong Hoa Bùi Văn Chiến 1 338 Doan Khue 4 Khe Sanh town Huong Hoa Đặng Thị Kim Cúc 1 339 Doan Khue 4 Khe Sanh town Huong Hoa Nguyễn Tri Phương 1 340 Doan Khue 4 Khe Sanh town Huong Hoa Nguyễn Đình Đức 1 341 Doan Khue 4 Khe Sanh town Huong Hoa Bùi Văn Thể 1 342 Doan Khue 4 Khe Sanh town Huong Hoa Nguyễn Văn Nam 1 343 Doan Khue 4 Khe Sanh town Huong Hoa Nguyễn Thị Thoanh 1 344 Doan Khue 4 Khe Sanh town Huong Hoa Lê Xuân Thọ 1 345 Doan Khue 4 Khe Sanh town Huong Hoa Nguyễn Văn Kiên 1 346 Doan Khue 4 Khe Sanh town Huong Hoa Lê Văn Niềm 1 347 Doan Khue 4 Khe Sanh town Huong Hoa Nguyễn Duy 1 348 Doan Khue 4 Khe Sanh town Huong Hoa Võ Văn Thành 1 349 Hung Vuong 4 Khe Sanh town Huong Hoa Hồ Minh Hải 1 350 Hung Vuong 2 Khe Sanh town Huong Hoa Hồ Minh Đức 1 1 351 Hung Vuong 2 Khe Sanh town Huong Hoa Lê Văn Ngọc 1 352 Hung Vuong 2 Khe Sanh town Huong Hoa Lê Đức Thắng 1 353 Pham Van Đong 354 Pham Van Đong 355 Pham Van Đong 356 Pham Van Đong 357 Huynh Thuc Khang Xuan Phuoc Xuan Phuoc Xuan Phuoc Xuan Phuoc Lao Bao town Huong Hoa Trương Đình Việt 1 Lao Bao town Huong Hoa Bùi Ngọc Dũng 1 1 Lao Bao town Huong Hoa Chu Văn Nam 1 Lao Bao town Huong Hoa Huỳnh Văn Sơn 1 An Ha Lao Bao town Huong Hoa Trần Thanh Hiệp 1 358 Huynh Thuc Khang An Ha Lao Bao town Huong Hoa Lê Văn Nam(Nan) 1 1 39

359 Huynh Thuc Khang An Ha Lao Bao town Huong Hoa Trần Trường 1 360 Huynh Thuc Khang An Ha Lao Bao town Huong Hoa Hồ Thị Minh Tuyết 1 361 Huynh Thuc Khang An Ha Lao Bao town Huong Hoa Nguyễn Ngọc Thảo 1 362 Huynh Thuc Khang An Ha Lao Bao town Huong Hoa Trần Văn Châu 1 363 Huynh Thuc Khang An Ha Lao Bao town Huong Hoa Nguyễn Viết Khiếu 1 364 Huynh Thuc Khang An Ha Lao Bao town Huong Hoa Nguyễn Hữu Mót 1 365 Thach Han An Ha Lao Bao town Huong Hoa Mai Thành 1 366 Thach Han An Ha Lao Bao town Huong Hoa Hoàng Văn Viện 1 367 Thach Han An Ha Lao Bao town Huong Hoa Nguyễn Văn Diễn 1 368 Thach Han An Ha Lao Bao town Huong Hoa Nguyễn Văn Trung 1 369 Thach Han An Ha Lao Bao town Huong Hoa Nguyễn Văn Dĩ 1 370 Thach Han An Ha Lao Bao town Huong Hoa Nguyễn Quốc Tuấn 1 371 Thach Han An Ha Lao Bao town Huong Hoa Nguyễn Thị Dung 1 372 373 374 375 376 377 378 379 380 Nguyen Thien Thuat Nguyen Thien Thuat Nguyen Thien Thuat Nguyen Thien Thuat Nguyen Thien Thuat Hoang Hoa Tham Hoang Hoa Tham Hoang Hoa Tham Hoang Hoa Tham Cao Viet Lao Bao town Huong Hoa Mai Văn Quý 1 Cao Viet Lao Bao town Huong Hoa Nguyễn Bình 1 Cao Viet Lao Bao town Huong Hoa Nguyễn Văn Hoàng 1 Cao Viet Lao Bao town Huong Hoa Đặng Văn Mẫn 1 Cao Viet Lao Bao town Huong Hoa Phan Văn Chiến 1 Tan Kim Lao Bao town Huong Hoa Nguyễn Quang Sơn 1 Tan Kim Lao Bao town Huong Hoa Nguyễn Quang Huấn 1 Tan Kim Lao Bao town Huong Hoa Nguyễn Thị Nhung 1 Tan Kim Lao Bao town Huong Hoa Lê Hữu Phước 1 40

381 Hoang Hoa Tham Tan Kim Lao Bao town Huong Hoa Lê Thị Kim Nga 1 382 Hoang Hoa Tham Tan Kim Lao Bao town Huong Hoa Lê Văn Thưởng 1 1 383 Hoang Hoa Tham Tan Kim Lao Bao town Huong Hoa Lê Văn Hữu 1 384 Hoang Hoa Tham Tan Kim Lao Bao town Huong Hoa Nguyễn Văn Tâm 1 385 Hoang Hoa Tham Tan Kim Lao Bao town Huong Hoa Nguyễn Quang Tâm 1 386 Hoang Hoa Tham Tan Kim Lao Bao town Huong Hoa Nguyễn Ngọc Bảo 1 387 Hoang Hoa Tham Tan Kim Lao Bao town Huong Hoa Nguyễn Quang Xoài 1 388 Hoang Hoa Tham Tan Kim Lao Bao town Huong Hoa Nguyễn Quang Hoài 1 389 Hoang Hoa Tham Nguyễn Văn Dạ Tan Kim Lao Bao town Huong Hoa Khánh 1 390 Hoang Hoa Tham Tan Kim Lao Bao town Huong Hoa Lê Thị Thái 1 1 391 Hoang Hoa Tham Nguyễn Quang Tan Kim Lao Bao town Huong Hoa Nhâm 1 392 Hoang Hoa Tham Tan Kim Lao Bao town Huong Hoa Nguyễn Thị Loan 1 393 Hoang Hoa Tham Tan Kim Lao Bao town Huong Hoa Lê Văn Tứ 1 394 Hoang Hoa Tham Tan Kim Lao Bao town Huong Hoa Lê Thị Quỳnh Hoa 1 395 Ho Ba Kien Cao Viet Lao Bao town Huong Hoa Nguyễn Thị Mỹ Linh 1 396 Ho Ba Kien Cao Viet Lao Bao town Huong Hoa Nguyễn Hải Chiến 1 397 Cao Ba Quat 398 Cao Ba Quat 399 Cao Ba Quat 400 Cao Ba Quat 401 Cao Ba Quat Xuan Phuoc Xuan Phuoc Xuan Phuoc Xuan Phuoc Xuan Phuoc Lao Bao town Huong Hoa Nguyễn Viết Hùng 1 Lao Bao town Huong Hoa Dương (Nguyễn)Thị Thu Lan Lao Bao town Huong Hoa Lê Thị Tâm 1 Lao Bao town Huong Hoa Nguyễn Thị Phi 1 Lao Bao town Huong Hoa Nguyễn Đức Sỹ 1 1 41

402 Thach Han An Ha Lao Bao town Huong Hoa Trần Minh 1 1 403 Thach Han An Ha Lao Bao town Huong Hoa Nguyễn Văn Thảo 1 404 Thach Han An Ha Lao Bao town Huong Hoa Hoàng Văn Viện 1 405 Thach Han An Ha Lao Bao town Huong Hoa Nguyễn Khánh 1 406 Dang Tat An Ha Lao Bao town Huong Hoa Trần Thị Xoan 1 407 Dang Tat An Ha Lao Bao town Huong Hoa Nguyễn Ngọc Hùng 1 408 Dang Tat An Ha Lao Bao town Huong Hoa Trần Hùng 1 409 Dang Tat An Ha Lao Bao town Huong Hoa Nguyễn Ngọc Tra 1 410 Dang Tat An Ha Lao Bao town Huong Hoa Nguyễn Thế Kiệt 1 411 Dang Tat An Ha Lao Bao town Huong Hoa Nguyễn Duy Lâm 1 412 Dang Tat An Ha Lao Bao town Huong Hoa Nguyễn Thanh Huy 1 413 Dang Tat An Ha Lao Bao town Huong Hoa Nguyễn Hữu Cẩm 1 414 Dang Tat An Ha Lao Bao town Huong Hoa Trương Văn Khanh 1 415 Dang Tat An Ha Lao Bao town Huong Hoa Nguyễn Duy Bắc 1 416 Ho Ba Kien Duy Tan Lao Bao town Huong Hoa Nguyễn Thị Kim Trang 417 Ho Ba Kien Duy Tan Lao Bao town Huong Hoa Trương Văn Vân 1 418 Ho Ba Kien Duy Tan Lao Bao town Huong Hoa Trương Thị Bướm 1 419 Phung Hưng Duy Tan Lao Bao town Huong Hoa Trần Nghĩa 1 1 420 Phùng Hưng Duy Tan Lao Bao town Huong Hoa Trần Đại Luận 1 1 421 Phung Hưng Duy Tan Lao Bao town Huong Hoa Trần Thanh Ngọc 1 422 Phung Hưng Duy Tan Lao Bao town Huong Hoa Trương Văn Cần 1 1 423 Phung Hưng Duy Tan Lao Bao town Huong Hoa Nguyễn Văn Hõn 1 424 Dao Duy Anh Duy Tan Lao Bao town Huong Hoa Võ Hào(Trần Thị Lợi) 1 425 Dao Duy Anh Duy Tan Lao Bao town Huong Hoa Trần Thanh Long 1 1 426 Dao Duy Anh Duy Tan Lao Bao town Huong Hoa Trần Thanh lộc 1 427 428 Nguyen Binh Khiem Nguyen Binh Khiem Duy Tan Lao Bao town Huong Hoa Trần Phương 1 Duy Tan Lao Bao town Huong Hoa Trương Văn Dụng 1 1 42

429 Nguyen Binh Khiem Duy Tan Lao Bao town Huong Hoa Trương Thanh Tùng 1 430 Nguyen Binh Khiem Duy Tan Lao Bao town Huong Hoa Nguyễn Nhật Anh 1 431 Sê Pôn Ka Túp Lao Bao town Huong Hoa Lê Văn Trọng 1 432 Sê Pôn Ka Túp Lao Bao town Huong Hoa Hồ Thị Thom 1 1 433 Sê Pôn Ka Túp Lao Bao town Huong Hoa Hồ Văn Lỗ 1 434 Sê Pôn Ka Túp Lao Bao town Huong Hoa Hồ Văn Xiên 1 1 435 Sê Pôn Ka Túp Lao Bao town Huong Hoa Hồ Văn Mặt 1 436 Sê Pôn Ka Túp Lao Bao town Huong Hoa Hồ Văn Hoàn 1 Tổng số 436 43

5.2. Legal documents on compensation policy and compensation unit prices - Decision No.38/2014/QD-UBND dated 19/9/2014 by the People's Committee of Quang Tri province on the issuance of regulations on compensation, support and resettlement when the State recovers land in Quang Tri province; - Decision No.49/2016/QD-UBND dated 15/12/2016 by the People's Committee of Quang Tri province on the provision of a number of policies on compensation, support and resettlement when the State recovers land in Dong Ha city; - Decision No.17/2016/QD-UBND dated 11/05/2016 by the People's Committee of Quang Tri province, promulgating the periodical land price tarrif for 5 years (2015-2019) in Quang Tri province; - Decision No.51/2016/QD-UBND dated 20/12/2016 by the People's Committee of Quang Tri province on the promulgation of unit prices for construction of houses, structures and units of plants and crops in Quang Tri province; - Official Letter No.1578/UBND-CN dated 06/5/2016 by the People's Committee of Quang Tri province on the unit prices of all kinds of assets as houses, structures, prices of crops and rice for compensation and site clearance of the GMS Corridor Town Development Project; - Approval Decisions: No.1109/QD-UBND dated 24/5/2016 by the People's Committee of Quang Tri province, approving specific land prices (replacement cost) to calculate the compensation and support when the State recovers land to implement the GMS Corridor Town Development Project, Quang Tri province. - Decision No.2053/QD-UBND dated 30/8/2016 of the People's Committee of Quang Tri Province on the promulgation of specific land prices (replacement cost) to calculate compensation and support when the State recovers land for implementation. Urban Development Project in the Greater Mekong Subregion, Quang Tri Province (Supplement). 5.3. List of households that have not received compensation No Full name of HH heads Address Amount A Dong Ha city I Ba Trieu 1 Nguyễn Ngọc Hùng Quarter 3-3 234,918,000 II Hoang Dieu 1 Nguyễn Đức Quang Quarter 5 - Dong Thanh 358,432,000 2 Phan Quốc Sành Quarter 5 - Dong Thanh 433,185,000 3 Lưu Văn Hòa Quarter 5 - Dong Thanh 468,393,000 4 Hồ Sỹ Tri và Phạm Thị Mến Quarter 3- Dong Thanh 2,131,036,000 5 Hồ Sỹ Ái và Thái Thị Khanh Quarter 4- Dong Thanh 745,917,000 6 Nguyễn Thị Hiệp Quarter 7- Dong Thanh 625,984,000 7 Nguyễn Ngọc Triển Quarter 7- Dong Thanh 354,078,000 III - - Dong Le 1 Nguyễn Thị Mượn Quarter 5 -Dong Le ward 1,124,037,000 IV Truong Chinh 1 Lê Thị Hồng Hạnh Quarter 10 171,119,000 2 Đào Văn Hiền Quarter 9 327,080,000 3 Đào Văn Hải Quarter 9 1,263,758,000 4 Phan Thị Thu Vân Quarter 9 444,967,000 5 Đào Thị Hồng và Đỗ Đình Vy Quarter 9 710,087,000 6 Đào Văn Quế Quarter 9 110,197,000 7 Châu Kiến Đồng Quarter 7 1,559,371,000 44

V Thanh Nien 1 Hoàng Thị Phượng và Hoàng Đức Hướng Đong Giang ward 245,892,000 2 Hoàng Quốc Thịnh 180,584,000 B Huong Hoa District I Flooding Roads 17 Nguyễn Chí Tâm An Ha cluster, Lao Bao town 6,754,000 18 Nguyễn Chí Thanh An Ha cluster, Lao Bao town 2,439,000 19 Nguyễn Văn Dĩ An Ha cluster, Lao Bao town 21,879,000 58 Trương Minh Hạnh An Ha cluster, Lao Bao town 2,709,000 60 Nguyễn Thị Hải Yến An Ha cluster, Lao Bao town 2,212,000 90 Nguyễn Hữu Kha An Ha cluster, Lao Bao town 5,923,000 105 Nguyễn Thành Dinh An Ha cluster, Lao Bao town 05,057,000 207 Đặng Văn Mẫn (tức Gia Mẫn) Cao Viet cluste, Lao Bao town 8,821,000 261 Bạch Thanh Dũng Xuan Phuoc cluste, Lao Bao town 42,566,000 342 Nguyễn Thị Ngãi Mai Văn Cường Tan Kim cluste, Lao Bao town 98,912,000 II Group 4 II.1 Truong Cong kinh 1 Lê Thị Thanh Tâm Cluste 4, Khe Sanh town 58,428,000 2 Phan Thị Thuận Cluste 4, Khe Sanh town 165,196,000 3 Lê Văn Quýnh Cluste 4, Khe Sanh town 30,011,000 4 Lê Văn Quýnh Cluste 4, Khe Sanh town 238,680,000 5 Lê Văn Thanh Cluste 4, Khe Sanh town 306,077,000 6 Lê Quang Trị Cluste 4, Khe Sanh town 15,676,000 7 Nguyễn Thành Trung Cluste 4, Khe Sanh town 81,810,000 II.2 Doan Khue 1 Lê Thanh Chung Cluste 4, Khe Sanh town 919,978,000 2 Trần Huyền Trung Cluste 4, Khe Sanh town 623,613,000 3 Lê Thanh Sơn Cluste 4, Khe Sanh town 318,793,000 4 Nguyễn Văn Điển Cluste 4, Khe Sanh town 25,489,000 5 Nguyễn Thuận Cluste 4, Khe Sanh town 35,894,000 III Hung Vuong 1 Lê Gia Bảng Cluste 1, Khe Sanh town 73,230,000 2 Lê Gia Bảng Cluste 1, Khe Sanh town 13,637,000 3 Nguyễn Thị Chỉ Cluste 1, Khe Sanh town 111,571,000 4 Nguyễn Ngọc Quang Cluste 2, Khe Sanh town 519,940,000 5 Nguyễn Duy Mạnh Cluste 2, Khe Sanh town 697,778,000 6 Trần Tính Cluste 2, Khe Sanh town 43,268,000 7 Lê Đức Hanh Cluste 2, Khe Sanh town 81,289,000 8 Lê Quang Cluste 2, Khe Sanh town 2,509,440,000 9 Trần Văn Bá Cluste 2, Khe Sanh town 263,708,000 10 Trần Văn Biên Cluste 2, Khe Sanh town 44,160,000 11 Lê Tứ Dư Cluste 1, Khe Sanh town 6,223,000 12 Lê Ngô Cluste 1, Khe Sanh town 14,685,000 III To Huu 1 Nguyễn Văn Đức Tan Kim Cluste, Lao Bao town 26,692,000 45

5.4. Some photos of field monitoring 46

47

48