CONTRACT C1039: N2/BORCHERDS QUARRY INTERCHANGE AND RELATED WORKS SARF SEMINAR 11 AUGUST 2016

Similar documents
Transport Impact Assessment

Chapter 4 Traffic Analysis

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

List of Display Boards

INTERSTATE 540 IMPROVEMENT STUDY

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Design Criteria. Design Criteria

Appendix 9.A - Interchanges Figure 9-A-1 Four-leg Interchanges between Expressways

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

DUNBOW ROAD FUNCTIONAL PLANNING

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

I-95 NORTHBOUND AT US 1 (EXIT 126) ALTERNATIVES DESIGN ANALYSIS

Harrah s Station Square Casino

Iowa Highway 58 Corridor Improvement Study

CHIEF PEGUIS TRAIL EXTENSION WEST

Simons Run Corridor Study

Terwillegar Drive Expressway Draft Concept Plan

Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council

Capital Region Council of Governments

Casablanca Boulevard & GO Station Access

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

Grade Separated Intersection

Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January 2015).

Let s Make I-40 Better Action Team. Friday, March 29, 2019 Hosted by RTP Foundation

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

Freeway System Considerations

Traffic Impact Statement. Durbanville Development Erf 40, Re 72, Erf and Erf 91, Durbanville

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Transportation Committee Project Priority List

444 North Capitol Street NW, Suite 249, Washington, DC (202) Fax: (202) ERRATA

Operational & Geometrical Analysis Technical Memorandum

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

RIGHT TURNS AT INTERSECTIONS: ARE THERE ALTERNATIVES?

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

Project Description Form 6V

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

County of Fairfax, Virginia. Department of Transportation

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

Hospital Link Project Project Update September 2017

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

CITY OF SPOKANE VALLEY Request for Council Action

Chapter 33. Grade Separated Intersection Overview Classification of Intersection Grade Separated Intersection

Journey to Excellence. Building Markham s Future Together MARCH 24, 2015 HIGHWAY 407 TO HIGHWAY 7 MAIN STREET MARKHAM

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

SECTION 12 ROAD MARKINGS AND DELINEATION

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

Appendix D: Concept Screening

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

SAMRAND DEVELOPMENT (PTY) LTD C2562/01TIA FEBRUARY 2019

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

Diverging Diamond Interchange and Double Crossover Intersection Vehicle and Pedestrian Performance

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

TECHNICAL MEMORANDUM

ACCESS MANAGEMENT PLAN: BLUFFTON PARKWAY BLUFFTON PARKWAY: PHASE FOUR TOWN OF BLUFFTON & BEAUFORT COUNTY, SC

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

The following notes describe comments received that were written/drawn on maps by workshop participants.

VicRoads. Drysdale Bypass Overview Traffic Modelling Report

CITY OF CAPE TOWN BICYCLE MASTERPLAN UPDATE

Alberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future

SECTION 12 ROAD MARKINGS AND DELINEATION

DYNAMIC LANES FOR AUCKLAND

Route 29 Solutions Projects

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria

University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

APPENDIX E: Transportation Technical Report

ScienceDirect. Microscopic Simulation on the Design and Operational Performance of Diverging Diamond Interchange

Fairfax County Parkway Widening Fairfax County

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

State Route 160 (Blue Diamond Highway)

Highway 111 Corridor Study

NMT SAFE STUDY APPROACH

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

Truck Climbing Lane Traffic Justification Report

Cincinnati Dayton Rd Widening

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

Washington DC Section of ITE Project Briefing

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

#!! "$% ##! &! # '#! % $ #!

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

SH1 Western Belfast Bypass Transportation Assessment

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

3.2.2 Proposed Road Network within Phase 1B Lands

Innovative Intersections Presentation by Andrew O Brien

Hospital Link Project Project Update November 2017

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Transcription:

CONTRACT C1039: N2/BORCHERDS QUARRY INTERCHANGE AND RELATED WORKS SARF SEMINAR 11 AUGUST 2016

Current Spatial Pattern - MSDF

MSDF

City Of Cape Town CTOD

City Of Cape Town CTOD

Project Planning Objectives Understand the medium to long term land-use and transport infrastructure scenarios for the study area. Improve N2 access to Philippi Industria. Improve N2 access to CTIA and adjacent industrial areas (Airport Industria, Airport City) Improve public transport access on: Proposed IRT corridor along Eisleben/Lansdowne/New Borcherds Quarry. Extend N2: 3rd lane/bmt lane from Borcherds Quarry Interchange to Mew Way Interchange. Allow in the infrastructure planning for Airport Beltway Expressway improvements. Support a consistent road network/hierarchy in the study area.

Philippi Freeway Accessibility Existing Situation DELFT SOUTH N2/R300 SWARTKLIP INTERCHANGE AIRPORT INDUSTRIA PHILIPPI INDUSTRIA (NORTH) PHILIPPI EAST NEW CROSSROADS PHILIPPI INDUSTRIA (SOUTH) NYANGA PHOLA PARK ROUTE 1 R300 access from North and N2 access from East ROUTE 2 R300 access from West ROUTE 3 N2 access from West BROWNS FARM

Borcherds Quarry Road

Eisleben Drive

PREVIOUS ROAD/INTERCHANGE LAYOUTS New Borcherds Quarry Alignment Airport Industria CTIA Perimeter Road King David Golf Course Development

Alternative Interchange Layouts

Minimum Ramp Spacing Requirements RECOMMENDED MINIMUM RAMP TERMINAL SPACING (SANRAL) Table 7.1 Interchange Spacing in terms of Signage Requirements Interchange Configuration Ramp access to access Ramp access to system interchange System interchange to ramp access System interchange to system interchange Minimum ramp spacing in urban areas 1300m 2100m 1400m 2500m

3 Signalised intersections (200m spacing) (sub-standard spacing; 540m required) N2/R300 SWARTKLIP INTERCHANGE Exit ramp to Symphony Way off new extended C-D road leading to N2/R300 eastbound ramp. 300m between merges Meets AASHTO minimum spacing. TO CAPE TOWN ALTERNATIVE A-1 N2 half diamond interchange onto Symphony Way. Indirect N2 access into Philippi Industria via Sheffield Road. LEGEND Freeways New Arterial/Service/Access Roads Existing Arterial/Service/Access Roads MyCiti Busway Lanes Traffic Signals

TO SOMERSET WEST NEW CROSSROADS TO CAPE TOWN ALTERNATIVE A-2 N2 partial trumpet interchange with west facing ramps only, direct N2 access onto extended Stock Road. LEGEND Freeways New Arterial/Service/Access Roads Existing Arterial/Service/Access Roads MyCiti Busway Lanes Traffic Signals

TO SOMERSET WEST INTERSITE LAND NEW CROSSROADS TO CAPE TOWN ALTERNATIVE A-3 Full trumpet interchange with direct N2 access onto extended Stock Road. LEGEND Freeways New Arterial/Service/Access Roads Existing Arterial/Service/Access Roads MyCiti Busway Lanes Traffic Signals

TO SOMERSET WEST Requires CTIA perimeter fence to be set back additional 10-20m NEW CROSSROADS TO CAPE TOWN ALTERNATIVE A-4 Full diamond interchange with direct N2 access onto Stock Road extension. LEGEND Freeways New Arterial/Service/Access Roads Existing Arterial/Service/Access Roads MyCiti Busway Lanes Traffic Signals

TO SOMERSET WEST TO CAPE TOWN ALTERNATIVE B-1 Minimum infrastructure intervention. Retain existing Borcherds Quarry (BQ) Road Interchange, build extension of New Eisleben Drive over N2 into New Borcherds Quarry (NBQ) with no access to N2. Option to add east facing ramps on NBQ for Airport Precinct. LEGEND Freeways New Arterial/Service/Access Roads Existing Arterial/Service/Access Roads MyCiti Busway Lanes Traffic Signals

TO SOMERSET WEST ` TO CAPE TOWN ALTERNATIVE B-2 Combine existing BQ and NBQ Interchanges as a split Diamond Interchange on N2, option to add east facing ramps on NBQ for Airport Precinct. LEGEND Freeways New Arterial/Service/Access Roads Existing Arterial/Service/Access Roads MyCiti Busway Lanes Traffic Signals

TO SOMERSET WEST TO CAPE TOWN ALTERNATIVE B-3 Combine existing BQ and NBQ Interchanges as a double (B type) Parclo Interchanges with a 500m weave length on N2 between merging and diverging ramps. LEGEND Freeways New Arterial/Service/Access Roads Existing Arterial/Service/Access Roads MyCiti Busway Lanes Traffic Signals

TO SOMERSET WEST ` Note: C-D roads in fill for overpass structure over existing Borcherds Quarry Road TO CAPE TOWN ALTERNATIVE B-4 Combine existing BQ and NBQ Interchanges with C-D road arrangement with partial single point diamond arrangement for major N2/Eisleben Drive/NBQ turn movements. LEGEND Freeways New Arterial/Service/Access Roads Existing Arterial/Service/Access Roads MyCiti Busway Lanes Traffic Signals

TO SOMERSET WEST ` ` Note: C-D roads in fill for overpass structure over existing Borcherds Quarry Road TO CAPE TOWN ALTERNATIVE B-5A New single point diamond interchange on NBQ with only west facing ramps retained at existing BQ interchange. Proposed C-D roads linking two sets of west facing ramps. LEGEND Freeways New Arterial/Service/Access Roads Existing Arterial/Service/Access Roads MyCiti Busway Lanes Traffic Signals

TO SOMERSET WEST ` TO CAPE TOWN ALTERNATIVE B-5B New single point diamond interchange on NBQ with only west facing ramps retained at existing BQ Interchange. No C-D roads proposed. LEGEND Freeways New Arterial/Service/Access Roads Existing Arterial/Service/Access Roads MyCiti Busway Lanes Traffic Signals

TO SOMERSET WEST Note: C-D roads in fill for overpass structure over existing Borcherds Quarry Road TO CAPE TOWN ALTERNATIVE B-6A New diamond interchange on NBQ with only west facing ramps retained at existing BQ Interchange. Proposed C-D roads linking two sets of west facing ramps. LEGEND Freeways New Arterial/Service/Access Roads Existing Arterial/Service/Access Roads MyCiti Busway Lanes Traffic Signals

TO SOMERSET WEST TO CAPE TOWN ALTERNATIVE B-6B New diamond interchange on NBQ with only west facing ramps retained at existing BQ Interchange. No C-D roads proposed. LEGEND Freeways New Arterial/Service/Access Roads Existing Arterial/Service/Access Roads MyCiti Busway Lanes Traffic Signals

TO SOMERSET WEST TO CAPE TOWN ALTERNATIVE B-6C New diamond interchange on NBQ with no west facing ramps retained at existing BQ Interchange. No C-D roads proposed. LEGEND Freeways New Arterial/Service/Access Roads Existing Arterial/Service/Access Roads MyCiti Busway Lanes Traffic Signals

Alternative Interchange Layouts

Summary of Successive Ramp Spacings on N2 Freeway Distance Between Successive Ramps Along N2 Freeway EB (To Somerset West) WB (To Cape Town) Design Spacing Minimum Spacing (SANRAL) Design Spacing Minimum Spacing (SANRAL) Alternative 3a Alternative 8 Airport Approach NBQ 1555m 1300m R300 NBQ 1895m 1400m NBQ R300 2855m 2100m Airport Approach EBQ NBQ Airport Approach 2105m 1300m 830m 1300m R300 NBQ 1895m 1400m EBQ NBQ 830m 1300m NBQ EBQ 1045m 1300m NBQ R300 2855m 2100m EBQ Airport Approach 1045m 1300m

Nett Total Cost R mil Nett Total Cost R mil (excl. VAT); (incl. Contingency and Contractor P&G) N2 CORRIDOR (PGWC) Interchange Upgrades Additional 3rd lane on N2 to km 17.5 Subtotal ROAD NETWORK (CoCT) km 17.5 - Mew Way SANRAL Nett Total Cost (excl. VAT) Alternative 1 R 263.68 R 96.75 R 360.43 R 219.71 R 82.52 R 662.67 2 R 313.32 R 96.75 R 410.08 R 219.71 R 82.52 R 712.31 3A R 205.49 R 96.75 R 302.25 R 219.71 R 82.52 R 604.48 3B R 255.14 R 96.75 R 351.89 R 219.71 R 82.52 R 654.13 4* 5 7 R 413.93 R 96.75 R 510.68 R 247.76 R 82.52 R 840.96 R 220.08 R 96.75 R 316.83 R 219.71 R 82.52 R 619.07 R 222.19 R 96.75 R 318.95 R 219.71 R 82.52 R 621.18 8 R 210.98 R 96.75 R 307.73 R 219.71 R 82.52 R 609.97 *Measurement Includes C-D Roads and Realignment of the N2

Multi Criteria Evaluation PROPOSED EVALUATION CRITERIA FOR INTERCHANGE / ROAD NETWORK ALTERNATIVES Proposed Rating Description Rating Excellent 5 Above average 4 Average 3 Below average 2 Poor 1

Multi Criteria Evaluation: Summary of Findings: Weighting Summary Evaluation Criteria HHO AFRICA (ORIGINAL WEIGHTING) CoCT IRT Planning CoCT Spatial Planning HHO AFRICA (EQUAL WEIGHTING) Construction Cost Cost of roads, bridges, services, property acquisition, etc. 20 20 20 16.7 Interchange Planning / Road Network Considerations Network Traffic Performance PT Services / NMT Network Improved Access and Security Risk to Implementation Interchange/C-D ramps: spacing requirements 10 10 10 8.3 Road hierarchy 5 5 5 4.2 Intersection spacing 5 5 5 4.2 Travel time savings and level of service 20 20 10 16.7 IRT/ Public transport services 5 7.5 10 8.3 NMT routes across N2 5 7.5 5 8.3 Philippi Industrial & surrounds 15 7.5 15 12.5 CTIA, Airport precincts, etc. 5 7.5 10 4.2 Potential delays due to housing relocation and land acquisition 10 10 10 16.6 Total 100 100 100 100

Multi Criteria Evaluation: Summary of Findings: Score Summary Weighting Alternative 1 2 3a 3b 4c 5 7 8 HHO AFRICA (ORIGINAL WEIGHTING) 373 4 373 4 412 1 405 3 331 7 351 6 318 8 412 1 CoCT IRT Planning 372 4 369 5 410 1 400 3 323 8 367 6 325 7 407 2 CoCT Spatial Planning 375 4 371 5 410 1 402 3 318 8 371 5 345 7 405 2 HHO AFRICA (EQUAL WEIGHTING) 365 4 360 5 399 1 389 3 323 7 348 6 319 8 397 2 TOTAL 1485 4 1473 5 1631 1 1596 3 1295 8 1437 6 1307 7 1621 2

Preferred Alternative

Land Use Projections & Traffic Modelling CoCT Pragmatic Densification Scenario (PDS) for 2032 as based Modelled scenario uses PDS as base, plus : CTIA generated traffic (25 MPA) PEDI "optimistic scenario" (105ha) Portion of Glebe land (76 ha; 70% of 108ha) 1% pa background peak hour traffic growth

Future Flows on Alternative 03A Network : AM Peak Hour

Future Flows on Alternative 03A Network : PM Peak Hour

Borcherds Quarry Road Robert Sobukwe to Airport Approach

New Borcherds Quarry Road Airport Approach to N2

New Borcherds Quarry Road/N2 Interchange

New Eisleben Drive N2 to Govan Mbeki

Project Planning Objectives In conclusion we have met the following objectives: Understood the medium to long term land-use and transport infrastructure scenarios for the study area. Improved N2 access to Philippi Industria and its linkage to the Airport & Airport Industrial Area. Improved N2 access to CTIA and adjacent industrial areas (Airport Industria, Airport City) Improved public transport access on: Proposed IRT corridor along Eisleben/New Borcherds Quarry, with links to Klipfontein & Wetton-Lansdowne Road Corridors Extend N2: 3rd lane/bmt lane from Borcherds Quarry Interchange to Mew Way Interchange. NMT infrastructure along the route Improved NMT accessibility across the N2 Allowed in the infrastructure planning for Airport Beltway Expressway improvements. Supported a consistent road network/hierarchy in the study area. Paving the way towards the City s vision of a node at Philippi

Way Forward Phase 1: 3 rd lane on N2 underway Remaining Phases: Scheduled for 2018/19 Finalise detailed design Relocation of Steenbras water main Relocation of informal housing within road prism