A local passenger train passed through level crossing on which half barriers were open.

Similar documents
LEVEL CROSSING SAFETY CAMPAIGN IN CROATIA

Health & Safety Policy & Plan. Rightway Roofing.

A study on the relation between safety analysis process and system engineering process of train control system

Sharing practice: OEM prescribed maintenance. Peter Kohler / Andy Webb

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

Accident/Incident Reporting and Investigation Procedures

O&M MANUAL HIGHLIGHTS

Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls

ATOC Guidance Note- Investigation of Station Stopping Incidents

Forewarned is Forearmed Highways Agency approach to quantifying network safety risk

Workers Compensation Accident Investigations

Road Safety Annual Report 2016 OECD/ITF Chapter 26. Morocco

LEVEL CROSSING SIGHTING DISTANCES

Safety Assessment Grade Crossing. Executive Summary ENCLOSURE 1

Large Valve Causes Back Injury

LADDERS FIXED AND PORTABLE

Taking Safe Decisions and the CSM on Risk Evaluation and Assessment. George Bearfield Head of Safety Knowledge and Planning RSSB

Definition of Safety Integrity Levels and the Influence of Assumptions, Methods and Principles Used

Emergency Procedures

Analyses and statistics on the frequency and the incidence of traffic accidents within Dolj County

Hazard Reporting Training Guide

A MESSAGE FROM THE MD

Learning event following Ironmen runaway

Equivalent arrangements accepted under the 1974 SOLAS Convention and the 1966 Load Lines Convention. Notification by the Government of France

Work Health and Safety Risk Management Procedures

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

STATISTICAL SUMMARY RAILWAY OCCURRENCES 2015

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

Part 1 Road Transport

Summary Safety Investigation Report A person was struck on the tracks Oostende - 21 September 2017

INSTRUCTIONS TO PROSPECTIVE CHARTERING SERVICE PROVIDERS FOR FOREIGN YACHTS AND BOATS - ACCOMMODATION SERVICES ON BOARD YACHTS AND BOATS -

Reducing accidents by improving roads - Demonstration on TARVA evaluation tool

Accident Investigation

Raw Material Spill. Lessons Learned. Volume 05 Issue USW

Road Safety Facilities Implemented in Japan

Estonian way to safer roads: what is behind the numbers? Maria Pashkevich Road Safety Department/Chief specialist

REPORT OF THE AD HOC COMMITTEE ON THE FEASIBILITY OF A COMMUNITY TRAIL USING THE RAIL CORRIDOR RIGHT-OF-WAY APRIL 28, 2016

Table of Contents. Feature Article. Prevention of Traffic Accidents involving Elderly People

PRACTICAL EXAMPLES ON CSM-RA

LIFTING PIN VDI3366. Item code: B Use and maintenance manual complete of EC conformity declaration. San Maurizio C.

Load Falls From Crane

Instrument Craftsman Receives Caustic Burn to Ear

THE RULES AND REGULATIONS OF THE PORT MARINE KAŠTELA d.o.o.

Drain Splash Back Burns Operator

Workshop to Generate Guidelines For the Implementation of: 1 - Step 1 of State Safety Program (SSP) and 2 - Phases 1 & 2 of ICAO SMS

Appendix B Transportation Report

RISK ASSESSMENT Installation of electrically operated service lifts (non passenger type)

Hazard Training Guide

<:\_J Senior Manager- Safety, Security & Emergency Response. Ell ORIGINAL DELIVERED BY COURIER. June 7, 2017

CONCLUSIONS AND RECOMMENDATIONS

Unattended Bleeder Valve Thaws, Causing Fire

Cutting Oils Used With Metal Cutting Machines Are Biological Hazards

TORONTO VISION ZERO Improving Safety for Pedestrians and Cyclists Roger Browne, Manager Traffic Safety Unit October 11, 2018

Dropped Objects The Regulators Perspective

All TSOs of the Nordic Capacity Calculation Region Proposal for fallback procedures in accordance with Article 44 of Commission Regulation (EU)

BYPAD. Bicycle Policy Audit CITY OF GENT March Summary. Tim Asperges Liesbeth Reekmans. Langzaam Verkeer

Our Approach to Managing Level Crossing Safety Our Policy

Introduction to Emergency Response & Contingency Planning

Road Side Design: When is a Barrier Required?

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

A Production Operator Received a Lime Burn on His Wrist

A GUIDE TO WRITING A RISK ASSESSMENT FOR A BMAA EVENT

Low Voltage Electricity System Safety Rules & Associated Safety Guidance

Accident Precursor Monitoring in Metro Railways

Measurement accessories METPOINT OCV for the measurement in systems up to 40 bar

Incorrect Relief Valve Material Causes Release

Bombardier CRJ700 registered F-GRZF Date and time 1 July 2010 at around 7 h 25 (1) Operator. Scheduled public transport of passengers Persons on board

IMPLEMENTATION PROCESS OF DIRECTIVE 2008/96/EC IN SLOVENIA

Pressure Gauge Failure Causes Release

Operator Exposed to Chlorine Gas

Safety Risk Assessment Driving Grey Fleet Vehicles

Road safety training for professional drivers: worldwide practices

AUSTRIAN RISK ANALYSIS FOR ROAD TUNNELS Development of a new Method for the Risk Assessment of Road Tunnels

Accident, Incident and Ill-health Reporting Procedure. This is a sub-policy of UEL s main Health and Safety Policy Statement

Issue 8. Module S5. Passing a signal at danger or an end of authority (EoA) without a movement authority (MA) GERT8000-S5 Rule Book

This in an internal Commission document provided to Industry for reference purposes only.

CASUALTY REVIEW

Emerging Crash Trend Analysis. Mark Logan Department of Main Roads, Queensland. Patrick McShane Queensland Transport

CYCLING TIME TRIALS The national governing body for CYCLING time trials

REGULATION 8. ELIGIBILITY TO PLAY FOR NATIONAL REPRESENTATIVE TEAMS

New Jersey State Police / New Jersey Department of Transportation Incident Management Partnership

DRAFT INTERIM ADVICE NOTE 150/17

Road Surface Characteristics and Accidents. Mike Mamlouk, Ph.D., P.E. Arizona State University

OL Finland Vision Railway safety education as part of elementary school traffic safety education. Sanna-Riia Mäkitalo 23 rd July 2008

ROAD SAFETY RISK MAPPING USING STRUCTURED DATA

FACT SHEET ChemiRisk. Getting started. Keys and functions. Moving back and forwards

Mountain Bike Risk Management Plan

PART 15 CYCLING FOR ALL Version on

The role of researchers in Finnish safety management

unable to summon help as a result of injury, ill health or an emergency. unable to carry out a task safely while alone.

Nitrogen System Contamination

Characteristics of Traffic Accidents in Highway Work Zones

Measurements of the grip level and the water film depth for real accidents of the German In-Depth Accident Study (GIDAS).

City of Oakland Employment Opportunity Part-Time

National Standard for Commercial Vessels

Management of Change (MOC) Could Have Prevented Death

Success Paths: A Risk Informed Approach to Oil & Gas Well Control

NZQA unit standard version 1 Page 1 of 5. Demonstrate knowledge of hazardous substances relevant to Certified Handlers

Hazard & Risk Management

Urgent duty driving (UDD) This chapter contains these topics: Overview Legal provisions - defences Responsibilities

Transcription:

-589 Occurrence Summary What Location Date of occurrence 12-5-16 Location name Vinkovci Station Local time 21:6 Latitude 45:18:15 North Event type Infrastructure events Longitude 18:48:44 East Description Direct Cause descrip A local passenger train passed through level crossing on which half barriers were open. The direct cause of this incident is: - Failure of the cable splitter switchgear contact K2/K12 and switchoffgear contact K4/14 (Chapter 4.3.1.). Final Report Other Attachments Nam Desc Type Size Last Orga Repo Nam Desc Type Size Last Orga Repo KI PDF 2426 6/28 Vink File 667 /21 ovci_ 7 216 3:46: _KI_ 23 web. PM pdf What Title Infrastructure events, 12-5-16, Vinkovci Station (Croatia) Occurrence type Infrastructure events Occurrence Class Incident Date of occurrence 12-5-16 Local time 21:6 Events Infrastructure events Descriptions Description A local passenger train passed through level crossing on which half barriers were open. Language Croatian Translation provider Original version ERAIL-REP PUBLIC 1 Friday, March 22, 219

-589 Description Putnicki vlak broj 2611 prešao preko nezacticenog ŽCP-a Location name Vinkovci Station Railway System type Railway Country Croatia Location type Station Border Country Line type Single track Line number L28 Allowed line speed Km number +846 Latitude 45:18:15 North Longitude 18:48:44 East Location description Additional location in Location type details Level Crossing Fixed installations Infrastructure - Level crossing protection Infrastructure - Level crossing protection - Active level crossing Occurrence details Railway vehicles Movement type Regional passenger train Train number 2611 RU Croatia Wagons overturned No HŽ PUTNICKI PRIJEVOZ Train speed at mom 5 km/h Passengers onboard Yes Vehicle description DMU Other objects involved in the occurrence Other objects Parties involved IM Involved Croatia - HŽ Infrastruktura RU Croatia - HŽ PUTNICKI PRIJEVOZ Passengers Staff Level crossing users Unauthorised persons Others Total Fatalities Serious injuries Minor injuries ERAIL-REP PUBLIC 2 Friday, March 22, 219

-589 Material consequences Material Damage Estimated total mate < 15 Damage description Images Name Description Type Size Last modified Organization Repository Causation Causes Direct Cause description The direct cause of this incident is: - Failure of the cable splitter switchgear contact K2/K12 and switchoffgear contact K4/14 (Chapter 4.3.1.). Underlying and root causes description Contributing factors: - Damage of the cable head splitter switchgear contact K2 / K12 switchoffgear contact K4/14 K4/14 (Chapter 4.3.1.), - above average rainfall (Chapter 2.4). Organizational factors: - Procedure of training and teaching executives in charge of maintenance of safety devices (chapter 4.3.2) Causation classification Infrastructure events Recommendations Recommendation Issuing information Recommendation title Education of IM workers Recommendation REC-238 End implementer IM Status Addressee NSA Issue date 2-6-17 Recommendation texts ERAIL-REP PUBLIC 3 Friday, March 22, 219

-589 Language Croatian Translation provider Original version Recommendations text Upravitelj infrastrukture tijekom poucavanja i školovanja izvršnih radnika trebao bi više pozornosti posvetiti na propisane postupke u slucajevima kad se pojavljuju opasnosti vezane za neukljucivanje SS-uredaj, a koje izravno utjecu na sigurnost prometa (poglavlje 4.3.2). Recommendations text The Infrastructure Manager, during regular education program of executive workers, should pay more attention to the training of the personal in prescribed procedures when an incident involving malfunctioning of a signaling and safety occurs (chapter 4.3.2). Implementation information Implementation status Implementation date 28-6-17 NSA Response NIB Comment Causation links Infrastructure events Investigation details Legal Basis Other reason descrip National rules imposed by implementing of the Safety Directive 24/49/EC - in light of Article 19, 2 of SD - (a) the seriousness of the accident or incident -589 National investigatio 341-9/16-3/27 Occurrence creation 27-5-16 14:4:53 Investigator in charge DBELAS Decision to investigate 13-5-16 Declaration date 23-5-16 Date of IM/RU notific 23-5-16 Report Type Final report Workflow Status Validated Report Version 4 Investigation Status Closed Other Attachments Name Descriptio Type Size Last Organizati Repositor ERAIL-REP PUBLIC 4 Friday, March 22, 219

-589 Final Report Name Descriptio Type Size Last Organizati Repositor KI PDF File 2426667 6/28/217 Vinkovci_ 3:46:23 216_KI_ PM web.pdf ERAIL-REP PUBLIC 5 Friday, March 22, 219