Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives)

Similar documents
Regulations Respecting Compressed Gas Pressure Vessels

MSC Guidelines for Independent Fuel Tanks

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

Liquefied gas cargo tanks and process pressure vessels

Vertical and Horizontal Bladder Tanks

OPENINGS AND REINFORCEMENTS 26

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

WELCOME to CAUx Local India 2018

2.1 Introduction to pressure vessels

DESIGN AND ANALYSIS OF PRESSURE VESSEL

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)

CERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION

MSC Guidelines for Pressure Vessels

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (ELEVENTH REVISION)

Other Si min/max. Cr min/max. 0.4/ / / / Bal.

SOP #: Pressure Vessels

TECHNICAL DATA OBSOLETE

Design of Pressure vessel for the Hydrocarbon release from the Vent Header Lines

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2)

RELIEF VALVES. General Description

ASME Boiler & Pressure Vessel Code Analysis of the 1497 MHz High-Current Cryomodule Helium Vessel

Installation Operation Maintenance

Installation, Operation and Maintenance Manual for Back Pressure Regulator

Pipe Thread Connection 1/2 inch NPT. Friction Loss Refer to Figure 3

Tutorial on Flange Qualification using CAEPIPE

Limited quantities of compressed gases.

Outline for Safety Performance Supervisory Inspection of Boiler and Pressure Vessel Products

Model 7989T Steel Pipe Squeezer Sch. 40 & Sch. 80. Operations Manual

P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints

Horizontal Bladder Tanks

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC

Manual Actuated Boiler Blowdown Valves

Vertical Bladder Tanks

29 SERIES - SAFETY VALVE

PRESSURE RETEST. 49 CFR, (g) Co#: Vin#: DOT Spec: MAWP:

Subpart F Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A)

Storage Systems and Accessories

PTF4 Pivotrol Pump (patented) version Dual Mechanism - Pressure Powered Pump

SERIES SAFETY VALVE

Model MTB-ASME Vertical Bladder Tanks

AWWA C504 COMPLIANT VALVES FROM 3 THRU 108

Model MTB-ASME Horizontal Bladder Tanks

WHEATLEY Series 500 Swing Check Valve

Model MTB-ASME Vertical Bladder Tanks

CAST IRON SAFETY VALVE TYPE 6301

PART 178 SPECIFICATIONS FOR PACKAGINGS. Subpart A [Reserved] Subpart B Specifications for Inside Containers, and Linings

Fall Protection- Part 2

SPIRAL PIPE - OVAL SINGLE WALL

Use equation for the cylindrical section and equation or for the ends.

Australian/New Zealand Standard

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

Guideline No.M-05(201510) M-05 AIR COMPRESSOR. Issued date: 20 October China Classification Society

ASME and PED Requirements for Drum Level Instrumentation. Presented by: Amir Hedayatnia Clark-Reliance Corp.

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

SABERINDO PACIF SABERINDO PACIFIC CIFIC SABERINDO PA. A Tyco International Company

CODE OF FEDERAL REGULATIONS TITLE 49. Parts

Supervisory Inspection Rule for Safety Performance of. Boiler and Pressure Vessel Products

SRI Jigger Tubes System

Pressure Vessel Design

VERTICAL BLADDER TANK

DUPLEX TECHNICAL INFORMATION FABRICATED DUPLEX STRAINERS

PVP2006-ICPVT

HEALTH AND SAFETY PROGRAM 201 HOT TAP PERMIT/FILLET WELD REPAIRS

HORIZONTAL BLADDER TANK

TP1 and TP2 Temporary Cone Shaped Strainers

INDUSTRIAS IBAIONDO, HYDROPNEUMATIC TANKS

Model C Pipe Line Strainer 6, 8 & 10 Inch (DN150, DN200 & DN250) 250 psi (17,2) General Description. Technical Data. Page of 6 MAY, 2006 TFP1644

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

OLD GI PART 3, FIXED LADDERS COMPARISON TO NEW RULES

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS

Occupational Safety and Health (Vessels under Pressure) GN. No. 274 (contd.)

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

STS 650 PRESSURE EQUIPMENT

WATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL

1213B2 Service Regulators Maximum Inlet Pressure 125 PSIG

Labor Chapter ALABAMA DEPARTMENT OF LABOR ADMINISTRATIVE CODE CHAPTER INSPECTIONS AND NOTIFICATIONS TABLE OF CONTENTS

TECHNICAL DATA. System water supply pressure enters the priming chamber of the deluge valve (A.1) through the 1/4 (8 mm) priming line, which

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

TECHNICAL DATA Q= C. Table 1 - Specifications

SECURITY AND CONFIDENCE AT HEIGHT

49 CFR 195 Transportation of Hazardous Liquids by Pipeline THIS DOCUMENT CONTAINS ONLY THE SECTIONS NEEDED FOR THE API 1169 ICP EXAMS

Model B-1 Pipe Line Strainer 3, 4, 6 & 8 Inch (DN80, DN100, DN150 & DN200) 175 psi (12,1 bar) General Description. Technical Data

Piped Air SCBA Refilling System Standard

BASIC REQUIREMENTS FOR FIBER REINFORCED PLASTIC (FRP) TYPE 3FC COMPOSITE CYLINDERS

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

Section GATE VALVES

FV Flash Vessel Installation and Maintenance Instructions

API-510 PRESSURE VESSEL INSPECTOR

1800C and 1800C-HC Service Regulators

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS

IAPMO GUIDE CRITERIA FOR BALL VALVES IAPMO IGC PURPOSE

THIN CYLINDERS AND SHELLS

NATURAL GAS MAINTENANCE. Part 192 Subpart "M"

NBIC Committee Action Block

BLADDER TANK PROPORTIONING SYSTEM PRE-PIPED

Atmospheric relief valve type 1100 Installation and maintenance instructions

High-Pressure Boiler Inspection Procedures: A Complete Checklist

Title: Pressure Relieving and Venting Devices Function: Ecology & Safety No.: BC Page: 1 of 7 Reviewed: 6/30/12 Effective: 7/1/12 (Rev.

Roughneck TM Mesh Slings

Transcription:

Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives) December 5, 1994 TM

Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives) Effective: December 5, 1994

CONTENTS PART I - GENERAL 1. SHORT TITLE 2. SCOPE 3. DEFINITIONS 4. GENERAL 5. RESERVOIR INSTALLATION REQUIREMENTS 6. INSPECTION AND HYDROSTATIC TESTING 7. HYDROSTATIC TESTING PROCEDURES 8. TELLTALE DRILLING PART II - FILING REQUIREMENTS 9. FILING REQUIREMENTS WITH THE DEPARTMENT APPENDIX I- SPECIFICATION AND INSPECTION REPORT FOR AIR RESERVOIRS AND ASSOCIATED COMPONENTS - 2 -

PART I - GENERAL 1. Short Title 1. For ease of reference, this rule may be referred to as the "Air Reservoir Rule". 2. Scope 2.1 These rules prescribe the standards for installation, inspection, testing and reporting of air reservoirs used by railway companies subject to the jurisdiction of Transport Canada. These rules apply to stationary and portable reservoirs except those on locomotives. 3. Definitions In these rules:. 3.1 "air reservoir" means a tank of air larger than 5 cubic feet and under pressure greater than 15 pounds per square inch; 3.2 "automatic drain valve" means a device which automatically drains condensate from the air reservoir supply system; 3.3 "department" means the Department of Transport, Surface Group; 3.4 "design pressure" means the maximum permissible internal operating pressure for a vessel in its normal operating position at the operating temperature specified for that pressure, and includes a factor of safety of 4*; 3.5.1 "factor of safety" means a margin of safety and is used to determine maximum allowable stress value used for the design of the reservoir; 3.6 "authorized working pressure" means the pressure at which a vessel is authorized to operate; it must always be less than the design pressure; 3.7 "hydrostatic testing" means a test capable of pressurizing the reservoir to a minimum test pressure of 1 1/4 times the maximum authorized working pressure (as prescribed on the badge plate); 3.8 "railway company" means a railway or railway company subject to the Railway Safety Act; * factor corrected to read 4 instead of 5 as per approval letter dated March 11, 1998 3.9 "railway safety inspector" means a Department of Transport inspector appointed pursuant to section 27 of the Railway Safety Act; 3.10 "telltale drilled" means a reservoir drilled to a pre-determined depth over its entire surface, both shell and heads, using a standard 3/16" drill. - 3 -

4. General 4.1 A railway company is responsible to ensure that all air reservoirs, associated piping, pressure gauges and safety valves attached thereto, are safely maintained. 4.2 A railway company shall prepare and distribute suitable air reservoir maintenance guidelines to railway staff which upon request shall be made available to a railway safety inspector. These guidelines will include authorized working pressure. 4.3 Any reservoir developing leakage through a telltale hole or corrosion of the reservoir steel plate shall be permanently removed from service. 4.4 Any newly installed reservoir shall be telltale drilled using the procedures in section 8.2. 5. Reservoir Installation Requirements 5.1 Identification A serial number and the authorized working pressure shall be plainly stamped in figures not less than 1/4 inch high on a metal plate, and the metal plate fastened to the reservoir in a conspicuous location. 5.2 Pressure Gauges Each stationary air reservoir system shall be equipped with a pressure gauge graduated to a least fifty per cent above the safety valve setting. 5.3 Safety Valves a) Capacity: All air pressure systems shall carry a safety valve or valves of approved design in an approved location and of the capacity specified to suit conditions of the individual service. In this section, 'approved' refers to the current version of Section 1, ASME Boiler and Pressure Vessel Codes. b) Adjustment: Safety valves shall be set at a pressure not to exceed 6 pounds above the authorized working pressure, and never above the design pressure. 5.4 Drain Valve Every air reservoir shall be provided with an automatic or manual drain valve connected to the lowest part of the reservoir. 5.5 Setting Reservoirs shall be set up on supports, so that the bottom of the reservoir is clear of the ground and ample space for a drain valve is provided. - 4 -

6. Inspection and Hydrostatic Testing 6.1 Reservoirs will be inspected to verify condition of reservoir system, air gauges and safety valves. Air gauges and safety valves shall be inspected annually. Defective components will be replaced. 6.2 Inspections and hydrostatic testing will be performed: a) following telltale drilling; b) following a modification to the reservoir; c) and according to the following schedule: i) Corrosion resistant steel ii) INSPECTION FREQUENCY TYPE OF RESERVOIR STATIONARY PORTABLE Once every 10 years Telltale drilled, welded Once every 5 years iii) Undrilled, welded Once every 3 years To be included with routine inspection of main equipment To be included with routine inspection of main equipment To be included with routine inspection of main equipment HYDROSTATIC TESTING Not required Not required Once every 3 years iv) Riveted Annually Annually Annually 7. Hydrostatic Testing Procedures 7.1 Reservoirs requiring hydrostatic testing shall be tested to a pressure at least 25 per cent greater than the working pressure authorized under 5.1. The date of the hydrostatic test shall be stenciled in not less than one inch figures at a prominent location on each reservoir. 7.2 The entire surface of an undrilled reservoir shall be hammer-tested before each hydrostatic test with reservoir under atmospheric pressure. 7.3 All undrilled air reservoirs shall be thoroughly cleaned by washing out at each hydrostatic test, so as to remove all foreign matter, and then closely examined for corrosion and pitting. 8. Telltale Drilling 8.1 General Existing welded reservoirs may be telltale drilled using the procedures in section 8.2. Newly installed reservoirs, except those constructed of corrosion resistant steel, must be telltale drilled. - 5 -

8.2 Procedures a) Each air reservoir, originally constructed and maintained to withstand at least four* times the authorized working pressure, may be drilled over its entire surface both shell and heads with telltale holes, made by a standard 3/16" drill which shall be spaced not more than 12 inches apart, measured both longitudinally and circumferentially, and drilled from the outer surface to a minimum depth determined by the formula: D = where: D = 0.6 PR ---------- S - 0.6 P minimum depth of telltale holes in inches but in no case less than 1/16 inch; P = S = design pressure in pounds per square inch; 1/5 of the minimum specified tensile strength of the material in pounds per square inch; and factor corrected to read four instead of five as per approval letter dated March 11, 1998 R = inside radius of the reservoir in inches; b) the design pressure P is obtained from: where: P = SEt ----------- R + 0.6t S = E = t = R = 1/5 of the Minimum tensile strength in pounds per square inch; joint efficiency as specified per UW-12 ASME Code Section VIII Div 1; minimum thickness of shell plate in inches; and inside radius of shell in inches; c) on horizontal reservoirs, one row of holes shall be drilled lengthwise in a line at the bottom of the reservoir; d) on vertical reservoirs one row of holes shall be drilled on a line passing through the lowest point of the reservoir; e) the holes drilled in each head shall be radially in line with the longitudinal rows of the holes in the shell; and f) flange connections, longitudinal seams or other permanent connections to the air reservoir that interfere with telltale hole lines or circles must be cleared by a least one inch. - 6 -

PART II - FILING REQUIREMENTS 9. FILING REQUIREMENTS WITH THE DEPARTMENT 9.1 Stationary Air Reservoirs a) each railway company shall file with the Department a list of all air reservoirs in service; b) any new air reservoirs placed in service or air reservoirs removed from service shall be filed with the Department annually; and c) a copy of "Specification and Inspection Report for Air Reservoirs and Associated Components" form (Appendix I) will be displayed under transparent cover at or near the location of the air reservoir. 9.2 Portable Air Reservoirs a) each railway company shall file with the Department a list of the air reservoirs in service; b) any new air reservoirs placed in service or air reservoirs removed from service shall be filed with the Department annually; and c) the inspection date will be stamped or stenciled on the reservoir. - 7 -

APPENDIX I SPECIFICATION AND INSPECTION REPORT FOR AIR RESERVOIRS AND ASSOCIATED COMPONENTS... (Name of railway company) Located at or on Railway Serial No. Manufactured by Service Manufacturer's No. Design pressure Constructed at Date Authorized working pressure lb. per sq. inch Factor of safety Diameter of reservoir Material of shell plates Radius of heads Top Bottom Material of heads Minimum tensile lb/sq. in. Thickness of shell plates Minimum tensile lb/sq. in. Thickness of heads Number and size of manholes Position of reservoir - vertical or horizontal Number, size, make and model of safety valves Location of safety valves (on reservoir, in supply line, etc.) Safety valve or valves set at Telltale drill depth The data upon which calculations were made was obtained from drawing Nos. Date of: the inspection: telltale drilling: hydrostatic testing: the annual inspection of air gauges and safety valves:

TM Railway Association of Canada 99 Bank Street, Suite 901 Ottawa, ON K1P 6B9 Telephone: (613) 567-8591 Fax: (613) 567-6726 Email: rac@railcan.ca www.railcan.ca @RailCanada www.facebook.com/railcanada