Specification for Medical Gas Pipeline s

Similar documents
Technical Specification

SUPPLY, DESIGN, ERECTION & COMMISIONING OF COMPLETE MEDICAL GAS PIPE LINE SYSTEM BOQ (NSR)

PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

Manifolds & pressure reducing sets

MANUAL GAS MANIFOLDS

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

AUTOMATIC GAS MANIFOLDS

COMPACT TRIPLE WALL OUTLET STATION MODEL INSTALLATION AND OPERATING INSTRUCTIONS

Perfect Medical Product

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

Instructions for Use. Plug connection for medical gas and vacuum acc. to DIN / 2004 DIN EN ISO

Instruction Manual. CG16K Barometrically Compensated Capsule Dial Gauge. CG16K Capsule Dial Gauge, 0 to 25 mbar

OXY Integral. INTERCON ENTERPRISES INC Tel: Fax: Internet:

Nitrous Oxide / Oxygen FLOOR MOUNTED OUTLET STATION Installation and Instructions

Installation and Maintenance Manual. Compact Medical Gas Outlets

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

AREA VALVE SERVICE UNITS

Technical Datasheet. Rigid & Retractable Pendants. Rigid Pendant

M03 WUNDATRADE. Heat Pump Manifold. Before you start: Check the contents. Optional. ...a division of WUNDA GROUP PLC

Emergency Mobile Unit Medicinal gases everywhere, always on time

MEDICAL EQUIPMENT CATALOG

ASSE International Product (Seal) Listing Program

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

Specialists in HTM Medical Gas Pipeline Equipment AVSU/Module Operating and Maintenance Instructions

SATURN EVO COLOR A N A E S T H E S I A S Y S T E M. Manufacturer of high quality anaesthesia products

Zeus Vertical Headwall

MEDICAL GAS OUTLETS & PROBES

ACCU-PULSE Installation and Operation Instructions

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

HYQUEST SOLUTIONS PTY LTD INSTRUCTION MANUAL TIPPING BUCKET RAIN GAUGE MODEL TB6

Installation and Maintenance Manual. Dual Medical Gas Outlets

USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions

Section GAS CHLORINATION SYSTEM

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2)

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

Piped Air SCBA Refilling System Standard

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

HOSPITAL STRUCTURAL PRODUCTS 12. MEDICAL GAS SYSTEMS LUMINAIRES AND OTHER EQUIPMENTS WALL CORNER PROTECTION SYSTEMS A. B. C.

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA OBSOLETE

DUPLEX PRESSURE REDUCING SET

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

MEDAP-MOBILE GAS SUPPLY

SECTION BUTTERFLY VALVES

TECHNICAL DATA. Q= Cv S

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

High Precision Gauge Pressure Indicators

IX1 Spirax-Monnier International Compressed Air Filter Installation and Maintenance Instructions

System Pressure Manager Standard & System Pressure Manager Plus

Premium Series. Economical Price & Reliable Performance. High Quality. Rust-Resistant. Long Life. Tamper-Resistant locking Screw.

Unit 24: Applications of Pneumatics and Hydraulics

Chlorinator MODEL MK-I

Medical Gas Control Panel

Pressure Equalising Valves Model , for Differential Pressure Gauges

Gas Welding Hoses and connections, the weak link

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

MEDICAL GAS SYSTEM & EQUIPMENT

IP2, IP2A and IP2D. Spirax-Monnier International Compressed Air Filter/ Regulators

Compact Triple Cabinet Outlet Station Model Installation and Operating Instructions

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

The Compact, Portable, Efficient and Economical Solution to boost Shop Compressed Air Pressure by 2 or 3 times

Installation Instructions for NP100 Series Nitrogen Control Panels

TECHNICAL DATA. Q = C v P S

Pipe threads for tubes and fittings where pressure-tight joints are not made on the threads. (requires PTFE sealing tape or liquid sealant).

v. Size shall be specified on drawings.

BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications

Gas Pressure Regulator HON 200

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS. This work covers part of outcome 2 of the Edexcel standard module:

TECHNICAL ACCESSORIES

TECHNICAL DATA. Trimpac 251a. Spetember 16, 2013

EMPLOYEES STATE INSURANCE CORPORATION SUPER SPECIALITY HOSPITAL SANATHNAGAR, HYDERABAD LIMITED TENDER For ANNUAL MAINTENANCE CONTRACT

South-Tek Systems - Nitrogen Generation Corrosion Inhibiting System. Designed for: Dry or Preaction Fire Protection Systems (FPS)

Copper tubes, as we are all aware, have

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S

Horizontal Bladder Tanks

Tank Blanketing Pressure Regulators RHPS Series

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

PART 1 GENERAL..2 Components of the gas chlorination system include, but are not limited to the following:

CENTRAL GAS SUPPLY SYSTEMS : CYLINDER BATTERIES AND HIGH PRESSURE HOSES

Radiator thermostats type RA2000, valve bodies type RA-FN (series D) and RA-G

Compact Triple Cabinet Outlet Station Model B Installation and Operating Instructions

TECHNICAL DATA. TRIMPAC Model B-5 & B-5B

OPERATING INSTRUCTIONS MANUAL FOR QACV PNEUMATIC DOSING PUMP

PRESSURE CONTROL REGULATORS

Vertical Bladder Tanks

INSTRUCTION MANUAL TIPPING BUCKET RAIN GAUGE. MODEL TB3/0.1mm

Chemical Feed Equipment Floor-Mounted Gas Dispenser - Series CH4200

Transferring and Storage

Forged Brass Bellows Valves

TECHNICAL DATA. Q = C v P S

Radiator thermostats type RA2000, valve bodies type RA-FN (series D) and RA-G

INSTALLATION OPERATION MAINTENANCE

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

Safety Policy Manual Policy No. 133

CLEAN AGENT FIRE EXTINGUISHING SYSTEM MX 1230 Extinguishing Agent Cylinders

Gas plug-in hose, straight-through form. Instructions for Use. suitable for gas socket model G2019T, G2016T. G2023 from 01/1990.

Serie ECO 3T. Threaded end back flow preventer with controllable reduced pressure zone. made in. Application fields. Protection E U R O P E

SUPPLY OF ISOLATION AND APPLIANCE VALVES PTS - APPLIANCE BALL VALVE

Transcription:

M.S Specification for Medical Gas Pipeline s Supply, installation and commissioning of medical gas pipelines at pediatric emergency and Outborn NICU S. No. Area Beds Gas outlet Oxygen- O2 Flow meter Ward Vacuum Unit 1 Outborn NICU 12 16 12 12 2 Neonate receiving area 3 Emergency ward 4 Emergency receiving area 1 1 1 1 6 8 6 6 1 1 1 1 5 TOTAL 20 26 20 20 MGPS Should be designed as per norms laid down in guidelines of HTM2022 /EN737 standards. The Products, wherever offered, should fully meet and comply with HTM 2022 standards. COMPONENT OF MGPS SYSTEM Medical Gas Pipeline component like Gas outlet points, Medical Gas area Line pressure alarm, Zonal Valve Box, Oxygen flow Meter, Humidifier Bottle, Vacuum Regulator, Collection Jar, High pressure antistatic tubing, Bed Head Wall Panels with railing should be from one source for easy compatibility and of good quality as per the specifications. MGPS PRE-INSTALLATION CERTIFICATION FOR MATERIAL SUPPLIED Test certificate from the manufacturer saying that products like Gas outlet points, Medical Gas Area Line pressure alarm, Zonal Valve Box, Oxygen flow Meter, Humidifier Bottle, Vacuum Regulator, Collection Jar, High pressure antistatic tubing, Bed Head Wall Panels with railing are fully tested and suitable for medical use. MGPS POST COMMISSIONING AND TESTING CERTIFICATES Testing and installation certificate from tenderer with complete details of the product. 1. The entire project has to be completed by the contractor before handover to the Hospital.

2. The specifications provided are basic guidelines. The contractor should collect the copy of building layout plan, visit the site and make their proposal. The details of the number of outlets and BOQ are indicative. SPECIFICATIONS OF MGPS SYSTEM Medical Gases Supply System DISTRIBUTION PIPING Copper Pipeline 1. The piped distribution system must use copper pipes manufactured from phosphorus deoxidized non arsenical copper. All pipelines used along with flow meter etc. should be ISI mark preferably size, 12 mm, 15 mm, 22 mm, and 28 mm (outer diameter) and of thickness > 0.7mm to 0.9mm,.0.9mm and 0.9mm respectively. 2. Should be drawn, seamless, deoxidized, non-arsenical, half-hard tempered and degreased materials conforming to BS-6017/1981 and manufactured as per BS-2871/the new European standard EN 1057. 3. All copper pipes are to be certified by Authorized Test House Services for physical properties and Chemical properties. 4. Copper to copper joints shall be made on site using a silver copper phosphorus brazing alloy. Copper to brass or gun metal joints shall not be made on site. 5. Pipe lines should be supported at the intervals specified in HTM 2022 using suitable metallic, non ferrous material. Plastic supports may be used only for the drown drops to the terminal units. 6. Fitting shall be end feed type, manufactured from the same grade of copper on the pipes 7. Fittings shall be degreased suitable for oxygen use and supplied sealed in protective polythene bags. Gas Outlet/Terminal Unit-(Front Loaded-Emerald Type) 1. Outlets/valve with probe- each adapter should have suitable threads so that it can be connected to tube/ flow meter/ wvu /tsu etc. 2. All oxygen outlets and Suction outlets should be preferable Imported.

3. The socket assembly must retain a capsule assembly, a sealed with check valve and probe O ring seal 4. Outlets should be gas specific and only accept the correct medical gas probe. 5. Should be pin indexed to ensure correct gas assembly Oxygen Flow meter with Humidifier Bottle 1. It should have Humidifying bottle with whole flow meter assembly, should be of light weight material. 2. It should have backpressure compensated flow meter. 3. It should provide accurate gas flow measure by 0-15 liter/m flow meter. 4. Flow tube should be of good quality, transparent with measuring humidifying bottle. 5. Flow meter should be fitted with matching adaptor (probe) for oxygen outlet point. Ward Vacuum Unit 1. It should include vacuum pressure regular up to 760 mm Hg with Dial gauge 2. Should have re-usable collection bottle made with a wall bracelet. or unbreakable polycarbonate materials, fully auto-clavable along with safety device to prevent overflow and with a wall bracetk. 3. Should be wall mounted and back flow resistance should have 600ml capacity with play contracted jar 4. The controller should be operated by means of a 180 degree on/off switch and a bonnet adjustment. Isolation Valve (medical gas line Ball Valve- indigenous) 1. Each point should have separate isolation valve 2. Isolation/ shut off ball valves shall be of non lubricated 90 degree turn level stainless steel all valve with PTFE seat, having opening by quarter turn of handles. 3. Sizes should be appropriate of copper pipes with screw threaded ends and bran adapter. 4. All valves should be pneumatically tested for twice the working pressure degreased of medical gen service before supply.

5. The shut of valves should be from any of make CIM/RB/AUDKO- Italy make in ISO factories Antistatic Rubber Tube Should comply and meets requirement of ISO standards. It should be as per the specified standard Color. Bed head unit The bed head panel (horizontal) should be made from high strength extruded Aluminium with anodized finish. The length should be 5feet & 4 feet as per BOQ. The panel should not be flipped opened. The panel should be able to house 2 X Oxygen, 1 X vacuum and 1 X Air outlets, 5 nos. X 5/15 amp electrical receptor (4 nos. electrical receptors in 4-feet panel). The panel should have provision for double rail mounting system and include accessories i.e. I.V. poles with four hooks, Infusion pump mounts, monitor tray with slider and utility basket. Alarm System 1. The medical gas alarms must be capable of monitoring medical gas services by means of pressure sensors, which detect deviations from the normal operating limits of either pressure or medical vacuum. 2. Should have digital display of low pressure & high pressure valve. 3. Each gas service must be displayed by colored LEDs to show normal (green) low and high Pressure (red) conditions. Medical Vacuum systems must be displayed in normal; (green) and low vacuum (red) conditions only. Failure indicator must be displayed by flashing lights and normal indications must be steady 4. An audible warning must sound simultaneously with any failure indication and a mute facility must be provided. Following a mute selection the audible must resound after approx 15 minutes, or must operate simultaneously.a maintenance mute switch must be provided internally to the panel for use during maintenance which results in prolonged pipeline or plant shutdown. This facility must automatically reset when the gas services return to normal. 5. The alarm panel must have a test facility to prove the integrity of the internal circuits. LEDs an audible warning.each alarm must provide a green LED to indicate that electrical power is available at the panel and a red led to indicate system alarm. In the event of an electrical power failure the System alarm LED illuminate (flashing) and the audible warning.

Installation Testing Painting 1. Installation of piping shall be carried out with utmost cleanliness. Only pipes fitting and valves, which have been degreased and brought in polythene sealed bags, shall be used at the site. Pipe fixing clamps will be non-ferrous or non- deteriorating plastic suitable for the diameter of the pipe. 2. All pipe joint shall be made using insert gas fluxes brazing method.all joints shall be of copper to copper and shall be brazed by silver brazing filter material 3. All pipes shall be installed without printing or forcing. All pipes shall be protected against mechanical injury in a manner satisfactory to authorities having justification. After erection all the new pipelines would be cleared and purged with the help of dry nitrogen gas. Testing will be carried out a pressure of 6-kg/cm2 pressures for 24 hours to make the system leak out. All existing and proposed exposed pipe be painted with two coats of synthetic enamel paint and color codification as per prevalent hospital practice. Certification After completion of installation, contractor will certify that complete installation has been tested and all relevant tests have been carried. General terms and conditions 1. The firm should be an authorized agent/manufacturer of gas pipeline system along with accessories related to pipeline system. The medical gas specialist/ product manufacturer must be having ISO 9001-2008 certificate (ISO/CE certified) 2. Product quoted must be installed in a Government Hospital preferably in Delhi. The firm should have satisfactory working equipment certificate from other Govt Hospital 3. The firm should have minimum 5 years of working experience in Medical Gas pipeline system along with control panel and manifold equipment in other Govt. Hospital/major hospitals having at least one manifold room with 100 oxygen and suction outlets +2 outlets of nitrous oxide.

4. It should give warranty of minimum 5yrs for pipelines and its accessories. 5. Firm should provide good quality of Medical gas pipeline/medical gas system that should be Safe and deliver medical gas in wards with safety norms. Medical gas Specialist/product manufacturer should be responsible for preparing design, flow rate calculations, pressure drop calculations, and operation maintenance manuals. 6. The firm should be manufacturer/sole distributor of manufacturer. 7. At least one engineer of the bidder must have gone through training programme at the original manufacturing unit. 8. Bidder must have completed/awarded three projects of single order value of 10lac in a government hospital preferably in Delhi. The company should have experience of 5 years or more in Government hospital. The company to provide work satisfactory report from the same institutions. 9. Firm should come and visit the actual installation site and submit the tender along with technical details, costs and pamphlets showing equipment to be supplied by them along with all the accessories required for maintenance. 10. Performance Certificate for All indigenous item quoted must be submitted. 11. Company should provide an undertaking that they will provide AMC for next 5 years after expiry of warranty period and should quote rates of AMC for next 5 years. 12. On site repair of the system to be provided. 13. The firm should keep spare s of sales equipment for 10 years 14. The entire project has to be done on turnkey basis including internal civil and electrical works at the time of execution. 15. Should have service facility in Delhi. 16. Copper pipes must be certified by a recognized certified agency for its compliance to specific standard. 17. Any misinformation regarding the specification of equipment offered would mean technical rejection.

18. The tender should be submitted in double i.e. Technical & Financial bid separately 19. Demonstration of equipment in working condition is a must. After satisfactory installation the firm should be able to show proper functioning of outlet points and pressure drop test to check the leakage. 20. Payments will be made on the actual measurement basis in front of the board members. Measurements will be made by the installing agency, which will be verified by the board on actual basis. 21. The quantity may be decreased or increased as per actual requirements of installation at a given time. 22. List of all spare parts with the rates should be submitted with the tender along with reasonability certificate for rates.