Public Notice. Corps File No. LRE Date: March 19, 2017 Expires: March 18, 2022

INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

JANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

Preliminary Engineering Study

Design Criteria. Design Criteria

Union Pacific Railroad

Inspector MUST Sign and Date Each Inspection

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

Moving Together Conference Complete Streets from the MassDOT District 5 Perspective

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Hennepin County Transportation Department

City of Hanover TRANSPORTATION STUDY

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013

STATE AID FOR LOCAL TRANSPORTATION Rev. July 2010 De MINIMIS WRITE-UP FOR PM For parks, recreation areas, wildlife or waterfowl refuges Page 1 of 3

FY Candidate Sidewalk Projects. Sidewalk Advisory Committee

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

RIDGE ROAD EXTENSION - PHASE I AND II (FROM RIDGE ROAD I DECUBELLIS ROAD I MOON LAKE ROAD INTERSECTION TO US 41)

Friends of the Detroit River Habitat Restoration Project Update

Proposed Economic Development Sports Project for Southern Dallas. Dallas City Council Meeting December 5, 2012

Appendix J: Q1-Highway 35 Route Construction Plan

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

WELCOME. FM 2818 (Harvey Mitchell Parkway) Open House. Tuesday, Nov. 14, 2017

FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS

Theodore Roosevelt Expressway (TRE) study was completed in Conducted Public meetings Analyzed traffic Provided good information

APPENDIX D COST SUMMARY TABLES

Route 47 (North Main Street) Reconstruction

IH 20 RANGER HILL PUBLIC MEETING

SNCC Demographic Trends

SECTION 3 STREET DESIGN

Demo ID SAFETEA-LU # Approp DIST Bill_Description

Central Jersey Transportation Forum. March 2007

5. RUNNINGWAY GUIDELINES

Access Management Standards

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Site Improvements

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT. Existing 10' sidepath Existing 10' sidepath MATCH LINE. Project Number: 310. Drawing Number: 1/1

Reams Road RCA Study. Board of County Commissioners Public Hearing

Beacon Lakes NW 122nd Ave

31st Street Corridor Study Iowa Street to County Route 1057

JAP Additional Information Sheet

Somerville Community Path Feasibility Study

MnPASS System Today and the Future

Bolton, CT. January 7, 2016

Great Lakes Stream Crossing Inventory Instructions

NWP Page 1 Enclosure 1

Programmatic Categorical Exclusion Update Question & Answers

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

Itasca County ATV Policy/Ordinance Public Input Meeting. February 6, 2017 Marcell Family Center February 8, 2017 Itasca County Courthouse

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

122 Avenue: 107 Street to Fort Road

Puget Sound Nearshore Ecosystem Restoration Project Restore America s Estuaries Conference 2012 Tampa, FL

Appendix I. Catalytic Infrastructure Opinions of Probable Cost

SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

INTERSECTION IMPROVEMENTS

Roadway Design Manual

Town of Orangetown Neighborhood Traffic Calming Program

section 4 Existing Conditions, Issues, and Options

STANLEY STREET December 19, 2017

TRANSPORTATION COMMISSION East 19 th St, Harper to O Connell Thursday, March 29, :00 PM City Commission Room, City Hall, 6 E.

Cincinnati Dayton Rd Widening

CTH M HIGHWAY PROJECT CTH Q to STH 113

Non-Motorized Transportation 7-1

Roundabout Feasibility Memorandum

Technical Report Culvert A Hydraulic Analysis

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida

Building Coastal Resiliency at Plymouth Long Beach

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

DRAFT. Table of Contents. Background

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

POLICIES FOR COST PARTICIPATION BETWEEN HENNEPIN COUNTY AND OTHER AGENCIES FOR COOPERATIVE HIGHWAY PROJECTS

Minam Curve. Project Location OR82: Minam Curve Project Wallowa Lake Hwy No. 010 (OR 82) Umatilla. Wallowa

Proposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017

APPENDIX A. GIS ANALYSIS FOR THE MRT

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Introduction to Roadway Design

Chapter 2: Alternatives

Highway 111 Corridor Study

CTH M Reconstruction

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study

SIDEWALK ASSESSMENT PHASE TWO

What s New!!! Blackstone River Bikeway Fact Sheet: April 2004

GUIDESTAR. Local ITS Wayne H. Sandberg Washington County Engineer Deputy Public Works Director

Charlesgate. World Series Path

ADA on Construction. Guidance for Section C Plan Preparers

Preliminary Design of Wayzata Boulevard Improvements(CSAH 112)

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Accommodating Pedestrians in the Work Zone

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

Final Sidewalk Feasibility Study

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Transcription:

Information for File # MVP- 218-2671-LSP Applicant: Pennington County Highway Department Corps Contact: Lawrence Puchalski Address: 4111 Technology Drive W, Suite 295, Bemidji, Minnesota 5661 E-Mail: Lawrence.S.Puchalski@usace.army.mil Phone: 651-29-5339 Primary County: Pennington, Minnesota Section: 3 Township: 153 Range: 43W Information Complete On: 19 February 219 Posting Expires On: 1 April 219 Authorization Type: LOP-5-M (A) This application is being reviewed in accordance with the practices for documenting Corps jurisdiction under Sections 9 & 1 of the Rivers and Harbors Act of 1899 and Section 44 of the Clean Water Act identified in Regulatory Guidance Letter 8-2. Project State Aid Project umber: 57-68-9 PROJECT DESCRIPTIO AD PURPOSE: Bridge construction, approach grading, intersection reconstruction, lighting and drainage improvements on CSAH 8 in the city of, Minnesota. The purpose of the project is to provide improved access for safe, economical, and practical movement of goods, services, emergency services, and development in the southern part of through intersection improvements at highway 32 and CSAH 17, a new bridge crossing over the Red Lake River, and a new road corridor along CSAH 8 from the red lake river east to CSAH 17. The proposed project will involve the construction of a new, three span bridge over the Red Lake River approximately 1.75 miles south of the city of Thief River Falls, Minnesota. The proposed project would relocate a portion of existing roadway on the west side of the Red Lake River and construct a new portion of roadway on the east side of the Red Lake River. The proposed project is shown on the attached plan sheets. AME, AREA AD TYPES OF WATERS (ICLUDIG WETLADS) SUBJECT TO LOSS: The entire project corridor was surveyed for the presence of wetlands. A total of 11 wetlands were mapped, most of which occur as wetlands within linear ditches along existing roads or within drainage ways. A small amount of rock rip rap fill will be placed within the bed of the Red Lake River, a Section 1 water. The consultant identified approximately 1.8 acres of wet-mesic prairie and shallow marsh type wetlands within road ditches and drainage ways that will be permanently filled and/or excavated for this project. Page 1 of 2

Approximately 1.28 acres of naturally occurring floodplain forest and shallow marsh wetlands will be permanently filled and/or excavated for bridge construction. Approximately.13 acres of rip rap will be installed below the ordinary high water mark of the Red Lake River. Approximately.35 acres of the bed of the Red Lake River will be excavated during bridge construction. ALTERATIVES COSIDERED: The applicant considered a no-build alternative and an alternative which would locate the crossing one mile south of the proposed project location. The no-build alternative would completely avoid wetland impacts, but would not meet the need to improve traffic flow and safety in the south end of. The projected wetland impacts for the southern alternative would be of a similar magnitude to the preferred alternative. A detailed traffic study suggested that this alternative would provide less benefit, both in terms of economics and feasibility, than the proposed location. COMPESATORY MITIGATIO: The applicant has proposed to utilize wetland bank credits through the state local road replacement program. Drawings See attached. Page 2 of 2

MVP-218-2671-LSP Page 1 of 7

MVP-218-2671-LSP Page 2 of 7

H:\\JB\3816 Pennington County Hwy\3816-13 PennCty ew Bridge and Corridor\CAD\Eng\Wetland Fill_Exc_recover.dwg-Layout1-1/29/219 11:45 AM-(dkayser) W WETLAD 2 FILL - SQ. FT./. AC. T- + 1+ 2+ 3+ 4+ 5+ 6+ 7+ T- X X X X WETLAD 1 FILL - 2779 SQ. FT./.64 AC. WETLAD 3b FILL - 1747 SQ. FT./.4 AC. T- WETLAD 3a FILL - 984 SQ. FT./.23 AC. WETLAD 4e FILL - 1287 SQ. FT./.3 AC. WETLAD 4d FILL - 2747 SQ. FT./.63 AC. CUT - 499 SQ. FT./.11 AC. T- X X X WETLAD 4a FILL - 3429 SQ. FT./.79 AC. WETLAD 4b FILL - 414 SQ. FT./.1 AC. WETLAD 4f FILL - 114 SQ. FT./.25 AC. MVP-218-2671-LSP Page 3 of 7 Drawn by DJK 1-29-218 WETLAD 4g FILL - 124 SQ. FT./.3 AC. X X X X X X X X X X X X APPROXIMATE WETLAD FILL APPROXIMATE WETLAD CUT WETLAD BOUDARY WETLAD 4c FILL - 389 SQ. FT./.9 AC. CUT - 215 SQ. FT./.5 AC. WETLAD IMPACTS PROJECT O. 3816-13 1 1 of 5 X X X

H:\\JB\3816 Pennington County Hwy\3816-13 PennCty ew Bridge and Corridor\CAD\Eng\Wetland Fill_Exc_recover.dwg-Layout1 (2)-1/29/219 11:45 AM-(dkayser) T- T- X X WETLAD 4h FILL - SQ. FT./. AC. W 7+ 8+ 9+ 1+ 11+ 12+ 13+ 14+ 15+ 16+ 17+18+ T- X X X T- MVP-218-2671-LSP Page 4 of 7 WETLAD 5 FILL - SQ. FT./. AC. WETLAD 4i FILL - SQ. FT./. AC. APPROXIMATE WETLAD FILL APPROXIMATE WETLAD CUT WETLAD BOUDARY WETLAD 6 FILL - 57 SQ. FT./.13 AC. Drawn by DJK 1-29-218 19+ 2+ WETLAD IMPACTS PROJECT O. 3816-13 21+ 22+ 1 2 of 5

MVP-218-2671-LSP Page 5 of 7 1 WETLAD 7 PUBLIC WATERS IMPACTS: FILL - 3947 SQ. FT./.91 AC. CUT - 2624 SQ. FT./.6 AC. WETLAD 7 TOTAL WETLAD IMPACTS: FILL - 38266 SQ. FT./.878 AC. CUT - 5955 SQ. FT./.137 AC. PUBLIC WATERS IMPACTS: FILL - 583 SQ. FT./.133 AC. (RIPRAP) CUT - 15198 SQ. FT./.349 AC. T- TOTAL PUBLIC WATERS IMPACTS FILL - 97 SQ. FT./.224 AC. CUT - 17822 SQ FT./.49 AC. APPROXIMATE WETLAD FILL APPROXIMATE WETLAD CUT WETLAD BOUDARY PUBLIC WATERS PUBLIC WATERS IMPACT AREA T- 24+ 25+ H:\\JB\3816 Pennington County Hwy\3816-13 PennCty ew Bridge and Corridor\CAD\Eng\Wetland Fill_Exc_recover.dwg-Layout1 (3)-2/13/219 9:47 AM-(dkayser) 22+ 23+ 26+ 27+ 28+ 29+ 3+ 31+ 32+ 33+ 34+ 35+ 36+ 37+ WETLAD 8a FILL - 5369 SQ. FT./.123 AC. Drawn by DJK 1-29-218 WETLAD 8b FILL - 24 SQ. FT./.47 AC. T- WETLAD IMPACTS PROJECT O. 3816-13 R T- 3 of 5

H:\\JB\3816 Pennington County Hwy\3816-13 PennCty ew Bridge and Corridor\CAD\Eng\Wetland Fill_Exc_recover.dwg-Layout1 (4)-1/29/219 11:45 AM-(dkayser) T- T- 6+ 37+ 38+ 39+ 4+ 41+ 42+ 43+ 44+ 45+ 45+79 MVP-218-2671-LSP Page 6 of 7 APPROXIMATE WETLAD FILL APPROXIMATE WETLAD CUT WETLAD BOUDARY WETLAD 8c FILL - 15462 SQ. FT./.355 AC. CUT - 136 SQ. FT./.3 AC. WETLAD 8d FILL - SQ. FT./. AC. CUT - 4659 SQ. FT./.17 AC. Drawn by DJK 1-29-218 WETLAD 9 FILL - 198 SQ. FT./.5 AC. PROJECT O. 3816-13 T- WETLAD IMPACTS 4 of 5 1

H:\\JB\3816 Pennington County Hwy\3816-13 PennCty ew Bridge and Corridor\CAD\Eng\Wetland Fill_Exc_recover.dwg-Layout1 (5)-1/29/219 11:45 AM-(dkayser) T- T- WETLAD 9 FILL - 198 SQ. FT./.5 AC. T- W WETLAD 11a FILL - 2764 SQ. FT./.63 AC. WETLAD 1 FILL - 241 SQ. FT./.6 AC. T- T- T- WETLAD 11b FILL - 4662 SQ. FT./.17 AC. MVP-218-2671-LSP Page 7 of 7 APPROXIMATE WETLAD FILL APPROXIMATE WETLAD CUT WETLAD BOUDARY Drawn by DJK 1-29-218 WETLAD IMPACTS PROJECT O. 3816-13 1 5 of 5