North Avenue Corridor Study

Similar documents
North Avenue Corridor Study

North Avenue Corridor Study

Explanation of Criteria. Cross Section Comparison. Cross Section Scores. Intersection Comparison. Intersection Scores. Corridor LTS Overall

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

STONY PLAIN ROAD STREETSCAPE

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Omaha s Complete Streets Policy

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

Org Chart. Steering. Committee. Project Advisory. Committee. Nicole Losch, PTP Senior Transportation. Bryan Davis, AICP Senior Transportation

Community Task Force July 25, 2017

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

OCALA/MARION TPO CITY OF BELLEVIEW CORRIDOR PLAN STUDY PRESENTATION TO THE BELLEVIEW CITY COMMISSION JANUARY 25, :00 PM

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Transportation Planning Division

Executive Summary Route 30 Corridor Master Plan

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Tonight is for you. Learn everything you can. Share all your ideas.

EXECUTIVE SUMMARY. Vision

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

Vision. Goals and Objectives. Walking

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Columbia Pike Implementation Team (CPIT) Meeting

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

San Jose Transportation Policy

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

A Complete Streets Policy for Saratoga Springs. Presented By: Shared Access Saratoga

Preliminary Transportation Analysis

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

Active Transportation Facility Glossary

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

Monterey Road Complete Streets

Making Phoenix Streets Complete. City of Phoenix Complete Streets Initiative

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

IBI Group November 5, 2012

Albany Shaker Road Corridor Study Public Meeting # 2

LANCASTER CITY BICYCLE NETWORK

Welcome to the Quebec Alternatives Analysis Public Meeting

NJDOT Complete Streets Checklist

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

Washington St. Corridor Study

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Org Chart. Steering. Committee. Project Advisory. Committee. Nicole Losch, PTP Senior Transportation. Bryan Davis, AICP Senior Transportation

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

Complete Streets. Designing Streets for Everyone. Sarnia

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

North Coast Corridor:

Samish-Maple-Ellis Corridor Pedestrian & Bicycle Safety Improvements. Bellingham City Council March 26, 2018

Road Diets FDOT Process

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

Cycle Track Design Best Practices Cycle Track Sections

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Simulation Analysis of Intersection Treatments for Cycle Tracks

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

Arterial Transitway Corridors Study. Ave

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Complete Streets Accessible Networks for an Age-Friendly World

The DC Pedestrian Master Plan

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

MASTER BICYCLE AND PEDESTRIAN PLAN

Lynchburg District Update

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

5. RUNNINGWAY GUIDELINES

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Complete Streets Successes, Opportunities, and Challenges

Hennepin County Pedestrian Plan Public Comment Report

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Designing for Pedestrian Safety in Washington, DC

PROJECT OVERVIEW. Auburn Station Access Improvements Project

TRANSPORTATION COMMISSION Agenda Staff Report

Maywood Town Hall Meeting. May 4, 2016

Lincoln Highway Streetscape Plan Concept Plan

COMPLETE STREETS PLANNER S PORTFOLIO

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

VT15 / Allen Martin Drive Intersection Scoping Study

Eliminate on-street parking where it will allow for a dedicated bus only lane %

North Shore Transportation Improvement Strategy

C C C

Bicycle Master Plan Goals, Strategies, and Policies

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Transcription:

North Avenue Corridor Study City Council October 6, 2014

Presentation Outline Project Initiation & Process Corridor Conditions & Issues Vision & Goals Concept Development - Development/Evaluation Implementation Plan - Recommended Concepts City Council Action 2

Corridor Study Origin 2011 Transportation Plan A shift to a complete streets strategy Burlington s gateway streets must carry all travel modes cars and trucks, buses, bikes, and pedestrians - because no alternatives exist The only essential element of a complete street is accommodating all travel modes safely and efficiently. 3

Corridor Study Process & Chapters Public Workshop #1 Public Workshop #2 Public Workshop #3 Collect Information & Identify Issues Evaluate Existing and Future Conditions Develop Corridor Vision and Goals Identify Options Evaluate Options Implementation Plan Public Outreach Process Advisory Committee Participants: Burlington City Council Burlington School District City of Burlington Departments CCRPC CCTA AARP NPA Reps from Wards 3, 4 and 7 Burlington Partnership for a Healthy Community Local Motion Other Outreach: Direct outreach to stakeholders Online input tool Website & email comments Heineberg Senior Center JJ Flynn PTO 4

Existing Conditions Characteristics: 66 ROW, but constrained Sidewalks throughout, but poor condition and few crossings Inconsistent bike facilities, limited connections to paths Single family + multi-family + scattered retail + institutions Frequent driveways CCTA Route 7 Unclear parking locations / regulations Skewed intersections, highspeed right turns Forecasted traffic growth of 5% - 15%, heaviest growth near Burlington College Heaviest traffic between VT 127 ramps and Ethan Allen Pkwy (19,100 AADT) HCL 2: Birch Ct to Woodbury Rd HCL 4: Strong St/Ward St to Sherman St HCL 3: Gosse Ct/Woodlawn Rd to Poirier Pl HCL 1: Lakewood Pkwy to Ethan Allen Pkwy 5

Vision & Goals

Vision Statement for North Avenue North Avenue will continue to serve as the primary transportation corridor connecting Burlington s New North End with the rest of the City. As the North End s Main Street, North Avenue will provide for safe, inviting, and convenient travel for all users of all ages and abilities including motorists, pedestrians, bicyclists, and public transportation riders. The need to move people through the corridor will be balanced with the need to provide access to homes, businesses, and local institutions. The corridor will develop into an attractive public space through creative streetscape, signage, and other site design features. The corridor will become more livable and desirable by promoting social interaction, public health, economic development and environmentally sustainable initiatives. 7

Major Goals for North Avenue Remake the North Ave corridor into a Complete Street that accommodates the safe and efficient travel for all users of all abilities and provides transportation choices. Improve safety for all users. Provide a range of convenient and efficient travel options and improve multimodal connections. Develop strategies that support vibrant and livable neighborhoods in the New North End; enhance the quality of life of residents and visitors; and support sustainable economic growth. 8

Concept Development and Implementation Plan

Initial Universe of Improvement Options Intersection treatments: Signal improvements, re-alignment, high speed turn elimination, and/or roundabouts Improved pedestrian and bicycle travel through intersections Concept Development Travel lane, parking and bicycle-related treatments: Lane width reductions, travel lane reduction, turn lane creation, and/or lanes for bicycle travel On-street parking on one side, both sides, and/or removed Designated bike facilities: sharrows / bike lanes (regular, buffered, or protected) Advisory Committee Online Input Tool & General Comments Public Workshops Pedestrian facilities: Crosswalks, pedestrian signal improvements, and/or gateway treatments 10

Evaluating Concepts Addresses study goals? Improves safety for all users Balances transportation choices Improves multimodal connectivity Supports vibrant and livable community Supports sustainable economic growth Other design criteria: Provides consistent facilities throughout corridor Health Impact Assessment What are the potential health impacts of proposed changes? Which proposals have the most potential to improve the health of vulnerable populations? 11

Recommended Implementation Timelines Short term: Minimal design; completion within 1-3 years; improvements to advance with additional public process Medium term: Design needed; completion within 3-7 years; public involvement included in design process Long term: Evaluation, scoping and design needed; completion is more than 7 years; public involvement included in design process 12

Short-Term Concepts All signalized intersections: ADA-compliant curb ramps and crosswalks on all approaches; Audible pedestrian countdown timers with a minimum 5- second (push-button) Leading Pedestrian Interval (LPI); and Bicycle facilities maintained through intersections (where provided in advance of intersections). 13

Short-Term Concepts New pedestrian crossings: Green Acres / Cayuga Court Gosse Court Killarney Drive / Village Green Drive Burlington College Ward Street Transit: Up to three additional shelters at high ridership stops (pending funding) Larger shelters at Burlington High School 14

Short-Term Intersection Concepts Shore Road: Increase pedestrian crossing times Pedestrianactivated no right turn on red Split phasing VT 127 Ramps: Optimize signal timing Remove high-speed NB ramp, WB freeflow right turn Remove gantry over North Ave Gateway treatments Ethan Allen Shopping Center: Increase pedestrian crossing times Pedestrianactivated no right turn on red Institute Road: Reduce intersection footprint w/ paint Relocate NB bus stop Realign SB sidewalk Pedestrianactivated no right turn on red Fix signal detection 15

VT 127 Traffic Simulations 2035 AM/PM 3 lanes 16

Short-Term Cross-Section Concept Pilot project to include: No parking north of Institute Road Buffered bike lanes between Plattsburg Avenue and Shore Road 3-lane cross section with bike lanes between Shore Road and VT 127 ramps Protected bike lanes between VT 127 ramps and Institute Road Buffered bike lanes between Institute Road and Washington Street Bike friendly drain grates (as needed) 17

Medium-Term Concepts Washington Street: Raised intersection Pedestrian-actuated rapid flash beacon Gateway treatments Potential pedestrian crossings: Loaldo Drive/Fairmont Place Poirier Place Lakewood Parkway Saratoga Avenue Transit: 15-minute headways on weekday peaks Increased weekend service 18

Medium-Term Intersection Concepts Plattsburg Avenue: Slow high-speed NB right turns & relocate signals Resolve Tracy Dr turns/access to market Exclusive pedestrian phase at south crosswalk Gateway treatments Ethan Allen Pkwy: Scoping Study Relocate park entrance Add Little Eagle Bay into the signal Slow high-speed NB right turn Shore Road: Realign Shore Road (if ROW is donated or easily acquired) Keep longer crossing times and pedestrianactivated no right on red North Street: Parking lot right in/right out or curb cut removal Realign north and south crosswalks Protected/permitted SB left turns Pedestrian-activated no right turn on red Gateway treatments 19

Long-Term Concepts Potential pedestrian crossings: Staniford Road Mid-block between VT 127 ramps and Institute Road near NB/SB bus stop pair Convent Square Canfield Street Redesign the corridor for 25 mph and improve connections to parks and paths 20

Long-Term Intersection Concepts Plattsburg Avenue: Scoping for singlelane miniroundabout or other alternatives Ethan Allen Pkwy: Implement scoping study (signal or single-lane roundabout) Ethan Allen Shopping Center: Reconstruct curb and sidewalk at Farrington s Mobile Home Park and Bamboo Hut VT 127 Ramps: Scoping study for roundabout or other alternatives Institute Road: Scoping study for roundabout or other alternatives Resolve bus driveway 21

Long-Term Cross-Section Concept Long-term concept to include: On-street one-way protected bike lanes along the entire corridor Parking on one side of street in certain segments (pending evaluation of no parking trial) Maintains 3-lane cross section between Shore Road and VT 127 ramps 22

Planning-Level Cost Estimates Timeframe Concept Estimated Cost Short Term Total short-term improvements $207,000 - $292,000 New pedestrian crossings (basic to enhanced) $25,000 - $110,000 Intersection (minor reconstruction) $70,000 Cross section: 4- to 3-lane pilot planning & implementation $52,000 Cross section concept (buffered/protected bike lanes) $60,000 Medium Term New pedestrian crossings (basic to enhanced) $45,000 - $180,000 Long Term Intersections Cross section concept (on-street one-way protected bike lanes) TBD (scoping study) $7,479,000 23

City Council Action 1. Convene a North Avenue Task Force to foster a collaborative implementation process between city departments and residents 2. Direct DPW to regularly inform the TEUC and Council of the task force progress 3. Direct the DPW to implement the recommendations within the North Avenue Corridor Study 24

Resources Project website: http://www.bit.ly/north-ave Vision and Goals Full text Existing and Future Conditions Report Draft Implementation Plan Public meeting agendas, meeting notes, and presentations Advisory Committee agendas, meeting notes, and presentations North Avenue Corridor Plan: Posted October 3 rd 25