APPENDIX 4 PEDESTRIAN FACILITY DESIGN INFORMATION

Similar documents
Long Island Rail Road Expansion Project Floral Park to Hicksville

Connecting cyclists to work. Syracuse Metropolitan Transportation Council

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Bicycle and Pedestrian

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

NJDOT Complete Streets Checklist

Section 8. Partnerships and Funding

APPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET. B. Subdivision/Site Development Plan/Grading Permit Name and Number:

Appendix C. Bicycle Route Signage

Implementing the Three Es of School Zone Traffic Calming

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES

City of Charlottesville Bicycle and Pedestrian Master Plan Update

TRAFFIC IMPACT STUDY CRITERIA

Traffic Calming Policy

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

Highway 111 Corridor Study

Bicycling Routes on Provincial Roads Policy

Non-Motorized Transportation 7-1

Morristown, NJ Complete Streets Policy

MASTER BICYCLE AND PEDESTRIAN PLAN

TRAFFIC IMPACT ANALYSIS

10.0 CURB EXTENSIONS GUIDELINE

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

Appendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan

Peterborough Council on Aging

Austell Road Access Management Plan Public Meeting February 17, 2009

City of Ottawa s Complete Streets Approach to Transportation Projects

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Appendix 3 Roadway and Bike/Ped Design Standards

Elon Bicycle, Pedestrian and Lighting Plan. Pedestrian Rail Crossings Study

AMATS Complete Streets Policy

2018 Transportation Survey October 17, Prepared by:

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

West Village Mobility & Integration

HIGHWAY DESIGN MANUAL

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution

Prince George s County plans, policies, and projects

Lake Whitney Elementary School

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS

MASTER BICYCLE AND PEDESTRIAN PLAN

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

CITY MANUALS AND STANDARDS REVIEW

New Orleans Complete Streets Experience CITY OF NEW ORLEANS. Louis Haywood Department of Public Works January 19, 2016

Sixth Line Development - Transit Facilities Plan

This page intentionally left blank.

ACTIVE TRANSPORTATION Active Community Checklist

Hidden Oaks Elementary School

El Paso County 2040 Major Transportation Corridors Plan

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

2.0 LANE WIDTHS GUIDELINE

City of Waterloo Complete Streets Policy

International Physical Activity Prevalence Study SELF-ADMINISTERED ENVIRONMENTAL MODULE

Vision. Goals and Objectives. Walking

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

Appendix A: Crosswalk Policy

IMPLEMENTATION STRATEGIES

WHEREAS, the New Jersey Department of Transportation' s Complete Streets

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Durrance Elementary School

CONCERNS / CHALLENGES

WELCOME! To the Centennial Neighbourhoods Secondary Plan and Transportation Management Plan Information Centre. City of Hamilton

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Sustainable Mobility in Greater Sudbury NeORA Conference September 25, 2012

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Off-road Trails. Guidance

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

Getting Your SRTS Project Funded. Ryan Snyder

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

ORDINANCE NO

Active Transportation Infrastructure Investment A Business Case

6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION 6.2 BICYCLE DEMAND AND SUITABILITY Bicycle Demand

CHAPTER 3: Vision Statement and Goals

SECTION 1 - TRAFFIC PLANNING

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

Chapter 13 ORANGE COVE

Appendix C 3. Bicycle / Pedestrian Planning

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

DOWNTOWN MIAMI PEDESTRIAN PRIORITY ZONE

Thank you for attending the first Public Open House for the Thunder Bay Transportation Master Plan!

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

City of Saline. Complete Streets Ordinance

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS


All Season Age Friendly Pedestrian Safety and Walkability Checklist *

Complete Streets Training. Georgia Municipal Association June 27, 2016

Traffic Impact Memorandum. May 22, 2018

ADA TRANSITION PLAN 2013

Seattle Bicycle Advisory Board August 3, 2011

Windy Ridge Elementary School

Transcription:

APPENDIX 4 PEDESTRIAN FACILITY DESIGN INFORMATION 96

EXHIBIT 1 97

EXHIBIT 2 Guidelines for Installing Sidewalks Source: Design and Safety of Pedestrian Facilities, Institute of Transportation Engineers, 1998, p. 31 98

EXHIBIT 3 Federal Manual on Uniform Traffic Control Devices (MUTCD) 99

EXHIBIT 4 Typical Crosswalk Markings Source: Design and Safety of Pedestrian Facilities, Institute of Transportation Engineers, 1998, p. 53 100

EXHIBIT 5 Guidelines for Crosswalk Installation at Uncontrolled and Mid-block Crossings Source: Design and Safety of Pedestrian Facilities, Institute of Transportation Engineers, 1998, p. 55 101

EXHIBIT 6 NYSDOT Pedestrian Generator Checklist PEDESTRIAN GENERATOR CHECKLIST PIN: Project Name: Location: Note: The term generator in this document refers to both pedestrian generators (where pedestrians originate) and destinations (where pedestrians travel to). A check of yes indicates a potential need to accommodate pedestrians and coordination with the Regional Bicycle and Pedestrian Coordinator is necessary during project scoping. Answers to the following questions should be checked with the local municipality to ensure accuracy. 1. Is there an existing or planned sidewalk, trail, or pedestrian-crossing facility? YES NO 2. Are there bus stops, transit stations or depots/terminals located in or within 800 m of the YES NO project area? 3. Is there more than occasional pedestrian activity? Evidence of pedestrian activity may YES NO include a worn path. 4. Are there existing or approved plans for generators of pedestrian activity in or within YES NO 800m of the project that promote or have the potential to promote pedestrian traffic in the project area, such as schools, parks, playgrounds, places of employment, places of worship, post offices, municipal buildings, restaurants, shopping centers, or other commercial areas, or shared-use paths? 5. Are there existing or approved plans for seasonal generators of pedestrian activity in or YES NO within 800 m of the project that promote or have the potential to promote pedestrian traffic in the project area, such as ski resorts, state parks, camps, amusement parks? 6. Is the project located in a residential area within 800 m of existing or planned pedestrian YES NO generators such as those listed in 4 above? 7. From record plans, were pedestrian facilities removed during a previous highway YES NO reconstruction project? 8. Did a study of secondary impacts indicate that the project promotes or is likely to YES NO promote commercial and/or residential development within the intended life cycle of the project? 9. Does the community=s comprehensive plan call for development of pedestrian facilities YES NO in the area? 10. Based on the ability of students to walk and bicycle to school, would the project benefit from engineering measures under the Safe-Routes-To-School program? Eligible infrastructure-related improvements must be within a 3.2 km radius of the project. YES NO Note: This checklist should be revisited due to a project delay or if site conditions or local planning changes during the project development process. Comments: Regional Bicycle and Pedestrian Coordinator: Project Designer: 102