Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Similar documents
EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

City of Fairfax, Virginia City Council Work Session

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

NOVEMBER 2017 DESIGN PUBLIC HEARINGS COMMENT SUMMARY (November 13, 14, and 16, 2017)

Fairfax County Parkway Widening Fairfax County

I-395 Express Lanes Northern Extension Project Public Hearings

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

PUBLIC COMMENT SUMMARY REPORT Public Information Meetings

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report

Capital Beltway HOT Lanes Project

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

Project Description Form 6V

Public Information Meeting

General Design Factors

City of Fairfax, Virginia City Council Work Session

Washington DC Section of ITE Project Briefing

County of Fairfax, Virginia. Department of Transportation

McLEAN CITIZENS ASSOCIATION

Route 29 Solutions Projects

APPENDIX D COST SUMMARY TABLES

I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016

Non-Motorized Overpass at SR 5/US1

I-66 Corridor Improvements Route 15 to I-495. November 2014

Commuter Connections Regional TDM Marketing Group Meeting

Freeway System Considerations

INDEX. Geometric Design Guide for Canadian Roads INDEX

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

Project Description Form 8EE

Capital Beltway HOT Lanes Project

MnPASS System Today and the Future

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council

Update of the Master Transportation Plan s (MTP) Bicycle Element

3.9 Recreational Trails and Natural Areas

5. RUNNINGWAY GUIDELINES

Roundabouts are good for business

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

Figure 1: East West Connector Alignment Alternatives Concept Drawing

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

N. Frederick Street to N. Manchester Street

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Off-Road Facilities Part 1: Shared Use Path Design

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Comments EXECUTIVE SUMMARY

Casablanca Boulevard & GO Station Access

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

WalkShop. Highland Creek Village

City of Madison: 2017 Capital Budget Capital Improvement Plan

The Year Ahead: Virginia Department of Transportation Northern Virginia District

Living Streets Policy

Appendix D: Concept Screening

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

Short and Long Term Needs

Terwillegar Drive Expressway Draft Concept Plan

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Solana Beach Comprehensive Active Transportation Strategy (CATS)

IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013

City of Fairfax, Virginia City Council Work Session

Capital Beltway HOT Lanes Project

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Prince George s County plans, policies, and projects

Supervisor Cook Announces Final Plans for Braddock Road Improvement Project

Engineering - Bicycle and Pedestrian

US 19 PEDESTRIAN AND BICYCLE SAFE ACCESS

Transit and Rail Funding in the Commonwealth

Fairfax County Bicycle Program

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

EXHIBIT U THE SCOPE DOCUMENT

Chapter 5 Future Transportation

Basalt Creek Transportation Refinement Plan Recommendations

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

TRANSPORTATION & MOBILITY

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

495 EXPRESS LANES NORTHERN EXTENSION STUDY COMMENT SUMMARY REPORT JUNE 11, 2018 PUBLIC INFORMATION MEETING

Columbia Pike Implementation Team (CPIT) Meeting

What Is a Complete Street?

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Traffic Signal Design

Chapter 7 Nonmotorized Facilities

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Keynote. Shannon Valentine Secretary of Transportation

FDOT Treasure Coast Traffic Impact Report

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Transcription:

Fairfax Alliance for Better Bicycling February 28, 2019 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Nancy Smith, Public Relations Manager FAM Construction Chris Wells, Bicycle and Pedestrian Program Manager Fairfax County Department of Transportation

66 Outside the Beltway Project Scope Multimodal improvements to 22.5 miles of the I-66 Corridor 2 express lanes in each direction from I-495 (Capital Beltway) to Gainesville (University Boulevard) 3 general purpose lanes in each direction New transit service and park-andride lots Safety and operational improvements at key interchanges 2

Project Roadmap 3

Trails in the I-66 Corridor The I-66 trail within Fairfax County will be delivered under three methods: EMP-FAM Built as part of the Transform 66 project (includes crossings of I-66) Compton Road passing under I-66 EC Lawrence Park: along Braddock Road/Walney Rd and Route 28 Fairfax County Park Authority: (at park properties) Cub Run Stream Valley Park: Compton Road to Stone Road Random Hills Park: connecting Route 50 to Random Hills Drive VDOT, in coordination with Fairfax County: Compton Road trail connection Stone Road to Lee Highway Upgrade existing sidewalk to shared use path on Lee Hwy from Route 29/I-66 interchange to Route 28 West Ox Road to Random Hills Park near Route 50 Blake Lane and Nutley Street along Sutton Road and Virginia Center Blvd 4

I-66 Trail Network 5

I-66 Trail Network: Bull Run to Route 28 6

I-66 Trail Network: Route 28 to Route 50 7

I-66 Trail Network: Route 50 to Blake Lane 8

I-66 Trail Network: Blake Lane to I-495 9

Trails and Noise Barriers Where the trail is at I-66 elevation, it will be separated from I-66 with a 50 barrier as shown below (approx. 4 miles) or with sound barrier Where topography allows, the trail will be at a different elevation (above or below) the roadway 10

Trail Access Access locations at interchanges and overpasses and: Braddock Rd at NW Quadrant of Route 28 Interchange. Underpass for connection to future trail along Braddock Road and Walney Road Audrey Dr (Cabell s Mill neighborhood, Centreville) Connect to the standard turn at the end of Veronica Rd (Cabell s Mill, Centreville) Stringfellow Rd at park and ride lot w/ street crossing to trail on east side of street Fair Lakes Shopping Center (behind Walmart) East Market Shopping Center Fairfax Farms Road (parallel roadway to US 50 WB) Waples Mill Rd (NE Quadrant of US 50 Interchange) Phoenix Drive (provides access to Jermantown Road) Arrowhead Dr/Rosehaven St (SW quadrant of Route 123 Interchange) Bushman Dr (just east of tennis courts property) Platten Drive (at dead end) Cedar Lane north side connection to I-66 parallel trail Connection to west bend of Yeonas Drive (west of Southside Park) Southside Park and Yeonas Park (by the baseball fields) Cedar Lane north side connection to I-66 parallel trail 11

Trail Maintenance and Operations VDOT will maintain: Trail pavement within VDOT right of way Pedestrian counters Lighting at overpasses where required Barriers and fences where required Design will accommodate access for future maintenance 12

Non-motorized Traffic Counters The Project will provide 8 permanent non-motorized traffic counters composed of combined bicycle detector loops and passive infrared sensors. The infrared sensors shall be enclosed in a vertical post with a 2 ft clearance from the trail where feasible. (TR Section 3.13.1(N)) The general requirements of the counters are as follows: Count both pedestrians and cyclists; Differentiate between pedestrians and cyclists; Measure the direction of travel of both pedestrians and cyclists; Record count data at 15-minute intervals, 24 hours a day, 365 days a year; Provide a wood post housing for natural settings or a metal vandal resistant post for urban settings. 13

What To Expect Community meetings in late spring to talk about design advances, noise analysis, and upcoming construction activities Construction will proceed across the corridor in multiple locations at same time Do not currently have a detailed schedule for trail construction There are no contract requirements for interim milestones FAM will work with key stakeholders as trail schedules are developed 14

Nutley Street Interchange Design Alternative Currently looking at design alternative to improve movement and traffic flow on Nutley Street Design utilizes two roundabouts ( Dog Bone ) Design concept would provide for a grade separated shared use path through portions of the interchange and could accommodate a westbound Express Lane exit to Nutley Street Future information meeting will be held as concept develops 15

Nutley Interchange Dog Bone Design Alternative vs. Diverging Diamond Improves traffic flow on Nutley Street compared to Diverging Diamond concept Eliminates the new traffic signals needed for Diverging Diamond Reduces conflict points for shared use path though interchange Reduces right of way and WMATA impacts Reduces interchange foot print Could accommodate a westbound Express Lane exit to Nutley Street 16

Route 123 Interchange Early construction activities underway including constructing box culverts as part of new shared use path I-66 shared use path through interchange will connect to planned George Snyder Trail in City of Fairfax to the south I-66 Express Mobility Partners operations building in southeast quadrant 17

County of Fairfax, Virginia Off-Corridor Trail Sections Vienna Metro Trail Random Hills Park Random Hills Dr/ Post Forest Dr Fair Lakes (Constructed by EMP/FAM) E.C. Lawrence Park Rte. 28 & Braddock Rd Newton Patent Dr Rte. 28 & Rte. 29 Trail Big Rocky Run Cub Run Stream Valley Park Compton Road Bull Run Regional Park Bull Run Creek Department of Transportation 18

County of Fairfax, Virginia Off-Corridor Trail Status Update Construction Schedule Funding Status East to West in general As funding becomes available TAP Grant TPP Funding Application to I-66 Commuter Choice Seeking other funding sources Coordination Fairfax County Park Authority VDOT Locally Administered Projects (LAP) Department of Transportation 19

County of Fairfax, Virginia Upcoming Fairfax County Public Schedule and Location Meetings on Trails Spring 2019 Two meetings, one on east side and one on west side of the County Trail Coordination Status Update Trail Naming Survey For additional questions and comments about Fairfax County Trail Status Update and Coordination: Chris Wells Bicycle & Pedestrian Programs Fairfax County Department of Transportation Chris.Wells@fairfaxcounty.gov (703) 877-5772 Department of Transportation 20

I-66 Inside the Beltway Trail Detours This Spring W&OD Trail Bridge over Lee Highway Construction begins April 2019 Trail users will follow detours approaching Lee Hwy Expected completion summer 2020 I-66 Construction above Custis Trail underpass near Bon Air Park Construction begins spring 2019 Trail detour in late March Expected completion fall 2020 21

495 Express Lanes Northern Extension Major Milestones Dates Public Information Meeting #1 Cooper Middle School June 11, 2018 Begin NEPA Environmental Assessment June 2018 Public Information Meeting #2 Spring 2019 Publish Draft Environmental Assessment Public Hearing Summer 2019 Fall 2019 NEPA Decision from Federal Highway Administration 2019 22

www.transform66.org THANK YOU 23