Completion Workover Riser System. Enabling efficient operations by reducing interface complexities and minimizes operational risk

Similar documents
Subsea Safety Systems

CHE Well Testing Package/Service:

RPSEA UDW Forum June 22 & 23, Secure Energy for America

The topics I will briefly cover, are; Stack Configurations Wellhead Connector Considerations Control Systems Tensioning Systems will be discussed by

5k Slickline Lightweight Pressure Control Equipment 4 ID

DRILLING HOSE SOLUTIONS

Performance and Value of the invision System : Offshore in Coiled Tubing Operations

Learn more at

2/15/06 Nora Ghobrial

IWCF Equipment Sample Questions (Surface Stack)

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

TAM Single SeT inflatable

Engineered solutions for complex pressure situations

Retrievable Bridge Plugs

MV Island Performer a first in Australia.

New Developments and Special Experiences in Geoinform s Well Testing Services

LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN

WOCS. Status Change no. Date Version Revision. Released Version A

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing

International Well Control Forum. Well Intervention Pressure Control Level 2 Syllabus July 2015 Version 7.0

Pasquale Imbò e Marco Pelucchi ENI S.pA;

En-Tegrity. A step change in subsea well control safety

TARPON A Minimal Facilities Platform

Cased-Hole Logging Environment

A practical solution for managing risk during locked to bottom operations

The Management of Hazards during Pinned to Seabed Operations. By: Paul Nardone, Graham Fraser, & Rita Painter. Revised 22 Aug 2016.

Success Paths: A Risk Informed Approach to Oil & Gas Well Control

Protecting People and the Environment during Stimulation Treatments in Offshore Settings

Autonomous Shutdown Valve

Cost-efficient polymer solutions

Flexible Engineered Solutions International CALM Buoy Swivels

Re-usable Riser and Flowline System for Deep Water Application. C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

Marine Technology Society

HIPPS Development Project

Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Alan Brodie, PTC

Phuel Portable Control Units

NORSOK STANDARD D-002 Edition 2 (2013)

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

AUTONOMOUS SHUTDOWN VALVE

OCEAN DRILLING PROGRAM

GH & GHL Series Gas-Over-Oil Valve Actuators

DIVERLESS SUBSEA HOT TAPPING OF PRODUCTION PIPELINES

VortexFlow DX (Downhole) Tool Installation Instructions

Phuel Modular Control Units

INSTRUCTIONS FOR THE USE OF ROTARY DRILLING, VIBRATOR AND CEMENT HOSES

Work Horses of the Breathing Air Industry

Low Pressure AutoChoke Console Precise wellbore pressure control for your underbalanced and managed-pressure drilling operations

Live well deployment of long perforating gun system using combined CT technologies

valves and actuators SUBSEA ACTUATION

SPE Coiled Tubing in High-pressure Wells. Well Control Considerations. Introduction

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

PLEM CONTROL SYSTEMS

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

FPSO Riser Solutions for Harsh environments

1. The well has been shut in on a kick and the kill operation has not started.

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

DB Bridge Plug. Features. Benefits. Applications

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

EM Global Initiatives in diving, Balder Life Extension Project & Decommissioning Opportunities

Talk 2 Tree & Wellhead Valve Testing Leak Rate Acceptance. Talk 3 DHSV Control Line hydrocarbon Ingress measurement & acceptability

SWS Option: Well Pressures. SWS Option: Stretch Correction (Corrected depth) SWS Option: MMD (Magnetic Marks Detection) ASEP Products

PLEM CONTROL SYSTEMS

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd

REVISION INDEX DESCRIPTION AND/OR PAGES MODIFIED

W I L D W E L L C O N T R O L SNUBBING OPERATIONS

On-Off Connector Skirt

Hose Reel Unit, OMM. Discipline: TECHNIC Configuration control: X. Rev. Purpose Date Prep. Check. Appr. Changeorder No.

Risers for Deepwater FPSO s

Captains Meeting 2009 Introduction to Well Testing- Expro. Edwin Schoorl

NORSOK Standard D-010 Rev 4, August 2012

RIGID RISERS FOR TANKER FPSOs

Captain Wellhead & Tree

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

Technical Bulletin. Parts and Service News. LPG Lock-Off valve replacement procedures for 4.2 Liter Ford V6

Commentary on the book by Andrew Hopkins. By Graham Dalzell

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

Subsea Wellhead and Conductor Fatigue

BERMAD Fire Protection Hydraulic Control Valves

International Well Control Forum. IWCF Drilling Well Control Syllabus Level 3 and 4 March 2017 Version 7.0

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

Deepwater Horizon Incident Internal Investigation

Drilling Chokes Ultimate pressure control for the most challenging applications

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS. This work covers part of outcome 2 of the Edexcel standard module:

Unit 24: Applications of Pneumatics and Hydraulics

FLOW COMPONENT TESTING FACILITIES API SAFETY VALVE VALIDATION TESTING

Digital Intelligent Artificial Lift. Technology Application Justification Operation

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

INSTRUCTIONS FOR THE USE OF LONG LENGTH AND SPLICED HOSES

Learn more at

Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1

Perforation Techniques in brown fields for Production optimization.

FAQ regarding NORSOK D-007 Revision 2

Transcription:

Completion Workover Riser System Enabling efficient operations by reducing interface complexities and minimizes operational risk

Well integrity with fatigue management were key drivers for our system design enabling efficient operations. Our full system integration of CWOR with the subsea equipment and vessel reduces interface management complexities and minimizes operational risk. Technical description The CWOR system is available in pressure ranges from 5,000 psi to 15,000 psi and bore sizes from 5 1/8" to 7 1/16". A 20,000 psi system with a 5 1/8" bore size is currently in development. The system complies with ISO13628-7, has the capability for Safety Integrity Level 2 (SIL-2) control of both emergency shutdown (ESD) and emergency quick disconnect (EQD), whilst delivering accelerated response times, and is configurable to suit anchored, Dynamically Positioned and Jack-up vessels. Operators benefit from our CWOR system with: ``Minimal operational costs with less offshore personnel ``Minimal third party equipment on the vessel Minimal operational risk through system integration ``Minimal operational risk through Safety Integrity Level 2 (SIL-2) rated fast response control system Minimal risk and maximum operating envelope through use of optional Riser Monitoring and Management 2 Completion Workover Riser System

System specification Intervention Workover Control System: ``Multimode Hydraulic Power Unit/Master Control Panel rated for SIL-2 ESD and EQD ``Tree umbilical and reel system with umbilical disconnect system ``Landing String umbilical and reel system ``Lubricator Valve umbilical and reel system ``Surface Flow Tree jumper ``Umbilical Deck Jumpers and Emergency Shutdown Panels ``Electro Hydraulic Workover Control Module (WOCM) ``Riser Monitoring and Management optional Surface equipment: ``Surface Flow Tree (SFT) - Available in 7 1/16" 10,000 psi and 5 1/8" 15,000 psi ``Wire Line / Coil Tubing adapter ``Swivel ``Riser Slick Joint also called Cased Wear Joint ``Upper Tension and Stress Joints ``Tension Frame Riser system (available in): ``5 1/8" 10,000 psi drill pipe style 5 1/8" to 7 1/16" casing riser style ``5 1/8" to 7 1/16" union nut style ``Dual bore and mono bore ``Safety joint protection system CWOR valve package equipment: ``All products available in 5 1/8" 10,000/15,ooo psi and 7 1/16" 10,000 psi ``Single or Dual Lubricator Valves ``EDP system with High Angle Release Connector and Retainer Valve ``WCP configurable with safety heads, Grip Seal Rams and Shear Seal Rams rated ``Annulus access via dual bore riser or via independent flexible hoses Completion Workover Riser System 3

Completion Workover Riser System overview 4 Completion Workover Riser System

Lubricator Valve (LV) ``The LV is a ball valve controlled by a separate control umbilical which can be configured as single or dual assemblies. ``It is a working valve which allows long wireline or perforating assemblies to be rigged up and run into the well. ``The LV allows the Landing String to be used in lieu of very long wireline lubricator assemblies above the surface flowhead. It therefore saves time and improves job safety. ``Designed to withstand dropped object impact from above (i.e. tools). ``Chemical injection porting is also provided both between and below the valves if required. Emergency Disconnect Package (EDP) ``The EDP contains a Retainer Valve (RV) which closes (cuts and seals wireline and/or coil tubing) just prior to unlatching the EDP connector, preventing hydrocarbon leakage to the environment. ``Provides a high angle release Emergency Quick Disconnect (EQD) connector which can unlatch under applied bending moments from a vessel drift or drive off scenario. Completion Workover Riser System 5

Well Control Package (WCP) ``Together with the EDP, the WCP serves as a subsea tree running and retrieval tool and remotely controlled fail safe main safety barrier towards the well during vertical intervention. ``It can be configured with a combination of Safety Heads, Grip Seal Rams (GSR) and Shear Seal Rams (SSR). ``It can be left in a secure status at any time when the CWOR is disconnected from the subsea tree system. ``It provides cutting and sealing capability for small drill pipe, coiled tubing, wireline & slickline. ``Pressure test capability from above. ``The LRP also facilitates circulation of the CWOR string and cut coil tubing if fitted with a combination of grip seal and shear rams. ``Can be configurable for multiple subsea tree upper hub interfaces (both monobore and dual bore). Workover Control Module (WOCM) ``Operation of valves and connectors on the EDP, LRP and workover valve on the subsea tree. ``Operation of connectors on the choke module. ``Monitoring of the PT/TT in the main and annulus bore on the LRP. ``Close the defined barrier envelopes required for ESD and EQD. ``SIL-2 rated system which includes redundant electronic modules and a manifold block for solenoid valves. 6 Completion Workover Riser System

IWOCS HPU/MCP ``No single failure in the IWOCS will cause an unintended system shut-down, unacceptable risk for personnel safety, environment or loss of financial assets. ``HPU/HDU/MCP can be one or several containers, typical 12-35ft. They are DNV 2.7-1 certified and A6o fire rated containers, with a control room section and a hydraulic section. ``Shutdown, PSD/ESD/EQD panels are included in system. ``Remote control panel for installation in driller cabin will show the same information as HMI in MCP control room. ``Redundant communication, A and B side with WOCM on EDP and SCM on Tree, is typically signal on power. ``SIL-2 rated safety system. Umbilicals and reels ``In riser Landing String (Electro Hydraulic comms) and Lubricator Valve (Hydraulic comms) umbilicals are optimized for size to minimize risk of damage. ``Open water umbilicals (Electro Hydraulic and Optic comms) are multifunction standardized designs that maximize flexibility towards TechnipFMC and other suppliers subsea tree production control systems. ``Umbilical reels can be delivered electrical or pneumatic driven with a local and remote control panel. ``They can all be run manually or have a constant tension. Completion Workover Riser System 7

TechnipFMC 11740 Katy Freeway Houston, Texas 77079 Tel: +1 281 870 1111 TechnipFMC.com TechnipFMC plc 2018 SS0XX