Culpeper District. Albemarle County Monthly Report September, 2011

Similar documents
Culpeper District. Albemarle County Monthly Report October, 2011

ROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP

Appendix A: Grouped Projects Projects by Grouping (FHWA Format)

Route 29 Solutions Projects

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Projects in bold are in the Development Area. Projects in bold and in italics are new on this year's priority list

Technical Memorandum TO: Joel DeNunzio, P.E. Residency Administrator Charlottesville Residency FROM:

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

FDOT Treasure Coast Traffic Report

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

CTH M HIGHWAY PROJECT CTH Q to STH 113

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

Legislative Update Williamsburg Residency

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Report

APPENDIX L: COST ESTIMATING TOOLS

FDOT Treasure Coast Traffic Impact Report

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

County of Fairfax, Virginia. Department of Transportation

Rio Intersection Traffic Restrictions Begin Monday

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

Fiscal Year 2017 Bicycle and Pedestrian Metric Report

Secondary Road Program

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

CITY OF SOUTH DAYTONA

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

News Release Eastern Oregon Region 5

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

The Year Ahead: Virginia Department of Transportation Northern Virginia District

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

PRELUDES VISIT HANDBOOK (updated December 2015)

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

FDOT Treasure Coast Traffic Impact Report

Bicycle and Pedestrian Master Plan Status Update (as of Dec. 2017)

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

Bank Street Widening Class EA Study Leitrim Road to Rideau Road. Gloucester South Seniors Centre, 4550 Bank Street

Safe Routes to School Action Plan Aberdeen, Idaho

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

Important Lane Closures for Jan , 2012

PRELUDES VISIT HANDBOOK (updated September 2016)

APPENDIX D COST SUMMARY TABLES

Charlottesville - Albemarle Rescue Squad

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

2012 PRIORITY TRANSPORTATION PROJECTS

Regional Transportation Priorities Survey Results. Introduction

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

2040 Long Range Plan Projects Draft October 2011

Small Area Study U.S. Route 220 and VA Route 615 Intersection. Bath County, Virginia

CULPEPER DISTRICT TRANSPORTATION UPDATE / FALL 2017

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Duwamish Way-finding and CTR Report

INDEX. Geometric Design Guide for Canadian Roads INDEX

Roadway Project Recommendations:

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

Bluffdale/ UDOT South High-T Intersection Project Type Operations

SECTION 14: LANDSCAPING AND BEAUTIFICATION

Chapter 5 Future Transportation

Access Routes from US 101 to the Richmond San Rafael Bridge

SUBJECT: AUTHORIZE BID ADVERTISEMENT FOR OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO

Sign Design Manual (TEM 295-2)

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Casablanca Boulevard & GO Station Access

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Hospital Link Project Project Update September 2017

Highway 56 Traffic Study Rymal Road to Cemetery Road

I-25 South Gap Project Monument to Castle Rock

Sign Designs and Markings Manual (TEM 295-2) Page 8-3

Use of Funding for Local Improvements City Example. Andrew Stone, P.E. City Engineer & Director of Public Works

PARDON OUR DUST. Arlington Boulevard (Route 50), 10 th Street and Courthouse Road Interchange (ARRA) Project No. (FO) , C501, B612, B611

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

SHENANDOAH FARMS SANITARY DISTRICT

County of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects

THE VDOT STARS PROGRAM AN OVERVIEW FOR DESIGNERS. Integrating Transportation Planning, Project Development, and Project Programming

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

APPENDIX E Activity Defect Assignment

STIP Scoping and Design Projects November Administrative Amendment

SC 41/Joe Rouse Intersection Improvements

Lynchburg District Update

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Transcription:

Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications are due November 1, 2011. Please see attached letter from Mike Estes dated August 9, 2011. Preliminary Engineering PROJECT Route 53 Safety Project Shoulder Widening 0.4 Mi E. of Monticello Loop Route 53 Safety Project Shoulder Widening 0.06 Mi E. of Monticello Loop Route 53 Safety Project Intersection Improvements at Route 20 Route 708, Dry Bridge Route 53 Safety Project Intersection Improvements at Route 729 Route 616, Black Cat Route 677, Broomley Route 637, Dick Woods Bridge Replacement over Ivy Creek Route 250, Bridge replacement over Little Ivy Creek LAST MILESTONE Design Public Hearing Project Scoping Project Scoping -- NEXT MILESTONE Right of Way September 2011 Summer 2011 Project Scoping AD DATE May October March 2014 December 2014 December 2014 Page 1 of 5

Preliminary Engineering Cont. PROJECT LAST NEXT MILESTONE MILESTONE Route 762, Rose Hill Church Lane, Unpaved Route 704, Fortune Lane, Unpaved Route 672, Blufton, Unpaved Route 608, Happy Creek, Unpaved Brocks Mill, Rural Addition -- Project Scoping Spring 2012 Route 774, Bear Creek, Unpaved 2016 Route 703, Pocket Lane, Unpaved 2016 Dates to be determined following evaluation of Scoping Team comments. AD DATE Construction Activities Georgetown (NFO) 0656-002-254, C501 Scope: 5 wide Pedestrian Facility with Crossing and Resurfacing with Refuge Islands. Next Major Milestone: SBL scheduled to reopen August 24 th to meet school opening date Contract Completion Date: September 23, 2011 Meadow Creek Parkway 0631-002-128, C502, B612, B613, B657 Scope: Grade, Drain, Asphalt, Utilities, Signals, Landscaping and Bridges. Next Major Milestone: Complete major construction items by August 25 th. Landscaping will not be completed until October. Contract Completion: October 14, 2011. I-64 Eastbound Shadwell Exit (FO) 0064-002-815, N501 Scope: Widen Ramps and Improve Signals. Next Major Milestone: Project complete Contract Completion Date: December 2, 2010 Jarmins Gap (NFO)0691-002-258, C501 Scope: Grade, Drain, Asphalt Pave, Planting and Utilities. Next Major Milestone: closed beginning August 29 th for approximately 60 days to facilitate box culvert installation. Landscape Architect and Engineers are working with HOA Committee on revisions to Old Trail/Jarmins Gap Stormwater Management Facility Contract Completion: September 21, 2012. Page 2 of 5

Construction Activities Bridge Deck Repair and Polymer Overlay (NFO) 0250-002-798, N501 Scope: Patch deck and epoxy overlay on the Route 250 Bridge over the Rivanna River. Next Major Milestone: Complete project. Contract Completion Date: July 29, 2011. Bridge Deck Repair and Polymer Overlay (NFO) 0029-002-044, N501, N502 Scope: Patch decks and epoxy overlay on the Route 29 Bypass over Route 29. Next Major Milestone: Complete project. Contract Completion Date: August 20, 2011. Slurry Seal Schedule SS7A-967-F11, P401 Scope: Slurry Seal various subdivisions in Albemarle Co. Next Major Milestone: Complete, pending possible additional work. Contract Completion Date: October 1, 2011. Bridge Repairs (NFO) BRDG-967-040, N501 Scope: Bridge Repairs - District Wide (Term 2). Next Major Milestone: Completion of Term 2 Work. Contract Completion Date: 7, 2012. Plant Mix Schedule (NFO) PM7A-967-F11, P401; PM7B-967-F11, P401 Scope: Plant Mix Southern Culpeper District. Next Major Milestone: Completion. Contract Completion Date: December 1, 2011. Plant Mix Schedule PM7K-967-F11, P401 Scope: Plant Mix (Secondary Routes in Albemarle, Greene, and Louisa Counties) Southern Culpeper District. Next Major Milestone: Completion. Contract Completion Date: December 1, 2011. Pipe Rehabilitation (NFO) BRDG-967-045, N501; BRDG-967-062, N501 Scope: Pipe Rehab in (Culpeper, Louisa, Madison, Albemarle, Fauquier, Orange, and Rappahannock Counties) Northern Culpeper District. Next Major Milestone: Executed, Begin Construction. Contract Completion Date: April 29, 2012. Guardrail Repair GR07-967-096, N501 Scope: Guardrail repairs District wide. Next Major Milestone: Preconstruction set for August 24, 2011. Contract Completion date: July 1, 2012. Page 3 of 5

Traffic Engineering Studies Completed Route 743, Hydraulic Intersection of Georgetown ; Installation of right on red arrow southbound on Hydraulic recommended and pending installation. Route 20, Scottsville At Calvary Baptist Church 7850 Scottsville ; safety study completed recommending installation of Watch for Turning Vehicles signs; No change in speed limit recommended. Sign installation pending. Route 600, Watts Passage from Route 641 to Route 20 Centerline pavement marking review completed recommending installation of centerline markings from Route 784 (Burnt Hill ) to Route 641 (Burnley Station ); Installation pending. Route 692, Plank at Route 693, Stillhouse Rd Safety review of intersection/ consideration of speed zone adjustment completed; recommendation for stop sign upgrade. Sign installation completed 4/18/2011. Route 626, Langhorn Rd/James River Rd Review of James River Heritage Trail bicycle route signage completed recommending installation of W11-1 Bicycle signs with W16-1P Share the plaques. Sign installation completed 6/26/2011. Route 743 Advance Mills area Review of tractor trailer truck advisory signs completed; no additional signage warranted. Route 810, Crozet Ave from existing 25 mph zone to north of Buck Speed study completed; no change in speed limit recommended. Route 250 from existing 45 mph zone west of Route 240 to four lane segment approaching I-64 Speed study completed; no change in speed limit recommended. Route 665, Buck Mountain from Route 601 (Free Union Rd) to Route 664 (Markwood Rd) Speed study completed; speed limit changed to 45 mph with curve warning signs; all signs installed 7/21/2011. Route 664/663, Buck Mountain from Route 665 Markwood Rd to Existing 35 mph zone - Speed study completed; no change in speed zone recommended Route 240, Crozet Ave at Route 1230 Meadows Drive Safety review of intersection completed; warning sign installation recommended pending installation. Under Review Route 706, Dudley Mtn from Route 631 (Old Lynchburg Rd) to Route 708 (Red Hill Rd) Speed study underway. Route 29 from Route 1575 (Austin Dr) to Route 763 (Dickerson Dr) Review of existing advance intersection and industrial intersection warning signs underway. Route 601 (Garth Rd) from Route 654 (Barracks Rd) to Route 601 (Free Union Rd) Review of roadway to determine potential for installation of Share the signs underway; subject of Route 614 from Route 601 (Free Union Rd) to Route 810 (Browns Gap Rd) Review of roadway to determine potential for installation of Share the signs underway; subject of Page 4 of 5

Traffic Engineering Studies cont. August, 2011 Route 676 (Owensville Rd) from Route 676 (Tilman Rd) to Route 614 (Garth Rd) Review of roadway to determine potential for installation of Share the signs underway; subject of Route 678 (Owensville Rd) from Route 250 (Ivy Rd) to Route 676 (Tilman Rd) Review of roadway to determine potential for installation of Share the signs underway; subject of Route 601 (Garth Rd) at Route 658 (Barracks Farm Rd) Intersection safety review study underway. Route 29 at Route 631 (Rio Rd) Review of EB approach stop bar for right turn lane underway; request from Delegate Bell. Route 637 (Dick Woods Rd) from I-64 interchange to Route 250 Review of roadway to determine potential for installation of centerline pavement markings underway; subject of Route 743 (Earlysville Rd) at Route 676 (Woodlands Rd) Safety review underway. Route 866 (Greenbriar Dr) at Route 1427 (Hillsdale Dr) Multi-way stop study underway. Routes 1670 (Ashwood Blvd), 1675 (Kendalwood), 1723 (Crosstimbers), 1737 (Watercrest) & 1720 (Timberwood Pkwy) Crosswalk study underway at multiple locations; subject of Routes 1765/1769, 1770/1769 & 1770/1771 Intersections in Fontana Subdivision - Multiway stop studies underway. Study also includes review of Routes 1765 (Fontana Dr) and Route 1771 (Verona Dr) for centerline and edge line pavement markings. Maintenance Activities State Force Maintenance Crews Have been working on storm cleanup. They are also mowing, cleaning Pipes and ditches, machining gravel roads, doing shoulder restoration, tree removal and applying dust control on various routes throughout the County. View memo re: FY Revenue Sharing Program Return to consent agenda Return to regular agenda Karen P. Kilby Programming/Investment Management Director Virginia Department of Transportation 1601 Orange Culpeper, VA 22701 Page 5 of 5