New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

Similar documents
O&M MANUAL HIGHLIGHTS

NATURAL GAS MAINTENANCE. Part 192 Subpart "M"

BSR GPTC Z TR GM References and Reporting Page 1 of 8

2017 LGA 191/192 & 195 Pipeline Safety Conference

Operation & Maintenance Manual

PIPELINE SAFETY. Darin Burk, Manager Pipeline Safety. January 28, 2014

Investigation of failures

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

LP Gas Odorization and Testing

Residential and Small Commercial

Subpart E. Pressure Testing

Committee Input No. 59-NFPA [ Section No. 5.9 ]

HEALTH AND SAFETY PROGRAM 201 HOT TAP PERMIT/FILLET WELD REPAIRS

Types 749B and R130 Changeover Manifolds

APPENDIX A GLOSSARY AND ACRONYMS

Be our partner in safe, reliable natural gas delivery

49 CFR 195 Regulatory Overview

GAS SAFETY Information Bulletin

Covered Task 614OP Training Guide Purging Pipeline Facilities with Air or Inert Gas

Veriforce TG CCT 609OP. Training Guide

NATURAL GAS DISTRIBUTION SYSTEM MAYOR: ROBERT BOB HARDY OPERATOR: MICHAEL WARREN

OPERATING PROCEDURES

Part 192 Subparts J & K. Testing & Uprating

Subpart L NOTES: NOTES:

EQUIPMENT AND MATERIALS

Covered Task 409OP Training Guide Inspecting Interference Bonds

5.0 INSPECTING, FILLING AND LABELING SMALL CYLINDERS

October 10, 2018 Annual Seminar New England Pipeline Safety Representatives Meredith, New Hampshire Randy Knepper Director of Safety, NHPUC

Yakima County Fire District 12 Standard Operating Guidelines SOG 5-1 Hazardous Materials Operations

Draft. Not yet Approved

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

Pressure Regulators. Operating Instructions. Instrumentation

PRESSURE RETEST. 49 CFR, (g) Co#: Vin#: DOT Spec: MAWP:

ONSHORE GAS GATHERING FAQS

Type 1367 High-Pressure Instrument Supply System with Overpressure Protection

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

WATER HEATER THERMAL EXPANSION TANKS Owner s Manual. Safety Instructions Installation Maintenance Warranty. Models: 2-5 Gallon Capacity

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures

Model 7989T Steel Pipe Squeezer Sch. 40 & Sch. 80. Operations Manual

CITY OF THIBODAUX GAS AND WATER DISTRIBUTION DIVISION

PE 2708 CTS & IPS GAS PIPE

Leticia Santos Hernández Pipeline Safety Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications

ISO INTERNATIONAL STANDARD. Small craft Liquefied petroleum gas (LPG) systems

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities.

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE

Operation and Maintenance Plan. Master Meter Gas Distribution Systems

ACCU-PULSE Installation and Operation Instructions

CONFINED SPACE WRITTEN PROGRAM

CITY OF THIBODAUX GAS AND WATER DISTRIBUTION DIVISION

HOT SHOT OPERATING INSTRUCTIONS AND OWNER S MANUAL. Model SPC-500. (Propane Torch)

WELDING AND OTHER HOT WORK

453 Series Steam Heated Vaporizing Regulator

IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317)

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE

Updates on CA Pipeline Safety Program

Overview EUSSAM12. Carry out tightness testing and direct purging of gas installations

INSTALLATION OPERATION MAINTENANCE

Full Internal Relief Valves Instruction Manual

Proposed Uniform Standards for Equipment Leaks

September 2018 Pressure Test

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) , even if

Start-up, Shutdown and Malfunction Plans. Norman L. Morrow Fresh Air Consulting

LO/TO LOCKOUT/TAGOUT PROGRAM

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 5 Utilities Gas Emergencies Revised

Dri-Line Mk3 Monnier Compressed Air Drain Trap

Knowing the Job: Any employee actively engaged in dispensing propane should meet minimum responsibilities

R122H, R222, R232A, and R232E Series Instruction Manual

User Information Sheet 015

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

DF1 and DF2 Diffusers

Tri-Safem Model I1 Regulator. INSTRUCTIONS and PARTS

RULE 36 & H 2 S SAFETY

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH PNEUMATIC RELEASE

Control of Hazardous Energy Lockout / Tagout Program

PV4 and PV6 Piston Valves

AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011

UTAS EH&S INSTRUCTION No. 036 June 2012 Revision No. 3. Purging of Flammable Gas Equipment and/or Piping (Explosion Hazard)

INOGATE Technical Secretariat UK Experience European Standards Implementation Key Expert Phil Winnard Session 2 Georgia, October 2015

CHAPTER 26 WELDING AND CUTTING

Management Plan for Compressed Gas

49 CFR 195 Transportation of Hazardous Liquids by Pipeline THIS DOCUMENT CONTAINS ONLY THE SECTIONS NEEDED FOR THE API 1169 ICP EXAMS

GAS DELIVERY PRESSURE AND MEASUREMENT

SA121, SA122, SA123, SA128 and SA1219 Self-acting Temperature Control Systems (Dial Adjustment)

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

R600 and HSRL Series Instruction Manual

Piped Air SCBA Refilling System Standard

Consult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc.

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

Flammability Chart. Gas Formula Ignition

Cylinder Exchange Training Manual

1.0 Scope and Application. 2.0 Definitions. Cal Poly Risk Management Confined Space Program Page 1

NBIC Committee Action Block

HYDROSTATIC LEAK TEST PROCEDURE

Transcription:

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations MINIMUM Pipeline Safety Regulations Application for Jurisdictional LPG Operators 1

Pipeline Safety Regulations 49 CFR Part 192 (NOTE: Subparts and Sections covered in this presentation are highlighted in Pink and Green) Designation Subpart A Subpart B Subpart C Subpart D Subpart E Subpart F Subpart G Subpart H Subpart I Subpart J Subpart K Subpart L Subpart M Subpart N Subpart O Subpart Title Section Ranges General 1-1616 Applicable Sections to LP Operators Materials 51-65 51,53,55,59,63 Pipe Design 101-125 125 101,103,123,125 Design of Pipeline Components 141-203 Welding of Steel Pipe 221-245 245 221,225,235,241,245 Joining of Materials other than by Welding 271-287 287 271,273,281,283,285,287 General Construction Requirements of Mains 301-327 327 301,303,305,309,311 Customer Meters, Service Regulators, Service Lines Corrosion Control Requirements 351-383 383 451-491 491 Testing Requirements 501-517 517 501,503,515,517 Uprating Operations Maintenance 551-557 557 601-629 629 701-761 761 Qualification of Personnel 801-809 809 801,803,805,807,809 Integrity Management 901-951 951 1,3,7,11,13,15,16 15,16 141,143,144,159,181,195, 197,199,201, 351,353,355,357,365,375, 379 451,453,455,459,461,463, 465,467,469,471,473, 469,471,473,479, 479, 481,483,487,491 None 601,603,605,613,614,615, 616,617,619,625,627,629 701,703,707 707,721,723,,721,723,725, 725, 727,739,743,747,751 None 2

Pipeline Safety Regulations 49 CFR Part 192 Designation Subpart A Subpart B Subpart C Subpart D Subpart E Subpart F Subpart G Subpart H Subpart I Subpart J Subpart K Subpart L Subpart M Subpart N Subpart O Subpart Titles Sections Ranges General 1-1616 Materials 51-65 65 Non Applicable Sections to LP Operators Pipe Design 101-125 125 107,109,111,113,115 Design of Pipeline Components 141-203 Welding of Steel Pipe 221-245 245 227,229,231,233,243 Joining of Materials other than by Welding 272-287 287 275,277,279 General Construction Requirements of Mains Customer Meters, Service Regulators, Service Lines 301-327 327 351-383 383 Corrosion Control Requirements 451-491 491 452,457,475,477,485,489 Testing Requirements 501-517 517 505,507,509,511,513 Uprating 551-557 557 Operations 601-629 629 609,611,612,621,673 Maintenance Qualification of Personnel Integrity Management 701-761 761 801-809 809 901-951 951 5,9,10,14 145,147,149,150,151,155, 157,163,165,167,169,171, 173,175,177,179,183,185, 187,189,191,193,203 313,315,317,319,321,323, 325,327 359,361,363,367,369,371, 373,377,381,383 ALL 705,706,709,713,715,717, 719,731,735,736,741,745, 749,753,755,761 NONE ALL 3

CFR 49 Part 192 Cross-reference reference to NFPA 58 Designation Subpart A Subpart Titles Section Range General 1-1616 Applicable Sections of NFPA 58,2004 excludes tank information Subpart B Subpart C Subpart D Subpart E Subpart F Subpart G Subpart H Subpart I Subpart J Materials 51-65 Pipe Design 101-125 125 5.8.3.1,5.8.3.2,5.8.4, Table 5.8.4.1 Design of Pipeline Components 141-203 Welding of Steel Pipe 221-245 245 6.8.3.2 Joining of Materials other than by Welding 271-287 287 5.8.5,6.8.3.2,6.8.3.5 General Construction Requirements of Mains 301-327 327 Customer Meters, Service Regulators, Service Lines 351-383 383 6.7.4.4,6.7.4.8,6.15.5 Corrosion Control Requirements 451-491 491 6.14 Testing Requirements 501-517 517 6.12 5.7.3,5.7.5,5.7.7.1,5.8.3.1,5.8.4, 5.8.5,5.8.6,5.10,5.11,5.15.5,5.19 5.7.3,5.7.4,5.10.1,5.15.1.3,5.19, 6.8.1,6.8.3.9,Table 5.15.1.2 6.7.2,6.7.3,6.7.4,6.8.1,6.8.2,6.8.3, 6.8.4,6.8.5,6.8.7,6.9,6.10,6.13,6.19, 6.20,6.23 Subpart K Uprating 551-557 557 Silent Subpart L Operations 601-629 629 Silent Subpart M Maintenance 701-761 761 Silent Subpart N Qualification of Personnel 801-809 809 Silent Subpart O Integrity Management 901-951 951 Silent 4

Subpart A General 192.1 Scope of Part This part prescribes minimum safety requirements for pipe line facilities and the transportation of gas. This part applies to 1. 10 or more customers from a single source 2. 2 or more with any portion of the system in a public place 5

Condominium Association NON JURISDICTIONAL SYSTEM Fewer than 10 customers and non-public place Propane Example #1 6

JURISDICTIONAL SYSTEM 10 or more customers Location does not matter Propane Example #2 7

CAFE NON JURISDICTIONAL SYSTEM Public place Single customer with system entirely on premises Propane Example #3 8

LAUNDRY JURISDICTIONAL SYSTEM CAFE More than one customer with a portion of the system in a public place Parking area Propane Example #4 9

54 58 & 192 54 58 & 192 10

Considerations of Jurisdictional Systems Size of container does not matter Number of containers in one group does not matter What should be considered 1. Number of customers. 2. Whether or not system is in a public place 11

Subpart A General 192.3 Definitions Main means a distribution line that serves as a common source of supply for more than one service line Operator means a person who engages in the transportation of gas (LP Company) "Maximum allowable operating pressure (MAOP)" means the maximum pressure at which a pipeline or segment of a pipeline may be operated under this part. Typically: 10 or 15 psi of LP 10, 40, 60, 100, 1000 psi of Natural Gas 12

Subpart A General 192.3 Definitions (cont d) "Service line" means a distribution line that transports gas from a common source of supply to an individual customer, to two adjacent or adjoining residential or small commercial customers, or to multiple residential or small commercial customers served through a meter header or manifold. A service line ends at the outlet of the customer meter or at the connection to a customer's piping, whichever is further downstream, or at the connection to customer piping if there is no meter. Petroleum gas means propane,, propylene, butane, (normal butane or isobutanes), and butylene (including isomers), or mixtures composed predominantly of these gases, having a vapor pressure not exceeding 1434 kpa 208 psi (1434 kpa) gage at 100F (38C). 13

Subpart A General 192.11 Petroleum Gas System Each pipeline system that transports petroleum gas must meet the requirements of this part and of ANSI/NFPA 58 and 59. In the event of a conflict between this part and ANSI/NFPA 58 and 59, ANSI/NFPA 58 and 59 prevail. Examples: If 58 is silent or nonspecific then 192 prevails Corrosion Control 192 Subpart I, NFPA 58 Silent, 192 prevails Maintenance 192 Subpart M, NFPA 58 Silent, 192 prevails Pipe Design 192 Subpart C, NFPA 58 Chapter 5, 58 prevails 14

Subpart A General 192.13 General No person may operate a segment of pipeline that is readied for service after March 12, 1971 unless 1. Installed and constructed according to this part 2. Repairs, replacements, relocations basically any changes make all of 192 applicable. 3. Each operator shall maintain and follow all plans and procedures required under this part 15

Subpart L Operations 192.601 Scope This subpart prescribes minimum requirements for the operation of pipeline facilities. 16

Subpart L Operations 192.603 General Provisions No person may operate a segment of pipeline unless it is operated in accordance with this subpart. Each operator shall keep records necessary to administer the procedures established under 192.605. The state (NHPUC) may require the operator to amend its plans and procedures as necessary to provide a reasonable level of safety. 17

New Hampshire Public Utilities Commission Model Propane Operating & Maintenance and Emergency Plans The New Hampshire Public Utilities Commission, courtesy of the Maine Public Utilities Commission, is providing these Model LPG Operation & Maintenance and Emergency Plans to assist jurisdictional propane facilities operators in complying with state statutes and regulations within the Commission s jurisdiction. The Commission s regulations specifically adopt 49 Code of Federal regulations, Parts 192.605 and 192.615, however, this model plan is only intended to assist in compliance with state, not federal laws. 18

Subpart L Operations 192.605 Procedural Manual for Operations, Maintenance, and Emergencies Each operator shall prepare and follow written manual of procedures for operations, maintenance and emergency response These procedures must be reviewed and updated once each year not to exceed 15 months The manual must be kept where operations and maintenance is conducted The manual must include the following: 1. All requirements of this subpart and subpart M 2. Corrosion control according to subpart I 3. Making system history available to appropriate personnel 19

Subpart L Operations 192.605 Procedural Manual for Operations, Maintenance, and Emergencies (cont d) 4. Incident reporting requirements under Part 191 5. Starting and shutting down any portion of the system within MAOP limits 6. Reviewing work done to determine effectiveness of procedures and making changes when necessary 7. Emergency response and accident investigation 20

21

Subpart L Operations 192.613 Continuing Surveillance Determine and take appropriate action concerning failures, leakage history, corrosion and other conditions that may effect operation of the system 22

23

Subpart L Operations 192.614 Damage Prevention Program Compliance with this section may be accomplished by being a member of a one call system ( Dig Safe ) 1. Record all notifications of planned excavations 2. Mark all buried underground facilities 3. Inspect more frequently when possibility of damage to facility may exist Dig Safe 888-Dig Safe or www.digsafe.com 24

Subpart L Operations 192.615 Emergency Plans Emergency Plans shall include at a minimum the following: 1. Receive, identify and classify events 2. Have adequate communication with emergency responders 3. Prompt response to each type of emergency including leaks, fires, explosions and natural disasters 4. Availability of resources needed of emergency 5. Actions directed towards protecting people first 6. Making safe any potential hazard to life and property 7. Notify appropriate officials and coordinate actions 8. Safely restore any service outage 25

Hillsboro o Picture by Richard Whiting 26

27

Subpart L Operations 192.615 Emergency Plans (cont d) Operator must also train and furnish the plan to appropriate personnel and verify that the training is effective Review procedures after each emergency Establish a liaison with appropriate public officials 1. Learn what each responders responsibility is 2. Explain what your capabilities are 3. Inform them when they will be notified 4. Work together to minimize hazards to life and property 28

Subpart L Operations 192.617 Investigation of Failures As part of the O&M there should be a written procedure that describes investigations of failures This procedure is to determine the cause of the failure and describe remedial actions to minimize the possibility of reoccurrence. 29

Subpart L Operations 192.619 Maximum Allowable Operating Pressure: Steel and Plastic Lines No person may operate a segment of steel or plastic pipe that exceeds the lowest of the following: 1. The design pressure of the weakest link 2. The test pressure divided by 1.5 3. The highest actual operating pressure for systems install before July 1970 30

31

Subpart L Operations 192.625 Odorization of Gas Each operator shall provide documentation of odorization of gas at the 1/5 lower explosive limit and conduct periodic sniff tests to confirm odorant. Most O&M Plans require sniff tests each time work is done on the system 32

Subpart L Operations 192.629 Purging of Pipelines Pipelines must be purged at a moderate rate to an area that will prevent an occurrence of a hazardous mixture of gas and air. 33

Subpart M Maintenance 192.701 Scope This subpart prescribes minimum requirements for maintenance of pipeline facilities. 34

Subpart M Maintenance 192.703 General No person may operate a segment of pipeline, unless it is maintained in accordance with this subpart. Each segment of pipeline that becomes unsafe must be replaced, repaired, or removed from service. Hazardous leaks must be repaired promptly. 35

Subpart M Maintenance 192.721 Distribution System: Patrolling Mains in places or on structures where anticipated physical movement or external loading could cause failure or leakage must be patrolled 36

Subpart M Maintenance 192.723 Distribution System: Leakage Surveys A leakage survey in a business district must be conducted once each calendar year not to exceed 15 months A leakage survey outside a business district must be done once every five years 37

Subpart M Maintenance 192.727Abandonment or Deactivation of Facilities Mains not being maintained under this part must be disconnected from any source of gas, purged of gas and sealed at both ends. 38

Subpart M Maintenance 192.739 Pressure Limiting and Regulator Stations: Inspection and Testing Each high pressure regulator (s) (1 st stage) must be inspected and tested once each calendar year not to exceed 15 months, these will determine that it is: 1. In good mechanical condition 2. Properly sized 3. Set at the correct pressure 4. Properly installed (including protection from freezing) 39

40

Subpart M Maintenance 192.743 Pressure Limiting and Regulator Stations Testing of Relief Devices Relief devices must be tested once each calendar year not to exceed 15 months to determine they are the proper capacity to limit pressure to MAOP. If a test is not feasible a review and calculation of required capacity of the relieving device. Once initial calculations are made subsequent calculations are not required if system remains unchanged. 41

(Key Valves) valves which may be necessary to make the system or portion safe must be checked and serviced once each calendar year not to exceed 15 months. Subpart M Maintenance 192.747 Valve Maintenance: Distribution Systems 42

Subpart M Maintenance 192.751 Prevention of Accidental Ignition An operator must take precautions to prevent accidental ignition of gas 1. When venting gas into the air 2. To prevent welding or cutting in unauthorized areas 3. Post warning signs where appropriate 43

Subpart I Corrosion Control Requirements 192.451 Scope This subpart prescribes minimum requirements for the protection of metallic pipelines from external, internal, and atmosphere corrosion. 44

45

Subpart I Corrosion Control Requirements 192.453 General Corrosion control procedures required by 192.605 must be carried out by a qualified person 46

Subpart I Corrosion Control Requirements 192.455 External Corrosion Control Buried or Submerged Pipelines Each buried pipeline installed after July 1971 must be protected against external corrosion including the following 1. Must external coating meeting section 192.461 2. Must have a cathodic protection system installed within one year if installation Exceptions 1. Copper tubing 2. Temporary pipelines for a period of service of less than 5 years 47

48

Subpart I Corrosion Control Requirements 192.459 External Corrosion Control Examination of Buried Pipeline When Exposed Operators must inspect underground piping when exposed for external corrosion and make repairs as needed 49

Subpart I Corrosion Control Requirements 192.461 External Corrosion Control Protective Coating External protective coating must: 1. Be applied on a properly prepared surface 2. Have sufficient adhesion to resist moisture 3. Resist cracking 4. Resist damage due to handling 5. Be inspected for holidays before backfilling 50

51

Subpart I Corrosion Control Requirements 192.463 External Corrosion Control Cathodic Protection Each cathodic protection system must meet the minimum criteria of the method that is used. Most propane operators use the -850mv Atmospheric metals must be electrically isolated from the cathodic protection 52

53

Subpart I Corrosion Control Requirements 192.465 External Corrosion Control Monitoring Cathodic protection systems must be tested once each calendar year not to exceed 15 months. Prompt remedial actions shall be taken when deficiencies are found 54

Subpart I Corrosion Control Requirements 192.479 Atmospheric Corrosion Control General Operators must clean and coat each section of exposed piping the coating must be suitable for the prevention of atmospheric corrosion. 55

Subpart I Corrosion Control Requirements 192.481 Atmospheric Corrosion Control Monitoring Operators shall inspect exposed piping at intervals not exceeding 3 years Special attention should given to areas where piping interfaces with the soil 56

57

Subpart I Corrosion Control Requirements 192.487 Remedial Measures: Distribution Lines Corroded lines with less than 30% remaining wall thickness must be replaced Piping with localized pitting that could cause leaks must be replaced 58

Subpart I Corrosion Control Requirements 192.491 Corrosion Control Records Each operator shall maintain maps of cathodically protected piping, these maps shall be retained for the life of the piping. Records of all tests and inspection shall be maintained for 5 years 59

Subpart N Qualification of Pipeline Personnel 192.801 Scope This subpart prescribes the minimum requirements for operator qualification of individuals performing covered tasks on a pipeline facility. For the purpose of this subpart, a covered task is an activity, identified by the operator, that: (1) Is performed on a pipeline facility (2) Is an operations or maintenance task (3) Is performed as a requirement of this part; and (4) Affects the operation or integrity of the pipeline. 60

Subpart N Qualification of Pipeline Personnel 192.803 Definitions Abnormal Operating Condition Malfunction of a component or a deviation from normal operation that may indicate a condition exceeding design limits Result in a hazard to persons Evaluation A process, established and documented by the operator, to determine an individual s ability to perform a covered task Qualified An individual has been evaluated and can: Perform assigned covered tasks; and Recognize and react to abnormal operating conditions. 61

Subpart N Qualification of Pipeline Personnel 192.805 Qualification Program Each operator shall have and follow a written qualification program. ram. The program shall include provisions to: Identify covered tasks; Ensure through evaluation that individuals performing covered tasks are qualified; Allow individuals that are not qualified pursuant to this subpart t to perform a covered task if directed and observed by an individual that is qualified; Evaluate an individual if the operator has reason to believe that t the individual s performance of a covered task contributed to an incident as defined in Part 191; Evaluate an individual if the operator has reason to believe that t the individual is no longer qualified to perform a covered task; Communicate changes that affect covered tasks to individuals performing those covered tasks; and Identify those covered tasks and the intervals at which evaluation of the individual s qualifications is needed. After Dec.16,2004 notify state agency if the operator significantly modifies the program 62

Subpart N Qualification of Pipeline Personnel 192.807 Recordkeeping Operator shall maintain records that include 1. Identification of qualified individuals 2. Identification of covered tasks 3. Date of current qualification 4. Qualification method Records must kept for 5 years after individual is no longer performing covered task 63

Subpart N Qualification of Pipeline Personnel 192.809 General Operators must have a written qualification program by April 27, 2001. Operators must complete the qualification of individuals performing covered tasks by October 28, 2002. Work performance history review may be used as a sole evaluation method for individuals who were performing a covered task prior to October 26, 1999. After October 28, 2002, work performance history may not be used as a sole evaluation method. 64

Contact Information Office Number E-Mail Randy Knepper 271-6026 randy.knepper@puc.nh.gov Chester Kokoszka 271-6027 chet.kokoszka@puc.nh.gov David Burnell 271-6040 david.burnell@puc.nh.gov Jon Osgood 271-6532 jon.osgood@puc.nh.gov Paula Bergeron 271-6022 paula.bergeron@puc.nh.gov Carolyn Stiles 271-6053 carolyn.stiles@puc.nh.gov Office web page puc.state.nh.us (click on the hard hat) DOT web site http://ops.dot.gov/regs/regsindex.htm 65