Overview EUSDSG3.6. Gas tightness testing and direct purging

Similar documents
Overview EUSDSG3.12. Install gas meters and regulators (2.5 to 16.0m3/hr)

Overview EUSSAM12. Carry out tightness testing and direct purging of gas installations

Understanding gas safety

Network Regulator Maintenance Operatives LS (Non-Accredited)

Module 6. Tightness Testing

ACS.CoNGLP1 SAFETY ASSESSMENT CRITERIA INITIAL & RE-ASSESSMENT DOMESTIC NATURAL GAS TO LPG GENERIC

ACS.CoNGLP1 SAFETY ASSESSMENT CRITERIA INITIAL & RE-ASSESSMENT DOMESTIC NATURAL GAS TO LPG GENERIC

Tightness testing and direct purging of small Liquefied Petroleum Gas/Air, Natural Gas and Liquefied Petroleum Gas installations

ACS.TPCP1A SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS TESTING AND PURGING

ACS.TPCP1 SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS; LPG; OTHER GASES TESTING AND PURGING

EUSMUNC06 (SQA Unit Code - FG2W 04) Locate and avoid supply apparatus for Utilities Network Construction

GAS DELIVERY PRESSURE AND MEASUREMENT

EUSCS04 Overseeing work in confined spaces

Summary of the MRA LPG Codes of Practice

INOGATE Technical Secretariat UK Experience European Standards Implementation Key Expert Phil Winnard Session 2 Georgia, October 2015

SEMIC05 Installing mechanical equipment

SEMEMI SQA Unit Code H2B7 04 Assisting in the installation of compressed air equipment

SEMEM3-73 Maintaining medical gas pipeline systems and equipment

SEMEM3-65 Servicing anaesthetic and ventilation equipment

This standard comprises the following:

SEMPEO SQA Unit Code FP2P 04 Maintaining fluid power equipment

ASTC210 (SQA Unit Code - F4PS 04) Clean confined spaces

LANNAC3 - SQA Unit Code F8J4 04 Maintain the cleanliness of the working environment

Engineering Data Sheet

PRESSURE SYSTEMS POLICY

SKSTEX36(SQA Unit Code-H7C9 04) Calibrate textile production equipment

INSTITUTION OF GAS ENGINEERS AND MANAGERS

SEMEMI SQA Unit Code H2AP 04 Carrying out fault location on electrical equipment and circuits

Changes to the Gas. (Safety and Measurement) Regulations. effective 1 July 2013

Gas Safety Management Procedure

SEMEEE36 Checking the compliance of electrical equipment against the specification

Examples of pressure systems and equipment are:

CERTIFYING GASFITTER

LEGIONELLA MANAGEMENT PROCEDURE

Installation pipework on industrial and commercial premises

LANCS17 SQA Unit Code H Maintain and repair paths or surfaces

User Information Sheet 015

SIZING AND CAPACITIES OF GAS PIPING

Overview. OPIPOH7 - SQA Unit Code HG1X 04. Operate an Oil and Gas Process (Gas Compression)

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

Overview ASTATT2. Prepare building for air tightness. testing

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

COSAO26 Identify workplace health and safety hazards and control risks in asbestos surveying and analysis

THE APPROVAL FOR THE PROVISION AND USE OF A METER BY-PASS

IGEM/UP/11 Edition 3 Communication 1821 Gas installations for educational establishments

INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION

SIZING AND CAPACITIES OF GAS PIPING

Facilities and Estates. Natural Gas: Standard Operating Procedure. Document Control Summary. Contents

Installation, commissioning and servicing instructions

Overview. SEMEMI216 SQA Unit Code HF4G 04 Carrying out fault location on fluid power equipment and circuits

Assembling and testing fluid power systems

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

SEMMME3-073 Checking that completed assemblies comply with specification

SEQUENTIAL SHOWER VALVE INSTRUCTION MANUAL PLEASE LEAVE THIS MANUAL WITH THE END USER

Accreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs)

Understanding health and safety in gas utilisation

Health and Safety Inspection Procedure

SEMEMI SQA Unit Code H2AX 04 Carrying out scheduled maintenance tasks on fluid power equipment

Bar valve with fixed shower head Installation guide

Gas and Carbon Monoxide Safety

Medium pressure two-stage meter regulators for gas flow rates not exceeding 6 m 3 h -1

Accreditation for In-Service Inspection of Pressure Systems/Equipment

Overview IMIARBBP21. Carry Out Motor Vehicle Body Metal Inert Gas (MIG) Brazing Operations

Gas Check. Short testing time, with automatic start-up if no leakage was detected from previous operation.

Installation Instructions and User Guide 15mm & 22mm Thermostatic Mixing Valve

SEMFWE3-33 SQA Unit Code HF2X 04 Cutting and shaping materials using portable thermal cutting equipment

Gas Pressures FAQs. Why only 19 mbar inlet pressure and 15 mbar outlet pressure? MOV: meter outlet valve ECV: emergency control valve

Overview IMPEM164K. This standard is for you if you work in food and drink operations or animal feed operations.

SEMAER2_41 Dismantling and removing aircraft access structures

SIZING AND CAPACITIES OF GAS PIPING

IGEM/GM/6 Edition 2 Communication 1750 Non-domestic meter installations. Standard designs

System Pressure Manager Standard & System Pressure Manager Plus

Installation and Operating Instructions Bypass Flow Meter DST

SEMFWE SQA Unit Code H1W9 04 Forming platework using power rolling machines

IGEM/UP/2 Edition 3 Communication 1771 Installation pipework on industrial and commercial premises

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

SEMPEO SQA Unit Code H2CB 04 Preparing and Manoeuvring Armoured Fighting Vehicles (AFVs) for Maintenance and Transportation

SEMAE3071 Installing aircraft countermeasure systems

Pressure Systems Safety Regulation

Cutting and shaping materials using thermal cutting equipment

SEMAE3064 Installing aircraft visual display units and computer systems

Installing, Repairing or Modifying Construction Resources by Heating, Welding, Brazing, Soldering and Thermal Cutting in the Workplace L/505/0144

SEMPEO SQA Unit Code FP2M 04 Maintaining mechanical devices and equipment

CCSSL35 Carry out the wiring and testing of electrical circuits and equipment

GAS SUPPLY APPLICATION GUIDE

DIRECTORATE OF ESTATES AND DEVELOPMENT CONTROL OF GAS NETWORK OPERATIONS

SEMFEW205 - SQA Unit Code H1VP 04 Joining materials by the manual MIG/MAG and other continuous wire processes

Overview. OPIPOH10 - SQA Unit Code HG Operate an Oil and Gas Process ( Gas Treatment)

FV Flash Vessel Installation and Maintenance Instructions

Installation and maintenance of twin 45kg LPG cylinder systems

COGPOLY39 Meet safety, health and environmental requirements in the workplace

CRP INSTALLATION, OPERATING AND MAINTENANCE INFORMATION FOR INLINE SAMPLING VALVES

Non-domestic meter installations

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

Incorrect installation, adjustment, or misuse of this burner could result severe personal injury, or substantial property damage.

Health & Safety: Electrical safety

PRESSURE TEST PUMP OPERATING & MAINTENANCE INSTRUCTIONS. Model No: PTP100. Part No: GC01/09

LANH23 SQA Unit Code H Exhume coffins and remains

SEMEM3-78 Testing and calibrating instrumentation and control equipment and circuits

1 Exam Prep. Tabs and Highlights

Transcription:

Overview This national occupational standard is for gas engineers who will be carrying out tightness testing and direct purging of small(domestic) natural gas installations. This standard also covers the work activities of planning, de-commissioning and commissioning gas installations. 1

Performance criteria You must be able to: Plan and prepare work activities for tightness testing and direct purging 1. Produce a risk assessment and method statement which incorporates safety provisions in the work site, access to the work site, movement of the workforce, members of the public, and the movement and safe storage of materials, tools and equipment for the job 2. Survey the work site, pre-tightness testing and direct purging, for any damage or defects to existing building features and record it 3. Advise the property occupier of any defects found and agree the planned work 4. Protect the work site and the building fabric against possible damage being caused during the tightness testing and direct purging process 5. Confirm the siting of the gas supply and the provision of ventilation meets the requirements for tightness testing and direct purging 6. Check and confirm all materials, tools and test equipment necessary for the de-commissioning, tightness testing and direct purging process are available as required and are fit for purpose 7. Confirm that the gas supply, earthing supply and the provision of ventilation meet the industry standards requirements for the installation 8. Carry out all necessary checks and tests to confirm the gas supply meets the industry requirements for the installation 9. Check existing installation for any unsafe appliances and system components and apply the gas industry unsafe situations procedures as required Tightness testing and direct purging of gas systems and components to industry standards and manufacturers instructions 10. Confirm the complete pipework installation complies with the manufacturers specification and industry standards 11. Carry out preparatory work for tightness testing and direct purging to meet industry standards 12. Check that conditions within the gas system will permit safe tightness testing and direct purging 13. Select and use the correct tools and equipment for tightness testing and direct purging activities 14. Measure, calculate and record gas system installation volumes for tightness testing and direct purging activities 15. Ensure ventilation for tightness testing and direct purging activities meets industry standards requirements 16. Remove existing gas components as required 2

17. Ensure existing gas systems are clean and free of debris 18. Carry out the tightness testing and direct purging process minimising damage to customer property and building features 19. Use tightness testing procedures to confirm the integrity of the system to industry standards 20. Follow approved procedures if the installation fails the tightness test 21. Use purging procedures to confirm the safe supply of gas to the installed gas system and appliances 22. Instruct the property occupier on the correct operation of the gas system, valves and components and provide them with their copy of the any literature 23. Take precautionary actions to prevent the unauthorised use of uncommissioned gas appliances, gas systems and components by isolation procedures and use of warning notices Use and communicate data and information to carry out decommissioning, tightness testing and direct purging to industry standards 24. Liaise with the property occupier and other people who will be affected by the work during the planning, de-commissioning and tightness testing and direct purging processes to minimise disturbance to the job 25. Use normative documents, industry standards, British Standards and information from manufacturers instructions applicable to the gas system and the appliance to ensure the work is done to the specification 26. Advise of any delays to the work, unsafe situations and required remedial actions to those who require the information 27. Check that the customer is satisfied with the finished job 28. Complete records and documentation confirming the safe tightness testing and direct purging of gas systems and components 29. Complete gas system de-commissioning records Resolve problems within own area of responsibility and competence which could affect de-commissioning, tightness testing and direct purging 30. Rectify problems within own area of responsibility and competence and report deficiencies in gas and earthing input services 31. Resolve problems in accordance with approved procedures when: a)pre- tightness testing and direct purging checks and tests reveal gas 3

system or component defects b)gas systems and components being tightness tested and purged do not meet design requirements c)the gas system and components cannot be restored to full performance 4

Knowledge and understanding You need to know and understand: General Knowledge 1. Regulations and guidance governing health and safety in the workplace, environmental protection and the use of risk assessments 2. Legislation covering the general responsibilities of the operative for their own safety and that of others 3. The limits of your own autonomy and responsibility Tightness testing and direct purging 4. The health, safety and environmental factors which need to be incorporated in risk assessment for the domestic tightness testing and direct purging process 5. Safe access and working at heights including providing safe access to work at heights, or in confined spaces 6. The methods of working which protect the building décor, customer property and existing systems and components 7. The tools, equipment, materials and components required for tightness testing and direct purging processes 8. The care and maintenance requirements of tools and equipment, and checks for safe condition 9. How to safely secure and store tools, equipment, materials and components to minimise loss or wastage 10. The potential hazards that could arise from all tightness testing and direct purging activities and the checks to be carried out before work takes place 11. The steps to take should materials, components, tools and equipment not be available at the site to commence the tightness testing and direct purging activity 12. How and where to access and correctly interpret the required information, including normative documents, industry standards guidance documents, British Standards and manufacturers instructions applicable to the appliance, to ensure the work is done to the specification and industry standards 13. Safe isolation methods, tests, and procedures to de-commission gas systems or components 14. The procedures for temporary and permanent de-commissioning of gas systems including use of temporary continuity bonds 15. The precautions to ensure that de-commissioned gas systems do not prove a safety hazard 16. Measures to prevent de-commissioned gas systems being brought 5

into operation utilising safety and warning notices 17. The need to liaise with others whose procedures or routines may be affected by the suspension of the gas system operation 18. The points in the de-commissioning, tightness testing and direct purging process where co-operation and liaison with other trades and property occupier may be required 19. The industry practices and work standards for fabricating and installing gas pipework, valves, systems and components to comply with the manufacturers specification, industry standards, Gas Safety (Installation & Use) Regulations, British Standards and Building Regulations 20. The types of pipe materials and fittings suitable for carrying gas including steel, malleable iron, copper, pliable corrugated stainless steel tubing, polyethylene & lead 21. The types of pipe fittings suitable for carrying gas including capillary, compression, push-fit, union joints & screwed joints 22. The industry practices and work standards for jointing materials and fittings suitable for carrying gas, including connecting to lead composition pipes 23. The positioning and fixing requirements for gas pipework, valves, systems and components to comply with the manufacturers specification, industry standards, Gas Safety (Installation & Use) Regulations, British Standards and Building Regulations 24. The procedures and work methods for connecting: a) to input services including; gas, earthing systems and ventilation 25. b) pipework, valves and components to both new and existing gas systems and appliances 26. How to confirm that the gas supply and ventilation are adequate for de-commissioning, tightness testing and direct purging of the gas system, appliance(s) and components 27. How to measure, calculate and record gas system installation volumes for tightness testing and direct purging activities 28. The test equipment and legislative requirements for applying tightness testing to gas systems, appliances and components 29. Tightness testing procedures to confirm the integrity of newly installed gas system and, where applicable, new and existing appliances 30. Tightness testing procedures to confirm the integrity of the existing installed gas system and, where applicable, new and existing appliances to ensure the installation doesn t exceed the maximum permissible pressure drop 6

31. Recognition of medium pressure regulator sets where the maximum operating pressure (MOP) at the outlet of the emergency control valve (ECV) is above 75mbar but not exceeding 2bar and, whether a meter inlet valve (MIV) is fitted 32. Tightness testing procedures to confirm the integrity of gas systems where the maximum operating pressure (MOP) at the outlet of the emergency control valve (ECV) is above 75mbar but not exceeding 2bar and, where a meter inlet valve (MIV) is fitted or, no meter inlet valve is fitted 33. The industry practices and procedures for tracing and repairing gas escapes 34. The process and procedures, equipment and legislative requirements for applying direct purging of gas systems, appliances and components 35. The routines and sequences for direct purging of gas systems, appliances and components 36. The routines and sequences for commissioning gas systems, valves and components to industry standards 37. Measures to prevent un-commissioned gas systems being brought into operation utilising safety and warning notices 38. How to complete all tightness testing and direct purging documentation and records to be left with the property occupier 39. The system handover procedures and demonstrating the operation of gas systems and components to end users 40. The steps to take when problems arise in the work activities 41. Job management structures and methods of reporting and recording job progress or problems delaying progress 42. How to safely collect and dispose of system contents that may be hazardous to health or the environments 43. How to isolate unsafe gas appliances, gas systems and components and application of the gas industry unsafe situations procedure 7

Glossary Cookers refers to Freestanding, Built In, Slide Under, Hotplates, Grilles, Range Cookers, and Dual Fuel Cookers Leisure Appliances refers to Greenhouse Heaters, BBQ s, Patio Heaters, Gas Flambeaux, and Outdoor Gas Lighting Small natural gas installations refers to Natural Gas Systems and Components downstream of an emergency control valve (ECV). The installation shall have; a maximum operating pressure (MOP) at the outlet of the ECV not exceeding 2bar, an operating pressure (OP) at the outlet of the primary meter of 21mbar (nominal), a nominal bore of not greater than 35mm, a maximum rated capacity through the primary meter of 16m3/h (U16), and a maximum installation volume (IV) supplying an individual dwelling or non domestic premises of 0.035m3 Work Site refers to the area where the work will take place and all areas affected by the works Services and Systems refers to water, central heating, gas, electricity supply, condensate disposal, chimneys and ventilation systems 8

Developed by Energy & Utility Skills Version Number 2 Date Approved December 2017 Indicative Review Date Validity Status Originating Organisation December 2021 Current Original Energy & Utility Skills Original URN DSG 3.6 Relevant Occupations Suite Keywords Engineering; Science and Engineering Technicians Down Stream Gas gas, tightness, testing, direct, purging, utility, utilities 9