Title: The Air Leakage Performance of Timber Doorsets fitted with NOR710 Series Smoke Seals in Accordance with BS 476: Part 31, Section 31.

Similar documents
BS EN ISO : 1999

CERTIFICATE OF APPROVAL No CF 877 ZOO HARDWARE LIMITED

A F LCON PANEL PRODUCTS LTD

CERTIFICATE OF APPROVAL No CF 111 ALLEGION (UK) LIMITED

CERTIFICATE OF APPROVAL No CF 877 ZOO HARDWARE LTD

Opening and closing force guidelines

CERTIFICATE OF APPROVAL No ME 5088

INSTALLATION INSTRUCTIONS PUSH BAR PULLMAN PANIC BOLT DEVICE TO EN 1125 : 2008

NOR 710 NOR 720. NOR 600 series NOR 650 NOR 850

1688 Jean-Berchmans-Michaud Drummondville, Quebec. J2C 8E9. Mr. Marc-Etienne Mathieu,ing.

PERFORMANCE TEST REPORT FOR AIR LEAKAGE AND DURABILITY OF BARRIER PRODUCTS ASTM E Rendered to: BAUTEX SYSTEMS

AAMA/WDMA/CSA 101/I.S.2/A AAMA/WDMA/CSA 101/I.S.2/A STRUCTURAL PERFORMANCE TEST REPORT SUMMARY RENDERED TO:

For optimum sealing apply strips of NOR 710 seal over hinge blades with 710 seal blades to align with 720 seal blades. NOR 710 NOR 720 NOR 855

RFU REGULATION 5 FINANCIAL. 5.1 Finance

WP2 Fire test for toxicity of fire effluents

Australian/New Zealand Standard

Significant Change to Dairy Heat Treatment Equipment and Systems

A2:1 The Facility Standards are focused on ensuring appropriate standards for the benefit of the Game including:

CALIBRATION SYSTEM REQUIREMENTS. ESCC Basic Specification No

PROCEDURES FOR STANDBY

OHRP Guidance on Written IRB Procedures

a Player is transferring from another Union. For Players at Level 4 and above, evidence of international Clearance must be provided.

RFU REGULATION 14 REGISTRATION OF ADULT MALE PLAYERS

Declaration of Conformity as per Directive 97/23/EC

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

MP 3.4 SWIMMING POOL BARRIERS. Table of Contents

UNIVERSITY OF TENNESSEE HEALTH SCIENCE CENTER INSTITUTIONAL REVIEW BOARD CONTINUING REVIEW OF RESEARCH

Discussion and guidance on the definition and qualification of porous loads

ATHLETICS AUSTRALIA SELECTION POLICY 16 th IAAF WORLD CHAMPIONSHIPS LONDON, GREAT BRITAIN 4 th to 13 th AUGUST 2017

Australian/New Zealand Standard

IECEx Certificate of Conformity Annexe

LONDON & SE DIVISIONAL ORGANISING COMMITTEE (DOC) ADMINISTRATIVE INSTRUCTIONS

Australian/New Zealand Standard

FAIRWAY PALMS II CONDOMINIUM PROPERTY

2016 AUSTRALIAN OLYMPIC TEAM WRESTLING AUSTRALIA INCORPORATED NOMINATION CRITERIA

IPSWICH & SUFFOLK YOUTH FOOTBALL LEAGUE - RULES Revised 27 June 2016

UNIVERSITY OF TENNESSEE GRADUATE SCHOOL OF MEDICINE INSTITUTIONAL REVIEW BOARD CONTINUING REVIEW AND REAPPROVAL OF RESEARCH

30 November 2017 ALL GOLF BALL MANUFACTURERS GOLF BALL SUBMISSIONS INTRODUCTION

Test Report. Test Report Smart Systems Limited Incorporating Smart Extrusions. Page 1 of 78

ANSI / ASSE Z88.2 American National Standard Practices for Respiratory Protection (1992 rev. versus 2015 rev.)

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

ISO INTERNATIONAL STANDARD. Cryogenic vessels Pressure-relief accessories for cryogenic service Part 1: Reclosable pressure-relief valves

The evolution of the Ex-proof flame path

Medium pressure two-stage meter regulators for gas flow rates not exceeding 6 m 3 h -1

Further guidance from BSI Technical Committee PH/5 - Personal Fall Protection on eyebolts for rope access

LATICRETE International Inc. One LATICRETE Park North Bethany, CT USA

VOLLEYBALL VICTORIA STATE LEAGUE BYLAW. Version 1 Adopted: 01/03/16

CYCLIC PERFORMANCE PER ASTM E 330 TEST REPORT. Rendered to: TRUSEAL TECHNOLOGIES, LTD. PRODUCT TYPE: Fixed Window

REFERENCE SPECIFICATION FOR END

SMOKE CONTROL DOORS AND SHUTTERS

Smart Water Application Technologies (SWAT) TM

Performance Standards for Non-Turf Cricket Pitches Intended for Outdoor Use [TS6] ecb.co.uk

PORTS AUSTRALIA. PRINCIPLES FOR GATHERING AND PROCESSING HYDROGRAPHIC INFORMATION IN AUSTRALIAN PORTS (Version 1.5 November 2012)


FLUID - Panic Exit Device

UK ADC Ltd. Association of Diving Contractors. Inland / Inshore Diving Supervisors Certification Scheme

NORTHERN CRICKET UNION OF IRELAND

ISO INTERNATIONAL STANDARD. Earth-mover tyres and rims Part 3: Rims. Pneumatiques et jantes pour engins de terrassement Partie 3: Jantes

SUMMARY STEPS TO CERTIFY ACOUSTIC DUCT SILENCER PERFORMANCE UNDER AMCA INTERNATIONAL S CERTIFIED RATINGS PROGRAM

SOUTH AFRICAN RUGBY UNION - ANTI-DOPING REGULATIONS

RESOLUTION MSC.235(82) (adopted on 1 December 2006) ADOPTION OF THE GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006

REGULATIONS FOR THE ESTABLISHMENT AND OPERATION OF THE WOMEN S FOOTBALL PYRAMID AND GIRLS FOOTBALL

Loss Prevention Standard

This test shall be carried out on all vehicles equipped with open type traction batteries.

AREA VALVE SERVICE UNITS

Application Notes. Aluminium Electrolytic Capacitors

Approved by National Game Board (As Amended by Council ) TRANSITIONAL REGULATIONS FOR THE PYRAMID LEAGUE SYSTEM

JEDEC SOLID STATE TECHNOLOGY ASSOCIATION

Guidance on room integrity testing and its interpretation

ARTICLES GOVERNING THE Toyota 86 Championship

"BS An overview of updates to the previous ( 2009 ) edition. Andrew Wrath & BS7965 Working Group

CORESTA RECOMMENDED METHOD N 6

Actuating elements for ComEx

Metering Code Gas TSO, measurement by connected party Effective from to the present

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

Changes to the Gas. (Safety and Measurement) Regulations. effective 1 July 2013

TERMS AND CONDITIONS FOR MEMBERS AND GUESTS

Design and Installation of Low Level Cycle Signals

Notice of Selection For Teams to Represent GBR at The Royal Ocean Racing Club Brewin Dolphin Commodores Cup 2016

AMENDMENTS TO AUSTRALIAN RULES OF RACING

Football Lighting Policy & Requirements Season 2016

Safety barriers to a swimming pool and spa pool at 130 Wharf Road, Pigeon Bay

ATHLETICS AUSTRALIA SELECTION POLICY 2017 WORLD PARA ATHLETICS WORLD CHAMPIONSHIPS LONDON, UNITED KINGDOM JULY 2017

CE conform applications according to EN Windows without thermal break Systems Forster presto and Forster norm

Standard Operating Procedure Measuring & Testing Equipment

BEST EVER GOLF ASSOCIATION (BEGA) BY-LAWS

2018 GOLF CLUB & OTHER EQUIPMENT SUBMISSION GUIDELINES

2019 PAN AMERICAN GAMES SELECTION CRITERIA

BRITISH STANDARD BS 341-4: Transportable gas container valves. Part 4: Pressure relief devices ICS

CONDITIONS FOR CHAMPIONSHIPS (PART A)

Meter regulators of nominal diameter 32 mm (1¼ inch) and not exceeding 150 mm (6 inch) and for inlet pressures not exceeding 75 mbar

REGULATION 8. ELIGIBILITY TO PLAY FOR NATIONAL REPRESENTATIVE TEAMS

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT

INTERNATIONAL STANDARD

SWIMMING POOL EXEMPTION COMMITTEE

ORDINANCE NO AN ORDINANCE OF THE CITY OF FOLSOM AMENDING CHAPTER OF THE FOLSOM MUNICIPAL CODE CONCERNING SWIMMING POOLS, SPAS AND HOT TUBS

New Castle County Guidelines for the Certified Construction Reviewer, Owner/Developer, Site Contractor and Professional Engineer

AMCA Certified Ratings Program. An Introduction to the. An AMCA International White Paper. January 2018

Intertek Testing Services Building Products. Enterdoor AB ubv

TITLE 11. DEPARTMENT OF JUSTICE NOTICE OF PROPOSED RULEMAKING

Transcription:

Exova Warringtonfire Holmesfield Road Warrington WA1 2DS United Kingdom T : +44 (0) 1925 655 116 F : +44 (0) 1925 655 419 E : warrington@exova.com W: www.exova.com Title: The Air Leakage Performance of Timber Doorsets fitted with NOR710 Series Smoke Seals in Accordance with BS 476: Part 31, Section 31.1: 1983 No: 196984 issue 3 Prepared for: Norseal Limited Norseal House 5 Regents Drive Prudhoe Northumberland NE42 6PX Date: 17 th September 2010 Registered Office: Exova (UK) Ltd, Lochend Industrial Estate, Newbridge, Midlothian EH28 8PL United Kingdom. Reg No.SC 70429

Page 2 of 13 SECTION TABLE OF CONTENTS PAGE EXECUTIVE SUMMARY... 3 INTRODUCTION... 4 ASSUMPTIONS... 4 PROPOSALS... 5 PRIMARY TEST EVIDENCE... 5 ASSESSED PERFORMANCE... 6 CONCLUSIONS... 9 VALIDITY... 10 SUMMARY OF PRIMARY SUPPORTING DATA... 10 DECLARATION BY NORSEAL LIMITED... 12 SIGNATORIES... 13

Page 3 of 13 Executive Summary Objective Report Sponsor Address Summary of Conclusions This report provides an appraisal of the expected air leakage performance of timber doorsets when fitted with a smoke seal arrangement comprising several variants of NOR710 series smoke seals, if it were to be tested in accordance with BS 476: Part 31, Section 31.1: 1983. Norseal Limited Norseal House 5 Regents Drive Prudhoe Northumberland, NE42 6PX It can be concluded that the air leakage of the timber doorsets incorporating the NOR710 smoke seal variants in the arrangement as described within this report, should not exceed 3 m 3 /m/h when tested in accordance with BS 476: Part 31, Section 31.1: 1983, when subjected to a pressure of 25 Pa from either direction. Valid until 1 st February 2023 This report may only be reproduced in full. Extracts or abridgements of reports shall not be published without permission of Exova warringtonfire.

Page 4 of 13 Introduction This report provides an appraisal of the expected air leakage performance of timber doorsets when fitted with a smoke seal arrangement comprising several variants of NOR710 series smoke seals, if it were to be tested in accordance with BS 476: Part 31, Section 31.1: 1983. Guidance with respect to the performance of fire doors required to resist the passage of smoke at ambient temperature conditions is given in Amendment 6160, October 1993 to BS 5588: Parts 2, 3, 6 and 10: 1983. A fire door required to resist the passage of smoke at ambient temperature conditions should, when tested in accordance with BS 476: Section 31.1 with the threshold taped and subjected to a pressure of 25 Pa, have a leakage not exceeding 3 m 3 /m/h. The threshold gap should be sealed by a seal either with a leakage rate not exceeding 3 m 3 /m/h at 25 Pa or just contacting the floor. In the absence of other criteria, this guidance has been adopted in reporting the previous test results and also for the purposes of this appraisal. FTSG The data referred to in the supporting data section has been considered for the purpose of this appraisal which has been prepared in accordance with the Fire Test Study Group Resolution No. 82: 2001. Assumptions It is assumed that the design and specification of the smoke seals will be identical to those detailed in this report or tested within WF Report No. 175378 issue 3. It is assumed that the doorsets and seals will be installed by competent installers. This report considers only the air leakage performance of the doorsets (with regards to the performance of the smoke seals). The report shall not be used to demonstrate the fire performance of the proposed doorsets when incorporating the proposed seals. It is assumed that separate suitable test evidence and approval relating to the fire resistance performance of the doorset has been obtained. Additionally, it is assumed that the door leaves are themselves impermeable to smoke. Durability of the seal used in the proposed configuration is not considered within this report. It is assumed that the clearance gaps (leaf to frame gaps) of the proposed doorsets shall be no greater than tested for the smoke seals considered in this report. It is assumed that the doorset which incorporates the seals is closed and latched such that the stop mounted NOR710 seals are fully compressed along both frame jambs and along the frame head.

Page 5 of 13 Proposals Primary Test Evidence It is proposed that the timber doors when fitted with a specific configuration of NOR710 smoke seal, fitted to the landing face of the doorstop, shall satisfy the aforementioned guidance with respect to having an air leakage not exceeding 3 m 3 /m/h. It is also proposed that the back blade of the NOR710 seal may be removed for the stop mounted application. In this stop face mounted configuration it is proposed that the leaf to frame clearance gap may be up to 5 mm. It is proposed that for the standard, as tested, (i.e. reveal mounted application) that the leaf to frame gap may be up to 4 mm. Details of the proposed door seal configuration and positions are detailed with this report. WR Report No. 175378 issue 3 To evaluate the performance of a specimen of a single-acting, single-leaf, doorset when fitted with a smoke seal within the door frame jambs, head and threshold, and subjected to a test utilising the test method detailed within BS 476: Part 31, Section 31.1: 1983. The doorframe was fitted with smoke seals referenced NOR710 which was Self adhered and continuous along the rebate of the door frame jambs and head and a drop down threshold seal referenced NOR810. The specimen also included a Dorma Door Controls Ltd door closer, referenced TS73V. Full details of the exact manner of installation are included in the Schedule of Components. Guidance with respect to the performance of fire doors required to resist the passage of smoke at ambient temperature conditions is given in Amendment 6160, October 1993 to BS 5588: Parts 2, 3, 6 and 10: 1983: A fire door required to resist the passage of smoke at ambient temperature conditions should, when tested in accordance with BS 476: Section 31.1 with the threshold taped/sealed and subjected to a pressure of 25 Pa, have a leakage not exceeding 3 m 3 /m/h. The threshold gap should be sealed by a seal either with a leakage rate not exceeding 3 m 3 /m/h at 25 Pa or just contacting the floor. The recorded leakage at 25Pa did not exceed 0.5m 3 /m/h (either pre or post cycling) and therefore was deemed to comply with the requirements.

Page 6 of 13 CF629 A CERTIFIRE approval relating to the smoke leakage performance of NOR710 seals. The approval certifies that the above seals are suitable for use with single-acting door assemblies required to restrict smoke leakage at ambient temperatures as defined in Appendix B of Approved Document B, Fire Safety to the Building Regulations 1991. It is applicable to latched and unlatched, single leaf and double leaf assemblies consisting of timber faced and edged leaves with timber, cellulosic or mineral cores in timber frames with or without intumescent edge seals. It is only applicable to assemblies that have been approved, or have been shown by test, to achieve the required period of fire resistance. Assessed Performance The proposed seal is CERTIFIRE approved for smoke sealing applications under the CERTIFIRE Certificate reference CF629. CERTIFIRE approval of products represents a higher level of attestation and quality control than simple type testing and the CERTIFIRE approval of the seals is awarded on the basis of: A design appraisal against TS35 and TS21 Initial type testing Manufacturing frequency checks Ageing and durability tests Evidence of technical support Clear and unambiguous labelling of seals Production surveillance under ISO 9001: 2000 Ongoing audit tests in accordance with TS35 Based on the high level of attestation and approval, the smoke leakage performance of doorsets incorporating any the specified seal, when fitted in a standard manner would therefore not be in doubt. However, due to the non-standard installation of the seals, consideration needs to be given to their combined ability to contribute to the doorsets smoke leakage performance. The following details show the proposed arrangement.

Page 7 of 13 Tested NOR710 Seal Orientation and Fitment Proposed NOR710 Seal Orientation and Fitment The proposal requires repositioning the seal from being adhered to the frame reveal to being adhered to the landing face of the stop. In the standard tested and approved fitment orientation, the NOR710 seal is fitted the face of the frame reveal such that the door leaf swipes across the seal blades. Smoke sealing in this orientation is provided by the effectiveness of the air tightness between the tips of the blades and the door leaf edge. As such the door leaf to frame gap size is critical to the correct functioning of the seal. The tested average leaf to frame gap dimension was 3.5 mm. the proposal requires that the gap dimension, in the standard tested reveal fixed orientation to be an absolute maximum of 4 mm. In view of the achieved performance of the seal (with the recorded leakage significantly below the failure limit), the fact that at 4 mm the seal will still contact the lipped edge of the leaf and also the fact that the back blade will continue to offer a level of seal regardless of leaf to frame gap, this proposed maximum gap is positively appraised.

Page 8 of 13 The proposed orientation changes the action of the seal from a swiping seal to a compressed seal with the blades of the seal being compressed between the face of the door leaf and the landing face of the stop. A seal in compression, which does not rely on the dimension of the leaf to frame gap being exactly as specified, could be expected to perform at least as well as, if not better, than an identical seal which is installed in a swiping orientation. The fact that the performance of the proposed compressed seal does not rely on the accuracy of the leaf/frame gap adds confidence in the proposal. For this reason, and for the stop mounted compression configuration only, it is considered acceptable to allow a leaf to frame gap of up to 5 mm. The seal in the standard swiping orientation performed during test such that the recorded leakage was significantly less than the failure limit. The compressed seal would potentially reduce the expected leakage further which adds confidence to the proposal. No Back Blade Seal Option (Stop Mounted, Compression Action ONLY) NOR710STOP It is proposed that the NOR710 seal may be provided without the integral back blade feature. The particular seal specification, referenced NOR710STOP will be used for stop mounted fitment only (i.e. with the twin blades being compressed between the leaf face and stop and not the swiping action mounted option). This option will be a rout-in design as detailed below: The omission of the back blade does not affect the compression of the remaining twin flaps. It has already been discussed that the use of the seal in compression is expected to be better than the tested configuration where the seal was of a swiping type. The achieved performance of the swiping blade and the fact that the recorded leakage was significantly less than that allowed provides confidence in this proposed design change. It is therefore expected that the rate of leakage for the doorsets with the sealing specification and options discussed in this report should be less than 3 m 3 /m/h when subjected to a pressure of 25 Pa from either direction.

Page 9 of 13 Frame Mounted and Stop Mounted Variants NOR710FR, NOR710SR and NORL710SR Variants It is proposed that the NOR710FR (frame mounted), NOR710SR (stop mounted) and NORL710SR (large stop mounted) seals varianst may be utilised. These referenced seals are detailed below: The proposed seals are all basically variants of the seals already discussed in this report the main difference being the inclusion of a kerf to fit within a routered groove within the frame or stop (depending on mounting variant). The interface of the twin flaps and back blades remains identical to the varianst tested and already assessed, and so it is expected that the smoke leakage performance of these variants will remain less than 3 m 3 /m/h when subjected to a pressure of 25 Pa from either direction. Conclusions It can be concluded that the air leakage of the timber doorsets incorporating the NOR710 smoke seal variants in the arrangement as described within this report, should not exceed 3 m 3 /m/h when tested in accordance with BS 476: Part 31, Section 31.1: 1983, when subjected to a pressure of 25 Pa from either direction.

Page 10 of 13 Validity This assessment is issued on the basis of test data and information available at the time of issue. If contradictory evidence becomes available to Exova warringtonfire the assessment will be unconditionally withdrawn and Norseal Limited will be notified in writing. Similarly the assessment is invalidated if the assessed construction is subsequently tested because actual test data is deemed to take precedence over an expressed opinion. The assessment is valid initially for a period of five years i.e. until 1 st February 2023, after which time it is recommended that it be returned for re-appraisal. The appraisal is only valid provided that no other modifications are made to the tested construction other than those described in this report. Summary of Primary Supporting Data WF Report No. 175378 issue 3 To evaluate the performance of a specimen of a single-acting, single-leaf, doorset when fitted with a smoke seal within the door frame jambs, head and threshold, and subjected to a test utilising the test method detailed within BS 476: Part 31, Section 31.1: 1983. Guidance with respect to the performance of fire doors required to resist the passage of smoke at ambient temperature conditions is given in Amendment 6160, October 1993 to BS 5588: Parts 2, 3, 6 and 10: 1983: A fire door required to resist the passage of smoke at ambient temperature conditions should, when tested in accordance with BS 476: Section 31.1 with the threshold taped/sealed and subjected to a pressure of 25 Pa, have a leakage not exceeding 3 m 3 /m/h. The threshold gap should be sealed by a seal either with a leakage rate not exceeding 3 m 3 /m/h at 25 Pa or just contacting the floor. In the absence of other criteria, this guidance has been adopted in reporting the results of this test. The leakage rates at other pressures are also included in this report. The specimen doorset had overall nominal dimensions of 2096 mm high by 1037 mm wide and incorporated a door leaf of overall dimensions 2043 mm high by 940 mm wide by 46 mm thick. The doorset was fixed within a plywood faced, timber studded partition, to form the test construction.

Page 11 of 13 The doorframe was fitted with smoke seals referenced NOR710 which was Self adhered and continuous along the rebate of the door frame jambs and head and a drop down threshold seal referenced NOR810. The specimen also included a Dorma Door Controls Ltd door closer, referenced TS73V. Full details of the exact manner of installation are included in the Schedule of Components. In accordance with the CERTIFIRE Technical Schedule TS21 the assembly was initially tested utilising the method detailed within BS 476: Part 31, Section 31.1: 1983 and then subjected to 100,000 opening and closing cycles. On completion of the cycling the assembly was again evaluated by test to the method detailed within BS 476: Part 31, Section 31.1: 1983. Test Results: Condition Pre-cycled threshold taped Pre-cycled drop down threshold seal engaged Post-cycled drop down threshold seal Leakage Rate at + 25 Pa (m 3 /m/h) Leakage Rate at - 25 Pa (m 3 /m/h) 0.38 0.39 0.47 0.46 0.50 0.46 Test dates : Pre-cycle 28 th July and post-cycle 4 th August 2008 Test sponsor : Norsound Limited CF629 A CERTIFIRE approval relating to the smoke leakage performance of NOR710 seals. The approval certifies that the above seals are suitable for use with single-acting door assemblies required to restrict smoke leakage at ambient temperatures as defined in Appendix B of Approved Document B, Fire Safety to the Building Regulations 1991. It is applicable to latched and unlatched, single leaf and double leaf assemblies consisting of timber faced and edged leaves with timber, cellulosic or mineral cores in timber frames with or without intumescent edge seals. It is only applicable to assemblies that have been approved, or have been shown by test, to achieve the required period of fire resistance.

Page 12 of 13 Declaration by Norseal Limited We the undersigned confirm that we have read and complied with the obligations placed on us by the UK Fire Test Study Group Resolution No. 82: 2001. We confirm that the component or element of structure, which is the subject of this assessment, has not to our knowledge been subjected to a fire test to the Standard against which the assessment is being made. We agree to withdraw this assessment from circulation should the component or element of structure be the subject of a fire test to the Standard against which this assessment is being made. We are not aware of any information that could adversely affect the conclusions of this assessment. If we subsequently become aware of any such information we agree to cease using the assessment and ask Exova warringtonfire to withdraw the assessment. Signed: For and on behalf of:

Page 13 of 13 Signatories Responsible Officer A Kearns* - Technical Manager Approved D Hankinson* - Principal Certification Engineer * For and on behalf of Exova warringtonfire Report Issued: 17 th September 2010 Issue 2 (17 th December 2010) change to design, gap dimensions and positioning of seal Issue 3 (11 th January 2018) addition of seal variants The assessment report is not valid unless it incorporates the declaration duly signed by the applicant. This copy has been produced from a.pdf format electronic file that has been provided by Exova Warringtonfire to the sponsor of the report and must only be reproduced in full. Extracts or abridgements of reports must not be published without permission of Exova Warringtonfire. The pdf copy supplied is the sole authentic version of this document. All pdf versions of this report bear authentic signatures of the responsible Exova Warringtonfire staff.