City of Birmingham Draft Multi-modal Transportation Plan

Similar documents
City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting

GIS Based Non-Motorized Transportation Planning APA Ohio Statewide Planning Conference. GIS Assisted Non-Motorized Transportation Planning

Physical Implications of Complete Streets Policies

City of Novi Non-Motorized Master Plan 2011 Executive Summary

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

CHAPTER 3: Vision Statement and Goals

EXECUTIVE SUMMARY. Vision

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Perryville TOD and Greenway Plan

City of Ann Arbor Pedestrian Safety & Access Task Force

GRAHAM PEDESTRIAN TRANSPORTATION PLAN

Creating Complete Streets to Accommodate All Users

PEDESTRIAN ACTION PLAN

City of Ann Arbor Pedestrian Safety & Access Task Force

Urbana Pedestrian Master Plan

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

MASTER BICYCLE AND PEDESTRIAN PLAN

City of Jacksonville Mobility Fee Update

This page intentionally left blank.

Existing Pedestrian Conditions. PSAC February 8, 2011

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Safety & Convenience for All Users, in All Modes. Barbara McCann NCSL December 3, 2013

Arlington s Master Transportation Plan

9/21/2016 VIA . RE: The Knot (DR16-270)

Non-Motorized Transportation 7-1

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Executive Summary Route 30 Corridor Master Plan

Table of Contents Introduction. 2 Purpose of the Plan...2 The Benefits of Walking and Bicycling...3 Vision and Goals of the Plan...

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

San Jose Transportation Policy

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution

Bicycle Facilities Planning

Introduction. Who is WILMAPCO. Why are walkable communities important

Appendix C 3. Bicycle / Pedestrian Planning

Plant City Walk-Bike Plan

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

HYATTSVILLE TRANSPORTATION PLAN. City Council Update March 19, 2018

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

IBI Group November 5, 2012

Complete Streets Accessible Networks for an Age-Friendly World

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Washington County SW Beaverton-Hillsdale Hwy. & SW Scholls Ferry Rd.

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Hennepin County Pedestrian Plan Public Comment Report

Complete Streets 101: The Basics

Rochester Downtown Bicycle Study 2009

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Chapter 5. Complete Streets and Walkable Communities.

2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

City of Ann Arbor Pedestrian Safety & Access Task Force

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

AMATS Complete Streets Policy

Pedestrian Project List and Prioritization

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Kelowna On the Move. Pedestrian and Bicycle Master Plan

If a person walks within this focus area, these are examples of the places he or she could walk to or from:

Agency Advisory Group Meeting #3 and Walk Audit Anchorage Non-Motorized Plan

Building Walkable Communities in the North Country - Jefferson Co, NY Sep Mark Fenton;

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

NJDOT Complete Streets Checklist

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

KEARNY MESA COMMUNITY PLAN UPDATE

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

MTP BICYCLE ELEMENT UPDATE. November 2017

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

CONNECTING PEOPLE TO PLACES

G AT E WAY PLAN. Community BRIEFING KIT GATEWAY BIKE

Minutes of the regular meeting of the City of Birmingham Multi-Modal Transportation Board held June 19, 2014.

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

Vision. Goals and Objectives. Walking

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

MASTER BICYCLE AND PEDESTRIAN PLAN

What s Health Got to Do With It? Health and Land Use Planning

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

CHAPTER 7 OF THE COMPREHENSIVE PLAN TRANSPORTATION Mobility for all Modes

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

Pedestrian and Bicycle Improvements in Balboa Park Station Area

Multi-Modal Transportation Assessment and Development Strategy. January 13, 2014 Madison County Commission Meeting

Transcription:

City of Birmingham Draft Multi-modal Transportation Plan City Commission Public Hearing Monday, November 25, 2013 7:30 pm Norman Cox, PLA, ASLA The Greenway Collaborative, Inc. Ann Arbor, Michigan The Greenway Collaborative, Inc. www.greenwaycollab.com

Planning Process Started September 2012 Web survey in October Visioning workshop in January Preliminary Plan Open House in February May Draft Plan June Draft Plan July Draft Plan Current October Draft Plan Under Consideration And monthly meetings with the project Steering Committee

Third Public Hearing October 14, 2013 Draft First Planning Board Public Hearing held in July: Added Executive Summary Changes to the Intersection Improvement section Second Planning Board Hearing held in September Minor Changes to Glossary Clarification on How the Plan will be Used The plan also received public input from a web survey and two public workshops

Changes from the September Draft No substantial changes since review and recommendation of approval from Planning Commission Fixed Minor Typos Fixed Glossary of Terms Public input since that time Concerns with 4 to 3 lane conversion on West Maple Concerns with removing signal option on Lake Park and West Maple

Executive Summary The Cost of Doing Nothing The Cost of Physical Inactivity Preparing for an Aging Population Positioning Birmingham for the New Economy Economical Implementation Through Long-range Planning How to Use the Master Plan Most residents are within convenient walking and bicycling distance to the majority of destinations in the City. The proposed network, policies and programs will make that a more attractive and safer choice.

The Cost of Doing Nothing From 2004 through 2011 automobiles struck: 67 Pedestrians 44 Bicycles Average one a month Tremendous physical and emotional toll on person hit and drivers Comprehensive economic cost nearly 17 million dollars $2.1 million per year $104 per resident each year Cost of Phase 1 & 2 about $2.3 million If phase 1 & 2 reduced crashes as little as 14% this would be viewed as a success from a cost benefit perspective

Cost of Physical Inactivity Metro Detroit s residents 1/3 overweight 1/3 obese 28% no physical activity Average cost per person of physical inactivity in 2002 was $1,175 Cardiovascular disease Obesity Diabetes Osteoporosis Mental health disorders Some cancers Growing body of research shows that the physical environment impacts physical activity levels You are 47% more likely to be active at least 30 minutes a day if you live in a neighborhood with sidewalks

Preparing for an Aging Population 4 to 3 lane conversions 2.3 % increase in residents 65 and older 2000 to 2010 14% population 65+ 65 + involved in 28% of all crashes In 2040, 65+ to make up 20% of population Many improvements will specifically help seniors age in place: Shorter crosswalks Better visibility Traffic calming Better access to transit

Positioning Birmingham for the New Economy Massive decline in 25 to 39 year old residents 2000 to 2010 Down 1,131 young adults in 10 years MSU Land Policy Institute Study; target the following for economic growth: Educated youth High-equity immigrants Educated senior citizens Entrepreneurs Pedestrian and bicycle linkages and transit key to attracting this demographic

Project Tailored to Birmingham 90% of the cost of proposed improvements are for pedestrian improvements More convenient and safer road crossings Address gaps in the sidewalk system Wayfinding improvements Proposed bicycle system includes a low-stress network utilizing lowspeed roads and connecting pathways Coordinated with transit

Economical Implementation Through Long-Range Plan Many of the improvements will be integrated into larger road construction projects Integrating multi-modal elements at the beginning of the process A system perspective rather than a piecemeal approach Focus on a foundation system

How to Use the Master Plan Very specific recommendations Reponses to the demands of planning within an existing constricted environment Pragmatic vision of what is currently feasible Use as a guide this is a city-wide view Rapidly changing field Each corridor or intersection should be revisited and studied prior construction Some should be tested

Multi-modal Network Responds to the needs of various users and trip types Web Survey Results: About 72% of respondents would walk to work and/or do errands if there was a system of sidewalks, pathways, crosswalks, bike lanes, etc. Around 84% of respondents feel that a complete network for bicycle facilities such as bike lanes, signed routes and trails are very important or somewhat important to making future bicycling trips actually happen

Bike Lanes 3.7 miles proposed Web Survey Results: Around 20% of respondents currently bike to work and/or the store on a weekly basis Around 58% would be comfortable riding a bike in a bike lane on a minor road Around 30% would be comfortable riding a bike in a bike lane on a major road If the appropriate facilities were constructed 69% of respondents would be interested in bicycling to work and/or for errands

Shared Lane Markings 10.7 miles

Neighborhood Connectors 15.4 miles on local roads, 2.2 mi. on pathways Web Survey Results: Around 73% of respondents would be comfortable riding a bike along a Bike Route on a Residential Road Web Survey Results: Around 82% of respondents feel wayfinding signs for suggested bicycle and pedestrian routes to key destinations are very important or somewhat important to making future walking and bicycling trips actually happen

Sidewalks 2.5 additional miles along major roads Web Survey Results: About 38% of respondents walk to work and/or the store daily or weekly About 80% of respondents walk for fun and/or exercise daily or weekly Around 79% of respondents feel a complete sidewalk system is very important to non-motorized trips actually happening in the future

Road Crossings Curb Extensions 42 Proposed When curb extensions are used on a road with bike lanes, the bike lane continues past the curb extension

Road Crossings Crossing Islands 9 Islands, 3 with Rectangular Flashing Beacons Proposed Crossing Island proposed at river trail location Web Survey Results: Around 61% of respondents feel that mid-block crosswalks are very important or somewhat important to making future walking and bicycling trips actually happen

Road Crossings Upgrades 18 Locations Proposed Many of the proposed improvements include upgrades such as ramps, detectable warnings, pedestrian signals and high visibility crosswalk markings

Specific Intersection Recommendations Prior to implementing any of the alternatives, a detailed engineering study will be undertaken For each of the 8 locations, a number of viable alternatives were identified based on an analysis of existing conditions Some of those alternatives are dependent on other proposed changes to the roadway

Network Implementation Plan Summary Costs for first two phases: Phase 1 $1,300,000 Phase 2 $1,000,000 Approximately 15 miles of new facilities are proposed in all four phases: 3.8 Miles of Bike Lanes 0.5 Miles of Buffered Bike lanes 12 Miles of Shared Lane markings 0.2 Miles of Colored Shared Lane Markings 16 Miles of Neighborhood Connector Routes 3.5 Miles Of Pathways & Sidewalks 64 Road Crossing Improvements 2 Tree Extensions 4 Active Transportation Hubs (Not shown on Map) 5 Bus Shelters (Not Shown on Map) 64 Bicycle Hoops (Not shown on Map) 3 enclosed & secured bike rooms (Not shown on Map)

A Number of Details Are Provided in Phasing Plan

Specific Area Plans Lincoln Street West Maple Road Woodward Avenue Downtown

Public and Program Recommendations Transportation Project Coordination and Public Input Bicycle Parking Ordinance Snow Removal ADA transition plan Walking & Bicycling Maps Ped. and Bicycle Counts Pedestrian and Bicycle Crash Tracking Continue with Community Recognition Programs Measurements of Infrastructure Progress

City of Birmingham Draft Multi-modal Transportation Plan Questions? Norman Cox, PLA, ASLA The Greenway Collaborative, Inc. Ann Arbor, Michigan The Greenway Collaborative, Inc. www.greenwaycollab.com