Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual

Similar documents
KECKLEY. Installation, Operation, and Maintenance Manual. Style KGV - Knife Gate Valve

Operating instruction

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Installation, Operation, and Maintenance Manual

BUTTERFLY VALVES Series 800

Installation & Operation Manual Proven Quality since 1892

INSTRUCTION MANUAL. Anchor Darling 800 Globe Valves. Installation Operation Maintenance. Sizes 1/2 through 2 FCD ADENIM

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

Installation, Operation and Maintenance Manual for Back Pressure Regulator

DelVal Flow Controls Private limited

WKM Model 320F Floating Ball Valve

Installation, Operation, and Maintenance Manual. XS150-ULV Urethane Lined Knife Gate Valve

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

Hydraulic Punch Drivers

INSTALLATION, OPERATION and MAINTENANCE MANUAL

FLANGED TWO-PIECE BALL VALVES

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL

WHEATLEY Series 500 Swing Check Valve

Pressure Dump Valve Service Kit for Series 2300 Units

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

FLANGED TWO-PIECE BALL VALVES

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TYPE BV2-LD

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

INSTALLATION & MAINTENANCE INSTRUCTIONS - ORIGINAL VERSION AVK KNIFE GATE VALVES

Anderson Greenwood Series 93 Positive Pressure POSRV Installation and Maintenance Instructions

FLANGED MULTI-PORT BALL VALVES

Installation Instructions, Pressure Regulator Series

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

Instruction manual

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

Installation, Operation, and Maintenance Manual. OM150 Over Molded Lined Knife Gate Valve

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

Index Table. Model 794. Installation, Operating and Maintenance Instructions

KTM V-PORT CONTROL BALL VALVES INSTALLATION AND OPERATION MANUAL

Telefon (+45) Telefax (+45)

WW-720. Pressure Reducing Control Valve

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

WW-720. Pressure Reducing Control Valve

CYL KNIFE GATE VALVES San Sebastian Spain

Type 1367 High-Pressure Instrument Supply System with Overpressure Protection

Engineering Data Sheet

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

Pure-Flo Handwheel Operated Valves (903, 913, 963) Instruction Manual

Control Valves ZK 610 ZK 613

Installation, Operation, and Maintenance Manual

Declaration of Conformity as per Directive 97/23/EC

Instruction Manual - Diaframless TM Ejector Chlorine, Sulfur Dioxide and Ammonia

WW-730. Pressure Sustaining/Relief Control Valve

6500 KNIFE GATE VALVES

HYDRAULIC PUNCH DRIVER 38456, 38520, 7306 / 7306SB, 7310 / 7310SB, 7506, 7606SB, 7610SB, 7625 / 7625Pg / 7625PgSB, 7646 / 7646Pg / 7646PgSB

Nextech. Trunnion - Mounted Ball Valve. Installation and Operations Maintenance Manual

Operation and Maintenance Instructions

INSTALLATION, OPERATION & MAINTENANCE MANUAL

KENNEDY VALVE RESILIENT WEDGE GATE VALVE MAINTENANCE MANUAL

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

Installation, Operation, and Maintenance Manual

Model GP PRESSURE REDUCING VALVE Installation & Operation Manual

Model PIV UL/FM Post Indicator Valve. Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515

Summary of Accumulators These operating instructions apply to the accumulators listed in the table shown below.

USER INSTRUCTIONS. NAF Duball DL Ball Valves. Installation Operation Maintenance. Experience In Motion. flowserve.com

Design DSA Steam-Atomized Desuperheater

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

Installation and operating manual. Pneumatic control station LK product no: PCS 1-10

Type 3709 Pneumatic Lock-up Valve. Translation of original instructions. Mounting and Operating Instructions EB 8391 EN

Instruction Manual O-Ring Ejector Chlorine & Sulfur Dioxide to 500 PPD (10 kg/h)

Type BBS-03, BBS-05, BBS-06, BBS-25

OPERATING MANUAL. Contents. Bottom outlet ball valve Type ecoline

INSTRUCTION MANUAL Pressure Relief Device LPT

Eaton Filtration, LLC

APCO ASU-SCAV & ASU-CAV SINGLE BODY COMBINATION AIR VALVES

Pure-Flo Handwheel Operated Valves (970) Instruction Manual

Installation Instructions For Flat Seated Bolted Type RAH Series Disk Holders

Installation, Operation, and Maintenance Manual

Fisher DVI Desuperheater Venturi Inline

Pressure Dump Valve Service Kit for Series 3000 Units

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

INSTRUCTIONS ON INSTALLATION, OPERATION AND MAINTENANCE FOR KIRLOSKAR MULTI DOOR NON RETURN VALVES

Right-Angle Tube Roller Model

GREIG FILTERS, INC. OPERATION MANUAL

Mounting and Operating Instructions EB 2558 EN. Self-operated Pressure Regulators. Type Pressure Build-up Regulator

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

Operation Manual Air Saver Unit ASV5000 Series

64 Series Pressure Reducing Regulators

VALVES & MEASUREMENT

Hydraulic Punch Drivers

Engineered Valves Group. Revision 2. FABRI-VALVE High Performance Knife Gate Valve.

1 DRIVE INDUSTRIAL IMPACT WRENCH

RAIMONDI. 3-way globe valve for feedwater heater outlet bypass Installation and Maintenance Instructions

Instruction Manual. PE-25/32/37 Tapping Machines. POLYTAPP Valves

MODELS & (OBS) REMOTE FLUID PRESSURE REGULATORS (30 OZ./MIN. & 100 OZ./MIN.)

Declaration of Conformity as per Directive 97/23/EC

G&H SPC-1 SANITARY PROPORTIONAL-CONTROLLED VALVE WITH POSITIONER INSTRUCTION MANUAL IM US1 S 0812

Declaration of Conformity as per Directive 97/23/EC and Manufacturer s Declaration as per Directive 98/37/EC

Types 749B and R130 Changeover Manifolds

Transcription:

Bray/ VAAS Knife Gate Valve 770/780 Series

Operations and Maintenance Manual Table of Contents Definition of Terms 1 Safety Instructions 1 Introduction 2 Unpacking 2 Storage 2 Installation 2 Commissioning 3 Cylinder-Operated Valves 3 Manual Valves 3 Maintenance 4 Lubrication 4 Packing Replacement 5 Seat Replacement 5 Actuator Maintenance 6 Spare Parts 6 Packing Details 7 Troubleshooting 8 For information on this product and other Bray products please visit us at our web page - www.bray.com.

Definition of Terms - Safety Instructions READ AND FOLLOW THESE INSTRUCTIONS SAVE THESE INSTRUCTIONS DEFINITION OF TERMS Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury. Indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury. NOTICE Used without the safety alert symbol indicates a potential situation which, if not avoided, may result in an undesirable result or state, including property damage. HAZARD-FREE USE This device left the factory in proper condition to be safely installed and operated in a hazard-free manner. The notes and warnings in this document must be observed by the user if this safe condition is to be maintained and hazard-free operation of the device assured. Take all necessary precautions to prevent damage to the valve due to rough handling, impact, or improper storage. Do not use abrasive compounds to clean the valve, or scrape metal surfaces with any objects. The control systems in which the valve is installed must have proper safeguards to prevent injury to personnel, or damage to equipment, should failure of system components occur. QUALIFIED PERSONNEL A qualified person in terms of this document is one who is familiar with the installation, commissioning, and operation of the device and who has appropriate qualifications, such as: Is trained in the operation and maintenance of electrical equipment and systems in accordance with established safety practices Is trained or authorized to energize, de-energize, ground, tag, and lock electrical circuits and equipment in accordance with established safety practices Is trained in the proper use and care of personal protective equipment (PPE) in accordance with established safety practices Is trained in first aid In cases where the device is installed in a potentially explosive (hazardous) location is trained in the commissioning, operation, and maintenance of equipment in hazardous locations 1

The valve must only be installed, commissioned, operated, and repaired by qualified personnel. The device generates a large mechanical force during normal operation. All installation, commissioning, operation, and maintenance must be performed under strict observation of all applicable codes, standards, and safety regulations. Observe all applicable safety regulations for valves installed in potentially explosive (hazardous) locations. INTRODUCTION The Bray/ VAAS Series 770/ 780 provides repeatable bidirectional shutoff in a rugged, double-piece cast body. Additional information about Series 770/ 780 valves including application data, engineering specifications, and actuator selection is available from your Bray/ VAAS distributor or sales representative. UNPACKING Ensure the box is not damaged externally. Remove the valve from the packaging and check for any damage to the valve and its components during transit. Valve size and brief material specification of body (markings such as SS or DI ) are marked on the valve body. Stainless steel nameplate (below) fixed on to the yoke of valve contains most of the relevant information on the valve including Bray/ VAAS work order number and unique serial number of the valve. These details should be quoted for all requirements of service and spares. SERIAL NUMBER SIZE MODEL FLG. DRILL BODY GATE STORAGE SEAT PACKING CWP MAX TEMP Wrap the valve with a polyethylene cover. Cover the ports for pneumatic actuator/accessories with plastic caps. Store these valves in the same packing indoors and without direct exposure to the environment. INSTALLATION Valves can be mounted with flow in both directions. Install the valve between flanges using fasteners & gaskets. Bolt holes are always blind tapped and care should be taken not to bottom the bolts while tightening. Refer to GA Drawing/ Technical Bulletin for quantity and size of blind tapped holes on valve chest area. If the correct size bolts are not available, use studs and nuts for chest area bolts to avoid damage of body. 2

Support should be used for valves size 8 and over when installed in vertical pipe. Failure to do so can result in improper valve operation and/or valve failure. COMMISSIONING GUIDELINES Gland packing is tightened to hold the specified pressure and tested for no leakage before dispatch. However, this may require some adjustment at site due to loosening in transit etc. Check for gland leakage after the valve is subjected to pressure and if any leak is observed, tighten the gland uniformly in a cris-cross pattern until the leakage stops. Wrong electrical supply to accessories will damage the equipment. Do not over tighten the gland nuts as this may cause excessive friction and premature damage to packing. Cylinder Operated Valves 1. Connect instrument quality air, preferably through an air filter/regulator of adequate size. The recommended air pressure is 80-120 psi (5-8 bar). Refer to the appropriate bulletin/drawing for port and cylinder size details. 2. Ensure the supply air is free from moisture, dirt, and other foreign particles. Drain the filter regulator before operating the actuator so that pipe rust and dirt if any in the air line will be removed before actuation. 3. If valves are supplied with electrical accessories like limit switch and solenoid valve, ensure wiring is done as per local electrical safety codes and regulations. Ensure correct electrical supply is given to electrical accessories for proper functioning and safety of the equipment. 4. Open the valve by energizing the solenoid valve/giving air supply to cylinder and operate the valve 2-3 times. Manual valves Open/Close the valve manually and observe valve operation. 3

MAINTENANCE NOTICE Any modification or use of unauthorized parts voids any and all warranty considerations. Lubrication The manual valve stem should be lubricated at regular intervals for smooth operation of the valve. A lubrication nipple is provided on the collar. Cylinder operated valves do not require routine lubrication. NOTICE If the cylinder actuator is disassembled for repair, the cylinder wall and seals need to be lubricated with a lithium-based grease prior to reassembly. Manual Valve Stem Cylinder Actuator 4

Packing Replacement Relieve line pressure before loosening gland nuts to avoid injury and/or equipment damage. 1. Relieve the line pressure. 2. Fully close the valve. 3. Ensure the line is empty, and flush if necessary. Manual Valves 1. Ensure the valve is fully closed. 2. Disconnect the stem from the gate by removing the clevis bolts & nuts (6). 3. Rotate the handwheel (1) counter-clockwise by holding the stem from rotation, so that the stem retracts fully from the gate. 4. If valves are supplied with bellows, ensure stem is not rotating, as rotation will damage the bellows. 3 Layer Packing 5. Remove the gland nuts (2) and the gland (3). Quad Seal 2-16 6. Remove the old packing (4) from the packing chamber, one layer at a time, using a long thin tool to pry it out. 7. Insert the new packing one at a time according to the illustration below. Stagger the cut end of the packing so that they meet together and do not line up. 8. Install the packing gland (3) and gland nuts (2). 9. Ensure the gap between the gland and the gate is uniform all around 10. Tighten the gland nuts finger tight plus one turn. C Packing PTFE 18 and up 4 Layer Packing Packing Joint Angle 45 11. For Series780, remove the gate cover at the bottom side and repeat the procedure as mentioned above for bottom packing replacements. 12. Lower the stem by rotating the handwheel clockwise while holding the stem and fasten the stem to the gate with nuts & bolts 1 6 2 3 4 5 NOTICE If leakage is observed from the packing area after installing the valve in the pipeline and the valve is pressurized or charged with media, tighten the gland nuts evenly side to side just enough to stop leakage. Do not over-tighten the gland nuts. Seat Replacement 1. Relieve the line pressure and close the valve. Flush the line if necessary. 2. Remove the valve from the line by loosening the flange mounting bolts, studs, and nuts. 3. Clamp the valve in the vertical position to a fixture. Do not block the valve port when clamping the valve. An overhead 5

hoist may be needed for larger size valves. 4. Make sure the valve is in the open position. 5. Replacing the seats does not require valve or actuator disassembly. 6. Remove the seats on either side (which are drop-in fitted) and replace with new seats. 7. Ensure alignment of the internal seat bores with same level 8. Seats require lubrication before installing. A silicon-based lubricant is recommended. (Applicable for Series 770) ACTUATOR MAINTENANCE Pneumatic Cylinder The Bray/ VAAS pneumatic cylinder actuator is a low maintenance design and does not require routine maintenance. It has an FRP tube which is lubricated for life with a special coating on the inside wall. Filtered dry, instrument quality air (nonlubricated) should be used for its operation at the specified air supply pressure. Recommended spare parts Following are parts recommended as spares, which may be stocked. Following are general recommended spares for valves. Provide the valve serial number and work order number from the nameplate for proper parts. Gland packing Spare Seat Cylinder repair kit 6

Packing Details Series 770 Valve Size (in.) Packing Size (mm) Length (mm) Packing Layers Quad Seal Layer Total Layers 2 Sq. 8 235 2 1 3 3 Sq. 8 275 2 1 3 4 Sq. 8 400 2 1 3 5 Sq. 8 425 2 1 3 6 Sq. 8 475 2 1 3 8 Sq. 8 545 2 1 3 10 Sq. 8 650 2 1 3 12 Sq. 8 775 3 1 4 14 Sq. 10 925 3 1 4 16 Sq. 10 1000 3 1 4 18 Sq. 10 1100 3 1 4 20 Sq. 16 1250 2 1 3 24 Sq. 16 1440 2 1 3 Series 780 Valve Size (in.) Packing Size (mm) Length (mm) Total Layers 2 Sq. 8 270 6 3 Sq. 10 330 6 4 Sq. 10 395 6 5 Sq. 10 425 6 6 Sq. 10 480 6 8 Sq. 10 580 6 10 Sq. 10 675 6 12 Sq. 12.7 800 6 14 Sq. 12.7 975 6 16 Sq. 16 1150 6 18 Sq. 16 1300 8 20 Sq. 16 1375 8 24 Sq. 16 1575 8 7

Troubleshooting Trouble Possible cause Solution Media oozing out of gland packing Packing deteriorated Replace packing Seat is worn out or torn Replace seat In fully closed position, valve leaks Gate is scratched Replace gate High torque during valve seating and unseating Misalignment between gate and stem a) Remove the clevis fasteners b) Loosen the superstructure fasteners c) Adjust the alignment of the stem and gate d) Connect the clevis fasteners e) Retighten superstructure fasteners Packing is not tighten properly Adjust gland nuts Superstructure fasteners loosen Tighten the super structure fasteners Valve jerks during open and close Insufficient air supply Solenoid valve dust accumulation Pneumatic operated valves: Increase supply pressure Remove and clean solenoid valve Piston rod seal damaged Replace seal All statements, technical information, and recommendations in this bulletin are for general use only. Consult Bray/VAAS representatives or factory for the specific requirements and material selection for your intended application. The right to change or modify product design or product without prior notice is reserved. Patents issued and applied for worldwide. Bray is a registered trademark of Bray International, Inc. 2015 Bray International, Inc. All rights reserved. OM 12_20_2016 Bray/VAAS Division of Bray International, Inc. 13333 Westland East Blvd. Houston, Texas 77041 Tel: 281.894.5454 www.bray.com 8