Paddle Bar Replacement

Similar documents
Pressure Dump Valve Service Kit for Series 3000 Units

Rudder Kit Assembly Instructions for Quest 13

INSTALLATION INSTRUCTIONS

Final Assembly Instructions Bikes with Quill Stems

Final Assembly Instructions Bikes with Threaded Headsets

Fiber Optic Lighted Bubbler Spillway Pot (DLP-45) Installation Manual

Installation Instructions

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

Final Assembly Instructions Bikes with Threaded Headsets

VERSA BIKE RACK INSTRUCTIONS

Installation Procedure for your Disco Double Kit, by Airgun Lab, LLC.

Lectric Cycles Mid-Drive Electric Motor Installation

Preferred Instruments Danbury, CT USA

HOME ASSEMBLY INSTRUCTIONS

FIRST TEAM SPORTS, INC Storm Portable Series Assembly Instructions

Read Before Operating!

Pressure Dump Valve Service Kit for Series 2300 Units

ASSEMBLY INSTRUCTIONS

I.H.S INSTALLATION INSTRUCTIONS

WIND CLIPPER KTS ILLUM SCALE INC DEC CLIPPER WIND SYSTEM

Tripod Setup Guide (M-TPx)

MASTER TRUING STAND TS-3. Optional Dial indicator set with brackets Dial indicator bracket set only

UNITY 2. Uni-DAAMS Manual. Version 1.3 (Changes to Section 1.1) March 2010

Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii

1.0 - OPENING AND CLOSING THE DOOR

Assembly Guide ST200 FUNCTIONAL TRAINER

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

QRPGuys Single Lever Paddle w/base

2019 MADONE ASSEMBLY MANUAL

WELLS JOHNSON HIGH VOLUME CANISTERS

Falcon 3 145, 170, 195 and Tandem Owner / Service Manual

TECH SHEET ORANGE PIVOT TOOL INSTRUCTIONS

Kari-Tek. Kari-Tek. Hydro Skeg Retro-Fitting Instructions. Instructions for retro-fitting of Hydro Skeg

310 SERIES TILT-TO-LOAD ROTATOR. The Specialist In Drum Handling Equipment

Combination Breathing Apparatus

Installation Instructions

Shoreline Cantilever Lift 2500lb Capacity Models: (108" inside width) - Part # (120" inside width) - Part #

SERVICE BULLETIN. TOPIC: Cylinder NUMBER: SUPERSEDES: NEW DATE: May 15, Indexing Basic Cylinder Height On CFR F-1/F-2 Rating Units

INDOOR CYCLING BIKE SF-B1110 USER MANUAL

602 STRINGING MACHINE OWNER'S MANUAL

Assembly Instructions. -Cantilever Boat Lifts

Santa Fe Cycles Assembly Guide Introduction

MAGNETIC INDOOR CYCLING BIKE

RG1200 Service and Repair Manual

X-6 STRINGING MACHINE OWNER'S MANUAL. Issue 1 - May Copyright 2004 GAMMA Sports - All Rights Reserved

8. Carefully layout all the parts of the reservoir setup and clean any dirt, grime or dust from the parts. ( image 8 ) 8

600 / 600FC OWNER'S MANUAL

Drive Belt Instructions

Assembly Instructions

SECTION 2 RING MOUNT

U.S. Patent No. 7,922,246. Patents Pending

2,500/4,000 LB Easy Riser Vertical Cable Feighner Lift

Installation Troubleshooting Maintenance Instructions Installation / Start-up

TABLE OF CONTENTS FRAME FEATURES INTRODUCTION

U STAND INSTALLATION INSTRUCTIONS

12S 1st Stage. -Maintenance Procedure-

Disassembling and assembling APP and APP 16-22

Side-of-Pole Mount for 1 Module (SPM1) For Module Type C

Universal Anchoring Adapter For Mercedes

Velocity USER GUIDE CPU WATER BLOCK. 1st Revision, September 6th 2018

Final Assembly Instructions Bikes with 16 Wheel Size

Ladies Shopper Bike Assembly Manual 28C03

HermanMiller Aeron. New Aeron Disassembly for Recycling. Materials Identification and Segregation: Tools Required. Step 1

CO2 Tank Conversion Kit P.N , P.N , and P.N

VK/VP SERIES : Sealless Vertical Pump. Assembling Instructions 2010

APP pumps APP and APP Disassembling and assembling

IS37 10 Metre Instrument Mast Handbook

2019 MADONE ASSEMBLY MANUAL

Gerber Sabre 404 and 408 Installation Instructions

TECHNICAL DATA BROCHURE - ZTR 428 & 429

Armorer s Handgun Sight Tool

-- SGP (NOVA TEAM SQUARE)

HoldUp Plus2. Safety Kit included: See additional instructions for installation. REAR WHEEL TRAY. BASE (1x) lock WASHER (1x) KEY (2x) SAFETY CLIP (1x)

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

INSTRUCTION MANUAL. January 23, 2003, Revision 0

USER MANUAL

Parker Hannifin Corporation Porter Instrument Division 245 Township Line Road Hatfield, PA USA Tel: Ref Rev.

MAINTENANCE OF THE HAND-OPERATED SIMPLE PUMP

3 in 1 Robot Gripper Assembly Guide

INSTALLATION INSTRUCTIONS

830 SureFlo Soap Systems Installation Instructions. Foam Soap Cabinet... Pages 2-9 Liquid Soap Cabinet... Pages 10-19

DBML-60/80 Squeeze Tool

Parts: Included in the parts box: Inner Rear Tire Tray. Inner Front Tire Tray. Trail Doc Clamp. Pivot Assembly. Trail Doc Post.

PRO1030 Bi-Directional Assembly Replacement

BICYCLE ASSEMBLY INSTRUCTIONS. dutchcycles.com.au. Distribution Centre

KEEP IN MIND THAT YOU ARE THE KEY TO SAFETY

Velocity USER GUIDE CPU WATER BLOCK. 1st Revision, September 6th 2018

BELT DRIVE INDOOR CYCLING BIKE SF-B1712

Installation Instructions

INSTALLATION INSTRUCTIONS

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

INSTALLATION INSTRUCTIONS PUSH BAR PULLMAN PANIC BOLT DEVICE TO EN 1125 : 2008

SPINNER RIDE GETTING STARTED GUIDE. Welcome to a personalized fitness experience for your members

Read Before Operating!

Assembly Instructions And User Guide

Cleaning rod: spring steel, stainless steel or carbon fibre cleaning rod - only use a one-piece rod. Avoid using snakes.

Glove Box Installation Manual

O P E R ATING INSTRUCTIONS FOR MODEL SPR-45 Automatic Screen and Stencil Printer

MUELLER. A Wall Type. Indicator Post. Reliable Connections. General Information 2. Technical Data/ Dimensions 3. Installation 4-5.

Retrofitting Green SkiErg Handles

Transcription:

This procedure is to help facilitate the replacement of the 23 Paddle Bar Assembly on the ANKOM Dietary Fiber Analyzer. Note: The following items will be sent in a replacement package as part of the 23 Kit. New Paddle Bar Assembly 4 Shims (0.015) 5/32 Hex key wrench Loctite 2 Screws #8269 3/32 Hex key wrench 1 Shoulder Screw Depth gauge 1/8 Hex key wrench 1. Prepare the instrument for service. a. Power off the instrument. b. Remove the clear back panel of the instrument by removing the six acorn nuts using a 3/8 nut driver (provided with the original instrument purchase). 6 Acorn Nuts 2. Tilt the instrument forward (if necessary) for easy access to the back of the. a. Unscrew the two black Service Access screws on the upper right and left sides of the instrument (near the ends of Clamp Bar A). b. Remove the four front clamp bars and set them aside. c. Clear the area in front and immediately behind the instrument of any items that might be in the way. d. Tilt the instrument forward, careful to guide it down slowly to ensure no tubing gets caught or pinched in the machine. Service Access Screws Remove Clamps Tilt Forward ANKOM Technology 2052 O Neil Road Email: service@ankom.com Phone: 315-986-8090 Fax: 315-986-8091 pg. 1 of 9

3. Unplug the black 25 pin Cable Connector plug. Twist counter-clockwise from the underside of the Electrical Enclosure (right side from the front) and pull to release the plug. Twist & Pull 4. Unscrew the Shoulder Screw that connects the cable block to the mixer piston. Using the 1/8 Hex key wrench, unscrew the Shoulder Screw on the Paddle Bar Assembly sticking through the hole in the front of the instrument, connecting to the brass Rod End of the Mixer Piston. Set the Shoulder Screw aside for later use. Shoulder Screw 5. Unscrew the 4 screws holding the Paddle Bar Assembly onto the front of the instrument. a. Lift the instrument to its upright position. b. Use the 5/32 Hex key wrench to remove the screws. Be careful while doing this as the Paddle Bar Assembly will fall out when the last screw is removed. 5/32 Hex Key Wrench Hold Left side Paddle Bar Hinge Post ANKOM Technology 2052 O Neil Road Email: service@ankom.com Phone: 315-986-8090 Fax: 315-986-8091 pg. 2 of 9

6. Gently feed the black 25 pin Cable Connector plug through the hole in the front of the instrument, being careful not to get it caught on the tubing and air lines. Front view Cable Connector Hole Rear view Cable Connector inserted through hole 7. Set the faulty Paddle Bar Assembly aside for return to ANKOM. 8. Prepare the new replacement Paddle Bar Assembly. Remove the cable-tie from the Paddle Bar Hinge Post on the left side. Be careful as the hinge block will fall off the Hinge Pin if tilted. Cable-tie on Left side Hinge Post 9. Install the new Paddle Bar Assembly. Feed the black 25 pin Cable Connector through the hole in the front of the instrument. Cable Connector 10. Loosely install the four screws. Line up the two Paddle Bar Hinge Posts with the four screw holes to the right and left being sure to loosely install the four screws with the 5/32 Hex key wrench. 5/32 Hex Key Wrench ANKOM Technology 2052 O Neil Road Email: service@ankom.com Phone: 315-986-8090 Fax: 315-986-8091 pg. 3 of 9

11. Place the four shims in their appropriate positions. a. Set the four 0.015 Shim spacers (provided in the new Paddle Bar kit) underneath the #1, 2, 5 & 6 paddles and set on top of Clamp Bar B to properly distance the Paddle Bar Assembly from Clamp Bar B. When doing this, allow the paddles to rest on the shims while tilting the paddles back so that the bottom front corner of each paddle is the only part of the paddle that is touching the shims. In this position the face of the paddles will not be perfectly vertical but slightly tilted back at the bottom. b. With the paddles held in a tilted back position, tighten the four screws in the Paddle Bar Hinge Posts using the 5/32 Hex key wrench. c. Once the screws are tight, remove the four Shim spacers from beneath the paddles. Shim Spacers underneath Paddle 12. Plug the 25 pin Cable Connector into its socket in the underside of the Electrical Enclosure. a. Carefully tilt the instrument forward. b. Make sure the cable is not caught up in the tubing or air lines in the back of the instrument. c. When plugging the connector in, align the pins to the sockets within the connector and twist clock-wise until it stops turning. d. Check to make sure it cannot be pulled out (it should lock in place). Align Cable Connector Sockets 13. Finger-tighten the Shoulder Screw. This will connect the cable block (on the Paddle Bar Assembly sticking through the hole in the front of the instrument) to the brass Rod End of the Mixer Piston in order to secure the Paddle Bar while testing it in the following steps. Shoulder Screw ANKOM Technology 2052 O Neil Road Email: service@ankom.com Phone: 315-986-8090 Fax: 315-986-8091 pg. 4 of 9

14. Check the back stroke of the paddles. a. Return the instrument to the upright position. b. Using the depth gauge (provided in the new Paddle Bar kit) with the Paddle Bar Assembly in the back stroke position (this is its normal, at rest, position) rest the squared-off end of the depth gauge against the bottom edge of the #5 paddle. Depth Gauge c. Measure the distance from the bottom edge of this paddle to the face of the orange gasket on Clamp Bar B. This distance should be 10/32. If this distance is not correct contact ANKOM Technology for instructions on how to make an adjustment. 10/32 10/32 4/32 5/32 ANKOM Technology 2052 O Neil Road Email: service@ankom.com Phone: 315-986-8090 Fax: 315-986-8091 pg. 5 of 9

15. Check the forward stoke of the paddles. a. Rest the squared-off end of the depth gauge against the face of the orange gasket on Clamp Bar B just in front of paddle #5. Depth Gauge b. Using either paddle #1 or #6 in your opposite hand, rotate the paddles forward so that they extend to their forward position. Rotate Paddles Forward c. Looking straight down on paddle #5, measure the distance that the bottom edge of this paddle extends beyond the orange gasket. This distance should be 4/32-5/32. If this distance is not correct contact ANKOM Technology for instructions on how to make an adjustment. 4/32-5/32 10/32 4/32 5/32 ANKOM Technology 2052 O Neil Road Email: service@ankom.com Phone: 315-986-8090 Fax: 315-986-8091 pg. 6 of 9

16. Secure the Shoulder Screw in place. a. Tilt the instrument forward to access the back once again. b. Remove the Shoulder Screw installed finger-tight in the previous step. c. Apply a drop of Loctite 242 (provided in the new Paddle Bar kit) to the threads of this screw. Apply Loctite d. Re-install the screw (do Not to get the Loctite on the brass Rod End of the Mixer Piston) and tighten with the ⅛ Hex key wrench. 1/8 Hex key Wrench e. Return the instrument to its upright position. f. Reinstall the two Service Access screws. Service Access Screws ANKOM Technology 2052 O Neil Road Email: service@ankom.com Phone: 315-986-8090 Fax: 315-986-8091 pg. 7 of 9

17. Adjust the reported temperatures on the Touch Screen Display with a calibrated thermometer accurate to at least 0.2 C. a. Obtain a calibrated thermometer and place it in the immediate environment of the paddles. Thermometer b. Allow the temperature reading to equilibrate with the environment. c. Turn the instrument on. c-1. From the Select a Function screen, press Diagnostics c-2. Service Mode c-3. Temperature Sensor Corrections c-4. Enter temperature offsets into the fields for each station. For example, if the calibrated thermometer is showing a temperature of 23.2 C but the Uncorrected temperature value for station 1 is showing a temperature of 24.0 C, enter an offset of -0.8 C. If the Uncorrected temperature value for station 2 is showing a temperature of 23.0 C, enter an offset of 0.2 C. Whatever number is entered as the offset (whether positive or negative) will be added to the uncorrected value. c-5. Write down the offset numbers you put in for each Paddle Bar to later ensure they save to the instrument. c-6. Select Save to Permanent Memory and exit out of Diagnostics. d. Turn the instrument off and then on again to check to ensure the corrected value information saved properly. e. Follow the above screen display selections again and check to ensure the Temperature Sensor Corrections match those that you wrote down after adjusting. ANKOM Technology 2052 O Neil Road Email: service@ankom.com Phone: 315-986-8090 Fax: 315-986-8091 pg. 8 of 9

18. Reinstall the back panel. Replace the clear back panel of the instrument securing it with the six acorn nuts removed in the first step. With this completed you are now ready to return your instrument to service. Contact ANKOM Technology for instructions on returning the faulty Paddle Bar Assembly. ANKOM Technology 2052 O Neil Road Email: service@ankom.com Phone: 315-986-8090 Fax: 315-986-8091 pg. 9 of 9