RÉGION D OTTAWA-CARLETON

Similar documents
2. executing a legal agreement with respect to the above.

b. executing legal agreements with respect to the above.

COMMITTEE RECOMMENDATIONS. That Council approve:

Having held a public hearing, that Council approve:

2. Executing a legal agreement with respect to (1) above.

2. Executing a legal agreement with respect to the above.

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department

1. Provide a dedicated westbound approach bus lane at the intersection;

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE

2. KING EDWARD AVENUE AND ST. PATRICK STREET - SAFETY IMPROVEMENT

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

5. WOODROFFE AVENUE BUS-ONLY LANES BASELINE STATION TO FALLOWFIELD PARK & RIDE CONSULTANT APPOINTMENTS CONTRACTS NOS. ETL , 6001 AND 6002

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

Transportation Impacts: Toronto York Spadina Subway Extension

Classification Criteria

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

CastleGlenn Consultants Inc.

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

TRAFFIC IMPACT ANALYSIS

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

Design Criteria. Design Criteria

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

TRASBURG RANSPORTATION

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

5 Transit & Traffic. Overview

19 July 2016 OUR REF:

4. That the transit facility to be constructed at the corner of Fallowfield and Woodroffe be officially named the Fallowfield Transit Station ;

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

Marina Loft (DRC 51-R-12)

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited.

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

PROPOSED RESIDENTIAL SUBDIVISION

1223 Michael Street, Suite 100, Ottawa, Ontario, K1J 7T2 P: l F: l

TRAFFIC STUDY GUIDELINES Clarksville Street Department

Vehicular and Pedestrian Access to Herndon Metrorail Station. Robert B. Boxer, Director John Stuart, Clark Nexen October 28, 2015

Access Management Guidelines February 2013 THE CITY OF

7 June 2018 OUR REF:

REPORT. Engineering and Construction Department

TRAFFIC IMPACT STUDY CRITERIA

PennDOT Access Management Model Ordinances Training

Durrance Elementary School

RÉGION D OTTAWA-CARLETON

Transportation Impact Study for Abington Terrace

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

St. Stefan Serbian Orthodox Church 1989 and 1993 Prince of Wales Drive, Ottawa REVISED TRANSPORTATION BRIEF

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives

Lake Whitney Elementary School

Sixth Line Development - Transit Facilities Plan

TRAFFIC MANAGEMENT PLAN

Traffic Analysis Update: 195 Meandering Brook Drive Development

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

December TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER

Station 1: Street & Sidewalk Upgrades

Traffic Study North Shore School District 112

Proposed Residential Building Bank at Fifth (99 Fifth Avenue)

King Soopers #116 Thornton, Colorado

CPC Parking Lot Riverside Drive. Transportation Rationale

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

4. ISLAND PARK, KIRKWOOD AND CHURCHILL AREA TRANSPORTATION ASSESSMENT AND TRAFFIC CALMING PLAN COMMITTEE RECOMMENDATIONS AS AMENDED

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

Michael A. Werthmann, PE, PTOE Principal

Design of Stanley Park S-Curve

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

25 May 2018 OUR REF:

Public Works and Infrastructure Committee. General Manager, Transportation Services

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Harriet Fraser Traffic Engineering & Transportation Planning

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

TENW Transportation Engineering NorthWest

Blair/Williamson Intersection Expressed Needs

APPENDIX D COST SUMMARY TABLES

D.13 Transportation and Traffic

Construction Staging Area Vaughan Road

Services Department A September 18, 2006 Region of Durham Recommended Arterial Corridor All Wards Guidelines Study

Traffic Control Signals Cosburn Avenue and Todmorden Lane/ Private Access

Transcription:

8 REGION OF OTTAWA-CARLETON RÉGION D OTTAWA-CARLETON REPORT RAPPORT Our File/N/Réf. Your File/V/Réf. 50 23-00-R030-H DATE 14 July 2000 TO/DEST. FROM/EXP. SUBJECT/OBJET Co-ordinator Transportation Committee Director Mobility Services and Corporate Fleet Services Environment and Transportation Department MODIFICATIONS TO INNES ROAD AND BLAIR ROAD INTERSECTION TO ACCOMMODATE THE CONSTRUCTION OF THE INNES CENTRE DEPARTMENTAL RECOMMENDATIONS That the Transportation Committee recommend Council approve the modifications to the traffic control signals at the intersection of Innes Road at Stonehenge Crescent east and Innes Road at Blair Road and associated roadway modifications along Innes Road between Stonehenge Crescent west and Blair Road as illustrated in Annexes B and C, subject to the owner, Canril Corporation: 1. funding the total cost for the roadway modifications, the associated utility relocations and existing traffic control signal modifications; and, 2. executing a legal agreement with respect to the above. BACKGROUND Canril Corporation is in the process of developing an 8.1 hectare site located on the south side of Innes Road, bounded by Blair Road to the east and Stonehenge Crescent West on the west side, in the City of Gloucester. The site location is shown in Annex A. The development will consist of a variety of retail establishments with approximately 22,271 square metres of retail space. At build out the remainder of the site will primarily consist of laneways, aisles, landscaping and accommodate approximately 986 parking spaces

9 Innes Road is a four-lane divided roadway between Stonehenge Crescent West and Blair Road. The owner/developer is committed to construct an auxiliary third eastbound lane plus a bicycle lane from a location at Stonehenge Crescent West to Blair Road intersection. This additional lane forms part of the road works being undertaken by Canril Corporation as detailed in the functional plan in this report (Annex B and Annex C). The development proposal includes the construction of three accesses to the site: a) A right-in/right-out access onto Innes Road midway between Stonehenge Crescent west and Stonehenge Crescent east (Annex B); b) An access adjacent to Stonehenge Crescent east (Annex B); and, c) An access at Blair Road (Annex C). Modifications to the traffic control signals are required at the Stonehenge Crescent east and Blair Road due to the road widening and intersection modifications. EXISTING CONDITIONS Pedestrian There are existing sidewalks along both sides of Innes Road in the vicinity of the site. A concrete sidewalk exists adjacent to the site along the northern side of Innes Road. The pedestrian volumes during the afternoon peak hour shows that 10 pedestrians crossed the Innes Road/Blair Road intersection, and 11 pedestrians crossed at the Innes Road/ Stonehenge Crescent east intersection. Pedestrian activated traffic control signals exist at both intersections. Bicycles Innes Road is a designated route in the Cycling Transportation Network. Bicycle volumes during the afternoon peak hour show 11 bicycles passing through these intersections. Transit There are six OC Transpo bus routes operating on Innes Road and Blair. In addition, bus bays for east and westbound buses are currently located adjacent to the proposed development.

10 Automobiles Innes Road is a four-lane divided roadway with a posted speed limit of 80 km/h. Blair Road is a twolane roadway with a rural cross-section and a posted speed limit of 70 km/h. Both roads are under the jurisdiction of the Region. Existing 1999 traffic volumes for Innes Road between Blair Road and Stonehenge Crescent east for the weekday P.M. peak indicate approximately 1,052 and 2,390 vehicles travelled westbound and eastbound respectively. DESIGN PROPOSAL The modifications contained in the following paragraphs will outline the benefits for improved safety and traffic operations along this section of Innes Road. Annexes B and C illustrate the proposed modifications. Road Modifications 1. The construction of an additional eastbound lane and bicycle lane across the frontage of the site on Innes Road between the Innes Road/Blair Road intersection and Innes Road/ Stonehenge Crescent west intersection. 2. Provide a new westbound left-turn lane in the existing median of the Innes Road/ Stonehenge Crescent east intersection. Construct a full movement access opposite Stonehenge Crescent east at the Stonehenge Crescent east/innes Road intersection with one inbound and three outbound lanes. 3. The construction of a new right-in/right-out site access from Innes Road at the west side of the site. The radius of the corners of the new access have been designed to accommodate the turning movements of large tractor semi-trailers. 4. Provide an exclusive new southbound lane in the northern leg of the Innes Road/Blair Road intersection. Utilize the existing westbound left-turn and eastbound right-turn lanes. Construct a full movement access opposite Blair Road at the Blair Road/Innes Road intersection with one inbound and three outbound lanes. Pedestrians Pedestrians on the south side of Innes road will be able to cross the signalized intersections at Blair Road and at Stonehenge Crescent east. The proposed modifications to Innes Road will include the construction of a new sidewalk on the south side of Innes Road across the entire frontage of the site. Crossing distances for pedestrians crossing Innes Road at both the Blair Road/Innes Road and Stonehenge Crescent east intersections will be slightly longer due to the construction of the auxiliary lane and bicycle lane.

11 The site has been designed to provide the efficient movement of pedestrians from the site, to the municipal sidewalk system on Innes Road which provides access to the public transportation system. Bicycles The proposed roadway widening and modifications include the provision for a 2.0 m eastbound cycling lane on Innes Road across the frontage of the site Transit Transit operations on Innes Road will not be affected by the widening or the installation of traffic control signalization. OC Transpo will advise on the final location of bus stops along Innes Road and Blair Road in the vicinity of the site. Automobiles Analysis based on projections shows that with the proposed roadway modifications, Innes Road adjacent to the site and in the vicinity of the site will operate at an acceptable level of service and safety. CONFORMITY TO THE TRANSPORTATION MASTER PLAN The guiding principle from the Transportation Master Plan (TMP) is the provision of a modal hierarchy with the emphasis on walking, cycling and transit usage. This principle is reflected in the following design detail features. 1. The construction of a sidewalk across the frontage of the site on the south side of Innes Road conforms to 2.2.2, items 1 and 2 of the TMP. 2. The provision for on-road cycling facilities along the proposed widened portion of Innes Road adheres to the direction outlined in the TMP which designates this portion of Innes Road as part of the Cycling Transportation Network FINANCIAL COMMENT Should Regional Council approve the proposed roadway modifications to Innes Road to accommodate the proposed Canril Development, the developer/owner will be responsible for 100% of the cost of the sidewalk, bicycle lane, roadway widening and traffic control signal modification costs. A site plan agreement will not be signed until such time that Canril Corporation become the property owners.

12 Cost Estimates The following preliminary cost estimates are based on functional design details, and are provided solely for the information of the Transportation Committee and Regional Council. Item Cost Estimate Construction $248,000 Traffic Control Signals & Utility Relocations 230,000 Engineering 40,000 Contingencies 51,000 Total Estimated Cost Before GST $569,000 GST @ 7% 39,830 TOTAL ESTIMATED COST $608,830 CONSULTATION Notice of the proposed Innes Road modifications to accommodate the development of the commercial site has been placed in Le Droit, the Ottawa Citizen and the Ottawa Sun for four consecutive weeks. COMMENTS FROM THE REGIONAL CYCLING ADVISORY GROUP A draft of this report has been circulated to the Regional Cycling Advisory Group (RCAG) for comments. RCAG S comments will be available at the Public Hearing. Approved by Doug Brousseau PJ/gc Attach. ( 3 )

13

14

15