Bulwell Cycling Consultation

Similar documents
Nottingham Cycle City Frequently Asked Questions

Frome Street Bicycle Route

Chelmsford City Growth Package

National Cycle Network Funding Scheme 2012/2012 Application Form. Waterford City Council. Paul Cleary, Executive Engineer. 3.2km 289, ,000

Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

Comments on the Hailsham to Eastbourne Sustainable Transport Corridor

Nottingham, the great cycle city

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION

Community engagement guide May 2018

Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Ladygrove Link

Easton Safer Streets - Final Project Report BRISTOL

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Joint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations. February 2010

Strategy for Walking & Cycling Action Plan

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Devonport City Cycling Network Strategy

Maynooth Cycling Submission on North South Corridor

Dodder Greenway Emerging Preferred Route Consultation - October 2018

Welcome! Public Open House on UBC s Transportation Plan

Yorkhill & Kelvingrove Community Council Cycling Village Proposal. Yorkhill Kelvingrove Cycling Village (1.3)

City of Wells Cycle Network

Roads and public rights of way

Maynooth Cycling. Presentation to Maynooth Community Council 14 December 2015

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

a CYCLING ACTION PROGRESS MEETING

Tonight is for you. Learn everything you can. Share all your ideas.

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Winnipeg Walk Bike Projects Downtown Tire Talk - Summary

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Regional Cycle Programme Update

MARKHOUSE ROAD IMPROVEMENTS

DMURS - Practical Implications

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Truro cycle transport - mapping and suggestions By Transition Truro

CUERDEN TRANSPORT PROPOSALS

Introduction. Prince Street Cycling Ambition Fund Public Realm Project

Dún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

Dowling/Beaty Cycling Route

HISTON ROAD Have your say on better public transport, cycling and walking journeys

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

Broom Hill/Blackberry Hill Walking and Cycling Improvements

C.A.R.S. Project Design Report.

London Cycle Network Annual Report 2000

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

Duwamish Way-finding and CTR Report

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Part B Design Guidance / Principles _

PEDESTRIAN ACTION PLAN

Kingswood Primary School s Travel Plan

El Centro Mobility Hub

Improving Thetford Cycling Provision. In and Around Thetford

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

NCN 78 Benderloch to Ledaig Summary

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

NW Bicester Masterplan. Access and Travel Strategy Appendix 2 Walking and Cycling Linkages

2. Context. Existing framework. The context. The challenge. Transport Strategy

Delivering the. Strategy 7.0

TRANSPORT AND MOVEMENT

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

Signage and condition of road and pavements on both sides of Chesil Street

BYRES ROAD: PUBLIC REALM Public Consultation

Active Travel Strategy Dumfries and Galloway

GETTING WHERE WE WANT TO BE

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

Warfield Neighbourhood Plan: 4.4 Infrastructure

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road)

5 DECEMBER Cycling In London. Andrew Summers, Transport for London Strategy and Policy Manager Active Travel and Health.

1.1 This information note accompanies Transport for Greater Manchester s cycle map data released at:

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

CONNECTING PEOPLE TO PLACES

MILTON ROAD LLF PROJECT UPDATE

City of Perth Cycle Plan 2029

Toronto Complete Streets Guidelines

NCN 78 Dalnatrat to Duror Summary

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Chapter 5 Future Transportation

Your views are important. Please fill in a form before you leave. Or alternatively

A27 Worthing and Lancing: facilities for walking, cycling, and horse riding [nonmotorised

Living Streets response to the Draft London Plan

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Guildford Borough (Draft)

TRANSPORTATION NEEDS ASSESSMENT

CHAPTER 3: Vision Statement and Goals

Launceston's Transport Futures. Greater travel options for the people of Launceston

Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016

SCHEME DESIGN AND ENGINEERING

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT

Transcription:

Bulwell Cycling Consultation Image 1 Bulwell Bogs (Sutton, 2015) As part of a final year research project, I am seeking feedback on proposals for cycling improvements in Bulwell. This consultation is not a finalised exhaustive solution, so I appreciate any feedback or input into the project. The introduction of a strategic cycle route is part of Nottingham City Council s Local Transport Plan, which has allocated funding to create a set of strategic cycle corridors throughout the City of Nottingham. By providing a high-quality cycle route through Bulwell, it could benefit the local area by; reducing air pollution and congestion, boost cardiovascular health, improve problems caused by transport poverty and exclusion, and improve access to areas of cultural heritage and biodiversity. Your feedback is appreciated and the deadline is Monday 3 rd April 2017 however, any feedback shortly after this time is still welcomed. If you have any queries regarding the proposals, please contact me on the email address below. Kind regards, Lucy Nightingale Lucy.nightingale2013@my.ntu.ac.uk Student at Nottingham Trent University (Civil Engineering BSc) Sutton, J. (2015) Bulwell Bogs Park, geograph. [image] Available at: http://www.geograph.org.uk/photo/4484698 (Accessed: 17 March 2017).

Introduction The Current Cycling Network and Problems The existing cycle network is shown below (Fig.1), after an initial investigation the main problems identified were: Access is severed by the railway line. There are limited crossing points but they are either on road or a via a pedestrian bridge which has no ramps. There is not a safe alternative to National Cycle Route 6 which can be used at night. Cycling in the town centre is difficult due to lack of space for cyclists and high density of motorised traffic. There is a lack of secure cycle parking at transport hubs, such as at Bulwell Station, Bulwell Tram Stop, Bulwell Forest Tram Stop and the Bus Station. Poor signage and way finding on NCN6, the Broxtowe Trail and other local cycle routes. There are issues in some places with the existing cycle infrastructure such as narrow paths, poor surfacing, and segmented routes. Figure 1 - Existing cycle network in Bulwell (Nottingham Interactive Cycle Map, 2017) Nottingham Interactive Cycle Map (2017) NCiC. Available at: https://fourpointmapping.sustrans.org.uk/nottinghamcyclemap/nottingham.html (Accessed: 26 March 2017). 2

Introduction Aims and Proposals The aims are to develop cycling infrastructure to connect the River Leen Cycle Corridor through Bulwell, improve access to Bulwell Bogs and the River Leen, and create safe, accessible cycle infrastructure that enhances biodiversity. It is not intended to be a standalone route, but a resilient and continuous network of cycle routes that can be further supplemented and improved in the future. Figure 2 shows a cyclist, with a trailer bike carrying fishing equipment, heading toward the River Leen. It is anticipated that leisure cyclists, as well as commuter cyclists, will be encourage to cycle more, if safe direct routes are available. The proposed cycle route is highlighted below (Fig.3), showing the proposed route through Bulwell connecting to National Cycle Route 6 (NCN6), Bulwell Bogs and the River Leen. Other routes which could be developed alongside or in subsequent phases are also highlighted to create a continuous cycle network in Bulwell. This consultation is focused primarily on cycling proposals Figure 2 - Cyclist with trailer in Bulwell Bogs that were developed after an initial stakeholder survey and full appraisal of options. The outcome of the initial survey and appraisal of options is provided in the main research document (dissertation), as well as further detail on the outcomes of the survey for potential ecological improvements. Key: Main cycle route Other connections ` Figure 3 - Proposed changes to the cycle network (Nottingham Interactive Cycle Map, 2017) Nottingham Interactive Cycle Map (2017) NCiC. Available at: https://fourpointmapping.sustrans.org.uk/nottinghamcyclemap/nottingham.html (Accessed: 26 March 2017). 3

Section 2 Introduction Improvements by Area Figure 4 shows the proposals broken down into geographical locations. Each location can be viewed in further detail on the types of treatment proposed. Section 1 Pedestrian Footbridge on NCN6 Section 2 Bulwell Bogs and the River Leen Section 3 Main Street / Highbury Road Bridge Section 4 Jennison Street and Newcastle Street Section 5 Other routes and proposals Section 3 Section 1 Copyright 1995 2016 Esri. Figure 4 - Proposed cycle network sections 4

Section 1 Pedestrian Footbridge on NCN6 Copyright 1995 2016 Esri. Figure 5 - Pedestrian Bridge NCN6 The Proposal This is the current NCN6 route, and the proposal is to provide ramps for cyclists and pedestrians to cross the bridge allowing inclusive safe access for all, over the railway. Imagery 2017 Infoterra Ltd & Bluesky, Map data 2017 Google Figure 6 - Proposed ramps 5

Section 1 Figure 7 -The existing bridge, view up the steps Figure 8 The existing bridge, view down the steps Your comments on Section 1 Please provide any comments on this proposal in the space below. Click or tap here to enter text. 6

Section 2 Bulwell Bogs and the River Leen Copyright 1995 2016 Esri. Figure 9 - Section 2 proposed route The Proposal The proposal is to provide a spacious path with a good quality surface, signs and wayfinding, and lighting that is affable with the surroundings, to provide a safe alternative route for cyclists through Bulwell Bogs and along the River Leen. More details on the proposals are on the following pages. Figure 10 - The existing path next to the river 7

Section 2 Replace the steel tube fence at the back of Bulwell Riverside to a timber post and rail fence to be more in keeping with the green environment. Surface of existing path to be upgraded to a sealed surface, reducing the need for maintenance. It is recommended that a natural or buff coloured aggregate be used to sympathise with the natural environment. Existing path to be widened to 3m minimum to create a shared cycling and walking path. Track along the River Leen Imagery 2017 Infoterra Ltd & Bluesky, Map data 2017 Google NCN6 Surface of existing route to be upgraded to a self-binding material sympathetic to the environment to give pedestrians an alternative route from the shared cycle path. Install lighting along the path to improve safety. The lighting must be low energy LED and timed to turn off during the early hours of the morning. Provide directional signing for cyclists at either end of the route showing where NCN6 is, the Broxtowe Trail and Bulwell Town Centre. NCN6 Figure 11 - Section 2 track along the river toward Bulwell Bogs 8

Section 2 Bulwell Bogs Station Road is proposed to be turned into a shared space with ramps at each end to highlight the shared space. The entire area should be at the same level to encourage pedestrians and cyclists to utilise the space and calm traffic. Imagery 2017 Infoterra Ltd & Bluesky, Map data 2017 Google Install a flush access to provide a cycle drop off point onto Station Road. Sign the cycle route using the Broxtowe Trail and NCN6 branding at all junctions. Install LED lighting along the path. The lighting should be programmed to turn off through the early morning hours to save energy and regard the local wildlife. Sign the tram and station from both directions. Sign Bulwell Market Place and Town Centre. Widen the existing path to a minimum of 3m wide to improve the existing shared path for both pedestrians and cyclists. Figure 12 - Section 2 proposals at Bulwell Bogs 9

Section 2 Figure 13 - Station Road Your comments on Section 2 Please provide any comments on this proposal in the space below. Click or tap here to enter text. 10

Section 3 Main Street / Highbury Road Bridge Copyright 1995 2016 Esri. Figure 14 - Section 3 proposed route The proposal It is proposed that from Bulwell Bogs and the Tram Stop that off-road cycle facilities are created for cyclists so they can access the Town Centre and cross the Main Street/Highbury Road Bridge safely. Shared paths should be created at a minimum of 3m wide to allow space for cyclists and pedestrians to pass each other. More details on the proposals are on the following pages. 11

Section 3 Main Street / Highbury Road Bridge Existing crossing to be upgraded to a toucan crossing on a raised plateau. Width of crossing to be 4m minimum. Northern footpath to be widened to 3m minimum to create a shared cycle/footpath. The southern footpath to be reduced to a minimum of 1.5m wide where necessary to maximise space on the share cycle route. Existing blue brick wall alignment to be altered to widen footpath on the bend to meet 3m minimum width. Bricks to be retained/reused where possible. Crossing on Spring Road to be upgraded to a Toucan Crossing with a plateau over the entire junction. Eastern footpath widened to a minimum of 3m. Lane spacing in the road adjusted to reflect the altered kerbline. Parking bays and bus stop to be retained. Figure 15 - Section 3 detailed proposals Imagery 2017 Infoterra Ltd & Bluesky, Map data 2017 Google Signs to be installed indicating NCN6, the Town Centre and Broxtowe Trail and other cycle routes. 12

Section 3 Your comments on Section 3 Please provide any comments on this proposal in the space below. Click or tap here to enter text. 13

Section 4 Jennison Street and Newcastle Street Copyright 1995 2016 Esri. Figure 16 - Section 4 proposed route The proposal The proposals are to create a one-way system for vehicular traffic around Jennison Street, except at the entrance to Tesco and the petrol station to Main Street. Jennison Street will have a 2-lane contraflow cycle route allowing cyclists to navigate the town centre, avoiding the busy Main Street. More details on the proposals are on the following pages. 14

Section 4 Jennison Street and Newcastle Street The existing footpath through the petrol station is to be widened to 3m minimum to create a shared path. Imagery 2017 Infoterra Ltd & Bluesky, Map data 2017 Google NCN6 Barriers to be removed at the entrance to the tram stop and replaced with a bollard with appropriate retroreflective bands. The section of Jennison Street around the entrance to Tesco and the petrol station is to remain 2-way for cars. TESCO PETROL STATION Advanced stop lines are proposed on both sides of the level crossing on St Albans Road. TESCO Jennison Street and Spring Road to be turned into a oneway street to create space for a 2-way segregated cycle lane. NCN6 Newcastle Street is quiet enough for cyclists to be on the road. It is proposed that this be turned into a cycle friendly street. Appropriate signing to be installed indicating NCN 6 and other local cycle routes. NCN6 Figure 17 - Section 4 detailed proposals 15

Section 4 Your comments on Section 4 Please provide any comments on this proposal in the space below. Click or tap here to enter text. 16

Section 5 Other routes and proposals To encourage more people to leave their cars at home it is recommended that a resilient cycle network is created to give people a choice of cycle route. Key: Main cycle route Other connections ` Proposals Figure 18 - Existing and proposed cycle network (Nottingham Interactive Cycle Map, 2017) Coventry and Highbury Road are proposed to have on road mandatory cycle lanes to give cyclists an alternative option for cycling at night, rather than the rural section of NCN6. Crossings over Main Street should be installed at key locations so that cyclists can access the residential areas and the town centre safely. A route through the Minerva Street residential estate providing off-road routes to Bulwell Academy and St Mary s Primary School, utilising existing cut-throughs / stopping up. It is also important that secure cycle parking is provided at key transport hubs so that sustainable door to door journeys can be made easily. So, it is proposed that: Bulwell train and tram station has a secure city cycle parking hub installed. Bulwell Forest has a secure city cycle parking hub installed. Bulwell town centre has some standard cycle parking installed. Bulwell bus station has secure cycle parking installed. Nottingham Interactive Cycle Map (2017) NCiC. Available at: https://fourpointmapping.sustrans.org.uk/nottinghamcyclemap/nottingham.html (Accessed: 26 March 2017). 17

Section 5 Your comments on Section 5 Please provide any comments on this proposal in the space below. Click or tap here to enter text. 18