THE NACTO MANUALS AND DESIGNING FOR VISION ZERO ZAKI MUSTAFA SHIRLEY ZAMORA

Similar documents
MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

Vision Zero Task Force June 28, 2017 COUNTERMEASURE PAIRING

Freeway ramp intersection study

Road Diets FDOT Process

Rightsizing Streets: The Seattle Experience

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

GLOSSARY CROSSWALK. CROSSING TYPES

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

Transportation Planning Division

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Polk Streetscape Project

North Avenue Corridor Study

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

TORONTO VISION ZERO Improving Safety for Pedestrians and Cyclists Roger Browne, Manager Traffic Safety Unit October 11, 2018

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Intersection LOS Intersection level of service (LOS) is defined by the Highway Capacity Manual (HCM) by the following criteria:

Retrofitting Urban Arterials into Complete Streets

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

Welcome to the Quebec Alternatives Analysis Public Meeting

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

Broad Street Bicycle Boulevard Design Guidelines

Toolbox of Countermeasures and Their Potential Effectiveness to Make Intersections Safer

Vision Zero & ITE. April 11, Toole Design Group. Jason DeGray, P.E., PTOE. Vision Zero & ITE

Designing for Pedestrian Safety in Washington, DC

Glenn Avenue Corridor Traffic Operational Evaluation

INTERSECTION CRASH COUNTERMEASURES

Active Transportation Facility Glossary

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Station 1: Street & Sidewalk Upgrades

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

TRAFFIC SIGNAL WARRANT STUDY

What Is a Complete Street?

NY Route 5 Comprehensive Pedestrian Safety Study: A Corridor Perspective CDTC Planning Committee. January 7, 2015

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

The DC Pedestrian Master Plan

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

SIGNALIZED T-INTERSECTION SAFETY REVIEW

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Lincoln Avenue Road Diet Trial

Central Avenue Bikeway Traffic and Safety Impact Assessment

F L E T C H E R A V E N U E

Pedestrian & Bicycle Safety Innovations & Applications

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

APS Stratford Project Transportation Analysis Overview. Stratford BLPC #5 June 1, 2015

Average Delay/Vehicle (sec/veh) Signalized. Unsignalized Intersection

Simulation Analysis of Intersection Treatments for Cycle Tracks

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

TRANSPORTATION & MOBILITY VISIONING MEETING. August 23 24, 2017

Project Goals and Objectives

Transportation Planning Division

INDEX. Geometric Design Guide for Canadian Roads INDEX

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Highway Safety Improvement

Appendix Y. Guiding Traffic Control Principles for Intersection Operations

Welcome. If you have any questions or comments on the project, please contact:

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

Gateway Transportation Study

Presentation Outline. Project/Study Purpose. Existing Conditions. Future Conditions. Understanding the Streetside. Similar Walkable Environments

WELCOME Public Information Centre

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Tonight is for you. Learn everything you can. Share all your ideas.

BUDGET FOR RESEDA BOULEVARD, STREET RECONSTRUCTION / VISION ZERO PROGRAM, REPORT BACK, COUNCIL FILE

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

Draft MOBILITY ELEMENET. Community Meeting May 22, 2013

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

East 12 th Street Bikeway Feasibility Study

Harrah s Station Square Casino

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation

City of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program

UNCONTROLLED PEDESTRIAN CROSSING GUIDELINES

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Designing for Pedestrian Safety. Alabama Department of Transportation Pre-Construction Conference May 2016

Project Description Form 8EE

PEDESTRIAN SAFETY STUDY

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

Military Road Safety Improvements

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Appendix A: Crosswalk Policy

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

MEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

List of Exhibits...ii

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

Downtown Signals Traffic Analysis

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Transcription:

THE NACTO MANUALS AND DESIGNING FOR VISION ZERO ZAKI MUSTAFA SHIRLEY ZAMORA

NACTO Design Guides 2

City of Los Angeles Vision Zero 3

Vision Zero Roscoe Boulevard Corridor SHIRLEY ZAMORA TRANSPORTATION ENGINEERING ASSOCIATE

CORRIDOR CHARACTERISTICS 5 ROSCOE BOULEVARD BETWEEN THE 405 FREEWAY & WOODMAN AVENUE 2.3 miles Boulevard II Over 41,000 ADT 74-80 feet wide Existing: 2 through lanes in each direction + 1 peak hour lane in each direction + LT pockets/2wltl

COUNTERMEASURE CROSSWALKS 6 New continental crosswalk with limit line across minor street Upgrade all existing crosswalks New crosswalks on major street (specials)

ROSCOE BOULEVARD CORRIDOR CONTINUE LOWER LEFT CONTINUE LOWER LEFT CONTINUE LOWER LEFT St. Genevieve PVT School CONTINUE UPPER RIGHT CONTINUE UPPER RIGHT CONTINUE UPPER RIGHT

COUNTERMEASURE TRAFFIC SIGNAL MODIFICATIONS 8 Protected-only left turn and protected/permissive left turn phase o LT vs TH Protected-only right turn and protected/permissive right turn phase Leading pedestrian interval (LPI) Increase pedestrian clearance time Increase yellow/all-red time o Broadside

ROSCOE BOULEVARD CORRIDOR CONTINUE LOWER LEFT CONTINUE LOWER LEFT CONTINUE LOWER LEFT St. Genevieve PVT School CONTINUE UPPER RIGHT CONTINUE UPPER RIGHT CONTINUE UPPER RIGHT

COUNTERMEASURE REGULATORY SIGNS 10 Vehicle vs Pedestrian Crossing

COUNTERMEASURE REGULATORY SIGNS (continued) 11 LT vs TH (only during peak hours)

ROSCOE BOULEVARD CORRIDOR CONTINUE LOWER LEFT CONTINUE LOWER LEFT CONTINUE LOWER LEFT St. Genevieve PVT School CONTINUE UPPER RIGHT CONTINUE UPPER RIGHT CONTINUE UPPER RIGHT

COUNTERMEASURE Special 1: Crosswalk Consolidation and Traffic Signal Modifications 13 Location: o Roscoe Blvd and Noble Ave (Vista MS & Noble ES) EXISTING PROPOSED

COUNTERMEASURE 14 Special 1: Crosswalk Consolidation and Traffic Signal Modifications (continued) ENTRANCE ONLY Requires: N/B & S/B: PRT E/B & W/B: PPRT E/B & W/B: PLT

COUNTERMEASURE Special 2: Scramble Crosswalk 15 Location: o Roscoe Blvd & Van Nuys Blvd DOT exclusive pedestrian phase criteria satisfied Outcomes: o No Right Turn on Red signs in all directions o Reduction of right-turn vs pedestrian collisions o Increase vehicle delay/queuing and pedestrian waiting time

SIGNAL COUNTERMEASURE Special 3: Rumble Strips 16 Location: o Roscoe Blvd & Van Nuys Blvd Determining factor: o Collisions involving DUI Outcome: o Alert drivers

COUNTERMEASURE Special 4: Raised Crosswalk, Pedestrian Refuge Island and RRFB 17 Locations: o Roscoe Blvd at Wakefield Ave o Roscoe Blvd at Columbus Ave

COUNTERMEASURE Special 4: Raised Crosswalk, Pedestrian Refuge Island and RRFB (continued) 18 Determining factors: o Collision patterns o Distance bet. controls o Pedestrian activity o Available access routes o Critical speed Outcome: o Left-turn pockets will be removed/prohibit left-turns (preferred at T type intersections) o Pedestrian refuge area o Better pedestrian visibility o Reduced speeds o Lower traffic volumes o Reduction in exposure time

COUNTERMEASURE Special 4: Raised Crosswalk, Pedestrian Refuge Island and RRFB (continued) 19 Challenges with a raised crosswalk: o Ambulance and bus use Design should be less severe than a speed table o Drainage issues

Vision Zero Corridor Countermeasures ZAKI MUSTAFA

OTHER COUNTERMEASURES 21 Offset (Danish) Crosswalk Jogged intersections Better visibility Less parking removal Pedestrians will be able to look directly at on-coming traffic

OTHER COUNTERMEASURES 22 Two Stage Bike Box Neighborhood Enhanced Network or Tier 2 and 3 Bike Lanes No Right Turn on Red signs for the minor streets Bike box should not block major street curb lane through traffic

OTHER COUNTERMEASURES 23 Bike Wrong Way Sign Vehicle vs Bike (traveling wrong way) Temporary countermeasure S

OTHER COUNTERMEASURES 24 Pedestrian Only Signal Phase Pedestrian and vehicular volumes Proximity to schools Not intended to accommodate diagonal crossings Modified to specific times of day S

OTHER COUNTERMEASURES 25 In-Pavement Crosswalk Flashers 10 year old installation

OTHER COUNTERMEASURES 26 In-Pavement Crosswalk Flashers (continued) Recent installation

OTHER COUNTERMEASURES 27 Demand Based Scramble Crosswalk (Wild Idea)