RICHARDS STREET BIKE LANE

Similar documents
WELCOME! We want to hear from you! CAMBIE BRIDGE INTERIM IMPROVEMENTS KEY OBJECTIVES:

1 ALEXANDER STREET BIKEWAY

We want to hear from you!

Downtown Public Spaces

Standing Committee on Policy and Strategic Priorities. Potential Granville Bridge Connector Public Engagement

5 Implementation Ideas

Standing Committee on Planning, Transportation and Environment. Active Transportation Update and Pilot for Skateboarding in Protected Bike Lanes

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

We want to hear from you!

FOLSOM-HOWARD STREETSCAPE OVERVIEW

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Implementation Report # False Creek Bridges

Report Date: July 16, 2013 Contact: Jerry Dobrovolny Contact No.: RTS No.: VanRIMS No.: Meeting Date: July 23, 2013

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Viaducts, Eastern Core and False Creek Flats Cycling Improvements HUB Vancouver/UBC committee 2013/05/13

Major Bike Routes 102 Avenue Workshop April 21, 2015

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Welcome. If you have any questions or comments on the project, please contact:

122 Avenue: 107 Street to Fort Road

Tonight is for you. Learn everything you can. Share all your ideas.

Transportation Assessment

CITY OF VANCOUVER ADMINISTRATIVE REPORT

Pennsylvania Avenue (CR 484) Design Alternatives Study

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

City of Charlottesville Bicycle and Pedestrian Master Plan Update

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

Chair and Members of Transportation Standing Committee. Bruce Zvaniga, P.Eng., Director, Transportation and Public Works

Observations from an Emerging Bike Culture Chris & Melissa Bruntlett Tuesday, November 4 th, #AKLConversations

ECONOMY PEOPLE ENVIRONMENT

CHAPTER 1 INTRODUCTION

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

6.4 RECOMMENDED IMPROVEMENTS

RICHARDS STREET UPGRADES

PEDESTRIAN ACTION PLAN

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

South False Creek Seawall Park Upgrades & Tree Replacements

41st Avenue B-Line Kerrisdale Village Street Improvements

Richmond-Adelaide Cycle Tracks

Polk Streetscape Project

Executive Summary Route 30 Corridor Master Plan

Richmond-Adelaide Cycle Track Study Including Peter Street & Simcoe Street

TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Seaside Greenway Improvements

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Presented by RBC Royal Bank and TransLink

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Safer Cycling: How the City of Vancouver is Proactively Improving Cycling Safety

Item No Halifax Regional Council January 16, 2018 January 30, 2018

Community Task Force July 25, 2017

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

City of Novi Non-Motorized Master Plan 2011 Executive Summary

ABOUT THIS OPEN HOUSE

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

2. Context. Existing framework. The context. The challenge. Transport Strategy

Chapter 5 Future Transportation

TRANSPORTATION COMMISSION Agenda Staff Report

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Transportation & Land Use. Workshop: March 6, 2013

2013 Pedestrian Volume and Opinion Survey. City of Vancouver 1

Living Streets Policy

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Executive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

- 1 - TAC SUSTAINABLE URBAN TRANSPORTATION AWARD SUBMISSION - VANCOUVER TRANSPORTATION PLAN PROGRESS REPORT (MAY 2006) SUMMARY

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

Frome Street Bicycle Route

PEDESTRIAN ACTION PLAN

Broadway Complete Streets Project

42nd Ave N Reconstruction

Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

Proposed White Flint Separated Bike Lane Network September 2015

Cycle Track Design Best Practices Cycle Track Sections

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

PEDESTRIAN ACTION PLAN

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Bike Routes Assessment: 95 Ave, 106 St & 40 Ave. Replace with appropriate image in View > Master.

Southside Pilot Proposal

Lincoln Highway Streetscape Plan Concept Plan

Welcome! San Jose Avenue Open House August 25, 2015

ACTIVE TRANSPORTATION POLICY COUNCIL SPECIAL MEETING MINUTES JANUARY 10, 2018

Physical Implications of Complete Streets Policies

Working Group Meeting

This page intentionally left blank.

Public Event 1 Community Workshops

Bicycle Friendly Niagara Falls

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Welcome! Public Open House on UBC s Transportation Plan

Policy Context & Network Planning Principles UBC Bike Design Course, Vancouver Dale Bracewell, Manager, Active Transportation

City of Davis East Covell Corridor Plan

Bicycle Master Plan Goals, Strategies, and Policies

Transcription:

RICHARDS STREET BIKE LANE Welcome! The City of Vancouver is planning to upgrade and extend the Street protected bike lane to provide better cycling access in the downtown area, and a safer and more comfortable cycling route for people of all ages and abilities. The proposed upgrades will: Close major gaps in the existing bike network by providing a north-south connection to both Gastown and False Creek Improve cycling connections and create safer intersections for everybody through protected intersections Be delivered using phased approaches to minimize impacts How can you provide input: 1. Talk to City staff or the project team 2. Fill out a comment sheet here, or later online at vancouver.ca/downtown-bike-network. If you ve filled out a comment sheet today, please drop it off at the sign-in table or mail it back to us (address on the form) 3. Write us at: downtownbikenetwork@vancouver.ca 4. Join our email list by signing in at the front table 5. Call us on 3-1-1

1. INTRODUCTION Why Street? Street is an important north-south route through downtown, making direct connections to popular destinations like False Creek and Gastown. also supports a bustling mix of street-oriented land uses, such as shops and civic facilities to the south and east, and more dense commercial activities to the north and west. To improve safe and accessible travel options along for all road users and trip purposes, there is a need to improve cycling conditions to ensure they are safe, comfortable and linked with major destinations. What opportunities are there for walking and cycling on Street? Redevelopment along the southern section of has provided wider sidewalks with two rows of trees. Although the northern section has narrower sidewalks and fewer trees, the wider roadway provides more potential for landscaping along the protected bike lane. The City has heard concerns about conflicts at driveways, intersections, bus stops, and alongside parking, as well as a lack of connectivity in the all ages and abilities cycling network. To address these concerns, City staff have reviewed and assessed potential opportunities for that seek to minimize conflicts between street users by avoiding higher conflict areas, introducing physical separation, adding protected intersections for people cycling to connect various east-west routes, and including more trees for an improved streetscape. Where are we now? 2016 2018 2019 2019 2019-2020 Downtown Bike Network Expansion Consultation on Revised Designs Refinement and Reporting Final Report Anticipated implementation Stakeholder meetings and a Public Open House Stakeholder meetings and a Public Open House to gather feedback, understand issues, and minimize impacts Design refinements based on public and stakeholder feedback Staff report final details to stakeholders

2. BACKGROUND What is the history of St? 1999 2002 Homer Corridor identified in the Bicycle Plan update identified in the Downtown Transportation Plan 2005 2006 Southbound painted bike lane on approved by Council, along with current Homer bike lane Southbound painted bike lane installed on along with current Homer bike lane 2012 2013 2016 Transportation 2040 adopted by Council, which identified on the five year AAA cycling priority map for upgrades Southbound painted bike lane is converted to parking-protected between Robson and Drake as part of repaving coordination Extending the bike lane on north to Cordova was considered as part of the 2016 Downtown Bike Network Expansion Public Bike Share Launch How does this fit within the larger cycling network? Bute St N Burnaby St Comox St Thurlow St Burrard St Robson St Haro St Barclay St Helmcken St Hornby St Howe St Granville St Seymour St Smithe St Nelson St Georgia St St Homer St Hamilton St Cambie St Beatty St Robson St Note: In the current bike network connects to the Cambie Bridge via Nelson and Smithe, and to the Adanac bikeway via Dunsmuir In the future, additional east-west connections to the West End, Strathcona, and the Burrard and Granville bridges are expected. Pacific St Drake St Davie St Mainland St ** Detailed alignment and timing subject to change. The aspiration for new routes and route upgrades is All Ages & Abilities (AAA). However, this may not always be achievable in the near term. Upgrades can range from a series of small spot improvements to more significant changes. Some projects fall on land outside City jurisdiction (e.g. Port, Park Board) and are subject to outside approval. Bike Routes Existing Route False Creek Existing Protected Route Cambie Bridge Downtown Bike Network Expansion ** New or Planned Upgrade Future Routes or upgrades in 5-Year Cycling Network Future Access Improvement

3. EXISTING SCENARIO The existing Robson - Drake protected bike lane was completed in 2013 as an interim design. Since its installation, the City has heard concerns around narrow widths, conflicts with people accessing on-street parking, lack of physical separation, no equivalent northbound cycling connection, and conflicts with motor vehicles on the west side of Street. Tow Fals e Cre ek Tow Conflicts with turning drivers Conflicts with parking and doors Conflicts at parkades & driveways Conflicts with transit vehicles Missing connections to AAA cycling network Gast own Need for northbound bike lane What did we hear? Greatly support expansion on St, but would rather see bike lane on east side of street due to high number of vehicle related facilities and parkade entrance/ exits on west side. Please make this a bi-directional separated bike lane. Many people use this route to commute for work. Right now there is no northbound crossing between hastings. Can the bike lane be extended to the Seawall? Want physical separation and protected intersections to avoid conflicts with passengers and vehicles. Looking forward to improvement as biking uphill next to cars can be difficult - hopes it can be upgraded to a concrete separation between bike lanes and parked cars. I m concerned about safety and risk of doorings Where will the new bikeshare docks be located? Vehicles parked curbside and drift into bike lane while waiting to make a right turn on the existing section between Robson and Drake!

4. EVALUATION How do we evaluate the street? Along with feedback from 2016, staff examined conflicts and challenges on both sides of Street. In most cases, a bidirectional protected bike lane along the east side of Street minimizes conflict while providing improved cycling connections. A protected bike lane on the west side would require bus boarding islands and the costly relocation of trolley wires north of Robson. Protected bike lanes on both sides of Street would be narrow with more significant impacts to motor vehicle parking and movement. West Side East Side Total intersection turning conflicts 10 (all except Nelson) 9 (all except Smithe and Dunsmuir ) 3-5 (Pacific, Davie, Dunsmuir, Intersections requiring turn phases Helmcken, Drake) 2 (Georgia, Nelson ) Total driveway conflicts 12 3 Total alley conflicts 3 (entry and exit) 3 (exit only) Bus stops 4 (Cordova, Hastings, Dunsmuir, Pender ) 0 Connecting protected bike lanes Bicycle turns to other streets Difficult protected intersections required at Dunsmuir, Smithe, and Nelson Similar to Hornby / Dunsmuir Better at Dunsmuir and Smithe Not required at Nelson Conflicts with left turning traffic require unique designs Note: Detailed parking analysis was not conducted, but due to the increased number of driveways and busier turns on the west side, would likely require removing more parking. Safety Dooring, in which motor vehicle drivers and occupants open doors into people cycling contrary to the BC Motor Vehicle Act, is the single most common cycling collision type according to the City-commissioned Cycling Safety Study. Doorings and other collisions with drivers parking on-street make up 40% of collisions* on and Homer between people cycling and driving, as compared to 15% city-wide. The section of that was converted to a protected bike lane in 2013 has lead to uncomfortable interactions with people parking, given its narrow width and painted separation. However, where bike lanes are unprotected, falls into traffic can lead to serious or even fatal injury. The recommended design aims to provide more space for both protected cycling and accessing parked vehicles. *Collision data from ICBC (2007-2017). The City of Vancouver does not attribute to ICBC any results, information or data derived from the use, interpretation or analysis of the collision data.

5. NETWORK PLANNING Bicycle Travel Patterns Currently, Street is busiest between Smithe and Nelson, at up to 500 trips/day midweek during summer. Limited data is available for Homer, suggesting approximately 200/day. With a lack of physical separation from motor vehicles and limited connections to the AAA cycling network, these volumes are below many downtown streets. We expect the following changes to significantly increase bicycle ridership on : Add physical protection from moving and parked motor vehicles Extend protected bike lane north of Robson and south of Drake Provide a continuous northbound protected bike lane, ending at Georgia Improved connections to existing protected bike lanes (Dunsmuir, Smithe, Nelson, Cambie Bridge) Future onward connections to Granville Bridge and the West End Future connections on the City s five year cycling priority map expect to significantly increase ridership on For example, bike lanes are being explored to create better connections along Drake and the Granville Bridge, Arbutus Greenway and Central Broadway. 5-Year Cycling Network: Additions & Upgrades 2018-2022 A B C D E F G H I J K L M N O Smithe Nelson Cambie Bridge Highbury Cypress 5th Ave Ontario Adanac BC Parkway 10th Ave Cambie Georgia 1st Ave Kent Planned Upgrade Some projects fall on land outside City jurisdiction (e.g. Port, Park Board) and are subject to outside approval. AAA Network Not shown: minor additions and improvements through redevelopment and road work. 1 Protected M Local Street Bikeway Painted 6 2 Shared Use Lane 5 19 9 A 17 H B 8 D 3 21 C E N 12 F 13 15 J 14 14 23 20 18 G 22 I 16 10 L 11 Water /Cordova Smithe /Nelson (West of ) Smithe /Nelson Protected s (East of Ricahrds ) Dunsmuir Protected * Park Board jurisdiction ** Port Authority jurisdiction Number/Letter sequence does not imply priority 3000 7 K 4 2500 2000 O 1500 1000 Helmcken Drake Davie Hastings Georgia Quebec Cambie Stainsbury Planned Upgrades Upgrades can range from a series of small spot improvements to more significant changes. Planned Route Robson 21 22 23 The aspiration for new routes and route upgrades is All Ages & Abilities (AAA). However, this may not always be achievable in the near term. Pacific Pender 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Planned Routes Park Lane* Bute Drake Smithe Nelson West Waterfront Road** Water-Alexander-Powell Granville Bridge Gore Hudson Kent Commercial Blanca 14th Ave George Rainway Duchess-Wales* Helmcken King Edward Pandora-Semlin Prince Edward Detailed alignment and timing subject to change. 500 200 Daily Bicycle Volumes on Connecting Streets Note: All volumes typical summer midweek daily bicycle volumes from automated counters or estimate from best manual count(s) available in the vicinity of St

6. POLICY BACKGROUND Transportation 2040 Transportation 2040 is a long-term strategic vision for the city that helps guide transportation and land use decisions and public investments. The plan sets long-term targets and includes policies and actions to help us reach them. Target: Make two-thirds of trips on foot, bike or transit by 2040 Achieve zero traffic-related fatalities Cycling Vision: Policies: Make cycling safe, convenient, comfortable and fun for people of all ages and abilities C1.1: Build cycling routes that feel comfortable for people of all ages and abilities C1.2: Upgrade and expand the cycling network to efficiently connect people to destinations M1.2: Consider impacts to transit, commercial vehicles, and general traffic flow prior to reallocating road space G2.2: Provide for efficient loading and unloading Related Policies Greenest City Action Plan - Green Transportation Healthy City Strategy - Getting Around, Active Living & Getting Outside Renewable City Strategy AAA Transportation Design Guidelines Designing for All Ages and Abilities on Major Streets Less Comfortable More Comfortable Shared Use Lane Buffered Protected (Parking / Boll) Protected (Concrete / Landscaping) The City s goal is to create cycling infrastructure that is safe and comfortable for people of all ages and abilities (AAA). In order to coordinate this network expansion with repaving and other projects, we are considering improvements along the AAA spectrum that will increase capacity, safety and comfort along these routes.

7. PROJECT OVERVIEW Retain sufficient road space for current motor vehicle volumes. Avoid conflicts with existing transit services and special-event detours Where possible, add a row of trees and a raised cycling route to provide an improved streetscape. Conceptual Tow Fals e Cre ek Tow Relocate existing Mobi bike share stations to integrate with the design and install two new Mobi stations along to plan for future demand on the network. Improved Streetscape Two way protected bike lane on East side Protected intersections for cycling to connect various east-west cycling routes and to reduce conflicts with vehicles. Protected Intersections Install a protected two-way bike lane on the east side of Curb-side Uses Gast own Retain most parking spaces and other curbside uses while physically separating them from the bike lane. Parking Integration with Public Bike Share Project Goals Upgrade Street for all ages and abilities cycling in both directions Improve safety by addressing doorings and conflicts with turning drivers Provide a seawall-quality experience with an additional row of trees and a raised, two-way cycling path Design for current and future cycling connections to build AAA network Retain most parking and curb-side uses while physically separating these uses from the bike lane. Retain sufficient road space for current motor vehicle volumes. Avoid conflicts with existing transit services and special-event detours

NEXT STEPS Next Steps Staff will refine the concepts based on feedback from local businesses, residents, other stakeholders, and the public Staff will work with individual businesses who have identified concerns along Street Improvements are targeted for completion by the end of 2020 How can you provide input: 1. Talk to City staff or the project team 2. Fill out a comment sheet here, or later online at vancouver.ca/downtown-bike-network. If you ve filled out a comment sheet today, please drop it off at the sign-in table or mail it back to us (address on the form) 3. Write us at: downtownbikenetwork@vancouver.ca 4. Join our email list by signing in at the front table 5. Call us on 3-1-1