Public Works and Infrastructure Committee. General Manager, Transportation Services

Similar documents
Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Evaluation and Changes to Pedestrian Priority Phase Signal (Scramble Crossing) at Bay Street and Bloor Street

Richmond Adelaide Cycle Track Planning and Design Study Pilot Project

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

Cycling Facilities on Woodbine Avenue and Corley Avenue

Public Works and Infrastructure Committee. General Manager, Transportation Services. P:\2016\Cluster B\TRA\TIM\pw16009tim.docx

Bloor Street Design Feasibility Study and Bike Lane Pilot Project. Public Works and Infrastructure Committee

Appendix A. Road Classification Review of Outstanding Issues and Proposed Classifications (All Wards) Staff Report Road Classification System

Construction Staging Area Vaughan Road

Traffic Control Signals Review 4325 McCowan Road

Transportation Impacts: Toronto York Spadina Subway Extension

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

TORONTO VISION ZERO Improving Safety for Pedestrians and Cyclists Roger Browne, Manager Traffic Safety Unit October 11, 2018

2. Executing a legal agreement with respect to (1) above.

Cycling Network Plan Implementation in Thorncliffe Park and Flemingdon Park

Toronto Police Services Board: Request for Increased Police Enforcement of Parking Regulations on Bicycle Lanes in Toronto

Welcome. If you have any questions or comments on the project, please contact:

As the Toronto Transit Commission (TTC) operates a transit service on Avenue Road, City Council approval of this report is required.

Confirmation of Levels of Service for Winter Maintenance of Bikeways, Windrow Opening, Sidewalks and AODA Compliance

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Traffic Control Signals - Cosburn Avenue and Cedarvale Avenue

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

Lawrence Avenue West Speed Limit Amendment

1. Provide a dedicated westbound approach bus lane at the intersection;

WELCOME Public Information Centre

Dowling/Beaty Cycling Route

City of Kingston Report to Council Report Number

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 21, 2017

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

2. KING EDWARD AVENUE AND ST. PATRICK STREET - SAFETY IMPROVEMENT

Traffic Calming Rosemount Avenue, between Ralph Street and Queenslea Avenue

Traffic Calming St. Clarens Avenue between Brandon Avenue and Davenport Road

Traffic Control Signals Cosburn Avenue and Todmorden Lane/ Private Access

Speed Limit Amendment Albion Road and Islington Avenue

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Recommendations. Central Salem Mobility Study

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Public Information Centre

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

CITY OF VANCOUVER ADMINISTRATIVE REPORT

Bicycle Transportation Budget Plan: Lawrence, KS

THE CORPORATION OF THE DISTRICT OF CENTRAL SAANICH. COMMITTEES - 7:00 PM Monday, April 27, 2015 Council Chambers AGENDA

Pedestrian Crossing Guidelines 2016

Pedestrian Crossing Protection Review - Howard Street

Edenbrook Hill Drive Traffic Calming Study

Welcome! San Jose Avenue Open House August 25, 2015

a) receiving of legal advice subject to solicitor client privilege and labour relations regarding contract negotiations

Regional Bicycle System Master Study. Preliminary Results Update

COMMITTEE RECOMMENDATIONS. That Council approve:

Two-Year Extension for Stationary Food Trucks (R55 Curb Lane Vending Permits)

Bicycle Master Plan Goals, Strategies, and Policies

Richmond-Adelaide Cycle Tracks

Installation of Traffic Signals and Pedestrian Crossings

Transportation Assessment

Chair and Members of Transportation Standing Committee. Bruce Zvaniga, P.Eng., Director, Transportation and Public Works

Welcome and Purpose of Meeting

CITY OF LOMITA CITY COUNCIL REPORT

CITY CLERK. (City Council on October 2, 3 and 4, 2001, adopted this Clause, without amendment.)

Having held a public hearing, that Council approve:

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

7 th Street Bike Lane Traffic Impact Study

Classification Criteria

Recommended Improvements - Ruby/Banning Neighbourhood Greenway

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

Item No Halifax Regional Council January 16, 2018 January 30, 2018

2.0 LANE WIDTHS GUIDELINE

Cycle Track Design Best Practices Cycle Track Sections

Richmond Street and Adelaide Street Cycle Tracks

Clackamas County Comprehensive Plan

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

122 Avenue: 107 Street to Fort Road

Lower Jarvis Street Pedestrian Promenade Plan, Front Street East to Queens Quay East

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

City of Saline. Complete Streets Ordinance

2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Downey Road. Transportation Improvement Study

Proposed Trial of Lane Reduction on Highway 19A (McMillan Corfield) City of Parksville Town Hall Meeting

Appendix A Guiding Principles for Cycling Safety in Work Zones

Options for Permitting Street or Intersection Murals on Local Streets. Public Works and Infrastructure Committee

WELCOME! To the Centennial Neighbourhoods Secondary Plan and Transportation Management Plan Information Centre. City of Hamilton

Long-term Urban Road Restrictions During Special Events. Kevin Phillips, P.Eng., AVS, Manager, Municipal Transportation, URS Canada Inc.

Traffic Congestion Management and Traffic Signal Coordination

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Station Plan: Penn & 43rd Avenue

Active Transportation Infrastructure Investment A Business Case

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Transcription:

STAFF REPORT ACTION REQUIRED Extending the Bay Street Bicycle Lanes Date: May 16, 2013 To: From: Public Works and Infrastructure Committee General Manager, Transportation Services Wards: Toronto Centre Rosedale, Ward 27 Reference Number: P:\2013\ClusterB\TRA\TIM\pw13007tim SUMMARY The reconstruction of Bay Street, from Bloor Street West to Davenport Road provides an opportunity to close a gap in the Bikeway Network on Bay Street. The existing bicycle lanes on Bay Street are being extended south from Cumberland Street to a point 30 metres south of Bloor Street West to provide a continuous, connected bikeway on Bay Street. City Council, at its meeting of February 20 and 21, 2013, adopted as amended the staff report, titled "Road Alteration Bay Street, Between Davenport Road and Bloor Street West" (TE21.58), authorising the road alterations necessary for the reconstruction of Bay Street, between Bloor Street West and Davenport Road as part of the 2013 Capital Works Program. The purpose of this report is to obtain Council approval to implement bicycle lanes on Bay Street from Cumberland Street to a point 30 metres south of Bloor Street West. RECOMMENDATIONS The General Manager, Transportation Services recommends that: 1. City Council approve the installation of bicycle lanes on both sides of Bay Street from a point 30 metres south of Bloor Street West to Cumberland Street; 2. City Council approve the prohibition of northbound and southbound left turns at all times at the intersection of Bay Street onto Bloor Street West to accommodate the new bicycle lanes on Bay Street; and 3. City Council authorize and direct appropriate City officials to take necessary action to give effect to Recommendation 1 and 2, including the introduction of all necessary Bills. Staff Report for Action Extending the Bay Street Bicycle Lanes 1

Financial Impact There are no financial impacts resulting from the adoption of this report. Funds to implement the bicycle lanes are contained in the Transportation Services 2013 Approved Capital Budget in Cycling Infrastructure Account CTP813-05. The Deputy City Manager and Chief Financial Officer has reviewed this report and agree with the financial impact information. DECISION HISTORY City Council, at its meeting of February 20 and 21, 2013, adopted as amended the staff report, titled "Road Alteration Bay Street, Between Davenport Road and Bloor Street West" (TE21.58), authorising road alterations necessary for the reconstruction or Bay Street, between Bloor Street West and Davenport Road as part of the 2013 Capital Works Program. While that report identified that extending the Bay Street bicycles lanes south to Bloor Street West was feasible it did not contain recommendations to implement the bicycle lanes because the designation of bicycle lanes is a matter delegated to the Public Works and Infrastructure Committee. ISSUE BACKGROUND The Davenport Road bicycle lanes extend from Old Weston Road to Bay Street and continue south on Bay Street to Cumberland Street. Transportation services will be implementing sharrows and bicycle lanes on Bay Street south of Bloor Street in 2013. This leaves a one-block gap between Cumberland Street and Bloor Street West. The reconstruction of Bay Street, from Bloor Street West to Davenport Road provides an opportunity to close this gap in the Bikeway Network. COMMENTS Bay Street, between Bloor Street West and Davenport Road, is a major arterial roadway. From Cumberland Street to Davenport Road, a curb-side bicycle lane and two general purpose traffic lanes are provided in each direction. South of Cumberland Street through the signalized intersection of Bay Street and Bloor Street West, two traffic lanes are provided in each direction, with the curb lanes designated as an "urban clearway," reserved for the use of transit vehicles, taxis and bicycles. In addition, northbound and southbound exclusive left turn lanes are provided at the intersection of Bay Street and Bloor Street West, which also operates with a pedestrian priority (scramble) phase. Through the design and consultation process for the Bay Street reconstruction project, Transportation staff worked with the Ward Councillor and the community to develop and evaluate potential improvements for all users of Bay Street. The proposed improvements along the corridor, including several cycling related enhancements, were presented to the general public, at an open house on Monday November 5, 2012. One of the key cycling improvements which received support from the community is closing the gap in the Staff Report for Action Extending the Bay Street Bicycle Lanes 2

Bikeway Network by extending the existing bicycle lanes south from Cumberland Street to Bloor Street West. Implementing bicycle lane bicycle lanes on Bay Street, between Cumberland Street to Bloor Street West, requires the removal of the existing northbound and southbound left turn lanes at the intersection of Bay Street and Bloor Street West. In addition, northbound and southbound left turns should be prohibited at all times to facilitate traffic flow. As noted in the Road Alterations report approved by City Council in February 2013, removing the left turn lanes and prohibiting the left turns "is feasible, given that the north-south left turns are relatively low, approximately 30 to 50 vehicles per hour, and that north-south left turns can be accommodated at alternate locations." Specifically, northbound left turns are permitted at Charles Street West and Yorkville Avenue and southbound left turns are permitted at Yorkville Avenue, Cumberland Street and Charles Street West. Counts of cyclists undertaken in August and September 2012 indicate that approximately 150 cyclists travel north-south and 250 cyclists travel east-west through the Bay Street - Bloor Street West intersection in each of the morning and afternoon peak hours. The removal of the northbound and southbound left turn movement from the Bay Street and Bloor Street West intersection will result in the removal of the northbound left turn advance phase form the traffic signal timing plan, which will allow additional green time to be reallocated to other movements, and result in some reduction of overall traffic delay through the intersection for other motorists and transit vehicles. CONTACTS Lukasz Pawlowski Senior Engineer Cycling Infrastructure & Programs Transportation Services Division Tel: 416-338-6583 Email: lpawlow@toronto.ca SIGNATURE Stephen M. Buckley General Manager Transportation Services Division ATTACHMENTS Appendix 1 Bay Street Context Map Appendix 2 Bay Street Bicycle Lanes: Cumberland St. to a Point 30 Metres South of Bloor St. West Staff Report for Action Extending the Bay Street Bicycle Lanes 3

Appendix 1 Bay Street Context Map: Staff Report for Action Extending the Bay Street Bicycle Lanes 4

Appendix 2 Bay Street Bicycle Lanes: Cumberland St. to a Point 30 metres south of Bloor St. West Staff Report for Action Extending the Bay Street Bicycle Lanes 5