Terwillegar Drive Expressway Draft Concept Plan

Similar documents
Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Tonight is for you. Learn everything you can. Share all your ideas.

122 Avenue: 107 Street to Fort Road

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

TRANSPORTATION NEEDS ASSESSMENT

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Major Bike Routes 102 Avenue Workshop April 21, 2015

Route 29 Solutions Projects

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

3.0 PROJECT DESCRIPTION

STONY PLAIN ROAD STREETSCAPE

CHIEF PEGUIS TRAIL EXTENSION WEST

Downey Road. Transportation Improvement Study

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Giles Run Connector Road

MARK MESSIER TRAIL LONG-RANGE PLANNING STUDY WELCOME. Mark Messier Trail Planning Study 137 Avenue to Anthony Henday Drive.

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Route 7 Corridor Study

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Transportation Planning Division

Public Event 1 Community Workshops

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Dowling/Beaty Cycling Route

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January 2015).

Bike Routes Assessment: 95 Ave, 106 St & 40 Ave. Replace with appropriate image in View > Master.

DUNBOW ROAD FUNCTIONAL PLANNING

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

CLOSED. Highlights of the Final Concept Design:

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

SANTA MONICA BOULEVARD CORRIDOR

WELCOME Public Information Centre

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

CITY OF VANCOUVER ADMINISTRATIVE REPORT

Classification Criteria

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

INNOVATIVE INTERSECTION DESIGN

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event

Welcome to the McKenzie Interchange Project Open House!

Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road

Governance and Priorities Committee Report For the July 2, 2015 Meeting

McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form

Clackamas County Comprehensive Plan

Transportation Assessment

Highway 56 Traffic Study Rymal Road to Cemetery Road

McKenzie Interchange Project Spring 2016 Comment Period. Appendix 1: Display Boards and Feedback Form

Southcote Road Improvements Class Environmental Assessment Study

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

NORTH TURNAROUND. Recommended Design: Expand the existing transit terminal

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Welcome. If you have any questions or comments on the project, please contact:

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Public Information Centre

1. Provide a dedicated westbound approach bus lane at the intersection;

PROJECT FACT SHEET March 21, 2018

Pennsylvania Avenue (CR 484) Design Alternatives Study

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

Copenhagen Cycling Map. Red Lines Cycling facilities

5 Transit & Traffic. Overview

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

COMMUNITY MEETING AGENDA

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

PROJECT FACT SHEET May 25, 2018

Enclosure 1. Crimson Drive Traffic Safety and Calming Review Report

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Transportation Corridor Studies: Summary of Recommendations

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

Glebe Neighbourhood Cycling Plan

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Sixth Line Development - Transit Facilities Plan

Project Description Form 8EE

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

Figure 1: East West Connector Alignment Alternatives Concept Drawing

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Foothill Expressway Improvements Between El Monte and San Antonio

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

Sacramento Grid 2.0. The Downtown Transportation Study

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

Draft North Industrial Area-Wide Traffic Plan

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

INDEX. Geometric Design Guide for Canadian Roads INDEX

Transcription:

Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m.

Let s Talk Today you can: Learn about the new direction for Terwillegar Drive View and ask questions about the draft concept plan Provide feedback on proposed plans for transit, pedestrians and cyclists, and landscape naturalization of the corridor

Project Overview Study Purpose: Need: To validate and update the plan for the future of Terwillegar Drive from Anthony Henday Drive to Whitemud Drive Terwillegar Drive is an important roadway for the movement of goods and services, transit and commuters. It is an important connector to 170 Street (Terwillegar Drive south extension) south of Anthony Henday Drive, which is planned to be a freeway to Leduc. Corridor is congested during peak hours. Goals: Alleviate congestion Provide for efficient, safe movement of all users, locally and regionally

Project Timeline Fall 2017 Study start Where we are today strategy concept design build operate February 27, 2018 Motion from City Council resulting in development of additional options. October 2, 2018 Presentation to Urban Planning Committee of both freeway and expressway options. Direction to advance expressway. December 2018 Budget decision for funding Terwillegar Drive Stage 1 Late Spring 2019 Phase 3 Public Information Sessions - report back and share recommended concept plan. November 2017 - Spring 2018 - January - 2019/2020 February 2018 Public Engagement Draft Freeway Options Fall 2018 Further development of the freeway plan and introduction of expressway. November - December 2018 Phase 2 Public Engagement - report back on study progress and gather feedback on draft expressway plan. May 2019 Develop recommended concept plan. Engineering design (if funding is approved) 2021/2022 Start construction (if funding is approved)

How We Got Here Following February 27, 2018 Council Motion: Potential updates to freeway assessed to meet Council direction and address public feedback Challenges with freeway Expressway considered as alternate solution High level analysis conducted Removes south access at Haddow Drive Transit stops only possible at service roads or ramps Parallel shared-use path not possible Significant height/visual impacts of bridges to provide all access for 40 Avenue/Bulyea Road Land acquisition potentially required Better meets Council direction and public feedback Lower cost and fewer construction stages for similar operations October 2, 2018 - Urban Planning Committee Motion to advance expressway

Phase 1 Engagement What We Heard What We Did Alleviate congestion quickly Advance expressway plan, with shorter implementation timeline than a freeway Stage 1 includes widening the full length of the corridor to 8 lanes. Stage 1 includes widening the intersections. City is assessing Adaptive Traffic Signal Controls to improve traffic flow. Stage 2 includes widening ramps on the Terwillegar Drive/ Whitemud Drive interchange, and Rainbow Valley Bridge. Maintain all current neighbourhood accesses All neighbourhood accesses have been maintained Minimize traffic diversion through area neighbourhoods Improving traffic flow on Terwillegar Drive will minimize shortcutting traffic through adjacent neighbourhoods Include options for transit users, pedestrians and cyclists Allowed for dedicated transit lane in each direction, and bus stops along the corridor. Transit service is being assessed. Provided shared-use path along east side of corridor and connections across all intersections Address safety, noise and aesthetic issues Reduced congestion helps to reduce frequency of collisions Assessed noise levels. Projected noise levels do not exceed City s noise policy Considering planting additional trees on the corridor

Definitions Freeway A high-capacity, high-speed, free-flowing roadway without signalized intersections. Speed limit: 80 km/h Conditions unsuitable for transit, pedestrian and cycle paths on corridor Local Example: Whitemud Drive Expressway A high-capacity roadway, with a slightly lower speed than a freeway, and widely spaced signalized intersections. Speed Limit: 70 km/h Potentially allows for Adaptive Traffic Signal Controls Conditions suitable for transit, pedestrian and cycle paths on corridor Local Examples: Manning Drive, Gateway Boulevard/Calgary Trail 100 Avenue/Stony Plain Road (Anthony Henday Drive to 170 Street)

Expressway and Freeway Comparison Themes Expressway Freeway Cost (+/- 50%) 2030 Travel Times in peak periods Note: Do-nothing is 12-12.5 minutes in peak periods Construction $300 million Stage 1: $100 million $1.2 billion Stages 1, 4, 5, 6: $370 Million 8-8.5 minutes 9-9.5 minutes 3 stages 10 years to construct based on current funding model. Widening between Anthony Henday Drive and Whitemud Drive completed in Stage 1 (first four years) *Full freeway not constructed by 2030 8 stages 30 years to construct based on current funding model Access Maintains all current neighbourhood access Removes south access at Haddow Drive Potentially removes north access at 40 Avenue Traffic Diversions Transit Opportunities Active Transportation Improves traffic flow on Terwillegar Drive which will minimize shortcutting traffic through adjacent neighbourhoods Potential for dedicated transit lanes and bus stops along Terwillegar Drive Shared-use path along Terwillegar Drive and connections across intersections Traffic potentially diverted through neighbourhood roads Potential for bus on shoulder with stops on service roads Pedestrian access on crossing roads Aesthetics Similar to existing configuration High bridge (3 level) structure at 40 Avenue/Bulyea Road - at height of second storey windows Land Acquisition No land required Land required potentially to accommodate some interchanges

Expressway (new direction for Terwillegar Drive) Current access is maintained at Haddow Drive Shared-use path and/ or sidewalk connections across intersections Current access is maintained at 40 Avenue/Bulyea Road Shared-use path on east side Potential for dedicated transit lanes on Terwillegar Drive Potential for bus stops on Terwillegar Drive Freeway (No longer being considered) Potential land acquisition to build Haddow Interchange Shared-use path connections across interchanges Transit on shoulders Transit stops on interchange ramps Haddow Drive: South access removed High bridge structure to provide access to 40 Avenue/Bulyea Road

Draft Expressway Concept Plan Motorist Widening of roadway and intersections Four lanes in each direction Additional turning lanes at all intersections Pedestrian/Cyclist Shared-use path along east side of corridor Shared-use path connections across all intersections Adaptive Traffic Signal Controls ( Smart Signals ) that may further improve operations (under consideration) 142 Street pedestrian/cyclist bridge Transit Widening of Whitemud Drive/ Terwillegar Drive interchange ramps and Rainbow Valley Bridge Westbound to southbound ramp: widen to two lanes Northbound to eastbound ramp: widen to two lanes Allows for potential future dedicated transit lanes (one in each direction) Allows for bus stops along the corridor Landscaping Continue landscape naturalization Considering additional localized tree planting

Traffic Analysis Watch the Video to See Expressway traffic flow operations were assessed using a traffic modelling tool with projected traffic volumes in 2030 Morning peak Congestion reduced on northbound Terwillegar Drive in the morning Evening peak Forecasted volumes are based on projected growth in southwest Edmonton Currently up to 40,000 vehicles per day Up to 75,000 vehicles per day in 2030 Congestion reduced on Terwillegar Drive southbound in the evening Congestion reduced on Whitemud Drive westbound to Terwillegar Drive southbound (interchange loop ramp)

Expressway Proposed Project Staging Stage 2 Capital Budget 2023-2026 Expressway between Anthony Henday Drive and Whitemud Drive Whitemud Drive Interchange improvements and Rainbow Valley Bridge widening $100 million $140 million Stage 3 Capital Budget 2027-2030 Anthony Henday Drive Interchange Subject to additional planning and approvals by the Province $60 million Concept Level Costs are +/- 50% Each stage requires City Council funding approval Stage 1 Capital Budget 2019-2022

Shared-Use Path The draft plan includes a shared-use path on the east side of Terwillegar Drive and connections across the intersections and to adjacent intersections. Aligns with the City s Bicycle Transportation Plan The City is assessing options for the route between 40 Avenue and the 142 Street pedestrian bridge Let s Talk What could be improved about the location of the proposed shared-use path? For the connection between 40 Avenue and 142 Street, would you prefer: A) a direct route (a shared-use path along Terwillegar Drive and Whitemud Drive) OR B) a route through the neighbourhood via a mix of shared-use paths and on-street bike lanes? What access points are important to you along this connection? Leave your comments on sticky notes on the shared-use path plan on the table or in the survey.

Transit The draft plan allows for dedicated transit lanes and bus stops The City s bus network is changing through the Bus Network Redesign project. New bus routes will be implemented in 2020, prior to upgrades to Terwillegar Drive Transit service on Terwillegar Drive once Stage 1 of the expressway is constructed is currently under review by Edmonton Transit Service (ETS) and as part of the City Plan Let s Talk Share your thoughts on the potential dedicated transit lanes and stop locations along Terwillegar Drive. Leave your comments on sticky notes on the expressway draft concept plan or in the survey.

Landscape Naturalization The landscaping on Terwillegar Drive is currently becoming naturalized and proposed to remain this way Naturalization is an ecologically- based approach to landscaping Maintained land is transformed to a more natural state, including trees, shrubs and wildflowers The City is considering planting more tree pockets to accelerate naturalization, as part of this Let s Talk Where along Terwillegar Drive is there an opportunity to plant pockets of trees. Leave your comments on sticky notes on the landscape plan on the table or in the survey. project and future initiatives

142 Street Pedestrian/Cyclist Bridge A pedestrian/cyclist bridge is proposed as part of Stage 2 over Whitemud Drive between Bulyea Heights and Brookside at 142 Street Different bridge styles are currently being explored Let s Talk Which bridge styles would you like to have and why? Leave your comments on sticky notes on the shared-use plan on the table or in the survey. Bridge Option A: Cable-Stayed Bridge Bridge Option B: Girder Bridge Single Span Bridge Option C: Tied Arch Bridge Bridge Option D: Pony Truss Bridge Bridge Option E: Girder Bridge Multi Span Location: Deerfoot Trail near 32 Avenue N., Calgary Bridge details: High visual impact Mid to high cost (relative to other options) High tower height - proportional to bridge length Location: Sanderling Drive and Country Hills Boulevard, Calgary Bridge details: Low visual impact Mid to high cost (relative to other options) Low height with optional safety cage on top Location: Shaganappi Trail, Calgary Bridge details: High visual impact Mid cost (relative to other options) Medium height - proportional to bridge length Location: Stoney Trail, Calgary Bridge Details: High visual impact Mid to high cost (relative to other options) Medium height - height of trusses increases with bridge length Location: Terwillegar Drive, Edmonton Bridge Details: Low visual impact Low cost (relative to other options) Low height with optional safety cage on top

Noise Current Noise Levels Noise Levels with Expressway Assessment A noise assessment determined that future traffic noise levels as a result of the expressway 40 Avenue Whitemud Drive are expected to be below or at 65 dba. Noise fences or walls are only considered when noise levels exceed 65 Rabbit Hill Road dba in private residential backyards (City s noise policy C506A). Haddow Drive 23 Avenue > 40 dba 40-45 dba 45-50 dba 50-55 dba 55-60 dba 60-65 dba 65-70 dba 70-75 dba 75-80 dba 80-85 dba > 85 dba

Understanding Noise Noise is measured using the Decibel (db) Scale The Decibel Scale is a base-10 logarithm scale (similar to Richter Scale) Double the traffic volume does not result in double the noise 2 times traffic volume results in only 3 dba* increase, which is barely noticeable 10 times traffic volume results in a 10 dba increase, perceived as approximately twice as loud

Next Steps Oct Dec 2018 Draft expressway plan public engagement Dec 2018 City Council decision on funding Stage 1 Late Spring 2019 Develop recommended expressway plan Late Spring 2019 Share recommended expressway plan with you 2019/20 Design if funding approved 2021/22 Begin construction of Stage 1 if funding approved

Thank You Complete our survey today or online until December 21, 2018 Leave comments on table maps