CITY OF ATLANTA 2017 ANNUAL BICYCLE REPORT

Similar documents
City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Perryville TOD and Greenway Plan

CONNECTING PEOPLE TO PLACES

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Bicycle Master Plan Goals, Strategies, and Policies

EXECUTIVE SUMMARY. Vision

Complete Streets. Designing Streets for Everyone. Sarnia

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Living Streets Policy

Broad Street Bicycle Boulevard Design Guidelines

City of Wilsonville 5 th Street to Kinsman Road Extension Project

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Chapter 5. Complete Streets and Walkable Communities.

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Complete Streets Chicago: Data Driven Design. Luann Hamilton Deputy Commissioner

Off-road Trails. Guidance

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

AMATS Complete Streets Policy

Solana Beach Comprehensive Active Transportation Strategy (CATS)

SPEED MANAGEMENT FOR VISION ZERO

CHAPTER 1 INTRODUCTION

Transportation Assessment

FINAL PLAN APPENDIX D CITY OF BERKELEY BIKE PLAN D-1

PEDESTRIAN ACTION PLAN

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Tonight is for you. Learn everything you can. Share all your ideas.

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Non-Motorized Transportation 7-1

Welcome. If you have any questions or comments on the project, please contact:

Complete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Basalt Creek Transportation Refinement Plan Recommendations

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

We believe the following comments and suggestions can help the department meet those goals.

Complete Streets Training. Georgia Municipal Association June 27, 2016

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Welcome! San Jose Avenue Open House August 25, 2015

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

CURBSIDE ACTIVITY DESIGN

Bicycle Friendly Niagara Falls

Arlington s Master Transportation Plan

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

ACTIVE TRANSPORTATION

Bicycle Facilities Planning

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities.

Active Transportation Facility Glossary

San Jose Transportation Policy

2014 Bellingham Bicycle Master Plan

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Community Transportation Plan Acknowledgements

Transportation Master Plan Advisory Task Force

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

City of Seattle Edward B. Murray, Mayor

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

Cycle Track Design Best Practices Cycle Track Sections

Bicycle and Pedestrian Plans and Improvements

Hennepin County Bicycle and Pedestrian Planning

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Who is Toole Design Group?

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Edgewood Kirkwood Grant Park Glenwood Park Cabbagetown East Lake Oakhurst Reynoldstown East Atlanta

Safe Routes to School Action Plan Aberdeen, Idaho

Zlatko Krstulich, P.Eng. City of O9awa

Environment and Public Works Committee Presentation

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Complete Streets Successes, Opportunities, and Challenges

CITY OF GRAND JUNCTION URBAN TRAILS COMMITTEE 2017 ANNUAL REPORT

Multimodal Through Corridors and Placemaking Corridors

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

MTP BICYCLE ELEMENT UPDATE. November 2017

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Transportation Planning Division

City Snapshot September 27, 2018

Shifting Gears for a Healthier City

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Land Use Bicycle Spaces Required Type Residential

4 Goals, Objectives & Actions

BUILDING THE CASE FOR TRAVEL OPTIONS IN WASHING TON COUNTY. Image: Steve Morgan. Image: Steve Morgan

Duwamish Way-finding and CTR Report

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

2.0 LANE WIDTHS GUIDELINE

COMPLETE STREETS POLICY Exhibit A to Ordinance

Mayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017

Physical Implications of Complete Streets Policies

FOLSOM-HOWARD STREETSCAPE OVERVIEW

Making Phoenix Streets Complete. City of Phoenix Complete Streets Initiative

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Small Town & Rural Multimodal Networks

Major Bike Routes 102 Avenue Workshop April 21, 2015

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

Bobbie Walthall. Hi Bobby, please include these comments in tonight s CC packet. Thanks for your consideration, Phil Collison Lawrence Resident

Transcription:

CITY OF ATLANTA 2017 ANNUAL BICYCLE REPORT Mayor, City of Atlanta Keisha Lance Bottoms

ATLANTA CITY COUNCIL Keisha Lance Bottoms, Mayor, City of Atlanta COUNCIL PRESIDENT Council Member Felicia A. Moore DISTRICT 1 Council Member Carla Smith DISTRICT 2 Council Member Amir R. Farokhi DISTRICT 3 Council Member Ivory Lee Young Jr. DISTRICT 4 Council Member Cleta Winslow DISTRICT 5 Council Member Natalyn Archibong DISTRICT 6 Council Member Jennifer N. Ide DISTRICT 7 Council Member Howard Shook DISTRICT 8 Council Member J. P. Matzigkeit DISTRICT 9 Council Member Dustin Hillis DISTRICT 10 Council Member Andrea L. Boone DISTRICT 11 Council Member Marci Collier Overstreet DISTRICT 12 Council Member Joyce M. Sheperd POST 1 AT-LARGE Council Member Michael Julian Bond POST 2 AT-LARGE Council Member Matt Westmoreland POST 3 AT-LARGE Council Member Andre Dickens 2 CITY OF ATLANTA

TABLE OF CONTENTS 4 6 10 12 14 16 18 INTRODUCTIONS 2017 KEY BICYCLE PROJECTS TYPES OF ATLANTA BIKEWAYS CITYWIDE BICYCLE DATA RELAY BIKE SHARE FUTURE BICYCLE PLANNING ACKNOWLEDGMENTS 2017 ANNUAL BICYCLE REPORT 3

INTRODUCTIONS As the 60th Mayor of Atlanta, it is my great pleasure to present the City of Atlanta 2017 Bicycle Report. In March 2015, residents approved the $250 million Renew Atlanta Bond Program which authorized improvements, upgrades, and repairs to infrastructure and transportation throughout Atlanta. Atlanta is always evolving, and we must continue to enhance the quality of life for our residents by creating new ways to revitalize our neighborhoods, reduce traffic and provide for healthy lifestyles. With the ever-growing number of people embracing cycling as a means to navigate our City, building miles of new bicycle lanes and providing safer infrastructure for bike riders preserves our reputation as a city that embraces and realizes modern urban trends. In 2016, CycleHop and Georgia s Own Credit Union partnered to launch Relay Bike Share, which has expanded from 100 to 500 Relay bikes and connects 15 neighborhoods. Through the Bike Share Champions Program, 16 residents have been committed to engaging and educating their neighbors about the benefits of bike share and the influence it can have within their communities. By providing citywide bikeways and promoting programs that enhance our mobility strategies, we stand to lower daily transportation costs and encourage healthy lifestyle for residents and visitors. Under my Administration, we plan to utilize our TSPLOST funding to double Relay Bike Share to make bikes available to more communities, especially those who require access to affordable transportation options. Plans to reconstruct near term road repairs, improvements to new trails, additional protected bike lanes and traffic calming solutions will be reviewed throughout this report. It is vital that we focus on our bike infrastructure and connecting it to our MARTA stations, schools and commercial areas. Incorporating quality bicycle transportation and infrastructure offers more options for our residents and visitors to navigate our beautiful city and perhaps to see it in a new and different way. Keisha Lance Bottoms Mayor City of Atlanta 4 CITY OF ATLANTA

The current and forecast growth of Atlanta presents an exciting opportunity. This growth has inspired a planning sensibility that includes an intentional shaping of the City to reflect our shared values, acquire new opportunities and achieve our goals. The Atlanta City Design is the guiding principle that creates a vision of how we as a City should grow, addressing our most challenging problems and important projects in a manner that results in a better city. Within the framework of City Design, we can truly visualize all that Atlanta is capable of fulfilling; with the involvement of all who call this City home. Rethinking our system for moving around the city to promote physical access, health and prosperity in our communities is an unwavering necessity. Additionally, City Design highlights our need to prioritize people in the design of Atlanta s physical form. Bicycling infrastructure, bike share and ridership hold great significance to ensuring a multi-modal future. The Atlanta Transportation Plan was created to operationalize the Access strategies of City Design. This annual Bicycle Report will highlight our residents enthusiasm about the optimization of Atlanta as a bicycle friendly city, and ensure that we are held accountable in pursuing and achieving the goals set forth by the Department of City Planning. Tim Keane Commissioner Department of City Planning 2017 ANNUAL BICYCLE REPORT 5

2017 KEY BICYCLE PROJECTS In 2017, the City of Atlanta implemented just over 10 miles of high-quality bikeways. In the past 5 years, the City s infrastructure focus has turned toward bikeways that are comfortable and connected for people of all ages and abilities. On the following pages, four 2017 bikeway projects are highlighted that reshaped Atlanta s roadways for the better. Ralph David Abernathy Boulevard Resurfacing Project MAJOR PARTNER In the summer of 2017, the Georgia Department of Transportation (GDOT) resurfaced Ralph David Abernathy between Cascade Road and Martin Luther King Boulevard due to the poor condition of the asphalt. Seizing the opportunity that resurfacing provides, the City of Atlanta Department of City Planning worked with the Westview Community Organization and the Business Association to design a vibrant walkable, bikeable street. With support from the community, GDOT converted the four-lane high speed street to a two-lane street with buffered bike lanes and on-street parking. The addition of bike lanes provides a safe way to bike to the Atlanta BeltLine Westside Trail, Kroger Citi-Center, Kipp Strive, the Westview commercial node and the West Lake MARTA Station. BEFORE AFTER: DECEMBER 2017 6 CITY OF ATLANTA

Atlanta BeltLine Westside Trail MAJOR PARTNER In September 2017, the three-mile Atlanta BeltLine Westside Trail opened, completing a highly anticipated link in the overall BeltLine system. This segment of the multi-use trail connects several historic Southwest Atlanta neighborhoods to transit, parks, and schools while providing a safe bicycle and pedestrian corridor. The Westside Trail connects over 40 acres of greenspace and contains an urban agriculture farm at the trail s southern end. BEFORE: JUNE 2014 AFTER: AUGUST 2017 GRAND OPENING Images courtesy Atlanta BeltLine 2017 ANNUAL BICYCLE REPORT 7

2017 KEY BICYCLE PROJECTS PATH Parkway MAJOR PARTNERS The PATH Foundation, City of Atlanta, and Georgia Tech partnered to repurpose two southbound lanes of Tech Parkway into a tree-lined protected bikeway, walkway, and landscaped median. The one and a half mile bikeway connects West Midtown, Georgia Tech, the Coca-Cola Company headquarters, and Centennial Olympic Park in Downtown Atlanta. PATH Parkway was named America s Best New Bikeway of 2017 by PeopleForBikes for its visionary design and connections to major activity hubs within the City. CONSTRUCTION AFTER: DECEMBER 2017 AFTER RIBBON CUTTING 8 CITY OF ATLANTA

Bicycle Art Programs MAJOR PARTNER The Mayor s Office of Cultural Affairs and Department of City Planning collaborated to implement the Mural Bike Rack Project. The goal is to bring greater attention to biking and bike infrastructure through public art and creative placemaking. The project provided 18 local artists with the opportunity to design and paint locally crafted racks. The 18 sculptural bike-shaped racks are installed at various neighborhood nodes. Also working with artists in the Little Five Points community, DCP wrapped three Relay bike share bikes with local art for all riders to enjoy. MURAL BIKE RACK ARTIST & INSTALLATIONS RELAY MURAL UNVEILING EVENT AND BIKE RIDE 2017 ANNUAL BICYCLE REPORT 9

TYPES OF ATLANTA BIKEWAYS As a general rule, the level of comfort for people biking is a balance between traffic volumes, speeds, and physical separation from vehicular traffic. On streets with lower traffic volumes and speeds, people can feel safe sharing travel lanes with vehicles. For these streets, shared lane markings can suffice to improve the level of comfort for cyclists. However, along streets with higher traffic volumes and speeds, a dedicated and protected space for people cycling helps improve safety and the perception of safety for interested cyclists. The diagram below, created by Alta Planning and Design, provides a graphic summary of the continuum of on-street marked bikeway facilities. In Atlanta, there is a full range of installed bikeways to create a balanced bikeway network that can accommodate a wider range of rider types. On-Street Marked Bikeway Continuum least protected most protected SHARED LANE MARKINGS BIKE LANE BUFFERED BIKE LANE Centerline of pavement marking placed at least 4 from curb CYCLE TRACK: At-grade, protected with parking CYCLE TRACK: Raised and curb separated CYCLE TRACK: At-grade, protected with flexible bollards P CYCLE TRACK: Raised and protected Complete curb separation or optional mountable curb P P Travel Lane 4 Min. SideWalk Positions bicyclists in the travel lane Alerts motorists to the presence of bicyclists Encourages bicyclists to ride an appropriate distance away from the door zone on streets with parking Should never be used as a replacement for bicycle lanes Travel Lane 5-7 SideWalk Exclusive bicycle travel lane increases safety and promotes proper riding Reduces possibility that motorists will stray into bicyclists path Visual reminder of bicyclists right to the road 6 width recommended. 5 width in constrained locations Bike lanes wider than 7 may encourage vehicle loading in bike lane Travel Lane 2-6 5-7 SideWalk Provides cushion of space to mitigate friction with motor vehicles on streets with frequent or fast motor vehicle traffic Allows bicyclists to pass one another or avoid obstacles without encroaching into the travel lane Increases motorist shy distance from bicyclists in the bike lane Requires additional roadway space and maintenance Reduces risk of dooring compared to a bike lane Parking Lane 3-6 5-7 SideWalk Dedicates and protects space for bicyclists and improves perceived comfort and safety Reduces risk of dooring compared to a bike lane, and eliminates of the risk of a doored cyclist being run over by a motor vehicle Low implementation cost through use of existing pavement using parking lane as a barrier Use along roadways with high motor vehicle volumes and/or speeds Best on streets with parking lanes with a high occupancy rate Travel Lane 3-6 5-10 SideWalk Provides similar benefits as a cycle track with an on-street parking buffer Best used on roads with high speeds and long distances between intersections and driveways Innovative bicycle-friendly design needed at intersections to reduce conflicts between turning motorists and bicyclists Travel Lane 6.5-10 SideWalk Change in level clearly demarcates space for different users and reduces conflicts between bicyclists and pedestrians Where bicyclists may enter or leave the cycle track, or where motorists cross at a driveway, the curb should be mountable with a small 45 degree ramp, allowing cyclist turning movements Travel Lane 3-6 6.5-10 SideWalk Cycle track should be two or three inches above street-level, and the sidewalk should be an additional two to three inches above cycle track Maintenance of the cycle track requires specialized sweepers Where opportunities exist, the buffer zone may be expanded to include bicycle parking Width should never be taken from the pedestrian zone to make room for a cycle track *Protected bicycle lanes and cycletracks are terms that are used interchangeably. 10 CITY OF ATLANTA

CHOOSING ATLANTA S BIKEWAYS The chart below, created by the National Association of City Transportation Officials (NACTO), provides guidance in choosing a bikeway design that can create an all ages and abilities bicycling environment, based on a street s basic design and motor vehicle traffic conditions such as vehicle speed and volume. This chart should be applied as part of a flexible, results oriented design process on each street, alongside robust analysis of local bicycling conditions. Protected bicycle lanes and cycletracks are terms that are used interchangeably. Target Motor Vehicle Speed * Any Contextual Guidance for Selecting All Ages & Abilities Bikeways Target Max. Motor Vehicle Volume (ADT) Roadway Context Motor Vehicle Lanes Any Key Operational Considerations Any of the following: high curbside activity, frequent buses, motor vehicle congestion, or turning conflicts All Ages & Abilities Bicycle Facility Protected Bicycle Lane < 10 mph Less relevant Pedestrians share the roadway No centerline, or single lane 20 mph 1,000 2,000 one-way < 50 motor vehicles per hour in 500 1,500 the peak direction at peak hour Shared Street Bicycle Boulevard 25 mph 1,500 3,000 3,000 6,000 Greater than 6,000 Any Single lane each direction, or single lane one-way Multiple lanes per direction Low curbside activity, or low congestion pressure Conventional or Buffered Bicycle Lane, or Protected Bicycle Lane Buffered or Protected Bicycle Lane Protected Bicycle Lane Greater than 26 mph 6,000 Single lane each direction Multiple lanes per direction Low curbside activity, or low congestion pressure Protected Bicycle Lane, or Reduce Speed Protected Bicycle Lane, or Reduce to Single Lane & Reduce Speed Greater than 6,000 Any Any Protected Bicycle Lane, or Bicycle Path High-speed limited access roadways, natural corridors, or geographic edge conditions with limited conflicts Any High pedestrian volume Low pedestrian volume Bike Path with Separate Walkway or Protected Bicycle Lane Shared-Use Path or Protected Bicycle Lane * While posted or 85th percentile motor vehicle speed are commonly used design speed targets, 95th percentile speed captures high-end speeding, which causes greater stress to bicyclists and more frequent passing events. Setting target speed based on this threshold results in a higher level of bicycling comfort for the full range of riders. Setting 25 mph as a motor vehicle speed threshold for providing protected bikeways is consistent with many cities' traffic safety and Vision Zero policies. However, some cities use a 30 mph posted speed as a threshold for protected bikeways, consistent with providing Level of Traffic Stress level 2 (LTS 2) that can effectively reduce stress and accommodate more types of riders. 18 Operational factors that lead to bikeway conflicts are reasons to provide protected bike lanes regardless of motor vehicle speed and volume. 2017 ANNUAL BICYCLE REPORT 11

CITYWIDE BICYCLE DATA In 2008, the City of Atlanta Department of City Planning developed and adopted Atlanta s first comprehensive transportation plan. The content and goals of this foundational plan set the stage for where we are now. With the support of the Mayor, the Atlanta City Council, and other stakeholders, the City installed the first protected bike lane in 2013. The success of the 10th Street protected bike lane motivated our largest growth of bikeways and bike ridership. Today Atlanta has just over 116 miles of bikeways built - doubling Atlanta s mileage since 2012. Another 84 miles of infrastructure are planned for future implementation. These improvements to the bike network are important because they highlight the City s commitment to improving citizens health, providing affordable transportation options, and becoming a bike-friendly city. 180 Atlanta s Bikeway Mileage 160 140 120 MILES 100 80 60 40 20 53.0 57.1 62.8 66.0 71.7 83.8 104.4 115.7 2017 Total Mileage by Type Bike Lane 46 Multi-Use Path 42 Shared Lane Marking 16 Buffered Bike Lane 5 Cycletrack 4 Uphill Bike Lane/Downhill Shared 3 0 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Bike Counter Daily Ridership Averages Bike Counter Monthly Ridership Counts COUNTERS INSTALLED IN 2016 10th Street & Monroe Drive 1137 10th Street & Myrtle Street 507 5th Street (Tech Square) 287 Peachtree Street 119 Peachtree Center Avenue 102 COUNTERS INSTALLED IN 2017 Edgewood Avenue 246 Hosea Williams Drive 51 Murphy Avenue 28 Westview Drive 6 TOTAL COUNTS 90,000 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 12 CITY OF ATLANTA

CITYWIDE BICYCLE DATA Below is a map of all installed bikeways and the locations of the automatic bike counters. While this is the start of a strong network, we must work to connect existing bikeways to make biking safer and more enjoyable in Atlanta. Current Bikeways Map Bicycle Mode Share 2016: 2030 TARGET: 1.4% 4% BIKE COUNTER LOCATIONS COUNTER INSTALLED IN 2016 COUNTER INSTALLED IN 2017 LEGEND BIKE LANE MULTI-USE PATH CYCLETRACK SHARED LANE MARKING BUFFERED BIKE LANE UPHILL BIKE LANE ATLANTA BELTLINE CORRIDOR 5th Street (Tech Square) 10th Street & Myrtle Street 10th Street & Monroe Drive Peachtree Street Peachtree Center Avenue Westview Drive Hosea Williams Drive Murphy Avenue Edgewood Avenue 2017 ANNUAL BICYCLE REPORT 13

RELAY BIKE SHARE The City launched Relay Bike Share in partnership with CycleHop and Georgia s Own Credit Union in June 2016 with 100 bikes at 10 stations in Downtown Atlanta. Since then, Relay has expanded to 500 bikes at 75 stations connecting 15 neighborhoods. The popular program provides a healthy and enjoyable transportation solution allowing residents and visitors alike to travel around Atlanta by bike. The City s bike share program uses Social Bicycles technology which allows riders to lock both at stations across Atlanta and to publicly-accessible bike racks. This flexibility is key to the success of the system. To date more than 25,000 people have ridden Relay Bike Share. Relay Totals Since June 2016 Launch 86,370 48,651 193,395 TRIPS HOURS MILES Average Relay Trip: 34 MINUTES 2.2 MILES Find out more at www.relaybikeshare.com. Bike Share Champions Program The City of Atlanta, Atlanta Bicycle Coalition, Relay Bike Share, WeCycle Atlanta, Urban Perform, Red, Bike & Green Atlanta, Annie Casey Foundation, Better Bike Share Partnership and HABESHA have worked collectively to implement two years of the Atlanta Bike Share Champion program. The program s goal is to work directly with Westside and NPU V community members on bike share station location selection, education and bike safety via the employment of residents. Program Highlights 16 2000 COMMUNITY MEMBERS HIRED FOR PAID OUTREACH HOURS OF OUTREACH AND EDUCATION PROVIDED The placement of Relay stations suggest that only 2% of riders would live in Westside neighborhoods. Due to the work of the Bike Share Champions, westside residents account for 4% of actual ridership. Over the next two years, the City plans to expand the bike share program to more westside and southern neighborhohoods 14 CITY OF ATLANTA

RELAY BIKE SHARE MAP Top 10 Relay Hubs Average Total Rentals per Month ATLANTIC STATION GEORGIA TECH MIDTOWN 1 Piedmont Park & Eastside BeltLine 1061 2 Historic Fourth Ward Park 773 3 Piedmont Park West 634 4 Greenwood Ave BeltLine 588 5 King of Pops 472 6 Piedmont Park East 465 7 Irwin & Eastside BeltLine 449 8 Tech Square 373 9 Georgia Tech - Clough Building 364 10 Outwright Station 252 OLD FOURTH WARD VINE CITY DOWNTOWN ATLANTA UNIVERSITY CENTER REYNOLDSTOWN WEST END GRANT PARK N 1 mi RELAY BIKE HUB LOCATION ATLANTA BELTLINE CORRIDOR 10,000 2017 Relay Membership Totals by Type TOTAL MEMBERSHIPS 5,000 MEMBERSHIP TYPE TOTAL Other 368 Student 727 Annual 357 Monthly 878 Pay-As-You-Go 6721 TOTAL 9092 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2017 ANNUAL BICYCLE REPORT 15

THE FUTURE OF ATLANTA BIKEWAYS The Department of City Planning (DCP) is responsible for guiding the future of Atlanta s transportation system. The Atlanta City Design highlights our need to prioritize people in the design of Atlanta s physical form. In 2017, DCP engaged Atlantans citywide to develop the Atlanta Transportation Plan which has been created to operationalize the Access Strategies of City Design. Cycle Atlanta 1.0 and 2.0 Studies are implementation strategies to build a network of bikeways inside the Atlanta Beltline and to MARTA Stations, respectively. This report documents the City s progress to complete these bikeway networks. Cycle Atlanta 1.0 In 2013, the City set out to define the future of bikeways inside the Atlanta BeltLine. The study leveraged the energy around the country for better protected bike lanes, trails, and new bike intersection treatments. The Cycle Atlanta 1.0 Study was completed in 2015. Since then the City has installed and funded 94% of the planned bikeways. PROGRESS THROUGH 2017 COMPLETED 10 mi FUNDED 20 mi PLANNED 2 mi TOTAL 32 mi 16 CITY OF ATLANTA

Cycle Atlanta 2.0 Building on the success of Cycle Atlanta 1.0, the City kicked off Cycle Atlanta 2.0 in March 2017. This study focused on how to build a network of bikeways to six MARTA stations to increase bike usage and transit ridership, and to improve bike access to the stations. Hamilton E. Holmes, West Lake, Oakland City, West End, Edgewood/Candler Park and Inman Park/ Reynoldstown Stations were studied. Because of this study, bike lanes were added to the Sylvan Road resurfacing project currently underway. PROGRESS THROUGH 2017 COMPLETED 1.8 mi FUNDED 13.5 mi PLANNED 26.7 mi TOTAL 42.0 mi 2017 ANNUAL BICYCLE REPORT 17

18 CITY OF ATLANTA

ACKNOWLEDGMENTS The Department of City Planning would like to thank everyone working to create safer bicycle infrastructure and more robust bicycle engagement programs across Atlanta. Without the efforts and dedication of many City departments, external stakeholders and engaged communities, we would have not achieve the accomplishments detailed in this report. Many thanks to the dedicated staff at the following: ATLANTA BELTLINE INC ATLANTA BICYCLE COALITION ATLANTA FALCONS YOUTH FOUNDATION ATLANTA REGIONAL COMMISSION BUCKHEAD COMMUNITY IMPROVEMENT DISTRICT CENTRAL ATLANTA PROGRESS CYCLEHOP GEORGIA BIKES GEORGIA DEPARTMENT OF TRANSPORTATION LIVABLE BUCKHEAD MARTA MIDTOWN ALLIANCE NATIONAL ASSOCIATION OF CITY TRANSPORTATION OFFICIALS PARK PRIDE PATH FOUNDATION DEPARTMENT OF PUBLIC WORKS RENEW ATLANTA-TSPLOST DEPARTMENT OF WATERSHED MANAGEMENT Special thanks to MailChimp and the Atlanta Bicycle Coalition who provided funding for a large portion of the automated bike counters. This report was produced by the Department of City Planning Office of Mobility Planning Staff including Chris McIntosh, Amelia Kane, Andrew Walters, Becky Katz, Crystal Griggs-Epps, James Washington, Janide Sidifall, Jason Morgan, Jordan Dowdy, and Monique Forte. 2017 ANNUAL BICYCLE REPORT 19