Overview. LANTw31. Carry out aerial tree rigging

Similar documents
LANTw17 - SQA Unit Code H2RX 04 Prepare for, and agree, emergency treework operations

LANCS17 SQA Unit Code H Maintain and repair paths or surfaces

LANH23 SQA Unit Code H Exhume coffins and remains

In Association With. City & Guilds 2013 Reproduction of this document in whole or in part is forbidden without prior consent of City & Guilds Rigging

LANH29 SQA Unit Code H52B 04 Implement plans for the management of sports turf areas

Overview LANCS79 - HY3G 04. Control vertebrate pests and predators by shooting

LANCU50 - SQA Unit Code F0N3 04 Prepare deer for human consumption

CITY & GUILDS NPTC LEVEL 3 AWARD IN AERIAL TREE RIGGING QAN 600/6498/5

SEMFEW339 - SQA Unit Code H1WC 04 Slinging, lifting and moving materials and components

COGPOLY39 Meet safety, health and environmental requirements in the workplace

LANCU46v2 - SQA Unit Code H2PW 04 Control vertebrate pests and predators using traps

SKSTEX36(SQA Unit Code-H7C9 04) Calibrate textile production equipment

LANCU60Ga - SQA Unit Code D9HX 04 Contribute to the management of a fishery

LANAqu12 SQA Unit Code HC0G 04 Monitor the aquatic production environment for farmed fish/shellfish

Overview IMPEM164K. This standard is for you if you work in food and drink operations or animal feed operations.

NZQA registered unit standard 1269 version 7 Page 1 of 5. Plan, prepare for, and carry out line shifts in a cable harvesting operation

Use of MEWPs in Arboriculture

LEVEL 2 CERTIFICATE OF COMPETENCE IN CHAINSAW AND RELATED OPERATIONS ASSESSMENT SCHEDULE

This standard comprises the following:

EUSCS04 Overseeing work in confined spaces

LANNAC3 - SQA Unit Code F8J4 04 Maintain the cleanliness of the working environment

BASIC ARBORIST TREE CLIMBING & WORK POSITIONING WORKSHOP

PROMP261 (SQA Unit Code H9J8 04) Use reel handling equipment

Overview. LANGa40. Stalk and cull deer

SEMAER2_41 Dismantling and removing aircraft access structures

SEMCW2-10 Testing quartz watches

EUSMUNC06 (SQA Unit Code - FG2W 04) Locate and avoid supply apparatus for Utilities Network Construction

Abseiling (Natural Surfaces) REGISTRATION LEVELS AND ASSESSMENT REQUIREMENTS

Overview IMIARBBP21. Carry Out Motor Vehicle Body Metal Inert Gas (MIG) Brazing Operations

SEMFWE SQA Unit Code H1W9 04 Forming platework using power rolling machines

SFHCHS78 Administer oxygen safely and effectively

SEMIC05 Installing mechanical equipment

SEMMPF201 Complying with Statutory Regulations and Organisational Safety Requirements

Overview EUSSAM12. Carry out tightness testing and direct purging of gas installations

CWA Work-at-Height Certification Assessment Criteria Competent Climbing Wall Worker

UK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit June June 2015 Page 1 of 16

SEMBIT SQA Unit Code F9JC 04 Complying with statutory regulations and organisational safety requirements

Overview. OPIPOH10 - SQA Unit Code HG Operate an Oil and Gas Process ( Gas Treatment)

SAEMA Document No. SDN Original Issue Date: April 2017 Revision Reference: Revision Date: Not later than end of April 2019

Personal Protective Equipment

Suitability of Work Equipment

Pro Climb. Save the Date Date! ITCC in Sydney: Hello Everyone! Climbing Services for Forestry, Arboriculture and Vegetation Management

CITY & GUILDS NPTC LEVEL 2 AWARD IN TREE CLIMBING AND RESCUE (QCF) QAN 600/6620/9

SFJFRSFF5 SQA Unit Code (H9FD 04) Protect life and the environment from the effects of hazardous materials

ASTC210 (SQA Unit Code - F4PS 04) Clean confined spaces

Technical Rescuer Rope Rescue Level I NFPA 1006

SEMEMI SQA Unit Code H2AP 04 Carrying out fault location on electrical equipment and circuits

SEMEEE3-34 Carrying out functional tests on electrical equipment

CAVING REGISTRATION LEVELS AND ASSESSMENT REQUIREMENTS

IRATA. Levels, 1, 2, or 3 5 days training + 1 assessment day (Includes Examination Fees + IRATA Registration)

SFJFF3 - SQA Unit Code D7WM 04 Save and preserve endangered life

The Lifting Operations and Lifting Equipment Regulations 1998 ('LOLER') How they apply to rope-based access systems for work at height

Overview. OPIPOH7 - SQA Unit Code HG1X 04. Operate an Oil and Gas Process (Gas Compression)

In Association With. City & Guilds 2013 Reproduction of this document in whole or in part is forbidden without prior consent of City & Guilds

Lifting Equipment Protocol

Level 3 Award in Emergency Rescue and Recovery Of Casualties from Confined Spaces

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER)

Lifting Operation & Lifting Equipment Procedure

Overview. SEMEMI216 SQA Unit Code HF4G 04 Carrying out fault location on fluid power equipment and circuits

SEMPEO SQA Unit Code FP2M 04 Maintaining mechanical devices and equipment

WILTSHIRE POLICE FORCE PROCEDURE

LEVEL 2 AWARD IN CHAINSAW AND RELATED OPERATIONS (QCF) CS34 - Sever Individually Uprooted Trees (Pre requisite: CS30, CS31 and CS32)

SEMFWE3-33 SQA Unit Code HF2X 04 Cutting and shaping materials using portable thermal cutting equipment

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

Understanding Anchor Systems

Level 2 Award in Working in High Risk Confined Spaces

Wilkins Safety Group

ASTICT1 - SQA Unit Code H54P 04 Prepare to carry out cleaning operations on information communication technology (ICT) equipment

SEMPEO SQA Unit Code FP2P 04 Maintaining fluid power equipment

SEMME269 - SQA Unit Code H2BK 04 Cutting and shaping using NC/CNC plasma or gas cutting machines

SF/15 SITE SPECIFIC METHOD STATEMENT. IOSH Ground Control Ltd CLIENT PRINCIPAL CONTRACTOR

SEMEMI SQA Unit Code H2AX 04 Carrying out scheduled maintenance tasks on fluid power equipment

CITY & GUILDS NPTC LEVEL 3 AWARD IN AERIAL TREE RESCUE OPERATIONS QAN 600/6292/7

Level 2 Award in Working in Medium Risk Confined Spaces

LEVEL 2 AWARD IN CHAINSAW AND RELATED OPERATIONS (QCF) CS38 - CLIMB TREES AND PERFORM AERIAL RESCUE ASSESSMENT SCHEDULE

LEVEL 2 AWARD IN CHAINSAW AND RELATED OPERATIONS (QCF)

COSAO26 Identify workplace health and safety hazards and control risks in asbestos surveying and analysis

Petzl Technical Institute Course Descriptions. TES, Inc Murdock Drive Knoxville, TN

Pro Climb Rigging Bollard USER MANUAL. Pro Climb Rigging Bollard

SEMEEE36 Checking the compliance of electrical equipment against the specification

SEMAE3064 Installing aircraft visual display units and computer systems

SEMAE3071 Installing aircraft countermeasure systems

Industry Code SPONSORED BY:

Draft Climbing Guidelines 05 th June 2010

DRAFT. Code of Practice. safe access in tree trimming and arboriculture

HOW TO PREPARE FOR THE LEVEL A CRANESAFE CERTIFICATION ASSESSMENT

Overview. SEMEMI211 SQA Unit Code HF4E 04 Carrying out modifications or rewiring electrical circuits

SEMLATA3-12 Measuring, weighing and preparing compounds and solutions for laboratory use

Qualification Guidance. Independently Assessed. Essential Qualification Information. Not to be used by the Candidate during Assessment

4.1 The Vice-Chancellor and University Executive Committee

INSTRUCTIONS FOR USER RBD - COMPACT RESCUE BELAY DEVICE

LEVEL 3 NPTC CERTIFICATE OF COMPETENCE IN THE THOROUGH EXAMINATION OF ARBORICULTURAL EQUIPMENT. ASSESSMENT SCHEDULE (Revised Aug 2010)

LEGISLATIVE DEVELOPMENTS IMPACTING PETROLEUM CONTRACTORS

Safe Working at Heights Theory Assessment

WORKING SAFELY IN TREES TREEKIT GUIDE TO THOROUGH INSPECTIONS OF EQUIPMENT FOR WORKING AT HEIGHT. Incorporating:

SEMEMI SQA Unit Code H2B7 04 Assisting in the installation of compressed air equipment

Level 3 Diploma in Moving Loads in Construction. Qualification Specification

SAFETY TRAINING and SERVICES CONFINED SPACE FALL PROTECTION EXCAVATION FORKLIFTS SCAFFOLD. Rescue. Spring D2000 Safety: Key Facts

Tree Surgery Method Statement

Module: Permit to work System

Transcription:

Overview This standard is about carrying out aerial tree rigging. It includes the removal of sections from a tree crown under the control of rope rigging and lifting gear. The work will be carried out by an operator with extensive experience of arboriculture operations and chainsaw operations in a canopy. As part of this standard, you will carry out a tree hazard and a working at height assessment to determine if the operative is safe to perform the work and to determine the safest and most efficient access method. This aerial work must be supported by a ground worker with extensive experience of aerial treework and rigging techniques. This standard covers the use of rigging for the removal of small tree sections. This is in relation to pruning operations, where targets below may pose a significant risk, and includes the removal of part/whole trees, where targets do not allow for free-fall/hand-thrown techniques. When working with machinery you need to be appropriately trained, and hold current certification where required, in line with relevant legislation. Your work must conform to all relevant legislation and codes of practice when carrying out this work. 1

Performance criteria You must be able to: 1. assess the risks associated with the site and the proposed work, including working at height 2. plan and implement a rescue plan and update this throughout the work 3. select and implement appropriate working methods in accordance with the assessed risks 4. select and use appropriate personal protective equipment (PPE) for the work 5. meet the specified legislative and organisational environmental requirements in relation to carrying out aerial tree rigging 6. select and use access and positioning methods appropriate to the assessed risks and the method statement 7. inspect access equipment to ensure it is safe and fit for use according to the manufacturer s instructions and relevant legislation 8. calculate the expected loads the rigging needs to take, within its design/safety factors and select compatible components to make up the rigging system 9. assess the position and select anchor points for rigging components taking into account the expected load, ground crew, other anchor points, access equipment position, planned drop zone and processing area 10. remove tree sections that can be lowered down using suitable cuts, minimising shock loading in the rigging system 11. communicate with ground staff in relation to the appearance and progress of the operation 12. deal appropriately with the arisings 13. ensure the site is left in a condition which meets environmental requirements, in accordance with the specification 14. maintain the health and safety of yourself and others at all times, in accordance with relevant legislation 2

Knowledge and understanding You need to know and understand: 1. how to identify hazards and assess risks 2. how to interpret risk assessments 3. the control measures to be implemented for the risks involved, including working at height 4. the selection, use and care of personal protective equipment (PPE) 5. emergency planning and procedures relevant to the site 6. how to select, prepare and use appropriate tools and equipment, safely and effectively in line with the manufacturer's recommendations 7. the legal requirements for checking equipment 8. how to evaluate the tree for hazards and the implications of the hazards identified 9. how to calculate the expected loads generated by the rigging operation 10. how to select compatible components to make up a rigging system appropriate for the expected load 11. how to select suitable anchor points for the expected loads without compromising the workers access position. 12. how to select the suitable access position and the planned drop zones 13. how to plan and lay out the rigging site on the ground to safeguard the ground crew, aid workflow, deal with the arisings and place the desired drop zones 14. how to set up communication systems 15. how to remove tree sections that can be lowered down by using suitable cuts, minimising shock loading in the rigging system 16. when tree rigging would be required and its limitations 17. how, when and where to use compound or complex rigging systems 18. how to install and use pull/tag line to aid the removal of sections. 19. the potential impact of your work on the environment and how this can be minimised 20. your responsibilities under relevant environmental and health and safety legislation 3

Glossary Compound/complex rigging systems: drift line load transfer balance cradle spider leg speedline/skyline fake anchor points craning and lifting techniques crane removal 4

Developed by Lantra Version Number 2 Date Approved February 2017 Indicative Review Date Validity Status Originating Organisation Original URN Relevant Occupations Suite Keywords February 2021 Current Original Lantra Arboriculture and forestry; Chainsaw and forest machine operators Treework aerial; rigging; tree; chainsaw 5