Personal Flotation Device (PFD) JAPBI Industry Day

Similar documents
RECOMMENDED MILITARY FREE-FALL PROFICIENCY AND REFRESHER TRAINING PROGRAM

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #72

Tactical Flotation Support System (TFSS) User s Manual

Characteristics. Advantages FM 31-19

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Air Crew Systems Development. FY 2011 Total Estimate. FY 2011 OCO Estimate

LESSON PLAN JANUARY Terminal Objective: Partially supported by this lesson topic: COURSE TITLE: Rescue Swimmer Refresher Course Q

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

i' ' ,\, S,-,:,~,..ao...:;..;._..,

UNCLASSIFIED R-1 ITEM NOMENCLATURE

SURVITEC GROUP LIMITED RFD Beaufort LTD 1-5 Beaufort Road, Birkenhead CH41 1HQ, United Kingdom T: / F: E:

JMPI for the MODULAR AIRBORNE WEAPONS CASE (MAWC)

MC6/T 11 ATPS Donning. Step by step instructions

031-COM-1004 Protect Yourself From Chemical And Biological (CB) Contamination Using Your Assigned Protective Mask Status: Approved

Survival Armor price list Item# ItemDesc Mfr MfrItem # Category Unit of Measure

SMA2100 Series CONSTANT WEAR LIFE PRESERVER VEST (CWLP) SMA2160 OWNERS MANUAL

Low-Cost Dry Submersible Technology & Dry Combat Submersible Light

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC MCO C21 21 Dec 92

Owner s Manual. MD3196 and MD3091 Compact Tactical Life Preservers. *Shown with the MA3090 Chest Belt/Crotch Strap Assembly

DEPARTMENT OF THE NAVY NAVAL AIR SYSTEMS COMMAND RADM WILLIAM A. MOFFEIT BUILDING BUSE ROAD, BLDG 2272 PATUXENT RIVER, MARYLAND,

BALLISTIC OPTICAL ARMOR (BOA ) GOGGLE

NOTE Equipment worn by survivor determines the procedures to be used in parachute disentanglement.

GGG-M-125/3A September 20, 1982 SUPERSEDING GGG-M-125/3 March 28, 1975 FEDERAL SPECIFICATION

DONNING FIT + ADJUSTMENT INSERTING ARMOR EMERGENCY DOFFING PROCEDURE RESETTING EMERGENCY DOFFING SYSTEM ADDITIONAL FIT OPTIONS ADDITIONAL FEATURES

TM PMC CREW/OPERATOR DAILY PREVENTIVE MAINTENANCE CHECKLIST FOR IMPROVED OUTER TACTICAL VEST GEN III (IOTV GEN III) NOTICE

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2008

DO NOT REMOVE PRIOR TO SALE! OWNER S MANUAL for Model No. 1212

ALPS Flotation Collar. User s Manual

RCM Applied to the CH-47 Chinook Heavy Lift Helicopter. For the Warfighter With the Warfighter

OYSTER BPLJ. Ballistic Protected Life Jacket ATLANTIS SPECIALIST TECHNOLOGIES OYSTER BPLJ

PRODUCT Retail Price List

Personal Protective Equipment

STOPPING THE UNDERWATER DIVER THREAT

REQUEST FOR PROPOSAL RFP FD SCBA. Closing Time: August 23rd, 2018 at 2:00pm Local time

PFD 1 275N INFLATABLE JACKET

ExtendAire TM II. Intermediate Pressure Accessory Kit USER INSTRUCTIONS

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC MCO C2I 13 Mar 92

Emergency Bailout Procedures for Pilots Presented by Allen Silver Sean Tucker 5April 2006

This is by no means a comprehensive list, but it will get the job done. It can be added to or subtracted from as the individual officer sees fit.

DIMERSAR TECHNICAL RESCUE. Ice Rescue Technician Level I & II

ANNUAL SELF INSPECTION / SERVICING INSTRUCTION SHEET

z Interim Report for May 2004 to October 2005 Aircrew Performance and Protection Branch Wright-Patterson AFB, OH AFRL-HE-WP-TP

EXTRAORDINARY ACTIVITIES

INSTRUCTIONS FOR USE

TECHNICAL DESCRIPTION AND OPERATING LIMITATIONS

PRO Lifting Operations

2018 Skydiver s Information Manual Summary of Changes

Notes for Soldiers Weapons Painting 101

DO NOT REMOVE PRIOR TO SALE MD1250

Aviation Rescue Swimmer School

ISO INTERNATIONAL STANDARD. Personal flotation devices Part 4: Lifejackets, performance level 100 Safety requirements

THIS CARD IS MAINTAINED TO PROVIDE PROCEDURAL TEXT ONLY AND IS NOT REPORTED TO ACMS

Supressors, Evolving to an Integrated Unit. Designing with the Soldier in mind

Boating Activity-Specific Plan

U.S. Patent No. 7,922,246. Patents Pending

User Instruction Manual Fixed Beam Anchor

Sea Eagle EZ Cart. Instruction & Owner s Manual. Sea Eagle Boats Inc. 19 N. Columbia Street, Suite 1 Port Jefferson, NY

T3200 TransPlate Harness

HSI TF and ad hoc working group: Back and neck pain, vibration, and impact from military systems

Policy for Evaluation of Certification Maintenance Requirements

User Instruction Manual For Davit Rescue System

Integration Challenges and Solutions for CBRN Defense- Respiratory Equipment in Modern Fixed Wing Military Aircraft

Notes for Soldiers M4/M16 Weapon Painting 101. Step One: Gather the materials

Confined Space Entry Program

PREMIUM PROTECTIVE SUITS AND EQUIPMENT FOR MARITIME OPERATIONS - V.2 - Q AMPHIBIOUS SOLUTIONS BY NEPTUNUS. distributed by

Course Firefighter I. Unit II Safety and Orientation

Variable Volume Chamber Cannon ( V²C² )

B&T GL-06. Technical Specifications. Single Shot Launcher cal. 40 x 46 mm manufactured by B&T AG, Switzerland

This document to be used with Hurley traditional Davits

Discussion and guidance on the definition and qualification of porous loads

DRI Policy for Safety Associated with Measurements, Sampling, and Related Streamgaging. Table of Contents

Summary Report for Individual Task 551-8ST-1021 Perform Water Survival Techniques and Procedures Status: Approved

SHIP SAFETY BULLETIN. Subject: Bulletin No.: 06/2012 RDIMS No.: Date: Y - M - D

TECHNICAL MANUAL OPERATOR'S MANUAL FOR AIRCREW INTEGRATED RECOVERY SURVIVAL ARMOR VEST AND EQUIPMENT (AIRSAVE)

Rapid Survival System

IPMBA Bicycle Response Team Training Fact Sheet: this is an overview of the various components which comprise the course.

INSTRUCTIONS FOR USE

A Previously Unidentified Failure Mode for Ladder-Climbing Fall-Protection Systems

SIDE 16 Sidemount System User Manual

PRE- JUMP TRAINING (T-11 Heavy)

PART TWO CAMOUFLAGE DURING TACTICAL OPERATIONS. Chapter 4 Camouflage Techniques FM 20-3

MAN-032 Rev 0. Performance Designs Zero Packing Manual

Live Round Interrupter (LRI) Technical Implementation White Paper

User Instructions 1790 Rail Anchor

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

Safety Flash. IMCA Safety Flash 10/09 July Compact Fluorescent Lights Interfering with Communications Equipment

NDIA 51 st Annual Fuze Conference Low Cost p-sdf for ICM Rounds. L-3 BT Fuze 51st ANNUAL FUZE CONFERENCE

CS150 CAP STAPLER OWNER S MANUAL

Product Bulletin No.: D99-RRV2015-PIB-001

HEADQUARTERS FM DEPARTMENT OF THE ARMY GRENADES AND PYROTECHNIC SIGNALS

Common Discrepancies Uncovered on ADCI Diving Contractor & Training Program Audits

User Instruction Manual Fixed Beam Anchor

Fruity Chutes Hawk CO2 Release Valve

REDMAN SUIT ASSEMBLING AND PACKING INSTRUCTIONS

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

FRONT BOLT ACTION ASSAULT SHOTGUN

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

Guide for Evaluating Your Hose Assembly Supplier

Safety File. Contract Avonbourne School Prepared By Steve Steel Date 20 th July 2008

Reliance Industries, LLC Operating instructions for the / Bolt-on D-Ring Anchorage. Model # 3071

Avoiding Short Term Overheat Failures of Recovery Boiler Superheater Tubes

Transcription:

Project Manager Soldier Protection and Individual Equipment Our Strength and Purpose Product Manager Soldier Clothing and Individual Equipment (PM SCIE) LTC Jonathan Allen PdM SCIE Personal Flotation Device (PFD) JAPBI Industry Day 29 November 2018 CPT Brian McNally Assistant Product Manager, Personnel Airdrop Mr. Jeff Myhre DPdM SCIE

Program Description Current and Legacy Flotation Systems: The B-7 is an Air Force life preserver system that is designed to be worn under the parachute harness with the inflatable portions under the jumper s armpits. The LPU 10/P is a Navy life preserver system worn under the parachute harness during flights over water or during airdrops. The TFSS is a Navy life preserver system that is designed to be fastened to an individual s waist belt. Issues: Do not meet all the Army s requirements for intended and/or unintended parachutist water entry, creating a capability gap The B-7 and LPU-10 are no longer available and the TFSS does not meet current buoyancy requirements. Army is not the Lifecycle Manager for the B-7, LPU-10, or TFSS legacy systems. This restricts the Army from inserting Engineering Change Proposals (ECPs) and/or Materiel Change Proposals (MCPs). 70

Program Description Integration Supporting Unintentional Water Landings T11 Parachute system in full combat load configuration T11 main T11R Reserve, Advanced Tactical Parachute Harness, Plate Carrier with plates Improved Outer Tactical Vest (IOTV) with ballistic plates, weapons container, basic combat equipment, and shown with the legacy LPU-10P 71

Program Description Integration Supporting Unintentional Water Landings RA-1 Parachute system in full combat load configuration RA1 in the Double Bag Static Line (DBSL) configuration, Improved Outer Tactical Vest (IOTV) with ballistic plates, weapons container, basic combat equipment, and shown with the legacy LPU-10P 72

Key Performance Parameters (KPPs) KPP KPP 1 System Reliability Production Threshold (T) (U) The PFD must demonstrate a reliability of 0.9 at 90% confidence level. (T) Production Objective (O) (U) The PFD must demonstrate a reliability of 0.99 at 90% confidence level. (O) Rationale/Analytic Linkage (U) Rationale: The system must demonstrate a reliability in confidence level that will allow the parachutist to remain afloat long enough to doff required equipment, self-recovery, assemble and/or await recovery. KPP 2 Supporting Weight/Time (U) Supporting Weight/Time. Once inflated, the PFD must be capable of supporting the weight of a 98th percentile male, with body armor, in an orientation in which the head is completely above the water line and tilting to the rear for at least one hour (T) (U) Once inflated, the PFD must be capable of supporting the weight of a 98th percentile male, with body armor and other standardized Soldier equipment that cannot be released from the parachute harness, in an orientation in which the head is completely above the water line and tilting to the rear for more than an hour (O). (U) The PFD must allow the jumper to remain buoyant for at least one hour. KPP 3 Inflation (U) The PFD shall fully inflate within six seconds after manual inflation. (T) (U) The PFD shall fully inflate within three seconds after manual inflation. (O) (U) The PFD must be able to inflate quickly for parachutist survivability where time in the water without buoyancy is critical to one s survival and may have catastrophic consequences. 73

Additional Requirements Production Threshold (T) Production Objective (O) Rationale/Analytic Linkage Compatibility (U) The PFD must be compatible with the Advanced Tactical Parachute System (ATPS) and RA-1 parachute harness when worn by a fully combat equipped jumper with body armor and Modular Airborne Weapons Case (MAWC). The PFD must be able to fit under the current harness and must not interfere with Jumpmaster Personnel Inspection (JMPI) (T=O) (U) The PFD must be compatible with the Advanced Tactical Parachute System (ATPS) and RA-1 parachute harness when worn by a fully combat equipped jumper with body armor and Modular Airborne Weapons Case (MAWC). The PFD must be able to fit under the current harness and must not interfere with Jumpmaster Personnel Inspection (JMPI) (T=O) (U) Rationale: The PFD must be compatible with legacy items for complete integration and not interfere with the normal functioning of these systems or the parachutist ability to perform emergency procedures. Inflation Method Temperature (U) The Soldier must be able to manually activate the PFD while in the parachute harness and wearing combat equipment. The system shall possess a manual backup inflation method (T=O) (U) The PFD must be able to properly function during parachute operations that include rapid temperature changes from -50 F to 110 F (T). (U) The Soldier must be able to manually activate the PFD while in the parachute harness and wearing combat equipment. The system shall possess a manual backup inflation method (T=O) (U) The PFD must be able to properly function during parachute operations that include rapid temperature changes from -60 F to 140 F (O) (U) In the event full inflation does not occur during the primary inflation process, Soldiers must be able to manually inflate the PFD while fully equipped. (U) PFD must be able to function in temperatures in which Soldiers operate. 74

Additional Requirements Production Threshold (T) Production Objective (O) Rationale/Analytic Linkage Altitude (U) The PFD must be able to properly function after exposure to the full operational altitude ranges of military personnel parachutists without adjustment or maintenance. This includes both low level mass tactical parachute and High Altitude Ram Air Parachute operations (High Altitude High Opening (HAHO) and High Altitude Low Opening (HALO)) from 25,000 feet above Mean Sea Level (MSL) to ground level. (U) The PFD must be able to properly function after exposure to the full operational altitude ranges of military personnel parachutists without adjustment or maintenance. This includes both low level mass tactical parachute and High Altitude Ram Air Parachute operations (High Altitude High Opening (HAHO) and High Altitude Low Opening (HALO)) from 25,000 feet above Mean Sea Level (MSL) to higher than 25,000 feet above MSL to ground level (O). (U) Rationale: Supports the full range of airborne operations. 75

Additional Requirements Production Threshold (T) Production Objective (O) Rationale/Analytic Linkage Storage (U) The PFD must be able to be stored in a fully operational configuration for a minimum of: 365 days (T). (U) The PFD must be able to be stored in a fully operational configuration for a minimum of: 730 days (O). (U) Rationale: The minimum storage time supports the inspection cycle of the PFD and as such will only work as intended if stored properly. APSize/Weight (U) The PFD must be smaller and lighter than the current legacy systems: B-7, LPU/10 and TFSS (T=O). (U) The PFD must be smaller and lighter than the current legacy systems: B-7, LPU/10 and TFSS (T=O). (U) Reducing the physical burden to the jumper includes ensuring the weight of the system is reduced to improve Soldier performance. Shelf/Service Life (U) The shelf life of the PFD will be a minimum of 4.5 years and the service life will be a minimum of twelve years (T). (U) Shelf/Service Life. The shelf life of the PFD will be a minimum of 4.5 years and the service life will be a minimum of sixteen years (O). (U) The shelf and service life of the PFD is synchronized with the T-11 parachute program and supports the Maneuver Force Modernization Strategy (MFMS). Carrier Color Anthropometrics (U) The color of the PFD carrier should be in earth tone colors not darker than Coyote 498 but not lighter than Tan 499. Selection of specific equipment color within this range will be at the discretion of PM SCIE (T=O) (U) The PFD shall accommodate the 2nd percentile female to the 98th percentile male based on the Policy for Implementation of Fit Attribute (T=O). (U) The color of the PFD carrier should be in earth tone colors not darker than Coyote 498 but not lighter than Tan 499. Selection of specific equipment color within this range will be at the discretion of PM SCIE (T=O) (U) The PFD shall accommodate the 2nd percentile female to the 98th percentile male based on the Policy for Implementation of Fit Attribute (T=O). (U) Ensures that the color is compatible with and compliments the current Army Operational Camouflage pattern and ensures that Soldier equipment is inconspicuous in a field environment. (U) Supports the fit attribute defined in the Policy for Implementation of Fit Attribute which allows for the fact that not everyone is of average size (50th percentile). 76

Program Request For Proposals will be released thru the Natick contracting office projected for 2QFY19 Contractor will be asked to provide test results in support of their technical proposal Contractor supplied data will be evaluated as part of the technical proposal Requisitions will be issued to qualifying contractors for Design Validation (DV) test assets in 2QFY19 DV will be conducted to verify system meets the basic design intent of a life support flotation device in 3QFY19 DV will include the evaluation of bladder integrity to 10 psig, leak tests, activations, physical conformity Results from DV will be a factor in the source selection process with a goal to bring one solution to Developmental and Operational Testing projected for 2QFY20 Government intents to procure the Technical Data Package in support of production and sustainment Procurement supporting fielding will begin 4FY20 77

PFD Schedule FY 18 19 20 21 22 23 24 25 26 Total Program of Record MDD MS-C TC-STD AROC FRP RFP Army KR DV Benchtop Testing supporting DT OT Materiel Solution Analysis/ Technology Maturation & Risk Reduction Engineering & Manufacturing Development Production (IOC ) Fielding FOC Sustainment PFD Assumptions: 1. Refinement of Technical requirements 1QFY19 2. Release of Request for Proposal (RFP) 2QFY19 3. Design Validation (DV) Benchtop Testing 3QFY19 4. DT OT 4QFY19 2QFY20 5. Army Production 4QFY20 Legend Complete Knowledge Points (KP) Future Knowledge Points Decision Points Key Events UNCLASSIFIED//FOUO