OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD

Similar documents
SUBJECT: AUTHORIZE BID ADVERTISEMENT FOR OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO

AUTHORIZE BID ADVERTISEMENT

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60)

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

Northside School Class I Bike Path, Cool, CA Application Attachments

Item No. 14 Town of Atherton

Tabulation of Bids. Counties: Project(s):

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)

Project Status Update

Pavement Management Report. City Council Meeting of May 21, 2013

BPP / SUB

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Tabulation of Bids. Counties:

ITEM 3 ATTACHMENT A RESOLUTION NO

PROPOSAL. PROPOSAL OF, a corporation a

Processing Requests & Petitions For Streets To Be Improved/Chip Sealed

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

SC 41/Joe Rouse Intersection Improvements

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

APPENDIX G: DETAILED COST ESTIMATES

EASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

5:30 1 Introductions, appointment of note taker (5 minutes) Ad

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Trail Feasibility. 1. Introduction FINAL. October What s inside?

Water Street Promenade Engineering and Design Services

IMPLEMENTATION WORKBOOK

Lake Waterford Community Association Meeting. November 15, 2016

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Peter Kremer, WSP/Parsons Brinckerhoff

Pavement Management Program

OneBayArea Grant Application

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge

Design of Stanley Park S-Curve

Legislative Update Williamsburg Residency

City of Davis Pavement Management Program

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

TOWN OF MORAGA. CAMINO PABLO & CANYON ROAD INTERSECTION IMPROVEMENTS Public Information Meeting February 20, 2019

TRASBURG RANSPORTATION

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015

Chapter 4: Funding and Implementation

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

Pavement Rehabilitation & Buffered Bike Lane

General References Definitions. (1) Design Guidance. (2) Supporting Information

City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

B741 TEMPORARY CONCRETE BARRIERS - OPSS 741

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

Derby Street. Project Updates. Salem, Massachusetts

Outer Cape Bicycle & Pedestrian Master Plan. PUBLIC WORKSHOP #2 March 26, 2015

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. Halifax Regional Council January 16, 2017

YAVAPAI COUNTY PUBLIC WORKS

Committed to Service

Township of Springwater

2017 Temporary traffic control guidelines for pedestrians. v.2

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

CTH M HIGHWAY PROJECT CTH Q to STH 113

October 30, Subject: Solicitation Number: ITB Printing of Florida Class E Driver License Handbook

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

MNDOT PAVEMENT DESIGN MANUAL

TRAFFIC CALMING POLICY & PROCEDURES

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

On Monday, December 12, 2011, you will be briefed on Pavement Markings. The material is attached for your review.

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Traffic Circulation & Pedestrian Safety Study

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

APPENDIX L: COST ESTIMATING TOOLS

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

River Road - Proposed Road Safety Enhancement Measures

SECTION 3 STREET DESIGN

BEVERLY HILLS STAFF REPORT. To: From: Subject: INTRODUCTION DISCUSSION. Meeting Date: August 7, 2018

SRTS IMPLEMENTATION COSTS

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

General Notes. Project No /15/2018 Page 1 of 1

Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

San Tomas Expressway

AGENDA ITEM G-2 Public Works

BID TABULATION - WEDNESDAY, March 28, 2018, - PRIMARY ROAD SURFACING Allegan County Road Commission 1308 Lincoln Road Allegan, Michigan

Illini Union Champaign, IL. February 24, Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017

Transcription:

STAFF REPORT MEETING DATE: June 7, 2016 TO: FROM: City Council Russ Thompson, Public Works Director Gosia Woodfin, Assistant Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org PRESENTER: Russ Thompson, Public Works Director SUBJECT: OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO. 13-009 - CONSTRUCTION CONTRACT AWARD REQUEST Consider awarding a construction contract for the Olive Avenue Class II Bike Lanes project (CIP Project Number 13-009) in the total amount of $333,888.40 to Team Ghilotti, Inc. as the lowest responsible bidder. RECOMMENDATION Award construction contract to Team Ghilotti, Inc. DISCUSSION The Olive Avenue Class II Bike Lane Project includes widening and re-striping of Olive Avenue between Samrose Drive and the eastern city limits to accommodate Class II bike lanes on both sides of the road. The roadway cross-section after widening will consist of 11-foot wide travel lanes and 5-foot wide Class II bike lanes in each direction. The current width of the paved roadway is as narrow as 24.5 feet at some locations. To accommodate the proposed pavement width of 32 feet it will be necessary to use the existing gravel shoulders and relocate the centerline of the roadway at some locations. The widening will take place on the south side of the road. Pavement rehabilitation will consist of micro-surfacing. Prior to pavement treatment the existing striping will be removed, and after pavement rehabilitation new striping will be installed. This project is funded under the Highway Safety Improvement Program (HSIP). On November 20, 2015 Caltrans obligated $487,255 in federal Highway Safety Improvement Program (HSIP) funds and granted the City authorization to proceed with construction and construction management. On May 3, 2016, the City Council authorize the advertising of the project for construction bids and staff subsequently advertised the project. The bid opening was held on May 31, 2016, and a total of 2 bids were received. After examination of the same, Team Ghilotti, Inc. was determined cc16_076 1 1

the lowest responsible bidders, with the bid amount of $333,888.40. The engineers estimate for the work was $405,630. PUBLIC OUTREACH The project has been previously presented to the Novato City Council at the following meetings: July 17, 2012: Application for a Highway Safety Improvement Program Grant December 11, 2012: Create Project and Fund Preliminary Engineering October 15, 2013: Authorize City Manager to Execute Program Supplement Agreement for Preliminary Engineering November 18, 2014: Prohibition of Excavation January 12, 2016: Authorize City Manager to Execute Program Supplement Agreement for Construction and Construction Management May 3, 2016: Approve Plans and Specifications and Authorize Bid Advertisement There was one public workshop held on April 8, 2015 with 6 attendees. The workshop introduced the project to property owners and residents in the vicinity of the project. The workshop was held jointly with the County of Marin who has a similar project scheduled on the County portion of Olive Avenue immediately east of the City s project. Staff also provided answers to questions from attendees. The workshop presentation is available on the City of Novato website: http://novato.org/home/showdocument?id=13488. Class II bike lanes along Olive Avenue from Samrose Drive to easterly city limits are recommended for construction by the City of Novato Bicycle/ Pedestrian Plan (2015). FISCAL IMPACT The project is included in the City of Novato Adopted Capital Improvement Program Budget for 2016/2017. The project is funded by Highway Safety Improvement Program (HSIP) funds and Gas Tax (10% local match required by the grant). The engineer s estimate for construction cost is within the budgeted amounts. ALTERNATIVES Take no action at this time and direct staff as to disposition of this project. ATTACHMENTS 1. Bid Abstract 2. Location Map 3. CIP Budget Excerpt 2 2

Detail Detail White PROJECT NAME PROJECT NO. : 13-009 Olive Avenue Class II Bike Lanes-HSIP CITY OF NOVATO ABSTRACT OF BIDS AND AWARD Of CONTRACT DATE 31-May-2016 BID NO. 13-009 BID OPENING 2:00 pm BIDDERS Engineer s Estimate Team Ghilotti, Inc. Ghilotti Bros., Inc. Item TOTAL BID $405,630.00 $333,888.40 $385,420.75 No. DESCRIPTION Unit Qty Unit Price Amount Unit Price Amount Unit Price Amount I Temporary Water Pollution Control/Wildlife Protection (10-1.05) LS 1 $15,000.00 $15,000.00 $7,400.00 $7,400.00 $15,000.00 $15,000.00 2 Removal of Existing Portland Cement Concrete (10-1.9) Sf 325 $5.00 $1,625.00 $30.50 $9,912.50 $4.76 $1,547.00 3 Removal of Existing Asphalt Concrete(I0-1.9) Sf 660 $5.00 $3,300.00 $23.00 $15,180.00 $5.00 $3,300.00 4 Removal of Existing Pavement Markings and Stripings (10-1.9) LS 1 $6,1 15.00 $6,! 15.00 $5,980.00 $5,980.00 $6,000.00 $6,000.00 5 Construction Area Signs (10-1.14) IS I $5,00t).00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,Ot)0.00 6 Maintaining Traftic (10-1.15) IS I $10,000.00 $10,000.00 $9,100.00 $9,100.00 $10,000.00 $10,000.00 7 Traffic Control System for Lane Closure (10-1.16) IS 1 $15,000.00 $15,000.00 $10,800.00 $10,800.00 $15,000.00 $15,000.00 8 Clearing and Grubbing(I0-1.I7) 15 1 $20,000.00 $20,000.00 $5,175.00 $5,175.00 $20,000.00 $20,000.00 9 Common Excavation (lo-l.18)f CY 115 $85.00 $9,775.00 $139.00 $15,985.00 $635.50 $73,082.50 10 final Stabilization- Hydroseeding(I0-l.l8) IS 1 $5,000.00 $5,000.00 $3,000.00 $3,000.00 $2,500.00 $2,500.00 H Class 2 Agregate Base West of Deer Island Ln (10-1.19) TON 140 $150.00 $21,000.00 $1 15.00 * $16,100.00 $140.00 $19,600.00 12 Class 2 Agregate Base East of Deer Island In (10-1.19) TON 30 $150.00 $4,500.00 $315.00 $9,450.00 $200.00 $6,000.00 13 Road Widening Deep lift I-IMA(10-1.20) TON 400 $350.00 $140,000.00 $203.00 $81,200.00 $205.00 $82,000.00 14 HMA Base Course (10-1.20) TON 100 $250.00 $25,000.00 $299.00 $29,900.00 $265.00 $26,500.00 15 Plane Existing AC Pavement 0.15 (10-1.21) SY 500 $20.00 $10,000.00 $44.00 $22,000.00 $17.00 $8,500.00 16 Pavement Reinforcing Fabric (10-1.22) SY 790 $8.00 $6,320.00 $5.70 $4,503.00 $5.00 $3,950.00 17 HMA Surface Course (0.15 ) (10-1.23) TON 160 $250.00 $40,000.00 $165.00 $26,400.00 $220.00 $35,200.00 18 Crack Sealing (10-1.24) IS I $5,000.00 $5,000.00 $9,900.00 $9,900.00 $9,200.00 $9,200.00 19 Microsurfacing Type II (10-1.25) F SY 9,400 $5.00 $47,000.00 $4.10 $38,540.00 $3.75 $35,250.00 20 Thermoplastic Pavement Stripe Detail 22 (10-1.26) If 1,875 $3.00 $5,625.00 $1.90 $3,562.50 $1.75 $3,281.25 21 Thermoplastic Pavement Stripe Detail 29 (10-1.26) If 235 $4.00 $940.00 $3.70 $869.50 $3.50 $822.50 22 Thermoplastic Pavement Stripe - 23 Thermoplastic Pavement Stripe - 24 Thermoplastic Pavement Markings - 39 (10-1.26) If 3,800 $2.00 $7,600.00 $0.80 $3,040.00 $0.75 $2,850.t)0 39A (10-1.26) IF 385 $2.t)0 $770.00 $0.54 $207.90 $0.50 $I92.5t) (10-1.26) SF 100 $5.Ot) $50t).00 $4.20 $420.00 $4.00 $400.00 25 Blue Reflective Pavement Markers (10-1.26) EA 3 $2t).00 $60.00 $16.00 $48.00 $15.00 $45.00 26 Relocate and Reinstall Roadway Sign (lt)-l.27) EA I $500.00 $500.00 $215.00 $215.0f) $200.00 $200.00 TOTAL BID $405,630.00 $333,888.40 $385,420.75 RECOMMENDATION: Award contract to Team Ghilotti, Inc. as the apparent lowest responsible bidder in the amotint of $333,888.40 * Corrected math error OTHER INFORMATION: Verified By: Submitted By 3 I agc I of I

GRAPHIC SCALE PROJECT LOCATION PROJECT NAME: OLIVE AVENUE CLASS II BIKE LANES-HSIP PROJECT LOCATION: OLIVE AVENUE FROM SAMROSE TO CITY LIMITS PROJECT NUMBER: 13-009 LOCATION MAP 4