Options. Agenda. Program

Similar documents
Better Market Street Project Update. Urban Forestry Council September 17, 2014

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

FOLSOM-HOWARD STREETSCAPE OVERVIEW

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

Better Market Street Project. Project Update January 15, 2015

Active Transportation Facility Glossary

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

CURBSIDE ACTIVITY DESIGN

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

Chapter 3: Multi-Modal Circulation and Streetscapes

San Jose Transportation Policy

Polk Streetscape Project

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Omaha s Complete Streets Policy

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting

STREETSCAPE CONCEPTS

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Broad Street Bicycle Boulevard Design Guidelines

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

A Guide to Great Streets: The Basics. September 25, 2009

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Protected Bike Lanes in San Francisco Mike Sallaberry SFMTA NACTO Workshop - Chicago IL

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3. Masonic Ave Street Design Study Community Workshop 3 September 30, 2010

6.4 RECOMMENDED IMPROVEMENTS

Report. Typical Sections. City of Middleton, WI

NJDOT Complete Streets Checklist

Active Transportation Rail to River Corridor. Community Meeting - Segment A

Ann Arbor Downtown Street Plan

Safe Routes to School Action Plan Aberdeen, Idaho

RZC Appendix 8A Marymoor Subarea Street Requirements

Streetscape: Core Shopping District

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Lawrence Avenue Streetscape Concepts August 30, 2011

Pedestrian and Bicycle Conditions

TRANSPORTATION COMMISSION Agenda Staff Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Cycle Track Design Best Practices Cycle Track Sections

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Welcome. If you have any questions or comments on the project, please contact:

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

EXECUTIVE SUMMARY. Vision

Geary Corridor Bus Rapid Transit: Staff-Recommended Alternative

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

5 CIRCULATION AND STREET DESIGN

Welcome to the Quebec Alternatives Analysis Public Meeting

City of Seattle Edward B. Murray, Mayor

INDOT Complete Streets Guideline & Policy

Observations and Ideas: Toomer s Corner Streetscape Improvements

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Environment and Public Works Committee Presentation

Multimodal Through Corridors and Placemaking Corridors

NEWMARKET UPHAM S CORNER

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

TLC GRANT K / WATER STREETSCAPE ENHANCEMENTS WILL HANDSFIELD, AICP TRANSPORTATION DIR, GEORGETOWN BID

El Centro Mobility Hub

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

What Is a Complete Street?

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Design Guidelines. Overview. Design Vision for Yellow Brick Road

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Southside Pilot Proposal

WORKSHOP 2 SUMMARY OVERVIEW GENERAL COMMENTS. Walking and Biking. Greening & Stormwater. Transportation & Parking. Lighting, Art and Identity

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

C C C

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

ABOUT THIS OPEN HOUSE

Community Task Force November 15, 2017

Complete Streets. Designing Streets for Everyone. Sarnia

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Miami Health District

TRANSPORTATION NEEDS ASSESSMENT

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

COMPLETE STREETS PLANNER S PORTFOLIO

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

Figure 5-1 Complete Street Zones. Roadside. May include frontage, pedestrian throughway, furnishings and curbside areas.

STONY PLAIN ROAD STREETSCAPE

CURB EXTENSIONS BULB OUTS DPS 201 NECKDOWNS

MARTIN LUTHER KING JR. WAY


Fulton Market Streetscape

Street Design Workshop. Existing cross section Traffic volumes Examine adjacent land uses You design future improvements

PUBLIC REALM MASTER PLAN

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

Transportation Assessment

Off-road Trails. Guidance

Transcription:

July 2013 Workshops

Agenda Parc 55 Main Library Open house 6-6:15pm 10-10:15am Presentation 6:15-7:00pm 10:15-11am Exhibit stations review & comments 7-8:20pm 11am - 12:20pm Meeting close 8:20-8:30pm 12:20-12:30pm Program Station 1: Three options and OWLs Proposals for three different design and transportation options. The options are also represented in a 3-D viewfinder. Options Station 2: Market Street - Six districts Help us create unique identities for Market Street s six districts - be creative! Stations 3-8: Representative blocks & plazas Conceptual designs for four blocks of Market and Mission Streets, illustrating the three design options, two plazas and two examples of proposed wayfinding signage. 3-1st Street to 2nd Street 4-3rd Street to 4th Street 5 - Hallidie Plaza & wayfinding at Stockton and Market 6-6th Street to 7th Street & 5th Street to 6th Street 7 - UN Plaza & wayfinding at Larkin Street and Market Street 8-9th Street to 10th Street

Option 1: Market Street Option 2: Market Street 15 ft 20 ft 13 ft 12 ft 12 ft 8.5 ft 15 ft 9,5 ft 15 ft 15 ft 7 ft 7 ft 8 ft 11 ft 12 ft 12 ft 8.5 ft 12 ft 7 ft 5.5 ft 15 ft SIDEWALK CURBSIDE BOARDING SHARED LANE TRANSIT LANE TRANSIT LANE BOARDING ISLAND SHARED LANE STREETLIFE ZONE SIDEWALK SIDEWALK STREETLIFE BICYCLE TRACK CURBSIDE ZONE BOARDING TRAVEL LANE TRANSIT LANE TRANSIT LANE BOARDING ISLAND TRAVEL LANE BICYCLE TRACK STREETLIFE ZONE SIDEWALK 35 ft 25 ft 12 ft 48 ft 37 ft 23 ft 12 ft 48 ft 60 ft 60 ft Market Street section 60 ft 60 ft Market Street section Streetlife Narrows sidewalk only where new boarding islands are located, leaving plenty of room for Streetlife Zone. Bicycle The existing cycletrack from Octavia to 8th remains with an improved super sharrow shared lane from 8th to Steuart. Pedestrian Retains most of the existing sidewalk space. Improvements include sidewalk widening, redesign of north side crosswalks, and traffic signal improvements. Auto restrictions Due to the shared bicycle / vehicular lane east of 8th, auto restrictions are recommended 7am to 7pm from Fremont to 8th to accommodate peak transit flow from the Transbay Terminal to 5th. Transit Retains four vehicular travel lanes and transit only center lanes. Boarding islands are upgraded to meet accessibility standards and improve waiting experience. Streetlife This cycletrack in this option requires narrowing of the sidewalk, leaving less room for Streetlife opportunities. Bicycle One-way cycletrack in each direction, from Steuart to Grant and 5th to Octavia, provides a safe, comfortable cycling experience. Pedestrian The cycletrack buffers pedestrians from vehicular traffic. The redesign of north side crosswalks and traffic signal improvements enhance pedestrian comfort and safety. Auto restrictions Due to the shared bicycle / vehicular lane from Grant to 5th, auto restrictions are recommended 7am to 7pm from Fremont to 5th to accommodate peak transit flow on Market from the Transbay Terminal, at 1st and Mission, to 5th. Transit Retains four vehicular travel lanes and transit-only center lanes. Boarding islands are upgraded to meet accessibility standards and improve waiting experience.

Option 3: Mission Street + Market Street Mission Street improvements in combination with Option 1- Market Street P 15 SIDEWALK 6.5 CYCLE TRACK 4 BUFFER 11.5 TRAVEL LANE 11.5 TRAVEL LANE 83 8 PARKING 5 BUFFER 6.5 CYCLE TRACK 5th Street-6th Street Section MISSION STREET Streetlife 0 2 4 8 Invites an integrated district that connects Market to SoMa and activates the network of streets and alleys in between. Bicycle A one-way, buffered cycletrack on Mission, in each direction, from South Van Ness to the Embarcadero, with greenwave signal timing (synchronized lights for bicycles). Pedestrian The cycletrack provides a buffer for pedestrians from vehicular traffic, opportunity for additional mid-block signalized crosswalks on Mission, and wider sidewalks at 1st to 2nd and 3rd to 4th. Auto restrictions Maximum auto restrictions on Market are recommended 7am to 7pm from Steuart to Van Ness. New left turns from Mission help facilitate traffic crossing Market. Transit The 14/14L, Golden Gate Transit and SamTrans bus lines move to Market. This proposal requires making Market the transit priority corridor. Bicycles and automobiles would primarily use Mission. Parking and loading Parking on one side of Mission retained on most blocks west of 4th. Also, there will be locations for floating parking and loading between the vehicular lane and the cycletrack buffer. 15 SIDEWALK Mission Street section Market A-Z

BART portals BART is in the design phase of a project to install canopies over selected entrances to protect customers, employees and the escalators by providing better lighting at the entrance, the addition of security cameras and a way to close off the escalator stairwell when a station is closed. Current concepts call for a durable, transparent shelter which fits into the surrounding cityscape and incorporates environmentally sustainable features such as natural lighting and ventilation. The canopy is intended to not only provide a welcoming entryway into BART but to also extend the service life of the escalator, reduce repairs and improve reliability. The raised cycletrack will be a 7- to 8-foot wide lane with a 3-inch rolled curb for easy transition into the adjacent vehicle lane. It increases safety by reducing conflicts with buses and vehicles. Based on the current operating conditions on Market Street, cyclists traveling in a dedicated cycletrack will be able to maintain an average speed of 12 mph. The cycletrack makes it easier to pause, stop outside a store or use other amenities along the street; making a safer experience for cyclists of all ages; and minimizes maintenance costs because of limited motor vehicle wear. Cycletrack on Market - raised A cycletrack is part of a long-term investment requiring curb changes, utility upgrades, and other infrastructure modifications. This model is more costly and allows less flexibility for future growth, but adds a permanent dedicated bicycle facility.

ST OV Market Street - six districts E HY DE GR ST EXPANDED PEDESTRIAN ZONE SHORTER CROSSING Eliminating pedestrian islands A unified design is proposed for Market Street with each district s unique identity expressed through Streetlife Zone furnishings. Help us create unique identities for Market Street s six districts by visiting Station 2! Market Street s six districts: Embarcadero (Embarcadero-Fremont) Financial (Fremont-3rd) Retail (3rd-5th) Mid-Market (5th-7th) Civic Center (7th-Van Ness) Octavia (Van Ness-Octavia) Pedestrian improvements bulbout SHORTER CROSSING NEW BULB-OUT AT CORNER 8TH ST WIDENED SIDEWALK STREETLIFE ZONE 8th Street & Hyde Street Hot Spot CYCLE TRACK OPTION 0 20 40 80 CYCLE TRACK PEDESTRIAN ZONE Bulbouts TRANSIT LANE ONLY Adding bulbouts and redesigning the complicated north-side intersections creates a safer, more comfortable pedestrian experience. Bulbouts slow traffic crossing Market Street enhancing pedestrian safety. Eliminating pedestrian islands Extending the sidewalks would eliminate the need for midintersection pedestrian islands, improving safety and comfort and speeding the crossing time. The Embarcadero District extends from the Embarcadero to Fremont Street

Pedestrian throughway A 15-foot area of the sidewalk between buildings and the Streetlife Zone for clear pedestrian movement. Stormwater treatment planters Streetlife Zone stormwater runoff planter inlet bio-filter planter bio-filter soil media under drainage cleansed water to storm drain The stormwater planter is a functional landscape area designed to allow rainwater to flow into the ground instead of the overburdened sewer system, reducing the chance for flooding. It provides a high-density spacing of trees, shrubs, and groundcover that maximizes the ability for plant roots to clean pollutants and absorb runoff. Road surface variation A super sharrow is a wide green area striped to emphasize a shared space for bikes and vehicles. They contribute to traffic calming, increased awareness and a more pedestrian-friendly environment. Unique paving between sidewalk and boarding islands to alert vehicles this is a highvolume pedestrian area. Shared lane with super sharrow

Streetlife Hub Areas on Market Street for street furnishings, art and other activities where there is adequate space and key adjacent activities. Streetlife Hubs are within the Streetlife Zone. Streetlife Zone The Streetlife Zone is a multi-use zone located within the existing sidewalk width, between the curb and the pedestrian throughway. The zone creates a unique Market Street experience through design, materials and furnishing elements, which accentuate the best elements of each district.

Transit Boarding islands Current transit boarding islands are neither wide nor long enough for customer comfort and vehicle needs. The new designs will accommodate three or more buses, give waiting passengers more space, and comply with ADA guidelines to incorporate wheelchair ramps. (Minimum 8-feet wide x 175-feet long) Enhanced Local In the Enhanced Local transit option, the Local and Limited buses will stop at common locations. Bus lines will run in the center or curb lanes depending on their destination: Ferry Building lines in the center and Transbay Transit Center (TTC) lines curbside. Rapid In the Rapid transit option, Local and Limited buses will have separate stops. Limited buses will stop at the boarding islands and Local buses will stop at curbside stops. The Local and Limited stops will be 1/2 to 1 block apart.

Mission Street cycletrack with buffer The Mission Street cycletrack is 6- to 8-feet wide and separated from vehicular traffic by various types of 2- to 5-foot buffers such as paint, landscaping and safe-hit posts. A cycletrack makes it easier to pause, stop outside a store or use other amenities along the street; makes people, especially young and senior bicyclists, feel more safe; and minimizes maintenance costs because of reduced motor vehicle wear. Mission A-Z With bicycle-preferential signal timing (green waves), people on bicycles will receive fewer red lights and maintain an average speed of 14 mph. The Mission Street design will also allow left turns.

Continuous sidewalk A continuous sidewalk or table crossing enhances pedestrian safety and comfort by identifying the crosswalk as primarily pedestrian space. The sidewalk remains at curb level across the intersection requiring cars to drive over an elevated crosswalk that functions like a speed bump. This design is proposed for alleyways along Mission Street. Owl World premiere! Linden Alley, SF There are sections along the Mission Street where a wide cycletrack buffer is proposed, creating an opportunity for flex space. Due to Mission Street s 15-foot sidewalk, there is little space for street furnishings or other streetscape amenities. Flex space could be used for street furnishings, a bike corral, more robust landscape planting, or other urban design ideas identified for each location. Flex space 9th Avenue, Manhattan via NYC DOT s Street Design Manual The OWL allows users to immerse themselves in a 3-D model of Mission and Market streets of the future based on the designs presented at this workshop. OWL was designed to be a civic engagement tool to give the public a more detailed, immersive look at proposed construction projects. It is styled after art deco-style coin-operated binoculars, providing a familiar and inviting user experience. OWL was created by San Francisco-based Owlized and is powered by Autodesk, maker of 3-D design software. The device prototypes were designed using Autodesk Fusion 360 cloud service and run Autodesk InfraWorks software. They were 3-D printed at the Autodesk Gallery at One Market St.

Agency Teams Working on the Better Market Street Project: City Team San Francisco Department of Public Works San Francisco Municipal Transportation Agency San Francisco Planning Department San Francisco County Transportation Authority San Francisco Public Utilities Commission Office of Economic and Workforce Development Design Team Gehl Architects - Prime, Urban Design Lead Perkins+Will - Project Management CMG Landscape Architects - Streetscape Design Transportation Team Parisi Associates - Transportation Planning Nelson\Nygaard - Transit Planning Fehr & Peers - Bicycle and Vehicular Planning Specialists Kate Keating Associates - Wayfinding CHS Consulting Group - Transit Planning Urban Design Consulting - Civil Engineering CirclePoint - Outreach William Kanemoto Associates - Visualization A&M Printers - Printing Stormwater Management Study Nevue Ngan - Lead Design Wilsey Ham - Engineering bettermarketstreetsf.org