Advisory Group Meeting #7. March 9, Transcribed Breakout Group Discussion Notes.

Similar documents
Federal Way City Center Access Study Comment Log Summary

Comments Heard PUBLIC INFORMATION CENTRE #1: SUMMARY

Technical Briefing Rapid Transit

PUBLIC OPEN HOUSE. Panet Road / Molson Street Reconstruction. April 24, 2013

PUBLIC OPEN HOUSE. Preliminary Engineering Study to Upgrade the Pembina Highway Underpass MAY 9, 2012

Location Consider areas in your community to focus attention on pedestrian safety. Example locations include:

2017 Active Allegheny Grant Program Program Guidelines

Presented by: Presented to:

CHAPTER 4 VISION, GOALS AND OBJECTIVES

Atherton Middlefield Road Bicycle Lane Improvements Public Meeting

COMPLETE STREETS HANDBOOK CHECKLIST Philadelphia City Planning Commission

CARLSON BOULEVARD CARLSON BOULEVARD CORRIDOR OVERVIEW EXISTING CONDITIONS. Maine Avenue to El Cerrito Plaza BART Station

North Avenue Reconstruction Project Context Sensitive Solutions Advisory Group Meeting #4

City of London Transport Strategy

Binghamton Metropolitan Transportation Study Pedestrian & Bicycle Advisory Committee Meeting Minutes April 14, 2008

The timelines for the proposed short-term, medium-term, and long-term improvements to the corridor be accelerated.

Livermore Harley Owners Group RIDING WITH LIVERMORE HOG

Parking Committee Report to Commissioners AUGUST 17, 2018

Stakeholder Working Group (SWG) Meeting #2 Summary

Pedestrian Safety Fourth Grade Lesson 1. Subject: Health, Physical Education

TRANSPORTATION DISCUSSION GROUP Laptop notes (as projected on screen during the meeting) Monday, June 10, 2013

Project Advisory Team Existing Conditions Meeting Agenda

South Portland Public Input Meeting Summary Notes and Public Comments

PSOMAS MEMORANDUM. North Santa Monica Boulevard Resonsturction PROJECT: 1BEVO PSOMAS Project No.

Bikeway Classification

SALT LAKE CITY BICYCLE ADVISORY COMMITTEE. Minutes of the August 15, 2016 Meeting

Community Meeting September 29, :30 7:30 p.m. Leataata Floyd Elementary School Multi-Purpose Room 401 McClatchy Way, Sacramento.

Tilghman Elementary School Facility Utilization Committee Meeting Talbot County Education Center Meeting Minutes November 20, 2017

Advisory Group Meeting Notes

Richmond District Strategy Community Conversation December 10th Meeting Notes. Table #1 Facilitator and Note Taker: Brittany Bendix and Victoria Chong

Working Group Meeting #2. One Financial Plaza 1350 Main Street 3rd Floor, Community Room A Springfield, Massachusetts

EXECUTIVB SUMMARY Regular Board Action Item 98 Approval of Revised Regional Roadway Network M"p, Revised Criteria and Joint Resolution

Active and Safe Routes to School Surveu Summary Program

Lamb Boulevard Safety Management Plan Between E. Desert Inn Rd. to Lake Mead Blvd. Clark County, NV

Project No.: Notes taken by:

SANDYFORD BUSINESS DISTRICT SUMMARY OF AREA WIDE MOBILITY MANAGEMENT PLAN.

Sellwood Bridge AM Traffic Evaluation

General Industry Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems

TECHNICAL MEMORANDUM

Alternative Ways to Improve Traffic on Loop 360 Paul Schumann 1

Nine Elms Lane and Battersea Park Road

Topic Sheet No. 2 Near misses: Learning from failure

Activity 2: The Incredible Journey

BaseStation 1000 Irrigation Controller Keeping a Pond or Cistern Full

Bus Driver Job Description

NOCRA Newsletter. Breaking News. In this issue: Breaking News. President s Update. New Rating System. Treasurer s Update. Thank You for the Memories

Make your own AUSTRALIAN CITIZENSHIP AFFIRMATION, customise and publish it

TITLE TEXT. School Start Times Exploration Update. Presented by Scott Nielsen

TDM on the Web. How To Use TDM On The Web. Below is information and instructions for using the scheduling modules in TDM

RM Checklist Client Version

DRAFT - TRANSPORTATION AND PUBLIC HEALTH

STEVENSON HIGH SCHOOL

DRAFT Active Transportation Work Plan

2.0 VISIONING DIRECTION

Stickin Together: Surface Tension, Cohension, and Adhesion

Crusader Senior Girls Summer Workout Program:

Date of SIG Team s LEA Visit: June 20, 2014 Date of SIG Fiscal Team s Visit: June 20, 2014

Neighborhood Discussion and Walk Notes Prepared by RBF and Lamphier-Gregory employees.

Understanding IRB Office of Research Integrity

Mission Bay Loop Project. Operations & Customer Service Committee August 9, 2016

Phase 1: Station Area Planning. Golden Valley Road Parking Management Strategies Assessment. Purpose. Context. Parking Management Options

City of Ottawa. Transit Solutions. O c t o b e r

A template mass rescue operations plan

Carlsbad Galaxy 2018 Referee Meeting

Quebec Street Multimodal Improvement Project Open House Summary September 27, 2017

Tubing Group Guide. Wilmot Mountain Tubing, a Vail Resorts Company Fox River Rd. Twin Lakes, WI 53181

Subject: Recommended Updates to Transportation Development Parameters

CITY of LOMPOC 2030 General Plan

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p

Let s go through the mechanics of air resistance that way we can understand why an aero helmet may be a good option for someone.

Cycling Strategy Group. Terms of Reference

June 11/12, Summer Time Week 1

Danny O Rourke Navy Slotbacks Coach Mpls Glazier No Huddle and Tempo Strategies

2. Don t Forget Your. Introduction. Activities. Equipment. Setup. A look at the personal and group equipment teams carry for safety and rescue.

American Association of State Highway and Transportation Officials

PILKINGTON RESPONSE o Rich Martinko returned call on 8/10/2014 at 2:50pm and spoke with Ms. Pilkington o The information below was given to her.

Traffic & Safety Update

OFFICE OF THE WATERFRONT July 6, 2015 KING COUNTY METRO

Grade 11 Performance Task

Introductory Training Guide. for. All New Students. Piscataway Martial Arts. www. PiscatawayDojo. Org. Belongs to. Student Name. Training Started On

MISSOURI STATE 4-H COUNCIL REGIONAL REPRESENTATIVE APPLICATION

Year 1 for New School Counselors

3 ways to build a healthy future for NSW

SVJFAC 2016 Review HIGHLIGHTS ACCOMPLISHMENTS

Visit Leader Emergency Action Card

Public School Choice EBR Guidance. North Banks Middle School

800 and 1600 Meter Training and Racing. Natalie Reyes Women s Middle and Long Distance Track Coach at Cherry Creek HS

Glenmore State School Executive Summary

Completed Project Justification Package Example

Appendix C. Travel Demand Forecasting Technical Memorandum

Prepared by: TH STREET SUITE 2301 DENVER, CO CITY AND COUNTY OF DENVER. n W

Referee Mentor Handbook

Selection Policy for Badminton Australia Support Structure (BASS) and National Squad.

Cantilever Beam Bending of Soft Tissue

Moura State School Executive Summary

The Facts About Brentwood School s Expansion Plans

Who s Your School Breakfast Star? Writing Contest Official Rules

Marburg State School Executive Summary

CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE

NCOA Softball Sacramento 2018 Study Session #2 Questions & Mechanics

Transcription:

Advisry Grup Meeting #7. March 9, 2017. Transcribed Breakut Grup Discussin Ntes. Discussin Questins. What feedback have yu heard frm yur cmmunities abut the near-term strategies? What d yu think wrks abut Optin B and where culd it be strengthened? Are there specific elements frm Optin C that yu wuld like t see carried frward? What wuld yu like t see included in the additinal analysis f Optin D? (Specific cncerns that shuld be analyzed? Suggestins yu ve heard frm peple fr hw t imprve it?) Grup 1. Cnsider car/bike parking at hubs, cnsider capacity fr bikes n buses/trains. Drp percent at hubs. Pedestrian mvement at hubs. Cnsider hub t uter edge f dwntwn (i.e. SODO, Stadium). Add capacity fr transit t accmmdate future grwth and enfrcement f transit pririty. Cnnected bike netwrk. Bus transfer: balance time savings with custmer need. Need better data n bus vlumes needed t understand impacts. Impacts t adjacent neighbrhds. Relatinship near-term t lng term. Each cnstituency has its needs. Why nw? Can we delay clsure f DSTT? Shuld be dne regardless. Mre enfrcement/3rd Ave transit nly, especially peak. 24/7? Speed barding at bus stps all rutes. Turns n/ff 3rd Ave affect flw. Safety: crime, perceptins f persnal security. Imprve n 3rd Ave t demnstrate hw 5th Ave culd wrk. Supprt analysis with additinal data, change vlume f buses. One Center City Advisry Grup Mtg. 7 Page 1 f 5

Balance transfer penalty time versus changing bus. Incentivize the transfer t encurage/supprt change in behavir. Partial 2-way 5th Ave versus entire crridr? Freeway access. Understand sidewalk impacts. Lk at ther examples f successful transit streets (Zurich). Optin D lite i.e. SB nly. Imprve 3rd Ave befre addressing 5th Ave. Hw d the tw differ? Why? Grup 2. Need t better understand extents f transit nly n 5th Ave and impacts (in prep fr IDS/C neighbrhd). Optin B elements easily implemented - little impact t peples experience. Real time inf at stps imprvement and can speed barding. Better experience. Service alerts needed. Freight, delivery, lad-znes, I-5-thrugh traffic - full netwrk. Mix and match apprach - additinal capacity. SB 5th Ave (transit nly)? 2-way 6th Ave? Alley use. Signal cnflict/sequence. Dn t fld ID with buses. Hub further suth. Dn t truncate 550/41. Better freight data. Ped imprvements t 1st Ave. Cntinue 5th Ave analysis transit crridr. Wayfinding signage (language barriers). Lw incme fare changes. Fare free zne. NB 4th/SB 5th avenues- bike lanes. Additinal SB dedicated bus lane. NB 4th/SB 5th avenues- bike lanes. Additinal SB dedicated bus lane. 2-way 6th Ave. N tree remval. Optimize 3rd Ave (stp frequency adjustment). 6th Ave - width fr 2-way cmfrt. Further investment in TDM. One Center City Advisry Grup Mtg. 7 Page 2 f 5

Grup 3. 5th Ave design fr transit/public realm can make it wrk. Better understanding f implementatin. Bus numbers. Impacts utside cre (all ptins). Maximize hubs. Simplify access t ORCA/relad/prelad/apps. A lt f interest in cmpletin f CCBN. Lack f general knwledge n what dwntwn is facing (buses ut f tunnel). Need mre utreach/cverage. Dn t knw hw rutes are changing. Lt f ther transprtatin effrts- hw d these align? Bring these int the fld. Need mre educatin/media cverage. Dedicated t bus lanes/signal pririty is critical. Lt f transprtatin prjects/utreach, versaturatin. Dn t want t make 5th Ave like 3rd Ave. Nt walkable; n sense f place. What is it abut 3rd Ave that desn t wrk? Transit nly = n retail. Public safety/enfrcement. Activity n 5th Ave cunteracts litering. T make transit n 5th Ave wrk, we need a blck by blck apprach. What wuld the cnstructin transitin n 5th Ave lk like? Shppers avid 3rd Ave. What wrks? Hw t strengthen? Need a 2-way prtected bike lane. Cannt remve sidewalks. Wrks- includes prtected bike lane. Need dedicated transit lanes. Need t elevate priritizatin f transit. Idea- have buses/streetcar n first. Have lack f cnsensus here. Optin C. Like priritizatin f transit. Dedicated transit lanes. Like a 2-way, mre functinal 6th Ave. Need wider buffer between radway/sidewalk. Like spreading transit acrss multiple streets (2nd, 3rd, 4th, 5th avenues). One Center City Advisry Grup Mtg. 7 Page 3 f 5

Hw are we ging t get mre bicyclists n 2nd and 5th avenues? What t include in additinal analysis? Need t justify making 5th Ave a transit crridr. What wuld the user experience be? Need t knw what went wrng with 3rd Ave. Hw will yu imprve the pedestrian experience n 3rd Ave? Prve 5th wn t get wrse by imprving 3rd Ave. Hw wuld Optin D impact travel times dwntwn; when cmpared with Grup 4. Hw wuld bus peratins n 5th Ave wrk? Need specificity. Des this pen up any public realm pprtunities? (i.e. widening sidewalks). SCA: cncerns abut bus restructure, impacts n the regin. Light rail capacity cncerns, and fleet arrival. When is analysis ready? Basic bike netwrk mving frward. Public realm n 5th Ave. Hw t keep it a beautiful street. Like legibility f 1st, 3rd, 5th avenues as transit. Get bike netwrk built. Cncerns abut sidewalk capacity n 5th Ave. Pedestrian realm needs t be cnsidered during cnstructin. SOVs need t be at bttm f the list. Separate transit riders/pedestrians with design. Intuitive design, even transit barding. Optin B lks gd. Parklets, public spaces n 5th Ave. Fr visitrs, t. Bikes, trucks, buses chabitating in cnventin center neighbrhd with expansin. Safety, ease f transit. Wayfinding - neighbrhd identity. Optin D did mst fr transit initially, but willing t pick best elements amng ptins. Signal imprvements n 2nd Ave are gd. Sidewalk/curb reductin f 5th Ave - shuld be maintaining/expanding. Cnstructin timing and hw it fits int near-term strategies. Lks durable. Want mre frm B - stepping stne t D. Mre transit pririty. Optin C. Keep: bus cuplet fr 4th/5th avenues if alleviates ptin D cncerns (fr B?). Replace general purpse lane with transit lane (5th Ave). Tw-way bike and transit capacity n 4th/5th avenues. One Center City Advisry Grup Mtg. 7 Page 4 f 5

What is the impact t sidewalks (reductin)? Mre detail n 5th Ave crss-sectins. Tree canpy. Retail and transit cnnectins transparency. Time savings fr 5th Ave passing lane (benefit) vs tw-lane cnfiguratin. Access t CID - impact frm 5th Ave changes (retail). 6th Ave: tw-way better fr pedestrians and mre detail t better understand hw this wrks. One Center City Advisry Grup Mtg. 7 Page 5 f 5