MEMORANDUM. DATE: October 6, Mayor & Council Members. Mike Anderson, Assistant to the City Manager. City Manager s Report

Similar documents
July 9 Mom's the Bomb at Waseca Waterpark th Ave NE (Mom's get in free with a paid child's admission.)

MEMORANDUM. DATE: September 28, Mayor & Council Members. Mike Anderson, Assistant to the City Manager. City Manager s Report.

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

IL Route 71 Construction Update

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

Project Update May 2018

Legislative Update Williamsburg Residency

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

CITY OF EPHRATA NAT WASHINGTON WAY OVERLAY TIB NO.: 3-E-164(003)-1 CITY OFFICIALS. Bruce Reim. Mayor. Tony Mora, Jr. City Council

UPDATES 11/14/2018: 10/25/2018: CLOSED 10/22/2018: 10/12/2018: 10/05/2018: 09/27/2018:

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

WESTERN PLACERVILLE INTERCHANGES PHASE 2 PROJECT CIP # 41828

Hospital Link Project Project Update September 2017

MEMORANDUM. DATE: July 8 th, 2016 MAYOR & COUNCIL MEMBERS DANNY LENZ, CITY MANAGER CITY MANAGER S REPORT

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

Traffic Control Inspection Checklist Segment:

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #2

Duwamish Way-finding and CTR Report

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

Driveway Design Criteria

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE

Building Great Neighbourhoods LANSDOWNE

MEMORANDUM. DATE: April 1 st, 2016 MAYOR & COUNCIL MEMBERS DANNY LENZ, CITY MANAGER CITY MANAGER S REPORT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

Downtown Redevelopment Project Update

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

CITY OF ROSEVILLE DESIGN STANDARDS

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

Water Street Promenade Engineering and Design Services

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

APPENDIX E GRADE CROSSING LOCATIONS

^Lee County Jt Sotft^West T:foH^a Lee County

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

Comments EXECUTIVE SUMMARY

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

Design Criteria. Design Criteria

Doug s Corner. Contractor s Weekly Update. In this issue: NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP SSWJV SAFETY QUALITY COURTEOUS

Department of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

Work Session. Agenda Item # 4. Meeting Date September 8, Daryl Braithwaite Public Works Director. Prepared By. Suzanne R. Ludlow City Manager

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

SECTION 3 STREET DESIGN

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

Traffic Control & Road Closures for Special Events

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Cincinnati Dayton Rd Widening

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

FDOT Treasure Coast Traffic Report

Building Great Neighbourhoods QUEEN ALEXANDRA

ACTION TRANSMITTAL No

Public Involvement Outreach Requirements for Public Information Open House Meeting: C.N , HSIP-5003(12) 132 nd and West Center Road, Omaha

Active Transportation Facility Glossary

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

section 4 Existing Conditions, Issues, and Options

Citywide Sidewalk and Crosswalk Programs

122 Avenue: 107 Street to Fort Road

Tonight is for you. Learn everything you can. Share all your ideas.

TRAFFIC STUDY. Birch Bluff Road / Pleasant Avenue 01/15/2018. City of Tonka Bay 4901 Manitou Road Tonka Bay, MN WSB PROJECT NO.

Lake Waterford Community Association Meeting. November 15, 2016

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE. February 2nd, 2015 Volume 2, Issue 107.

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Transportation Impacts: Toronto York Spadina Subway Extension

Traffic Calming Policy Manual

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

Blair/Williamson Intersection Expressed Needs

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Item No. 14 Town of Atherton

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Building Great Neighbourhoods BONNIE DOON

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE

Project Team Project Background Project Improvements Proposed Construction Approach Traffic Impact and Mitigation Next Steps Questions/Comments

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

Illini Union Champaign, IL. February 24, Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering

Mandan Commission Meeting August 2, 2016 Mandan City Hall

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

CTH M HIGHWAY PROJECT CTH Q to STH 113

Transcription:

MEMORANUM ATE: October 6, 2017 TO: FROM: SUBJECT: Mayor & Council Members Mike Anderson, Assistant to the City Manager City Manager s Report Old TH HWY 14/Elm Ave Update *Please see attached document* for updates Leaf Pick Up The Cities leaf pick up program begins on Monday, October 9. Please click on this link to view the schedule and location of pick up in your area. Maps are also available at City Hall. http://ci.waseca.mn.us/2017/09/2017-leaf-pickup/ Waseca Upcoming Events October 8 Waseca Fire epartment Open House - Chili Feed - Bake Sale 4:00 PM - 7:00 PM Waseca Fire epartment (North oors) 303 South State Street October 10 Social Security: Strategize to Maximize 6:00 PM - 7:00 PM Central Building, Room 153 501 East Elm Avenue October 13 Homecoming Parade 2:00 PM - 3:30 PM October 14 The Great Fall Get-Together - Waseca Art Center 6:30 PM - 9:30 PM Lakeside Country Club

October 15 Harvest Hustle 1:00 PM - 3:00 PM Farmamerica Waseca Library Events Level Up: Bloxels Build a video game from scratch using a Bloxel gameboard, colored blocks, and an ipad at Waseca Public Library on October 9th at 4 pm. Registration required. This free event is geared for ages 7-12. Stop by the Library to register or call 507-835-2910. Sponsored by the Jane and John King Family Fund Please contact Waseca Public Library (507-835-2910 or lienemann@tds.lib.mn.us) with questions.

508 South State Street Waseca, Minnesota 56093-3033 507-835-9700 FAX 507-835-8871 www.ci.waseca.mn.us October 6, 2017 Old TH 14/Elm Avenue Weekly Construction Updates Week 17 The City of Waseca and its project partners intend to send out and publish a weekly construction update on the Old TH 14/Elm Avenue Reconstruction Project. This weekly update will be issued through the weekly City of Waseca City Manager s City Limits report available at the City s website www.ci.waseca.mn.us, the Project website http://ci.waseca.mn.us/old-trunk-hwy-14elm-avenue-updates/ and is published online via the Waseca County News. Questions about the contents of the weekly updates or about the project in general can be directed to the City s contracted consulting engineer Joe Palen, Project Manager with Stantec at either 507.529.6036 or joseph.palen@stantec.com or Mark uchene, Waseca City Engineer at either 507.835.9716 or markd@ci.waseca.mn.us Additionally, project representatives have set aside time every Thursday from 12:30-1:00 pm to be available at Waseca City Hall, 508 South State St, Waseca, MN 56093 to answer questions. No appointment is necessary and if this time doesn t work, please contact either Mr. Palen or Mr. uchene to set up a meeting at a mutually convenient time. If there is an emergency within the construction limits outside of normal business hours please call 507.835.9718 and the 24 hour answering service will contact the appropriate parties. Previous Week Review 9/30/17-10/6/17 Work on the eastern phase of the project between 13 th St SE and 3 rd St SE continued with the last of the installation of catch basins at the 4 th Street intersection and last of the sanitary sewer and watermain services were also installed and the temporary water lines were removed. Gravel was extended in the road section up to 7 th Street and concrete pavement was poured on the south half of the road from just west of 9 th St to Clear Lake. See the end of this update for important information related to concrete paving operations. Work on the western phase included concrete paving of the shoulder and turn lane to Vista Villa Court on the north side of the road. Work was also completed on the deep sanitary sewer reconstruction between 10 th St NW and 7 th St and the watermain was also completed in this area and work began on installing the water services. Work also continued on the trunk storm sewer between Veterans Landing and 8 th St NW. Next Week Look Ahead 10/7/17-10/13/17 Crews will continue installing sump pump connection lines that connect to the road drain tile system in conjunction with subcutting the road and installing the sand and gravel from 5 th St to 3 rd St. If a property has an existing sump pump discharge pipe near the curb, the contractor will connect it to the new drain tile system. If there isn t an existing sump line, a future connection line is being installed to each residential property and will terminate on the house side of the sidewalk. Concrete roadway paving will also continue on the north part of the road between 8 th St and Clear Lake as

soon as the concrete on the south side is cured / strong enough to accommodate concrete truck traffic and as the weather allows. If the weather cooperates concrete may also be poured on half the road from 8 th St going west to 3 rd St. On the western part of the project, crews will continue to install the water services and storm sewer from near Veterans Landing and progressing east to 8 th St NW. The road will also be subcut and sand and gravel installed on the section from Veterans Landing towards 10 th St NW as construction and the weather allows. Concrete pavement construction of turn lanes and intersection connections will continue between Veterans Landing and Brown Avenue as weather conditions and construction sequencing allows. Traffic Control/etour Notes uring the duration of the project and through the entire project limits which extend from the western City limits (west of Brown Avenue) to the eastern City limits (east of Clear Lake rive), thru traffic (traffic traveling to/from Mankato and Owatonna directions) will be detoured off Old TH 14 on the east side at NW 92 nd Ave/CSAH 18 near Meriden and on the west side at 110 th St/CSAH 27. Portions of Old TH 14 within the project limits may be signed Road Open to Local Traffic or something similar. Please keep in mind that local traffic/access is defined as having direct access on Old TH 14, or having business with someone or a business who has direct access on Old TH 14. If you do not fall into either of these two categories, you should not be on Old TH 14 within the project limits at any time. Travel on Old TH 14 within the project limits should take place only when there is no other possible alternative. An updated local alternative access map is attached showing proposed access routes based on the following week s proposed construction activities. Note this map is intended to be updated weekly as construction progresses and every effort will be made to keep this map updated and as accurate as possible, but construction activities may require alterations to access routes before a new map is sent out. An interactive copy of this map is also available at: https://wasecacity.maps.arcgis.com/apps/publicinformation/index.html?appid=56178b878ee64926be6fd7be5f6e4460 Project Area West of TH 13 Old TH 14 will have a road closure from 6 th St NW to Lake Street/Experiment Station Road; however, access to the Vista Villa Mobile Home Community; Veterans Landing and impacted residential properties will be maintained via temporary roadway configurations. Two-Way access to HWY 14W Mini-Storage, eml Ford, Waseca Chrysler, Rent N Save and Vista Villa will remain open from the west project limits on the new concrete pavement and from the Lake Street/Experiment Station Road intersection as well. Access to Vista Villa has again been shifted to the temporary driveway west of Waseca Rent-N- Save. Please pay close attention to the signage on site and drive slow as there will still be some work to be completed in these areas even after they are open to traffic. The intersection of Brown Avenue and Old TH 14 will remain closed. In order to accommodate storm sewer construction, access to all properties west of 10 th St NW including Veterans Landing and the Waseca Mutual Building will be from the west via the Lake Street intersection. Access to properties east of 10 th St NW including, Latham Place, Lakeshore Inn, and residential will be provided via temporary access route including routing through the Latham Place parking lot. Please review the attached detailed access map and pay close attention to signage. See attached maps for alternative access routes to/from town, as well as business access routes. The interactive traffic map indicated above will be updated with the road closures when they occur. Project Area East of TH 13

Old TH 14 will remain a hard road closure from 3 rd St East to 13th St SE. Residents may access their properties through the road closure as construction activities and site conditions allow. The contractor will make reasonable efforts to provide access to residential driveways between the hours of 7pm and 7am. Please note that the road sections under construction are closed to non-local traffic and local traffic may enter the closed road sections to access their properties at the property owner s risk. If a property owner has questions about whether or not they should drive in the construction area or needs accommodations for service work, etc., the property owner should make contact with the project team or onsite construction worker to discuss their access needs. Intersections on Old TH 14 between 3 rd St E and 11 th St SE will be open for traffic crossing Old TH 14 unless there is work being done in the intersection or concrete is waiting to reach cure strength. These intersection closures may change daily so please drive slow and pay close attention to construction activities and signage. Access to Barney s rive In, Lodging at Lake Aire, Memorial Park, Maplewood and Kiesler s Campground is open from the east on Old TH 14 or from the west via 13th St SE to Old TH 14. IMPORTANT REMINER: Even though portions of the roadway are constructed though a gravel surface and vehicle access conditions are improving, the roadway is still an active construction site and there are numerous obstacles such as manholes and gate valves that extend above the gravel surface in the roadway that drivers need to pay attention to and avoid. Please drive slowly and pay careful attention if you are driving in the construction area. CONCRETE PAVING INFORMATION: The following is meant to detail the typical sequence for concrete paving operations in the residential areas once the gravel road subgrade has been installed. Concrete road construction is a lengthy process because of all the cure times needed before traffic can be allowed on the new concrete surfaces. If at any time you have special or emergency access requirements please contact project representatives as early as possible. 1. Crews set a string-line which is the guide for setting the elevations and grade for all the concrete paving operations. Please do not remove or cut the string line once it is set up. If you have an absolute need to get through the string line, please contact one of the project representatives on site. Every time the string line is disturbed it has to be rechecked and this can significantly delay the paving operations progress. 2. A gravel trimmer is used to fine tune to the gravel surface elevations and grade based on the string line. 3. Metal dowel baskets and rebar reinforcement is placed on the gravel surface. 4. The concrete paver paves half the road. uring concrete paving, access to both sides of the road adjacent to the paving area will be closed as the concrete trucks delivering the concrete to the paver will be blocking the half of the road not being paved. Each paving segment should take a day to pave. 5. Joints are sawed in the concrete. Joints are sawed at an appropriate time based on the timing of the concrete cure which is largely dependent on the temperatures. Concrete sawing may occur outside of normal working hours and extend into the night. 6. Concrete joints are sealed. 7. Once the concrete has reached the minimum cure strength, the new concrete road will be open to traffic. Once this happens the same sequence will be repeated for the other half of the road. 8. Once both sides of the road are paved, the concrete curb and gutter will be placed on the outer edges of the new concrete pavement. This will again limit access into driveways until the curb has again reached cure strength (estimate at 5-7 days after it is poured). 9. After the curb is installed the concrete driveway approaches and sidewalks will be installed. Again, each concrete pour requires cure time (5-7 days) before traffic can be allowed on it.

110th St 2nd St NW N State St MINNE S O T ªA 11th St SE To / From Mankato 14 360th Ave Brown Ave Closed SW Of Railroad Tracks Hwy 14 Mini Storage Storage eml eml Ford Ford Quad/Graphics Brown Ave Waseca Waseca Chrysler Chrysler Rent Rent 'N Save Save Vista Vista Villa ROA CLOSE See West Elm etail Map For Access To Properties Between 120th St & 8th St 350th Ave 375th Ave 120th St 362nd 123rd St Ave W Elm Ave via CSAH 27, 40 / University Ave & 4th St SW 7th Ave NW SROC 128th St 4th St SW University r S State St To / From Waterville ß13 3rd St NE 4th St NE St SE 5th 8th Ave NE 8th St SE 8th St NE E Elm Ave Intersections of 11th St SE & 9th St SE Closed For Concrete Paving Access May Be Available On North Side Of Elm Ave ClearLake r via 7th Ave NE, 3rd St NE, 8th Ave NE, Clear Lake r ROA CLOSE Boat Ramp Barney's 355th Ave Park Kiesler's via 8th St SE, 5th Ave SE, 355th Ave & 150th St - OR - 8th St SE, 4th Ave SE, 13th St SE 145th St 345th Ave To / From Owatonna 2. Old TH 14/Elm Ave Project Non-Posted Local Access Alternative Routes Week of October 9 2!. 340th Ave ± Current Construction Area Non-Posted Local Access Alternative Route Road Open for Resident and Business Access Road Closed to All Traffic Intersection Open to Traffic Crossing Old TH 14 / Elm Ave EXCEPT When Work Is Taking Place In Intersection Intersection Open to Traffic Crossing Old TH 14 / Elm Ave 0 0.25 0.5 Miles To / From New Richland 150th St isclaimer: The data represented on this document is neither a legally recorded map nor a survey, and is intended for reference purposes only. The information presented has not been verified and neither the City of Waseca, nor its employees or agents makes any representation to the accuracy of the features and data presented here within. This map was created through the use of several city, county, state and federal data sources. For specific information regarding this map, or to report errors or omissions, contact the City of Waseca Engineering epartment. Map #20170601-1 ate Printed: 9/29/2017

2nd St NW S State St MINNE S O N State St T ªA Two Way Traffic On New Concrete Of Elm Ave Vista Villa Use Temporary Access Road 10th St N W 10th Ave NW Between CSAH 27 and Brown Ave 360th Ave 110th St Brown Ave Brown Ave Closed SW Of Railroad Tracks Access To/From Experiment Station Rd & Lake Street 10th St NW 350th Ave ROA CLOSE W Elm Ave 120th St 362nd Ave 8th St NW 10th St NW Veteran's Landing Lakeshore Inn W Elm Ave 7th Ave NW Access For Properties Between Lake St & 10th St NW Only University r 7th St NW 14 128th St 4th St SW 5th Ave SW 2nd St SW Johnson Ave SW 2nd Ave NW ß13 2. Old TH 14/Elm Ave Project West Elm Ave Area Residential / Business Access Week of October 9 2!. ± Road Closed to All Traffic Intersection Open to Traffic Crossing Old TH 14 / Elm Ave EXCEPT When Work Is Taking Place In Intersection Intersection Open to Traffic Crossing Old TH 14 / Elm Ave Temporary Road Current Construction Area Non-Posted Local Access Alternative Route Road Open for Resident and Business Access 0 0.125 0.25 Miles isclaimer: The data represented on this document is neither a legally recorded map nor a survey, and is intended for reference purposes only. The information presented has not been verified and neither the City of Waseca, nor its employees or agents makes any representation to the accuracy of the features and data presented here within. This map was created through the use of several city, county, state and federal data sources. For specific information regarding this map, or to report errors or omissions, contact the City of Waseca Engineering epartment. Map #20170601-3 ate Printed: 9/29/2017