Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Similar documents
Kansas Department of Transportation DISTRICT U / HSIP-U054(101) Project(s): Min: Max:

Kansas Department of Transportation. Tabulation of Bids

Kansas Department of Transportation DISTRICT 1. Project(s): Max: Min:

Tabulation of Bids. Counties:

Replace sanitary manhole casting (CITY to furnish casting); complete as specified Each $ $23,600.00

Tabulation of Bids. Counties: Project(s):

The first lift, mainline, shall be placed using a spray paver.

REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST , LORAIN COUNTY, OHIO MAY 23, 2016 AT 2:00 P.M.

Riverside County Transportation Department Summary of Bids

General Notes. Project No /15/2018 Page 1 of 1

General Notes. Project No /15/2018 Page 1 of 1

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60)

Tabulation of Bids. Counties:

EASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison

Tabulation of Bids. ATLANTIC, BURLINGTON, CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER, SALEM Letting Date: Counties:

PROPOSAL. PROPOSAL OF, a corporation a

Federal Project No.: STP-007-8(154)

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

BID TABULATION - WEDNESDAY, March 28, 2018, - PRIMARY ROAD SURFACING Allegan County Road Commission 1308 Lincoln Road Allegan, Michigan

ADA on Construction. Guidance for Section C Plan Preparers

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER

Accommodating Pedestrians in the Work Zone

DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

Northside School Class I Bike Path, Cool, CA Application Attachments

IL Route 71 Construction Update

Restoration Requirements

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 900 TRAFFIC CONTROL

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions

2017 Temporary traffic control guidelines for pedestrians. v.2

0 CITY OF SANTA ANA 0

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

ITEMIZED LIST FOR TRAFFIC CONTROL TOTAL UNITS S

MUTCD Part 6: Temporary Traffic Control

Lake Waterford Community Association Meeting. November 15, 2016

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

Rio Intersection Traffic Restrictions Begin Monday

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017

WESTERN PLACERVILLE INTERCHANGES PHASE 2 PROJECT CIP # 41828

APPENDIX G SIGNAGE AND STRIPING SUPPLEMENT

TEMPORARY TRAFFIC CONTROL

Souder, Miller & Associates 401 W. Broadway Farmington, NM

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

Tabulation of Bids. BERGEN, ESSEX, HUDSON, MORRIS, PASSAIC, SUSSEX, UNION Letting Date: Counties:

Appendix D: Planning Level Cost Calculator

CURB RAMP INSPECTION REPORT

CHAPTER 6H. TYPICAL APPLICATIONS

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

CONTRACT 6 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

CITY OF EPHRATA NAT WASHINGTON WAY OVERLAY TIB NO.: 3-E-164(003)-1 CITY OFFICIALS. Bruce Reim. Mayor. Tony Mora, Jr. City Council

CDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO.

Downtown Redevelopment Project Update

SOUTH MAIN STREET ROUTE 28

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

Name Roads Station Distance Miles

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

SECTION VII ROADWAY AND SITE IMPROVEMENTS

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

4 GENERIC COST ESTIMATING TOOL

TRAFFIC FIELD OPERATIONS (1 of 7) - ADMINISTRATION

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

SRTS IMPLEMENTATION COSTS

Legislative Update Williamsburg Residency

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

Construction Newsletter No. 32 October 14, 2016 On-Going

ADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview

WalkSafe Vocabulary Matching. 1 pedestrian A marked place to cross the street. 2 intersection A person who is walking. 3 crosswalk. 4 curb.

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

SECTION 14: LANDSCAPING AND BEAUTIFICATION

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

SITE DEVELOPMENT PLAN FOR PLANTATION LANDING TOWNHOMES WILMINGTON, NORTH CAROLINA

Road Design Breakout Session

Taylor Road Resurfacing Project

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

CY2017 Summary of STP applications

Chapter 4: Funding and Implementation

Including Revision 1 dated May 2012 and Revision 2 dated May 2012

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones

MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS

NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG

CHAPTER 1 STANDARD PRACTICES

CONTRACT 5 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

CITY OF RICHMOND, VIRGINIA BIKE LANE

CONSTRUCTION SPECIFICATION

Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS

Transcription:

Page 1 of 13 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025200 REMOVAL OF EXISTING STRUCTURES 4 020100 CONTRACTOR CONSTRUCTION STAKING 5 025602 FIELD OFFICE AND LABORATORY (TYPE C) 6 070580 FLAGGER (SET PRICE) HOUR 50,000.00000 50,000.00 121,600.00000 121,600.00 0.00000 0.00 500.00000 500.00 5,000.00000 5,000.00 3,000.00000 3,000.00 2,650.00000 2,650.00 2,650.00000 2,650.00 4,500.00000 4,500.00 5,500.00000 5,500.00 25.00000 25.00 25.00000 25.00 $62,175.00 $133,275.00 Section Total with LCC: $62,175.00 $133,275.00

Page 2 of 13 SECTION: 02 ROAD ITEMS 7 025361 CLEARING AND GRUBBING 8 060359 CLEANING EXISTING STRUCTURE 9 012420 ROCK EXCAVATION 10 012412 COMMON EXCAVATION (URB) 11 012332 COMPACTION OF EARTHWORK (TYPE B) (MR-90) 12 025026 SIDEWALK CONSTRUCTION ( 4") (AE) 13 022625 SIDEWALK RAMP 14 071725 INLET (CURB) (SETBACK) 15 012077 INLET (CURB) (SETBACK) (SPECIAL) 16 013063 MANHOLE (REINFORCED CONCRETE) 96.000 CUYD 132.000 CUYD 5.000 CUYD 220.000 SQYD 50.000 SQYD 2.000 5,000.00000 5,000.00 5,277.60000 5,277.60 1,500.00000 1,500.00 1,688.25000 1,688.25 75.00000 7,200.00 99.65000 9,566.40 45.00000 5,940.00 51.45000 6,791.40 5.00000 25.00 30.37000 151.85 55.00000 12,100.00 79.20000 17,424.00 215.00000 10,750.00 382.85000 19,142.50 5,500.00000 5,500.00 5,000.00000 5,000.00 7,500.00000 15,000.00 6,500.00000 13,000.00 6,500.00000 6,500.00 5,000.00000 5,000.00

Page 3 of 13 SECTION: 02 ROAD ITEMS 17 056251 STORM SEWER (18") (RCP) 18 056674 STORM SEWER (24") (PEP) 19 056851 STORM SEWER (30") (RCP) 20 071055 FLOWABLE FILL (LOW STRENGTH) 21 011590 TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 22 010114 WATER (GRADING) (SET PRICE) 77.000 73.000 202.000 6.200 CUYD CUYD MGAL 65.00000 5,005.00 50.00000 3,850.00 70.00000 5,110.00 500 3,723.00 75.00000 15,150.00 108.00000 21,816.00 250.00000 1,550.00 130.00000 806.00 35.00000 35.00 35.00000 35.00 35.00000 35.00 35.00000 35.00 $96,400.00 $113,307.00 Section Total with LCC: $96,400.00 $113,307.00

Page 4 of 13 SECTION: 03 TEMP PRJ WTR POL CTL 23 072226 TEMPORARY SEEDING 24 071291 SEDIMENT REMOVAL (SET PRICE) 25 072400 TEMPORARY BERM (SET PRICE) 26 071320 TEMPORARY INLET SEDIMENT BARRIER 27 070895 BIODEGRADABLE LOG (12") 28 010123 WATER (EROSION CONTROL) (SET PRICE) CUYD 3.000 20.000 MGAL 400.00000 400.00 100.00000 100.00 35.00000 35.00 35.00000 35.00 00 1.00 00 1.00 450.00000 1,350.00 200.00000 600.00 50.00000 1,000.00 10.00000 200.00 35.00000 35.00 35.00000 35.00 $2,821.00 $971.00 Section Total with LCC: $2,821.00 $971.00

Page 5 of 13 SECTION: 04 CONCRETE SURFACING ITEMS 29 070432 CONCRETE PAVEMENT (10" UNIFORM) (AE) (NRDJ) 30 010171 AGGREGATE BASE (AB-3) ( 4") 31 061597 CURB AND GUTTER, COMBINED (AE) 32 010107 WATER (AGGREGATE BASE) (SET PRICE) 390.000 SQYD 668.000 SQYD 384.000 MGAL 100.00000 39,000.00 116.15000 45,298.50 15.00000 10,020.00 12.61000 8,423.48 45.00000 17,280.00 47.40000 18,201.60 35.00000 35.00 35.00000 35.00 $66,335.00 $71,958.58 Section Total with LCC: $66,335.00 $71,958.58

Page 6 of 13 SECTION: 05 ASPHALT SURFACING ITEMS 33 041003 HMA-COMMERCIAL GRADE (CLASS A) 34 012278 HMA-COMMERCIAL GRADE (CLASS A) (PATCHING) 35 011764 MILLING 36 025600 FIELD OFFICE AND LABORATORY (TYPE A) 872.000 TON 20.000 TON 6,614.000 SQYD 91.50000 79,788.00 91.30000 79,613.60 182.00000 3,640.00 181.05000 3,621.00 2.15000 14,220.10 2.15000 14,220.10 500.00000 500.00 1,842.60000 1,842.60 $98,148.10 $99,297.30 Section Total with LCC: $98,148.10 $99,297.30

Page 7 of 13 SECTION: 06 PAVEMENT MARKING ITEMS 37 070781 PAVEMENT MARKING (THERMOPLASTIC) (WHITE) ( 6") 38 070790 PAVEMENT MARKING (THERMOPLASTIC) (YELLOW) ( 4") 39 070793 PAVEMENT MARKING (THERMOPLASTIC) (YELLOW) (12") 40 013816 PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (12") 41 013812 PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 42 013348 PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) 43 032810 PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (ONLY) 44 013728 PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) THRU-RT ARROW 1,496.000 3,212.000 58.000 400.000 140.000 6.000 3.000 9.000 0.60000 897.60 0.60000 897.60 0.40000 1,284.80 0.40000 1,284.80 8.00000 464.00 8.00000 464.00 8.00000 3,200.00 8.00000 3,200.00 14.00000 1,960.00 14.00000 1,960.00 185.00000 1,110.00 185.00000 1,110.00 350.00000 1,050.00 350.00000 1,050.00 400.00000 3,600.00 400.00000 3,600.00

Page 8 of 13 $13,566.40 $13,566.40 Section Total with LCC: $13,566.40 $13,566.40

Page 9 of 13 SECTION: 07 TRAFFIC SIGNAL ITEMS 45 025325 TRAFFIC SIGNAL 46 071752 VIDEO DETECTION SYSTEM 47 025311 EMERGENCY VEHICLE SYSTEM 153,172.00000 153,172.00 156,396.00000 156,396.00 16,500.00000 16,500.00 19,000.00000 19,000.00 5,000.00000 5,000.00 5,000.00000 5,000.00 $174,672.00 $180,396.00 Section Total with LCC: $174,672.00 $180,396.00

Page 10 of 13 SECTION: 08 SEEDING ITEMS 48 030148 5,000.00000 5,000.00 3,500.00000 3,500.00 SEEDING $5,000.00 $3,500.00 Section Total with LCC: $5,000.00 $3,500.00

Page 11 of 13 SECTION: 09 TRAFFIC CONTROL ITEMS 49 025331 WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 50 025332 WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 51 025333 WORK ZONE SIGNS (16.26 SQ.FT. & OVER) 52 025376 WORK ZONE BARRICADES (TYPE 3-4 TO 12 LIN. FT.) 53 025374 WORK ZONE BARRICADES (PEDESTRIAN) 54 011492 CHANNELIZER (PORTABLE) 55 025343 WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 56 025364 ARROW DISPLAY 57 070916 PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I) 4,560.000 2,400.000 360.000 360.000 600.000 4,680.000 2,160.000 120.000 29.000 STAL 0.25000 1,140.00 0.25000 1,140.00 0.50000 1,200.00 0.50000 1,200.00 00 360.00 00 360.00 0.50000 180.00 0.50000 180.00 0.50000 300.00 0.50000 300.00 0.10000 468.00 0.10000 468.00 0.25000 540.00 0.25000 540.00 5.00000 600.00 5.00000 600.00 100.00000 2,900.00 100.00000 2,900.00

Page 12 of 13 SECTION: 09 TRAFFIC CONTROL ITEMS 58 072412 PAVEMENT MARKING (TEMP) (SYMBOL) (TYPE I) 59 013019 PAVEMENT MARKING REMOVAL 60 072116 TRAFFIC CONTROL (INITIAL SETUP) 6.000 872.000 150.00000 900.00 150.00000 900.00 0.40000 348.80 0.40000 348.80 14,000.00000 14,000.00 14,000.00000 14,000.00 $22,936.80 $22,936.80 Section Total with LCC: $22,936.80 $22,936.80 Contract Item Totals Contract Time Totals $542,054.30 $639,208.08 Contract Life Cycle Costs Totals $0.00 $0.00 Contract Grand Totals ( ) indicates item is bid as Lump Sum $542,054.30 $639,208.08

Page 13 of 13

Vendor Ranking Page 1 of 1 STP-A425(201) Rank Vendor ID/Name Total Bid Percent Of Low Bid 1 01861 BRYANT & BRYANT $542,054.30 100.00% 2 02065 APAC-KANSAS INC $639,208.08 117.92%