ACEforward. South San Joaquin County Alternatives Manteca Town Hall September 15, 2016

Similar documents
San Joaquin Council of Governments. Measure K Working. 2011/2012 Measure K Annual Report

Alternatives Analysis

I-35W Solutions Alliance Project Update July 13, 2017

PRESS RELEASE San Joaquin Council of Governments

AGENDA. 2. Minutes: Approve Minutes of September 19, 2018 ACTION. 6. Measure K Regional Arterial Program of Projects ACTION

APPENDIX W OFF-MODEL ADJUSTMENTS

Part of Growing Rail Network

Ravenswood Avenue Railroad Crossing Project Community Outreach Meeting Presentation May 2, Ravenswood Avenue Railroad Crossing Project

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

Setting 5. ENVIRONMENTAL CHECKLIST 15. TRANSPORTATION/TRAFFIC MOUNTAIN HOUSE NEIGHBORHOODS I AND J INITIAL STUDY. Issue

Arterial Transitway Corridors Study. Ave

Rock Road Transit. Northwest Plaza. Charles Rock Rd. Shopping Center Woodson & St. Center

Multi-Modal Facility Feasibility Study (WFC006)

TRANSPORTATION & MOBILITY

Central Corridor. Light Rail Transit. Improving mobility Easing congestion Strengthening our communities. Committee of the Whole January 30, 2008

NEED FOR ADDITIONAL FUNDING

2016 MONITORING AND CONFORMANCE REPORT

Community Task Force November 15, 2017

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Midtown Corridor Alternatives Analysis

Cedar Avenue Transitway/ METRO Red Line Implementation Plan Update. Metropolitan Transportation Committee July 27, 2015

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Regional Transportation Plan/Sustainable Communities Strategy PLAN PROJECT LIST

I-105 Corridor Sustainability Study (CSS)

El Camino Real Bus Rapid Transit Conceptual Engineering. Los Altos Council Workshop January 24, 2012

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

TABLE OF CONTENTS. Executive Summary

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Previous Transit Studies MTTF MEETING #

TAMPA BAY EXPRESS (TBX)

University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns

Technical Working Group November 15, 2017

Fitting Light Rail through Well-established Communities

Afeasibility study to evaluate bus rapid transit service in the East-West Corridor connecting major employment and activity centers between downtown

Foothill Expressway Improvements Between El Monte and San Antonio

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

3.0 PROJECT DESCRIPTION

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

Evaluation of Alternatives and Final Screening Results November 20 and 21, 2013

Item B1 November 19, 2009

DIVISION TRANSIT PROJECT COMMUNITY ADVISORY COMMITTEE MEETING

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

POTENTIAL SANTA CLARA COUNTY TRANSPORTATION MEASURE

El Paso to Las Cruces Proposed Rail Service Estimated Ridership and Proposed Schedule

Terwillegar Drive Expressway Draft Concept Plan

Highway 17 Transportation Improvement Study

DRAFT. Figure 20-1 Law Enforcement Facilities and Hospitals. P Legend. ( Sacramento. West Sacramento 80. Freeport. Elk. Clarksburg. ( Grove.

Title. Metropolitan Council Transportation Committee December 12, Brad Larson Metro District MnDOT

Interim Transit Ridership Forecast Results Technical Memorandum

2019 Development Charge Study: Historical Service Standards. Development Charges Stakeholders Sub-Committee City of Hamilton September 13, 2018

Item Description: Presentation and Discussion: Berkeley Rapid Transit Locally Preferred Alternative

Task Force Meeting #5, August 3, Prepared by DKS Associates

The Year Ahead: Virginia Department of Transportation Northern Virginia District

D O W N T O W N B A S E B A L L

West LRT Workshop Session Welcome Stony Plain Road from 149 Street to 124 Street May 12, 2010

Arterial Transitway Corridors Study

August 10, 2018 Meeting

The Vine: Mill Plain Bus Rapid Transit Project Open House Summary August 2018

Seattle Transit Master Plan

Organization Events and Divisions Dates Location

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

122 Avenue: 107 Street to Fort Road

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

CITY OF PORTSMOUTH PLANNING DEPARTMENT

South King County High-Capacity Transit Corridor Study

Gina M. M. Thomas. HDR, Transit Engineer Seattle, WA

ORANGE COUNTY TRANSPORTATION AUTHORITY. Metrolink Ridership and Revenue Quarterly Report. Staff Report

Hennepin County Bicycle and Pedestrian Planning

Bicycle Pedestrian Commission

FINAL PLAN APPENDIX H CITY OF BERKELEY BIKE PLAN H-1

Expansion of Bike Share within San Jose supports the City's ambitious mode shift goals to have 15% of commute trips completed by bicycles by 2040.

PROJECT OVERVIEW. Auburn Station Access Improvements Project

Executive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED

Public Hearing Tarrant County. October 11 th, 2012

East San Fernando Valley Transit Corridor. Draft EIS/EIR Public Hearing (September 1 thru October 16, 2017

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

COMMUNITY MEETING August 23, 2018

Bicycle Count Data. December 2008

7th Street Bridge Project. Public Presentation February 24, :30pm-8pm

Public Works and Infrastructure Committee. General Manager, Transportation Services. P:\2016\Cluster B\TRA\TIM\pw16009tim.docx

San Jose Transportation Policy

SUMMARY OF TRANSPORTATION INVESTMENTS

Community Task Force July 25, 2017

PROJECT OVERVIEW. Auburn Station Access Improvements Project

Highway Transitway Corridor Study

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

You are invited to an... OPEN HOUSE. Recommended Approach for the Franklin Avenue / East River Parkway Intersection

Stakeholder Representative Group Meeting #2 Summary

Westside Transportation Access Needs Assessment - Short and Long Term Improvements

ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

the Story of the 30s & 70s Bus Lines James Hamre - WMATA

South King County High Capacity Transit Corridor Report. Regional Transit Connections and Active Transportation

Gratiot Avenue Transit Study Tech Memo #4: Ridership

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

Transcription:

ACEforward ACEforward South San Joaquin County Alternatives Manteca Town Hall September 15, 2016

Tonight s Agenda Welcome & Introductions ACE Overview ACEforward Program South County Alternatives Q & A Open House

Background - 17 years of ACE

Current ACE Connectivity Map WESTBOUND TRAINS ACE 1 ACE 3 ACE 5 ACE 7 Stockton 4:20AM 5:35AM 6:40AM 7:05AM Tracy 4:51AM 6:06AM 7:11AM 7:36AM Pleasanton 5:33AM 6:48AM 7:53AM 8:18AM Great Am. 6:13AM 7:28AM 8:33AM 8:58AM San Jose 6:32AM 7:47AM 8:52AM 9:17AM EASTBOUND TRAINS ACE 4 ACE 6 ACE 8 ACE 10 San Jose 3:35PM 4:35PM 5:35PM 6:38PM Great Am. 3:49PM 4:49PM 5:49PM 6:52PM Pleasanton 4:28PM 5:28PM 6:28PM 7:31PM Tracy 5:11PM 6:11PM 7:11PM 8:14PM Stockton 5:47PM 6:47PM 7:47PM 8:50PM

Lathrop/Manteca Ride Costs and Travel Times From Lathrop/ Manteca to: Vasco Pleasanton Fremont Great America Cost per Ride* $5.93 $5.93 $7.69 $9.48 Travel Time 0:41 0:54 1:16 1:34 *Based on 20 Ride ticket prices and including 5.25% fare increase effective October 3, 2016.

Current ACE Rider Activities More than 37% of ACE riders work during their ride 55% read 43% of individuals use the internet for leisure or entertainment 44.7% of individuals listened to music 51% slept 14% chose other (Riders were able to chose more than one activity) 78% talked on the phone

ACE Origins and Destinations PLACEHOLDER in progress (basic map with area-bubbles, and arrows going west) to

10,307 11,782 More Commuters Making Megaregional Trips Sacrament o Area Bay Area 64,932 7,279 Nort hern San Joaquin Valley Monterey Bay Area Dat a Source: Census Transportation Planning Products, 2009-2013 Analysis: University of the Paci c www.bayareaeconomy.org @bayareaeconomy #megaregion

ACE Ridership 2010-2016

ACEforward Project-Level Analysis Stockton - Modesto Extension to Modesto Altamont Corridor Safety & Operational Improvements Increase Service to 6 Daily Round Trips

ACEforward Program-Level Analysis Stockton - Merced Extension to Merced Altamont Corridor Increase Service to 10 Daily Round Trips

Annual Riders ACEforward Ridership Forecast Merced Extension July 2016 No-build ridership forecast to increase by more than 25% by 2025 The highest long-term annual ridership could be up to 5.15 million riders, an increase of more than 280% compared to today s usage 6,000,000 5,000,000 5.9 5.15 4,000,000 No Build (No Extension) 3,000,000 2,000,000 1,000,000 0 2.25 1.33 2015 2020 2025 6 Daily Round Trips (Extend to Modesto) 10 Daily Round Trips (Extend to Merced)

Altamont Corridor Improvements Section Project Cost ($-MM 2014) Extension to Modesto San Joaquin County (1) $102.8 Stanislaus County $96.2 # of miles $ / mile ($-MM 2014) 9.7 9.1 $10.6 $10.6 5 th & 6 th Train Capital Cost (2) $202.0 n/a n/a 5 th & 6 th Train Equipment $60.5 n/a n/a Improvements to Support 5 th & 6 th Train Parking Platform Extensions Extension to Merced Stanislaus County (3) Merced County $59.8 $14.4 $122.5 $227.2 n/a n/a 12.6 25.9 7 th 10 th Train Capital Cost (4) $200.0 n/a n/a 7 th 10 th Train Equipment $117.5 n/a n/a TOTAL $1202.9 n/a n/a $9.7 $8.8 1 Extension to Ripon 3 Extension to Turlock 2 Capacity and grade crossing improvements Stockton San Jose section 4 Capacity improvements Stockton San Jose section & maintenance facility expansion

5 San Joaquin Valley

Tracy and Lathrop/Manteca Area Options Relocated Lathrop/Manteca (McKinley Ave.) Existing Lathrop/Manteca (Yosemite Ave.) Extension of Wyche siding River Islands West Tracy Options Patterson Pass Rd. Corral Hollow Rd. Lammers Rd. North Lammers Rd. South New track connection option: East of I-580 Downtown Tracy New track connection option: Oakland Sub to Tracy Sub along Highway 120 New track connection option: West of I-580 I-580 Tracy Hills Hansen Rd. New track connection option: Lyoth to Banta Grade separation: McKinley Avenue (5th + 6th trains) Extension of Midway siding Existing Tracy (Tracy Blvd.) Grade separation: Chrisman Road (5th + 6th trains)

with Parking and Access Road Project Typical Cost (millions) Track $5 Right-Of-Way $1-4 Platform $6 Access Road $0-4 Parking $4-7 Total $16-26

with Expanded Parking and Access Road Project Program Typical Cost (millions) Track $5 Right-Of-Way $1-4 Platform $6 Access Road $0-4 Parking $4-7 Typical Cost (millions) Expanded Parking $1-4 Total $17-30

with Parking on Both Sides + Ped Bridge Project Program Typical Cost (millions) Expanded Parking $1-4 Additional Program Needs / Future Needs Typical Cost (millions) Track $5 Right-Of-Way $1-4 Platform $6 Access Road $0-4 Parking $4-7 Typical Cost (millions) Pedestrian Bridge $4 Access Road $0-4 Parking $1-4 Total $22-42

Existing Alignment Travel Time Lathrop/Manteca to Great America 1:21 Existing Lathrop/Manteca (Yosemite Ave.) Environmental Impact Low Ridership for 2025 4.56 million Capital Cost Existing Tracy (Tracy Blvd.) $1.20 billion Existing ACE route New track connection Siding extension Grade separation

Existing Alignment with Relocated Lathrop/Manteca Travel Time Relocated Lathrop/Manteca to Great America 1:20 Relocated Lathrop/Manteca (McKinley Ave.) Ridership for 2025 4.57 million Environmental Impact Medium Capital Cost $1.22 billion Existing Tracy (Tracy Blvd.) Existing ACE route New track connection Siding extension Grade separation

New Alignment River Islands and Downtown Tracy End-to-End Travel Times Existing Alignment Downtown Alignment River Islands 4 Stockton trains 1:59 1:54-5 6 Merced Trains 2:48 2:50 + 2 Access Time to Downtown ACE Travel Time to GA Total SW Tracy (Hirsch E.S.) 0:11 1:10 1:21 Mountain House 0:22 1:10 1:32 Downtown Tracy Ridership for 2025 4.52 million Environmental Impact High (Biological and Farmland) Capital Cost $1.34-1.38 billion Existing ACE route Existing track to be rehabilitated New track connection Siding extension

New Alignment River Islands and West Tracy @ Lammers Rd. North Access Time to W. Tracy ACE Travel Time to GA Total W. Tracy SW Tracy (Hirsch E.S.) 0:10 1:08 1:18 Mountain House 0:18 1:08 1:26 Ridership for 2025 West Tracy only (replacement) 4.52 million River Islands Capital Cost 1.34 billion Environmental Impact West Tracy (Lammers Rd. North) High (Biological and Farmland) Existing ACE route Existing track to be rehabilitated New track connection Siding extension

New Alignment River Islands, Downtown Tracy, and West Tracy @ Patterson Pass Rd. Access Time to Downtown W. Tracy ACE Travel Time to GA Downtown W. Tracy Total SW Tracy (Hirsch E.S.) 0:11 1:14 1:25 Mountain House 0:19 1:02 1:21 Ridership for 2025 Downtown Tracy and West Tracy (additional) 4.60 million River Islands Capital Cost Downtown Tracy $1.37 1.39 billion West Tracy (Patterson Pass Rd.) Environmental Impact High (Biological and Farmland) Existing ACE route Existing track to be rehabilitated New track connection Siding extension

New Alignment with River Islands + Existing Alignment with Existing Tracy End-to-End Travel Times Existing Alignment via Tracy Sub and Banta- Lyoth Connection 4 Stockton trains 1:59 1:54-5 6 Merced Trains 2:48 2:52 + 4 River Islands Ridership for 2025 4.46 million Environmental Impact High (Biological and Farmland) Capital Cost $1.31 billion Existing Tracy (S. Tracy Blvd.) Existing ACE route Existing track to be rehabilitated New track connection Siding extension Grade separation

Existing Alignment + West Tracy @ Lammers Rd. South Access Time to W. Tracy Travel Time to GA Total SW Tracy (Hirsch E.S.) 0:11 1:08 1:19 Mountain House 0:20 1:08 1:28 Capital Cost $1.22 billion West Tracy only (replacement) Ridership for 2025 4.572 million Lathrop/Manteca (Yosemite Ave.) Environmental Impact Medium West Tracy (Lammers Rd. South) Existing ACE route New track connection Siding extension Grade separation

Existing Alignment and Existing Tracy + West Tracy @ Lammers Rd. South Access Time to Existing W. Tracy ACE Travel Time to GA Existing W. Tracy Total SW Tracy (Hirsch E.S.) 0:10 1:13 1:23 Mountain House 0:20 1:08 1:28 Capital Cost $1.23 billion Ridership for 2025 Lathrop/Manteca (Yosemite Ave.) Existing Tracy and West Tracy (additional) 4.54 million Environmental Impact Medium West Tracy (Lammers Rd. South) Existing Tracy (Tracy Blvd.) Existing ACE route New track connection Siding extension Grade separation

Existing Alignment + West Tracy @ Patterson Pass Rd. Access Time to W. Tracy ACE Travel Time to GA Total SW Tracy (Hirsch E.S.) 0:23 1:02 1:25 Mountain House 0:19 1:02 1:21 Capital Cost $1.23 billion West Tracy only (replacement) Ridership for 2025 4.546 million Lathrop/Manteca (Yosemite Ave.) West Tracy (Patterson Pass Rd.) Environmental Impact High (Biological) Existing ACE route New track connection Siding extension Grade separation

Existing Alignment and Existing Tracy + West Tracy @ Patterson Pass Rd. Access Time to Existing W. Tracy ACE Travel Time to GA Existing W. Tracy Total SW Tracy (Hirsch E.S.) 0:10 1:13 1:23 Mountain House 0:19 1:02 1:21 Capital Cost $1.23 billion Ridership for 2025 Lathrop/Manteca (Yosemite Ave.) Existing Tracy and West Tracy (additional) 4.63 million Environmental Impact High (Biological) West Tracy (Patterson Pass Rd.) Existing Tracy (Tracy Blvd.) Existing ACE route New track connection Siding extension Grade separation

Summary Existing Alignment Options Existing Alignment Downtown Alignment Ridership (millions) Capital Cost (billions) Existing s 4.56 $1.20 Relocate Lathrop/Manteca 4.57 $1.22 - Existing Tracy + West Tracy @ Lammers Rd. South 4.572 $1.22 Existing Tracy + West Tracy @ Lammers Rd. South 4.54 $1.23 - Existing Tracy + West Tracy @ Patterson Pass Rd. 4.546 $1.23 Existing Tracy + West Tracy @ Patterson Pass Rd. 4.63 $1.23 Existing Tracy + River Islands 4.46 $1.31 River Islands and Downtown Tracy 4.52 $1.34 1.38 River Islands and West Tracy @ Lammers Rd. North 4.52 $1.34 River Islands, Downtown Tracy, and West Tracy @ Patterson Pass Rd. 4.60 $1.37 1.39

10 Stockton trains with no Extension Existing Alignment Ridership for 2025 3.31 million Capital Cost $0.66 billion Existing Lathrop/Manteca (Yosemite Ave.) Environmental Impact Low Existing Tracy (Tracy Blvd.) Existing ACE route New track connection Siding extension Grade separation

10 Stockton trains with no Extension Existing Alignment + Relocated Lathrop/Manteca Ridership for 2025 3.32 million Capital Cost $0.69 billion Relocated Lathrop/Manteca (McKinley Ave.) Environmental Impact Medium Existing Tracy (Tracy Blvd.) Existing ACE route New track connection Siding extension Grade separation

10 Stockton trains with no Extension New Alignment River Islands and Downtown Tracy End-to-End Travel Times Existing Alignment Downtown Alignment 10 Stockton trains 1:59 1:54-5 Capital Cost $0.80 0.84 billion Access Time to Downtown ACE Travel Time to GA Total SW Tracy (Hirsch E.S.) 0:11 1:10 1:21 Mountain House 0:22 1:10 1:32 Ridership for 2025 3.35 million Downtown Tracy River Islands Environmental Impact High (Biological and Farmland) Existing ACE route Existing track to be rehabilitated New track connection Siding extension

10 Stockton trains with no Extension New Alignment River Isl., Dt.Tracy, + W. Tracy @ Patterson Pass Rd. Access Time to Existing W. Tracy ACE Travel Time to GA Existing W. Tracy Total SW Tracy (Hirsch E.S.) 0:11 1:14 1:25 Mountain House 0:19 1:02 1:21 Capital Cost $0.83 0.85 billion Ridership for 2025 3.39 million Downtown Tracy West Tracy (Patterson Pass Rd.) River Islands Environmental Impact High (Biological and Farmland) Existing ACE route Existing track to be rehabilitated New track connection Siding extension

ACEforward Project Schedule Activity Schedule Alternatives Description June 2016 In Progress Design August 2015 May 2016 In Progress Environmental Affected Environment In Progress Environmental Consequences Analysis Administrative Draft EIR September 2016 Full Package Design July 2016 Draft EIR + Public Review November 2016 Final EIR June 2017 October 2015 September 2016 December 2015 November 2016

ACEforward Town Hall Meetings: San Joaquin County Meeting Location Date & Time Tracy Lathrop Manteca Mountain House Council Chambers 333 Civic Center Dr. Tracy, CA Lathrop City Hall 390 Towne Centre Dr. Lathrop, CA Manteca City Hall 1001 W. Center St. Manteca, CA Mountain House CSD Office 230 Sterling Dr. Tracy, CA Wednesday, September 7 7:00-9:00 p.m. Monday, September 12 7:00-9:00 p.m. Thursday, September 15 7:00-9:00 p.m. Thursday, September 22 7:00-9:00 p.m.

Questions? Everything in life depends on a good connection.