APPENDIX F GROUNDWATER SAMPLING LOGS

Similar documents
APPENDIX G SUMMARY OF EXISTING PUMPING TEST DATA AND DATA PLOTS

vanishing water how to use the table: Choose the stream width Choose the stream length based on the gravel depth

Well PGE-6 Decommissioning Evaluation PG&E Topock Compressor Station

Annex P Water Well Modification Plan

Copies: Dave Favero Deputy Cleanup Manager Michigan RACER Trust. Rhonda Klann, MDEQ Amanda Armbruster, MDEQ John McCabe, MDEQ

Figure R: Timing of bilge pump cycles influenced the outflow temperature in the smaller boats.

Appendix A Test Pit Logs

MONITORING AND CONTROLS. BENEFITS OF VARIABLE FREQUENCY CONVERTERS (VFDs)

Gerald H. Grondin Oregon Water Resources Department Groundwater Hydrology Section Salem, Oregon. Lost River Groundwater Surface Water Management

For Establishing and Maintaining Your Spa using PROtech Spa Chemicals

Methods for Measuring Groundwater Elevation and Vacuum Pressure During Soil Vapor Extraction

Appendix D: Program Level Savings, Costs and Cost-Effectiveness

APPENDIX F BIGHT 13 FIELD SAMPLING DATA SHEETS

ARM & HAMMER Baking Soda

Carbon Fiber Sucker Rods versus Steel and Fiberglass

ANNUAL EVALUATION OF 2015 WATER LEVEL MONITORING DATA FROM THE CITY OF LAS CRUCES WATER SUPPLY WELLS, NEW MEXICO

SWIFT FSC GUIDE NET ARRANGEMENTS

STANDARD OPERATING PROCEDURE

Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures

ANNUAL EVALUATION OF 2016 WATER-LEVEL MONITORING DATA FROM THE CITY OF LAS CRUCES WATER SUPPLY WELLS, NEW MEXICO

ANNUAL EVALUATION OF 2017 WATER LEVEL MONITORING DATA FROM THE CITY OF LAS CRUCES WATER SUPPLY WELLS, NEW MEXICO

Acoustic Troubleshooting of Coal Bed Methane Wells

LPP S STEMS WORKSHEET

Casing and Cementing Requirements

Downhole Gas Separators

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

Alternative Test Procedures for Evaluating Leak Detection Methods: For Bulk Fieldconstructed

Pressure Test Tubing for Leak

Shallow foundations settlement

Dr. Bob Harrington March 2, 2015 Inyo County Water Department 135 South Jackson Street Independence, CA 93526

Geotech 1.66 Reclaimer Installation and Operation Manual

A Workbook Introduction

DW Module 8: Distribution Answer Key

APPENDIX H LAKE OKEECHOBEE FLOOD ROUTINES

Geotech 3.5 Reclaimer Installation and Operation Manual

1. Compute the TWA for the following respirable dust exposures:

Photo 1: Typical 4 Weephole

Appendix B Harris County Standard Operating Procedure for Determining In Situ Hydraulic Performance of High Flow Rate Bioretention Media

Western Canadian Spill Services Ltd. Field Testing Exercise Report

Liquefaction Vulnerability Parameter Sensitivity Analyses. Table J1.1 Classifications used for CPT and borehole log review CPT Examples J1 J11

San Antonio Creek Spreading Grounds Rehabilitation Project Ojai Valley, CA

Geotech 1.66 Auto-Reclaimer Installation and Operation

Geotech 1.66 Auto-Reclaimer

Water budgets of the two Olentangy River experimental wetlands in 2001

STATIONARY SPRINKLER IRRIGATION SYSTEM

Global Service Sector Trends

3 Groundwater Monitoring

Downhole Gas Separator Selection

MIA Training Example (Catalano 2H)

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

STS ICP-RIE. Scott Munro (2-4826,

PANACEA P200 STAINLESS STEEL USER MANUAL

Oceanographic Research With The LiquID Station

Ft. Tuthill Bike Park. design proposal

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Hawai'i Rural Water Association Water Course Listing updated 10/4/18 HRWA COURSE TITLE COURE LENGTH (HRS) WBOC APPROVED CEU'S

Emergency Response Policy

Appendix A. Imbrium Systems Jellyfish Filter Inspection and Maintenance Information

Operation Manual - PN A MENSOR MODEL 73 SHOP AIR BOOSTER

1 Exam Prep State Pool Contractor Feedback Questions and Answers

3.9 MW-30JD Mooring Winch. Technical Parameter

SHOALING PREVENTION: AN ALTERNATIVE TO DREDGING

FOR WASTEWATER APPLICATIONS

Revised Corrective Action Plan Part B

Change to Chloramines. Teresa Rogers Texas Commission on Environmental Quality Water Supply Division - Utilities & Districts Section

Division of Environmental Quality Wellhead Protection Section

In addition to this SOP, the policies and procedures of each operating company will be strictly observed by Rockwater personnel.

Deflate Gate : Preliminary Tests and Possible Science Explanations Introduction:

Eilat 's artificial lagoons project on the Red Sea - Israel R. Raviv Ir. R. Raviv, Coastal Engineering Ltd., P.O. Box 7322, z/b 37072,

MEMORIAL UNIVERSITY OF NEWFOUNDLAND Faculty of Engineering and Applied Science FLUID MECHANICS LABORATORY PIPE FRICTION

Pipeline Pigging and Hydrostatic Test

Calculus 12: Evaluation 3 Outline and Review

VACUUM TESTING PRECAST CONCRETE MANHOLES

Sacramento Regional County Sanitation District. Interceptor Sequencing Study. Technical Memorandum 5 Unit Costs for Interceptor Pipe.

High-performance submersible pressure transmitter For level measurement Model LH-10

Beam Pumping to Dewater Horizontal Gas Wells

Chapter 9 System Design Procedures

VACUUM REGULATORS CONTENTS

FOR LESS! The Secret to a Sparkling Pool and Patio. Enjoy a crystal clear pool with ARM & HAMMER Baking Soda

FLOWING GRADIENTS IN LIQUID LOADED GAS WELLS

Project Incorporation of Sea Level Rise City of Newport Beach Approach for Balboa Islands, City of Newport Beach, California

TABLE OF CONTENTS EXECUTIVE SUMMARY 1

PURITY INSTALLATION INSTRUCTIONS MODEL P40

Sucker Rod Pumping Workshop Technology in a Mature Industry. September 2017 John C. Patterson Consultant Retired from ConocoPhillips (2015)

UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER

STANDARD OPERATING PROCEDURES

Temporal Variability of Soil Gas Concentrations and Pressure Under Natural Weather Conditions at Petroleum Hydrocarbon Impacted Sites

SUMMARY OF MOVEMENT AND HABITAT USED BY TAGGED BROOK TROUT IN THE MAIN BRANCH AND NORTH BRANCH AU SABLE RIVER DURING SUMMER Data Submitted to:

DESIGN REPORT RANNEY NO. 5 WELL CLEANING PROJECT

Gas Locked Pumps are NOT Gas Locked!

UTAS EH&S INSTRUCTION No. 036 June 2012 Revision No. 3. Purging of Flammable Gas Equipment and/or Piping (Explosion Hazard)

STANDARD OPERATING PROCEDURES. Andersen Instruments Federal Reference Method (FRM) Ambient Particulate (PM 10 /PM 2.

SALINITY AND DISSOLVED OXYGEN IN THE MISSISSIPPI RIVER GULF OUTLET NAVIGATION CHANNEL AND IN ADJACENT SURFACE WATERS,

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

INSTALLING AN INEXPENSIVE AIR LINE TO MEASURE WATER DEPTHS IN WELLS

SERVICE BULLETIN This service bulletin is for Accu-Tab Blue Calcium Hypochlorite Tablets (EPA Reg. No )

A Novel Approach to Capitalize WITSML Data in Geospatial Platform for Realtime Monitoring and Risk Assessment

ROHO QUADTRO SELECT CUSHION ADJUSTMENT INSTRUCTIONS

Human gas exchange. Question Paper. Save My Exams! The Home of Revision. Cambridge International Examinations. 56 minutes. Time Allowed: Score: /46

NYE COUNTY NUCLEAR WASTE REPOSITORY PROJECT OFFICE TEST PLAN TITLE: REVISION: 0 SUPERSEDES:

Transcription:

APPENDIX F GROUNDWATER SAMPLING LOGS

Project:Enclave on 241 St Site Location: Bronx Well No: MW07 Date: 10/6/2015 Initial Depth to Water (ft): 15.13 Well Depth (ft): 20.00 Pump Intake Depth (ft): 19 1225 15.13 Start Pumping 1230 6.87 0.599 0.00-92 208 22.48 15.36 Slightly cloudy, no odor 1235 6.64 0.586 0.00-76 184 22.14 17.24 Slightly cloudy, no odor 1240 6.61 0.561 0.00-55 184 22.37 18.60 Slightly cloudy, no odor 1245 6.63 0.555 0.16-45 180 22.62 19.10 Slightly cloudy, no odor 1250 6.69 0.565 0.22-54 172 23.06 Slightly cloudy, no odor 1255 6.70 0.578 0.73-27 155 23.17 Slightly cloudy, no odor 1300 6.70 0.580 0.93-10 166 23.27 Clear, no odor 1305 6.67 0.582 1.01 13 136 23.36 Clear, no odor 1310 6.67 0.580 1.10 30 78.1 23.97 Clear, no odor 1315 6.66 0.586 1.08 1 67.6 23.57 Clear, no odor 1320 6.70 0.590 1.16 12 39.1 23.66 Clear, no odor 1325 6.69 0.590 1.23 34 27.0 23.88 Clear, no odor 1330 6.70 0.590 1.27 42 22.1 23.96 Clear, no odor 1335 6.70 0.576 0.71 47 17.9 25.27 Clear, no odor 1340 6.72 0.588 1.15-14 17.1 23.74 Sampled

Project:Enclave on 241 St Site Location: Bronx Well No: MW17 Date: 10/6/2015 Initial Depth to Water (ft): 14.67 Well Depth (ft): Pump Intake Depth (ft): 18 1035 14.67 125 Start Pumping 1040 6.84 0.814 1.47-86 86.3 18.57 15.85 125 clear, no odor 1045 6.79 0.838 0.55-117 272 18.57 15.90 125 clear, no odor 1050 6.78 0.843 0.46-131 224 18.62 15.98 125 clear, no odor 1055 6.78 0.844 0.15-139 162 18.64 16.03 125 clear, no odor 1100 6.77 0.848 0.09-143 83.0 18.52 16.07 125 clear, no odor 1105 6.77 0.847 0.00-146 62.3 18.62 16.05 125 clear, no odor 1110 6.78 0.846 0.00-149 107 18.69 16.05 125 clear, no odor 1115 6.77 0.845 0.00-152 95.9 18.65 16.05 125 clear, no odor 1120 6.77 0.844 0.00-153 56.8 18.72 16.05 125 clear, no odor 1125 6.77 0.846 0.00-152 32.7 18.64 16.05 125 clear, no odor 1130 6.76 0.846 0.00-153 28.3 18.68 16.05 125 clear, no odor 1135 6.76 0.844 0.00-154 23.2 18.84 16.05 125 clear, no odor 1140 6.76 0.842 0.00-155 21.6 19.01 16.05 125 clear, no odor 1145 6.76 0.842 0.00-157 13.4 19.04 16.05 125 Sampled

Project:Enclave on 241 St Site Location: Bronx Well No: MW16 Date: 10/6/2015 Initial Depth to Water (ft): 13.67 Well Depth (ft): 20.18 Pump Intake Depth (ft): 17 0758 13.67 150 Start Pumping 0803 6.03 0.862 4.76 71 318 14.52 13.87 150 clear, no odor 0808 7.04 0.827 4.99-27 242 14.23 13.87 150 clear, no odor 0813 7.02 0.788 4.17-26 155 14.14 13.87 150 clear, no odor 0818 6.97 0.753 4.23-22 111 14.11 13.87 150 clear, no odor 0823 6.92 0.717 3.09-16 80.2 14.12 13.87 150 clear, no odor 0828 7.10 0.708 3.61-25 57.6 14.10 13.87 150 clear, no odor 0833 7.09 0.706 3.28-26 61.0 14.08 13.87 150 clear, no odor 0838 7.06 0.706 3.40-24 43.3 14.07 13.87 150 clear, no odor 0843 7.01 0.705 3.02-22 34.6 14.09 13.87 150 clear, no odor 0848 7.00 0.705 2.94-23 32.4 14.10 13.87 150 clear, no odor 0853 6.99 0.699 2.66-24 29.2 14.11 13.87 150 clear, no odor 0858 7.10 0.697 2.74-32 26.1 14.13 13.87 150 clear, no odor 0903 7.10 0.695 2.55-34 20.2 14.12 13.87 150 clear, no odor 0908 7.09 0.696 2.49-36 14.6 14.15 13.87 150 Sampled

Project:Enclave on 241 St Site Location: Bronx Well No: MW08 Date: 10/6/2015 Initial Depth to Water (ft): 11.44 Well Depth (ft): 17.00 Pump Intake Depth (ft): 16.5 1518 11.44 Start Pumping 1523 6.95 2.24 4.97-220 1000+ 33.05 Cloudy, petroleum odor 1528 Well ran dry 1600 Sample

Project:Enclave on 241 St Site Location: Bronx Well No: MW11 Date: 10/6/2015 Initial Depth to Water (ft): 12.45 Well Depth (ft): Pump Intake Depth (ft): 19 1150 12.45 150 Start Pumping 1155 6.83 1.56 2.65 176 69.6 23.59 13.46 100 clear, no odor 1200 6.73 1.87 0.34 162 69.2 22.02 15.75 75 1205 6.72 1.93 0.00 146 68.8 22.36 17.02 50 1210 6.64 1.93 0.39 118 65.9 23.30 17.11 50 1215 6.60 1.98 0.01 98 62.7 23.50 17.12 50 1220 6.52 1.98 0.00 89 61.4 23.88 17.12 50 1225 6.43 1.99 0.00 85 60.6 24.12 17.12 50 1230 6.38 2.00 0.00 79 54.7 24.74 17.12 50 1235 6.41 2.01 0.00 77 51.7 25.16 17.12 50 1240 6.47 2.02 0.00 69 46.8 25.18 17.12 50 1245 6.51 2.03 0.00 68 43.2 26.03 17.12 50 1250 6.49 2.03 0.00 69 40.4 26.43 17.12 50 Sample

Project:Enclave on 241 St Site Location: Bronx Well No: MW13 Date: 10/6/2015 Initial Depth to Water (ft): 16.23 Well Depth (ft): Pump Intake Depth (ft): 18 1015 16.23 100 Start Pumping 1020 16.57 100 clear, no odor 1025 6.78 1.09 1.59 90 174 19.89 16.70 100 1030 6.74 0.927 0.64 85 92.0 19.97 16.74 100 1035 6.71 0.836 0.00 79 48.3 20.14 16.74 100 1040 6.70 0.810 0.00 79 35.7 20.15 16.74 100 1045 6.70 0.797 0.00 78 20.1 20.16 16.74 100 1050 6.69 0.779 0.00 74 18.0 20.21 16.74 100 1055 6.69 0.775 0.00 73 24.6 20.20 16.74 100 1100 6.69 0.769 0.00 72 13.2 20.15 16.74 100 1105 6.68 0.763 0.00 70 11.2 20.10 16.74 100 1110 6.68 0.761 0.00 69 16.2 20.07 16.74 100 1115 6.67 0.759 0.00 68 11.8 20.11 16.74 100 Sample

Project:Enclave on 241 St Site Location: Bronx Well No: MW15 Date: 10/6/2015 Initial Depth to Water (ft): 14.63 Well Depth (ft): 20.00 Pump Intake Depth (ft): 18 0820 14.63 150 Start Pumping 0825 5.96 1.36 2.74 196 130 16.98 16.23 150 clear, no odor 0830 6.39 1.38 1.68 172 123 16.82 16.95 100 0835 6.57 1.35 1.26 54 88.4 16.59 17.52 75 0840 6.64 1.30 0.86-5 63.8 16.50 17.92 50 0845 6.66 1.26 0.71-54 48.7 16.48 17.95 50 0850 6.68 1.24 0.54-76 29.6 16.46 17.95 50 0855 6.70 1.22 0.51-95 38.2 16.46 17.95 50 0900 6.74 1.20 0.52-113 20.7 16.47 17.95 50 0905 6.80 1.19 0.52-126 10.7 16.56 17.95 50 0910 7.01 1.19 0.55-135 10.2 16.81 17.95 50 0915 7.04 1.18 0.59-139 9.9 16.95 17.95 50 0920 7.06 1.16 0.62-144 9.8 17.21 17.95 50 0925 7.09 1.16 0.63-147 9.7 17.38 17.95 50 0930 7.09 1.16 0.59-142 9.0 17.42 17.95 50 Sample

Project:Enclave on 241 St Site Location: Bronx Well No: MW19 Date: 10/6/2015 Initial Depth to Water (ft): 12.35 Well Depth (ft): 17.00 Pump Intake Depth (ft): 16.5 1522 12.34 Start Pumping 1527 6.97 1.53 0.15-163 221 24.84 15.10 Yellow, cloudy, petroleum odo 1600 Well ran dry Sampling