FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

Similar documents
Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3

DEADWOOD CREEK FISH PASSAGE IMPROVEMENT PROJECT

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

Project Completion Abstract Fish Passage Activity ( Engineering Activities)

Executive Summary. Map 1. The Santa Clara River watershed with topography.

Big Spring Creek Habitat Enhancement and Fishery Management Plans

Tuolumne River Gravel Introduction

Eastern Brook Trout Joint Venture Annual Report The Nature Conservancy 2013

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

San Lorenzo Valley Water District, Watershed Management Plan, Final Version Part I: Existing Conditions Report

COA-F17-F-1343 YEAR END REPORT

Study Update Fish Distribution and Species Composition

P.O. Box 65 Hancock, Michigan USA fax

Stream Crossings I: Engineering and Design Approaches to Provide Fish Passage at Culvert Slipline Projects in Connecticut

STREAM SURVEY File form No..

1998 Willow Creek Downstream Migrant Trap Report. Draft. Prepared By: C. A. Walker. Lower Trinity Ranger District. Six Rivers National Forest

SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT

Fish Friendly Crossings- Examples from Nash Stream

APPENDIX B: CATALOG OF HUMBOLDT COUNTY CULVERTS LOCATED ON FISH-BEARING STREAM REACHES

La Crescent Township Zoning Ordinance

Alberta Conservation Association 2009/10 Project Summary Report. Project Name: North Saskatchewan and Ram Rivers Bull Trout Spawning Stock Assessment

Stevens Creek Corridor

California Steelhead: Management, Monitoring and Recovery Efforts

2 nd Steelhead Summit. October 27 & 28, 2016 in San Luis Obispo, CA

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Firth Creek Habitat Enhancement Project 1993

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project #

Nechako white sturgeon are an Endangered Species

COLUMBIA LAKE DAM REMOVAL PROJECT

MCCAW REACH RESTORATION

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA

Conserving the Forests, Lakes and Streams of Northeast Michigan

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Michigan Department of Natural Resources Status of the Fishery Resource Report Page 1

Newaukum Watershed Culvert Assessment

Assessing Ecosystem Impacts from Road Stream Crossings through Community Involvement

APPENDIX B: CATALOG OF COASTAL MENDOCINO COUNTY CULVERTS LOCATED ON FISH-BEARING STREAM REACHES

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary

Ontario Ministry of Transportation (MTO) Restoring Fish Passage to a Tributary of the Saugeen River

Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California

WFC 50 California s Wild Vertebrates Jan. 11, Inland Waters (Lakes and Streams) Lisa Thompson

DRAFT. Stonybrook Creek Watershed

Annual Report for Fiscal Year and Future Plans for the Tillamook Bay Watershed Council

STEELHEAD SURVEYS IN OMAK CREEK

Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries

Fish Passage at Road Crossings Assessment Boise National Forest FY 2004

JAP Additional Information Sheet

The Blue Heron Slough Conservation Bank

Great Lakes Stream Crossing Inventory Instructions

Sub-watershed Summaries

OVERVIEW OF MID-COLUMBIA FISHERIES ENHANCEMENT GROUP

Columbia Lake Dam Removal Project

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary

South Fork Chehalis Watershed Culvert Assessment

SURVEY METHODOLOGY. April 15, Rob Livick City of Morro Bay Public Services Director/City Engineer 955 Shasta Avenue San Luis Obispo, CA 93401

APPENDIX J HYDROLOGY AND WATER QUALITY

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

OREGON DEPARTMENT OF FISH AND WILDLIFE ROGUE FISH DISTRICT REPORT

Ecology of Columbia River redband trout (Oncorhynchus mykiss gairdneri) in high desert streams

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

VWP CONSTRUCTION INSPECTION REPORT. Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM

5B. Management of invasive species in the Cosumnes and Mokelumne River Basins

Design & Maintenance of Culverts

PROJECT OVERVIEW PROJECT AREA. FAHCE Fish Habitat Restoration Plan EIR

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

Columbia Lake Dam Removal Project

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1.

Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011.

Environmental Review and Permitting for Wild Trout

Blue Creek Chinook Outmigration Monitoring Technical Memorandum

Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River

Fish Migration Barrier Severity and Steelhead Habitat Quality in the Malibu Creek Watershed

Eastern Brook Trout. Roadmap to

Hydraulic Modeling of Stream Enhancement Methods

Klickitat County Shoreline Master Program Update. Open House March 15, 2017

Honorable City Council i. A / Richard A. Leahy, City Manager \~v Thomas E. Hansen, P.E., Public Works Director/ ;?:?-

City of Burnaby Environmental Review Committee (ERC) Guide for Applicants

Benchmark Statement Respecting the Fish, Fish Habitat and Fisheries of Fish and Little Fish Lake, within the Taseko River Watershed.

B-36

Hospital Link Project Project Update November 2017

APPENDIX B: CATALOG OF SISKIYOU COUNTY CULVERTS LOCATED ON FISH-BEARING STREAM REACHES. Prepared for the Siskiyou County Public Works Department

Fish Passage Assessment of Private Stream Crossings on Lower Stonybrook Creek

2012 Summary Report on the Juvenile Salmonid and Stream Habitat Monitoring Program

Presented by Fred Halterman, URS Jennie Agerton, URS

Oregon Department of Transportation (ODOT) Culvert Repair Fish Passage Pilot Programmatic Agreement Final ODFW Report

Searsville Dam Removal

TECHNICAL MEMORANDUM 002 EMORANNO. 001

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

River Restoration: Culvers Island weir removals and river naturalisation project.

Chadbourne Dam Repair and Fish Barrier

Packwood Hydroelectric Project Barrier Analysis December 12, 2006

Climate Change Adaptation and Stream Restoration. Jack Williams;

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project

1.Mill Creek Watershed Summary Description and Land Use

Little Kern Golden Trout Status:

WFC 10 Wildlife Ecology & Conservation Nov. 29, Restoration Ecology: Rivers & Streams. Lisa Thompson. UC Cooperative Extension

Transcription:

FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project Final Report 1

TABLE OF CONTENTS SECTION 1 - DESCRIPTION OF CONDITIONS BEFORE PROJECT WAS EXECUTED 3 SECTION 2 DESCRIPTION OF THE RESTORATION & PLANNING TECHNIQUES UTILIZED 3 SECTION 3 DESCRIPTION OF THE RESULTS OF THE PROJECT 7 TABLE OF FIGURES FIGURE 1 Map of Del Norte County, California 5 FIGURE 2 Illustrated Location of Project Site 6 FIGURE 3 Outlet of Yonkers Culvert Prior Replacement 9 FIGURE 4 Inlet of Yonkers Culvert Prior Replacement 9 FIGURE 5 Final Project, Aluminum Arch Culvert 10 SECTION 1 Yonkers Creek Migration Barrier Removal Project Final Report 2

DESCRIPTION OF CONDITIONS BEFORE PROJECT WAS EXECUTED Yonkers Creek is located in Del Norte County and is a tributary to Lake Earl (T17N, R1W, Sec. 34) (Figures 1 & 2). It is well documented as a valuable tributary to Lake Earl and according to the California Department of Fish and Game (CDFG), all native salmonid species have been found there. The metal culvert at Wonderstump Road was a migration barrier to adult and juvenile species of salmonids (Figures 3& 4). The replacement aluminum arch culvert is 30-feet long with a cross-sectional diameter of 28.3 square feet, constructed of corrugated steel. Under the culvert are two water mains, a 12-inch and a 24-inch diameter culvert. These are the main distribution water lines for the City of Crescent City. The Yonkers Creek culvert had high winter flow velocities and low summer flows. The outlet of was elevated approximately three feet (Figures 3 & 4) above the water surface, creating a jump barrier for juveniles. The combination of height and velocities within the culvert resulted in a migration barrier to the upper reaches of Yonkers Creek, which originates within the boundaries of Jedediah Smith Redwoods State Park. A study prepared by CDFG in 1975 recognized Yonkers Creek as essential habitat for the maintenance of salmonid populations for Lake Earl. The project site location is approximately five miles east of Crescent City on Wonderstump Road, a well traveled County maintained road (Figure 2). The project site was well within the County right-of-way and minimal offsite work occurred. SECTION 2 DESCRIPTION OF THE RESTORATION & PLANNING TECHNIQUES UTILIZED This project was consistent with the adopted Local Coastal Plan, the County General Plan, and State goals of protecting and enhancing resource habitats. The stream corridor for Yonkers Creek is well established, with substantial riparian vegetation upstream and downstream of the project site. The upstream and downstream property owner signed an access agreement for any work on this project that encroached upon his property. An adjacent property owner, and closing the road within the project area, provided adequate room for equipment operation, storage, water treatment, and general access to the project site. A Stream Alteration Agreement was obtained from CDFG as was a Coastal Grading Permit. County Planning Staff completed compliance with the California Environmental Quality Act (CEQA). The Regional General Permit for Fish Passage/Sediment Reduction Projects at Water Crossings (RGP 1) from United States Army Corps (Corps) was also obtained by CDFG. The final project was designed to provide for natural channel conditions, allowing for year-round unobstructed fish passage and increased fish habitat. Removing this barrier allows access to over 9,000 feet of historical salmonid spawning and rearing habitat. The original project design consisted of removing the culvert and replacing it with bridge. The design was changed to a constructing a natural bottom aluminum arch culvert with grade control at the outlet, allowing the City of Crescent City's water lines to cross Wonderstump Road. The grade control allows backwatering of the new structure during low flows, permitting anadromous fish to swim Yonkers Creek Migration Barrier Removal Project Final Report 3

upstream year-round. The upstream and downstream disturbed streambanks were revegetated and bioengineering techniques were utilized for erosion control. Wonderstump Road is a public roadway that is used by the school district to bus students to and from school throughout the school year. Temporary closure of the road in the project area, while school was in session, would have forced the school bus to un-safely detour onto Highway 101 due to the lack of a left turn lane. To avoid potential danger for the school bus traffic, it was essential to have the project completed by the beginning of the school year. Yonkers Creek Migration Barrier Removal Project Final Report 4

Figure 1 Map of Del Norte County, California Yonkers Creek Migration Barrier Removal Project Final Report 5

Figure 2 USGS 7.5 minute topographical map illustrating location of project site Yonkers Creek Migration Barrier Removal Project Final Report 6

SECTION 3 DESCRIPTION OF THE RESULTS OF THE PROJECT The Wonderstump Road/Yonkers Creek culvert was the County s last high priority project for fish barrier removal and unfortunately, the County needed to get a one-year extension from CDFG in order to complete the project. The reasons for the extension are as follows: 1. The City of Crescent City had no extraction plan for the 40,000 gallons of chlorinated water within the 12-inch water line that needed to be removed before the pipe was relocated. 2. While pot-holing the location of the 24-inch water line, ground water was observed to be extremely high (seven feet above the sub-excavation elevation), probably due to the high rainfall at the end of the spring season. 3. It was also observed that the 24-inch water line was serving as a conduit for ground water and because of the pipes location at the Yonkers Creek crossing, it would have been draining over two miles of roadway ditch delivery. 4. The bridge manufacturer would not have the bridge delivered by the August 16, 2005 targeted delivery date. 5. Several major projects were scheduled to be completed in 2005, creating a staff shortage in the Road Department. CDFG granted the County the extension and while preparing for the next construction season, the design was changed from a bridge to an arch culvert, which was the original concept in the CDFG grant proposal. The City agreed to install a portable water bypass line and relocate the 12-inch and 24-inch water lines over the top of the new arch culvert. In addition, the Five Counties Salmonid Conservation Program obtained grant funds to help pay for the relocation of the portable water lines. Before commencing the project, County staff requested, and was granted, permission from the Board of Supervisors to temporarily close a section of Wonderstump Road at the project site (Star Trek Drive to Donna DeClue Road) from July 17 through September 18. On July 11, 2006 Ross Taylor and Chris Katopothis of Ross Taylor and Associates, arrived at the project site and relocated fish from the site using electrofishing equipment and moved the captured salmonids down stream of the work area. Several Coastal cutthroat and steelhead trout were relocated downstream of the fish exclusion fencing (Chart 1). Fish exclusion fences were up and downstream of the project site. The upper screen (hardware cloth 36 high with 1/16 mesh, supported by two 48 long T-posts) was placed approximately 30 upstream of the culvert inlet. The lower fish exclusion screen of hardware cloth was placed at the tail-out of the first riffle downstream of the culverts outlet pool. Section within project area Channel Trout - Young-of- Year Chart 1 Summary of Species Relocation Coastal Coastal Prickly Cutthroat Cutthroat Sculpin Trout 1+ Trout 2+ Age Class Age Class Threespined Stickleback Lamprey Ammocetes Yonkers Creek Migration Barrier Removal Project Final Report 7

upstream of Culvert Channel downstream of Culvert 34 3 1 0 5 1 39 8 1 3 16 1 TOTALS 73 11 1 3 21 2 After placement of the fish screens, a gravity bypass system was installed, along with silt fencing to protect water quality during construction. The potable water bypass system was installed and the 12-inch and 24-inch water lines were removed. Once the subgrade for the new arch culvert was established, County road crews installed the aluminum arch culvert. This particular culvert has aluminum footings, which helped speed up the work process. Because of the County s past experience with aluminum arch culverts (Jordan Creek at Parkway Drive, 2000); the footings were encased in concrete to assure no shifting prior to arch installation and bolting. Afterward, the 24-inch and 12-inch potable water lines were reinstalled along side the arch culvert and were backfilled. The roadway was reopened with a gravel road surface and later surfaced with asphalt concrete. The final road treatment was installation of the guardrail system. The County s next sequence of work was revegetation of the project area, and installation of the downstream grade control and bioengineering structures to stabilize the streambanks. Habitat Protection and Restoration Projects Reporting Metrics Ross Taylor s Del Norte County Culvert Inventory and Fish Passage Evaluation (March, 2001) was used to identify the watershed and priority. Access to 2 miles of priority spawning and rearing habitat for adult steelhead and adult Coastal cutthroat trout and all juveniles. Photo points and longitudinal profiles are the types of monitoring techniques that will be utilized to evaluate the success of this project. No trees were planted, but it is presumed that several redwood trees in the area will propagate within the rich soils of the project area. Yonkers Creek Migration Barrier Removal Project Final Report 8

Figure 3 Migration Barrier Yonkers Creek Outlet Figure 4 Inlet of Yonkers Creek Yonkers Creek Migration Barrier Removal Project Final Report 9

Figure 5 Final Project Yonkers Creek Yonkers Creek Migration Barrier Removal Project Final Report 10

Project Budget is as Follows: County Engineering Staff $32,093.26 County Road Staff, Equipment, and Materials $164,611.19 Crescent City Labor and Materials for Water Line Relocation $52,780.12 Big R Culvert (including transportation) $48,404.77 Guardrail System (material and labor) $18,697029 Bioengineering/Revegetation $504.30 Rental Equipment $172.00 Construction Material (gravel and riprap) $26,870.10 Fish Nets $160.94 Geotechnical and Hydrology Consultants $13,900.00 Bypass Water System $5,377.58 Concrete (including pump truck) $2,992.34 Asphalt Concrete and Road Stripping $17,090.73 Permitting $1,061.46 Project Sign $1,982.95 Temporary Sanitation $304.05 TOTAL PROJECT COSTS $ 390,163.10 Funding for this project over a two-year period came from the following sources: CDFG Fisheries Restoration Grant Program $271,560.00 Coastal Conservancy Funds (engineering & construction) $91,987.39 Crescent City Water Funds $9,296.20 Del Norte County Road Funds $17,319.51 The Yonkers Creek Migration Barrier Removal Project success is due to the following institutions, organizations, and individuals: Del Norte County Board of Supervisors California Department of Fish and Game Five Counties Salmonid Conservation Program Del Norte County Road Division Crescent City Public Works Department Del Norte County Community Development Department Michael Love & Associates Taber Consultants California Department of Corrections Del Norte County Planning Commission United States Army Corps of Engineers California Coastal Conservancy Yonkers Creek Migration Barrier Removal Project Final Report 11