EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

Similar documents
Key objectives of the survey were to gain a better understanding of:

Appendix D. Glossary & Abbreviations

Santa Clara I-280 CORRIDOR STUDY

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

North Coast Corridor:

TABLE OF CONTENTS. Executive Summary

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

Clackamas County Comprehensive Plan

A Federal Perspective on Congestion Pricing. Wayne Berman Federal Highway Administration July 8, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Welcome! San Jose Avenue Open House August 25, 2015

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

POTENTIAL SANTA CLARA COUNTY TRANSPORTATION MEASURE

Transportation Master Plan Advisory Task Force

Dear City Council Members,

Public Event 1 Community Workshops

Plant City Walk-Bike Plan

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Washington DC Section of ITE Project Briefing

Chapter 5 Future Transportation

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Terwillegar Drive Expressway Draft Concept Plan

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

South King County High-Capacity Transit Corridor Study

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Regional Transportation Needs Within Southeastern Wisconsin

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

Managed Lanes: A Popular and Effective Urban Solution. Ed Regan Presented by Susan Buse

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer

DON MILLS-EGLINTON Mobility Hub Profile

Highway 17 Transportation Improvement Study

Beyond First First Last Last Mile Strategies. APA National Conference April 3, 2016 Chelsea Richer, AICP Fehr & Peers

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

COASTAL RAIL TRAIL ROSE CREEK BIKEWAY PROJECT COMMUNITY WORKSHOP #2 AUGUST 15, 2013

Bus Rapid Transit Plans

Central Freeway and Octavia Circulation Study

4.1 Evaluation Criteria

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

I-105 Corridor Sustainability Study (CSS)

Presentation to Media. February 27, 2008

1999 On-Board Sacramento Regional Transit District Survey

San Jose Transportation Policy

Lincoln Avenue Road Diet Trial

Congestion Reducing Activities. Toby Carr GDOT Director of Planning April 10, 2014

MnPASS System Today and the Future

CENTRAL AND EAST CORRIDORS

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

Highway 217 Corridor Study. Phase I Overview Report

COMMUNITY MEETING AGENDA

NEPA and CEQA Transportation Operation Analysis

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

Appendix B Workshop Materials

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

BRT for Berkeley A Proposal for Consideration

Performance Criteria for 2035 Long Range Transportation Plan

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

Preliminary Transportation Analysis

TRANSIT MARKET ANALYSIS OF FREEWAY-ORIENTED EXPRESS BUSES

Development Review Program Annual Report 2016

Rochester Downtown Bicycle Study 2009

TRAFFIC IMPACT STUDY CRITERIA

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

95 Express Annual Operations Report: Fiscal Year

Chapter 4 Traffic Analysis

Board of Supervisors February 27, 2017

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

UPDATING THE WEST COUNTY ACTION PLAN

395 Express Lanes Extension

Sacramento Grid 2.0. The Downtown Transportation Study

Philadelphia Bus Network Choices Report

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

Bellevue Transportation: Challenges, Opportunities and Priorities Bellevue Downtown Association September 20, 2018

Chapter 6 Transportation Plan

Foothill Expressway Improvements Between El Monte and San Antonio

DUNDAS WEST-BLOOR Mobility Hub Profile

Durham Region Long Term Transit Strategy

Monterey Road Complete Streets

Executive Summary Route 30 Corridor Master Plan

Dumbarton Transportation Corridor Study. San Francisco Bay ITE November 2016

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

TRANSPORTATION & MOBILITY

City of Birmingham Draft Multi-modal Transportation Plan

Transportation, Parking & Roads

Community Task Force July 25, 2017

A Selection Approach for BRT Parking Lots Nicolls Road Corridor Parking Study

5. RUNNINGWAY GUIDELINES

Circulation and Parking

NEWMARKET CENTRE Mobility Hub Profile

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Transcription:

Contents EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW... 1-1 1.1 Study Scope... 1-1 1.2 Study Area... 1-1 1.3 Study Objectives... 1-3 2 EXISTING CONDITIONS... 2-1 2.1 Existing Freeway Conditions... 2-4 2.1.1 SR 87 Mainline... 2-4 2.1.2 System Interchange Configuration... 2-5 2.1.3 Other Interchanges... 2-7 2.1.4 Transportation Technology Elements... 2-8 2.1.5 Freeway Traffic Operating Conditions... 2-10 2.2 Bicycle & Pedestrian Facilities... 2-20 2.2.1 Existing Bicycle Trails and Bicycle Lanes... 2-21 2.2.2 Existing First-Last Bicycle Connections... 2-29 2.2.3 Pedestrian Facilities and Access to Transit Stops... 2-32 2.3 Transit Services & Facilities... 2-34 2.3.1 Available Transit Services... 2-34 2.3.2 Transit Service Performance... 2-35 2.3.3 Park-and-Ride Facilities... 2-41 2.4 All Modes Travel Time & Speed Comparison... 2-44 3 COMMUNITY INPUT... 3-1 3.1 Summary of Key Findings... 3-2 3.2 Process... 3-2 3.3 Participation and Demographics... 3-3 3.4 Survey Results... 3-4 3.4.1 Geographical Data... 3-4 3.4.2 Weekday Travel Patterns... 3-12 3.4.3 Public Support for Potential Projects... 3-16 3.4.4 Ideas & Suggestions... 3-18 4 FUTURE CHANGES IN THE CORRIDOR... 4-1 4.1 Land Use... 4-1 4.2 Transit... 4-4 4.2.1 Diridon Station Redevelopment... 4-4 i

4.2.2 BART Silicon Valley Phase II... 4-4 4.2.3 California High-Speed Rail... 4-6 4.3 Transportation Technology... 4-6 4.3.1 Map and Traffic Apps... 4-6 4.3.2 Ridesharing Apps... 4-6 4.3.3 Autonomous Vehicles... 4-7 5 POTENTIAL IMPROVEMENTS... 5-1 5.1 Efficient Use of Highway Capacity... 5-1 5.1.1 Part-Time Shoulder Use/Part-Time Lane... 5-1 5.1.2 Dynamic Pricing/Express Lanes... 5-10 5.1.3 US 101 SB to SR 87 SB Ramp Improvements... 5-12 5.2 Technology-based Improvements... 5-13 5.2.1 Adaptive Ramp Metering... 5-13 5.2.2 Mobility as a Service Mobility Playbook... 5-14 5.3 Technology Infrastructure Enhancements... 5-18 5.3.1 Backbone Corridor Communications... 5-18 5.3.2 Changeable Message Signs... 5-19 5.3.3 Speed Harmonization... 5-19 5.4 Transportation Demand Management Strategies... 5-20 5.4.1 Extend Carpool Hours... 5-20 5.4.2 Increase Carpool Occupancy Requirement to 3+... 5-20 5.4.3 Promote Carpool Use By Providing Incentives... 5-20 5.4.4 Reduce Downtown On-Street Parking... 5-20 5.5 Multi-Modal Improvements... 5-21 5.5.1 First-Last Mile Options... 5-21 5.5.2 Bicycle & Pedestrian Improvements... 5-23 5.5.3 Transit Improvements... 5-33 6 EVALUATION OF POTENTIAL ALTERNATIVES... 6-1 6.1 Freeway Projects Evaluation & Cost Estimates... 6-2 6.2 Bicycle Projects Evaluation & Cost Estimates... 6-5 6.3 Pedestrian Projects Evaluation & Cost Estimates... 6-13 6.4 Future Planned Transit Projects... 6-21 7 RECOMMENDED IMPROVEMENTS... 7-1 7.1 Recommended Freeway High-Priority Improvements... 7-2 7.2 Recommended Bicycle and Pedestrian High-Priority Improvements... 7-3 7.3 Recommended Transit High-Priority Improvements... 7-4 7.4 2016 Measure B Funding... 7-4 7.5 Further Study... 7-5 ii

Figures Figure 1. SR 87 Study Corridor... 4 Figure 2. Northbound Travel Times for Multiple Modes Along the SR 87 Corridor... 5 Figure 3. Summary of Community Survey Results on Mode Choice... 6 Figure 4. Summary of Community Survey Results on Transit Use... 7 Figure 5. Summary of Community Results on Bicycle Use... 7 Figure 6. Summary of Community Survey Results on Potential Projects... 8 Figure 7. Feasibility of Part-Time Lane on Segments of SR 87 (Freeway Mainline)... 10 Figure 1-1. Study Corridor and Project Limits... 1-2 Figure 1-2. SR 87 Northbound Morning Commute Hours, Monday, September 12, 2016... 1-4 Figure 1-3. SR 87 Northbound Morning Commute Hours, Monday, October 10, 2016... 1-5 Figure 2-1. Study Corridor Map... 2-2 Figure 2-2. Existing Auxiliary Lanes... 2-3 Figure 2-3. Typical Cross Section of the SR 87 Mainline... 2-5 Figure 2-4. SR87/SR85 System Interchange... 2-5 Figure 2-5. SR 87/I-280 System Interchange... 2-6 Figure 2-6. SR 87/US 101 System Interchange... 2-6 Figure 2-7. Taylor Street On-Ramp to Southbound SR 87... 2-8 Figure 2-8. Existing Technologies Along SR 87... 2-9 Figure 2-9. SR 87 Freeway Level of Service... 2-12 Figure 2-10. Morning Travel Speeds in General Purpose & HOV Lanes on Northbound SR 87... 2-14 Figure 2-11. Average Weekday Morning Travel Speeds (MPH) on Northbound SR 87, May 2017... 2-14 Figure 2-12. Morning Congestion Near Capitol Expressway... 2-15 Figure 2-13. Morning Congestion at the SR 87/I-280 Interchange... 2-15 Figure 2-14. Evening Travel Speeds in General Purpose & HOV Lanes on Southbound SR 87... 2-17 Figure 2-15. Average Weekday Evening Travel Speeds (MPH) on Southbound SR 87, 2016... 2-17 Figure 2-16. Evening Congestion Near Mineta San Jose International Airport (SR 87/US 101/Charcot Avenue)... 2-18 Figure 2-17. Right-Lane Overload on Northbound SR 87 Approaching the I-280 Ramp... 2-19 Figure 2-18. Existing Bicycle Facilities Around SR 87... 2-22 Figure 2-19. Level of Traffic Stress Scores for Roads Around the SR 87 Corridor... 2-24 Figure 2-20. Islands of Connected, Comfortable, Low-Stress (LTS 1 or LTS 2) Bicycling Streets... 2-25 Figure 2-21. Bicycle Collisions Around SR 87 (2011 2016), Weighted By Collision Severity... 2-27 Figure 2-22. Pedestrian Collisions Around SR 87 (2011 2016), Weighted By Collision Severity... 2-28 iii

Figure 2-23. Observed Homeless Encampments Along SR 87... 2-30 Figure 2-24. Ford GoBike Bike Share Docking Stations Around Downtown San Jose... 2-31 Figure 2-25. Bird Scooters in Downtown San Jose... 2-31 Figure 2-26. Comparison of Half-Mile Walkshed Area and Half-Mile Radius Around Gish Light Rail Station... 2-33 Figure 2-27. Existing Transit Routes Along the SR 87 Corridor... 2-36 Figure 2-28. LRT 901 Average Weekday Travel Speed Profile... 2-37 Figure 2-29. Bus 168 Average Weekday Travel Speed Profile... 2-38 Figure 2-30. Passenger Ridership per Station for 901 LRT Northbound, Nov. and Dec. 2016... 2-40 Figure 2-31. Passenger Ridership per Station for 901 LRT Southbound, Nov. and Dec. 2016... 2-40 Figure 2-32. Park-and-Ride Lot Locations Along SR 87... 2-43 Figure 3-1. Survey Participant Demographics... 3-3 Figure 3-2. Home Location Density All Modes... 3-5 Figure 3-3. Work Location Density All Modes... 3-6 Figure 3-4. Survey Responses by Company... 3-7 Figure 3-5. Home to Work Based Trips... 3-8 Figure 3-6. Communications Hill as Origin... 3-9 Figure 3-7. Downtown San Jose as the Destination... 3-10 Figure 3-8. Golden Triangle Area as the Destination... 3-10 Figure 3-9. Neighborhood Zones for Origin Destination Alluvial Diagrams... 3-11 Figure 3-10. Weekday Travel Patterns on SR 87... 3-12 Figure 3-11. Most Common Modes of Transportation Used Along SR 87... 3-13 Figure 3-12. Motivating Factors Influencing Solo Drivers to Carpool... 3-13 Figure 3-13. Number of People per Vehicle Among HOVs... 3-14 Figure 3-14. Motivating Factors Influencing Respondents to Ride Transit... 3-14 Figure 3-15. Factors Influencing Respondents to Bicycle More Regularly... 3-15 Figure 3-16. Percentage of Respondents Who Have Biked Along the SR 87 Bikeway... 3-15 Figure 3-17. Support for Part-Time Lane Use... 3-16 Figure 3-18. Support for Potential Projects... 3-17 Figure 3-19. Words Commonly used by Respondents to the Community Survey... 3-19 Figure 4-1. Land Use Changes in San Jose... 4-2 Figure 4-2. Residential & Employment Center Locations for Intensified Growth... 4-2 Figure 4-3. Google Transit Village in Downtown San Jose... 4-3 Figure 4-4. BART Silicon Valley Phases I and II Alignments & Stations... 4-5 Figure 5-1. States Implementing Part-Time Lane as a Congestion Management Strategy... 5-2 Figure 5-2. Existing Infrastructure on Northbound SR 87 Near Hillsdale Avenue... 5-3 Figure 5-3. SR 87 Mainline Part-Time Lane Feasibility and Operating Conditions by Segment... 5-4 Figure 5-4. SR 87 Mainline Part-Time Lane Assessment Based on FHWA Guidance... 5-5 iv

Figure 5-5. Part-Time Lane Example on I-110 at I-5 in Los Angeles, CA... 5-9 Figure 5-6. Sensory Equipment Example Detector Loops on Freeway... 5-10 Figure 5-7. Express Lane on SR 237... 5-11 Figure 5-8. FasTrak Flex Toll Tag... 5-11 Figure 5-9. Metering on Southbound SR 87... 5-13 Figure 5-10. Snapshot of Bird Scooter Locations in Downtown San Jose... 5-14 Figure 5-11. Snapshot of Bird Scooter Locations South of I-280... 5-15 Figure 5-12. Changeable Message Sign Display with Train Schedule and Travel Time... 5-19 Figure 5-13. Bike Share in Downtown San Jose... 5-22 Figure 5-14. Bicycle Lanes in Downtown San Jose... 5-23 Figure 5-15. Better Bikeways Program... 5-24 Figure 5-16. SKY Lane Vision Study... 5-25 Figure 5-17. SKY Lane Vision Study Conceptual Alignment... 5-25 Figure 5-18. Communication Hills Planned Trail Alignment... 5-26 Figure 5-19. Proposed Across Barrier Connections Within a Mile Buffer Around SR 87... 5-28 Figure 5-20. Proposed Cross County Bikeway Corridors Within One Mile Around SR 87... 5-29 Figure 5-21. Half-Mile Walkshed Around VTA Light Rail Stations Used For Identifying Potential Pedestrian Improvements.... 5-30 Figure 5-22. Bike Counter in San Francisco... 5-31 Figure 5-23. Conceptual Sketch of Temporary Art Installation that Identifies the Guadalupe River Trail for Motorists on SR 87... 5-32 Figure 5-24. Conceptual Sketch of Billboard Reminding Drivers They Can Bike Instead of Drive.... 5-32 Figure 5-25. Illuminated Pavement, Poland... 5-33 Figure 5-26. Existing VTA Transit Network... 5-34 Figure 5-27. VTA NEXT Network Route Plan Weekday... 5-34 Figure 5-28. VTA NEXT Network Route Plan Weekend... 5-35 Figure 5-29. Light Rail in Downtown San Jose... 5-37 Figure 6 1. Half-Mile Walkshed Around VTA Light Rail Stations... 6-13 Tables Table 1. Recommended High-Priority Projects... 13 Table 2-1. SR 87 Freeway Interchanges... 2-7 Table 2-2. Data Sources Used to Assess Operating Conditions... 2-10 Table 2-3. SR 87 Carpool Lane Usage... 2-11 Table 2-4. SR 87 Truck Volumes... 2-11 Table 2-5. Peak Hour Operations on SR 87... 2-13 Table 2-6. Types of Bicycle Facilities... 2-21 Table 2-7. Bicycle and Pedestrian Counts at Three Locations Along Guadalupe River Trail... 2-21 Table 2-8. Bicycle LTS Categories... 2-23 v

Table 2-9. Number of Bicycle-Vehicle and Pedestrian-Vehicle Collisions within One Mile around the SR 87 Corridor (2011 2016)... 2-26 Table 2-10. Bicycle Parking at Transit Stations Around the SR 87 Corridor... 2-32 Table 2-11. VTA Bus and LRT Ridership and On-time Performance... 2-39 Table 2-12. Average Weekday Peak-Period Occupancy, Shown as a Percentage of Total Seated Capacity... 2-39 Table 2-13. Park-and-Ride Lots in the SR 87 Corridor... 2-41 Table 2-14. Travel Time and Speed Comparison for Single and Carpool Vehicles, LRT and Bicycle Modes... 2-45 Table 3-1. Geographic Distribution of Survey Respondents... 3-4 Table 5-1. Part-Time Lane Feasibility Along the SR 87 Mainline... 5-6 Table 5-2. Part-Time Lane Feasibility Along the SR 87 Connector Ramps... 5-8 Table 5-3. Available Parking in Downtown San Jose & Modes of Travel to Downtown... 5-21 Table 5-4. Changes to Operations of Existing Transit Routes in the SR 87 Corridor... 5-36 Table 6-1. Weighted Criteria for Evaluating Freeway Improvement Projects... 6-2 Table 6-2. Freeway Capacity Utilization Options... 6-3 Table 6-3. Technology-Based Improvement Options... 6-4 Table 6-4. Transportation Demand Management Options... 6-5 Table 6-5. Recommended Bicycle Improvement Projects... 6-6 Table 6-6. SR 87 Corridor Study Recommended Bicycle Infrastructure Improvements... 6-12 Table 6-7. Criteria Used for Evaluating Recommended Pedestrian Projects... 6-14 Table 6-8. Assumptions for Order-of-Magnitude Project Cost Estimates... 6-16 Table 6-9. SR 87 Corridor Study Recommended Pedestrian Improvement Projects... 6-17 Table 6-10. Future Transit Projects... 6-21 Table 6-11. Recommended Transit Improvements Not Identified in the RTP... 6-21 Table 7-1. Recommended High-Priority Improvements... 7-2 Table 7-2. Recommended Bicycle and Pedestrian High-Priority Improvements... 7-3 Table 7-3. Recommended Transit High-Priority Improvements... 7-4 Table 7-4. Near-Term Improvements For Potential Measure B Funding... 7-5 Appendixes Appendix A. Community Survey Questions Appendix B. Pedestrian Projects from Other Plans Appendix C. Potential Environmental Constraints Appendix D. Glossary & List of Abbreviations Photo Credits Chapter 2 (2.3), Santa Clara Station, Downtown San Jose: xatsukex, Santa Clara Valley Transportation Authority Wikiwand (http://www.wikiwand.com/en/santa_clara_valley_transportation_authority_light_rail) Chapter 4, Google bikes: Newland, Cameron, Google Rolls Out Ebikes To Their Mountain View Campus, Overvolted.com (http://overvolted.com/google-rolls-out-ebikes-to-their-mountain-view-campus/) Chapter 7, San Fernando St., San Jose: Sergio Ruis (http://ww.flickr.com/sirgious) vi